3. Public Hearing --Consideration of a request for a conditional use permit
allowing development of a church facility in an R-1 zone. Applicant, A
Glorious Church.
4. Public Hearing—Consideration of a request for preliminary plat approval of
the Monticello Business Center commercial subdivision. Applicant, Ocello
LLC.
S. Review zoning enforcement issues (Jeff report at meeting).
S. Comprehensive plan update or dtsmadon.
7. Adjournment.
M!N TCES
SPECIAL MEETING • MONTICELLO PLANNING COMMffiSION
Tuesday, July 25,1995 - 7 p.m.
Members Present: Dick Frio, Richard Carlson, Jon Bogart, Richard Martie
Members Absent: Rod Dragsten
Staff Present: Jeff O'Neill, Gary Anderson, Steve Griuman,
Wanda Kraemer
Chairman Dick Frie called the meeting to order at 7:00 p.m.
Jeff O'Neill, Assistant Administrator, reported to the Commission that this
subdivision was platted and developed in 1989.1990 for single family
residential development This subdivision has not progressed as planned.
Mr. Komarek is considering purchasing the site and developing it under a
twinhome concept. Komarek would like the Commissioner's input on
twinhomes being developed at the site. The site would be excellent for
twinhomes, but there will be variances needed on front or rear setbacks.
John Komarek, Developer, explained that he was interested in the views of
the Commissioners on twinhomes in this area Each unit would have their
own water and sewer line, the association would remove the snow, the units
would be from $120,000 to $160,000, and Broadway Circle would remain a
city street. There are options on how the twinhomes could be placed on the
site which will affect the variances needed. Komarek asked which option
would be the beat for the variance request.
Jon Bogart was concerned that a front yard setback variance would result in
cars being parked partially in the street right -of --way when in the driveway.
O'Neill stated that perhaps it would be beneficial for Komarek to meet with
Steve Grittman, City Planner, and review the placement of the town homes.
The Commission agreed and directed the City Planner to work with the
developer on preparation of an acceptable design.
Steve Grittman, City Planner, reviewed the status of the Comprehensive
Plan. The following activities have been completed:
Page 1 9
Special Planning Commission Meeting - 7/25M
1. Staff Discussion - to refine approach and identify issues.
2. Tactic Interviews - identify issues from a broad spectrum of the
community including: business owners, industry representatives, staff,
commission members, chamber, and others.
3. Issues Categorization - to combine comprehensive plan topics into
common areas.
4. Complete Inventory Report /Analysis - including sections specific to
the tactics categories, and appendix of inventory data in tabular form.
3. Fiscal Impact Report - for Planning Commission presentation on
July 28 in the draft form.
S. City Workshop - conducted to identify priority goals in housing and
economic development.
7. Concept Land Use Sketch - prepared to illustrate land use concepts
based on City -identified priorities.
8. Neighborhood Workshops - conducted to identify community
improvement ideas and needs.
9. Synthesis - workshops prepared for Planning Commission workshop.
10. Downtown Redevelopment Concepts - prepared for Planning
Commission and HRA workshops.
Next the issues of the neighborhood meetings were discussed.
Land Use Management and Rate of Growth - Monticello is currently
expanding to the east. Grittman suggested the City look at
encouraging development to the south and west. He suggested
encouraging large lot development that would encourage bigger homes
or keep residents that are looking for the one- to two -acre parcels.
Monticello should be trying to attract a share of the higher -end
housing, which can be done by allowing larger, unsewered lots. The
City should consider expanding the industrial development to the west
along the interstate.
It was noted that annexation might be difficult for annexation of land
for unsevered, scattered development that can be supported under
township jurisdiction.
Quality of New Development,
Page 2
Special Planning Commission Meeting - 7NZM
3. Cost/`Benefit of New Development - Grittman is in the process of
completing a fiscal impact analysis that will indicate the value level of
a house that must be achieved in order for tax revenue from the home
to match the cost of providing city services.
4. Community Facilities - Which facilities are priorities?
5. Economic Development - Where to focus?
6. Downtown Redevelopment - What is the City's role?
7. Industrial Development - Where should it expand?
During the neighborhood meetings the following issues were discussed as
priorities:
I. Higher valued housing development.
2. Continuation of current economic development programs.
3. Expansion area for additional industrial development. �
4. Redevelopment planning for the downtown area.
6. Intensification of city recreation facilities and amenities.
6. Focus on entertainmenthmcmation/civic activities in the downtown
7. Greater utilization of the river @rant.
S. Attention to trnific concerns (esp. Highway 28/Broadway).
9. Better access across I-94 (both pedestrian and automobile).
10. More attention to aesthetics in new and existing development.
The Commissioners discussed at length the next step in the process for
updating the Comprehensive Plan. Grittman commented that the main
emphasis at the neighborhood meetings was a community center in
coWuncd n with the redevelopment of the downtown area. 7be next step
would be to prioritize what facilities would be located in the community
center.
Page 3 O
Special Planning Commission Meeting - 7/25/95
Also, Dan Sjordal, firom Northwest Associated Consultants, displayed four
sketch ideas of various redevelopment ideas in the downtown area. He
stressed that the sketches were only preliminary and were done to give the
Commissioners a visual idea of the concepts being discussed.
During the review of the sketches there were a number of ideas discussed
that would be involved in the process:
1. Reinvent downtown verses revitalise.
2. Vacate a portion of River Street that would be along the West Bridge
Park area
3. The view of the river firm Highway 25 was a priority. This might
involve opening areas fium Broadway to the river.
4. Locate the community center along the river or within the view of the
river.
5. Realignment of Broadway to promote improvement of park/riverhretail
setting.
S. Walkways or trails through the park and along the river.
7. Using Walnut as a pedestrian only area with small shops.
8. Extending 7th Street to help by reducing traffic on Broadway.
9. River boat for dinner tours/entertainment.
10. Commercial component important.
Chairman Frie announced that the Parks Commission Tour would be August 9 at
4:30. He encouraged the commission members to attend.
4. AWe .*reran -
DICK MARTIE MADE A MOTION TO ADJOURN THE MEETING AT
10:00 P.M. SECONDED BY JON BOGART. Motion passes unanimously.
Respectfally submitted,
Wanda Kraemer. DST
Page 4
MIIwTIS
SPECIAL NUMUNG - MONTICELLO PLANNING COMMUSION
Monday, June 18,1996 - 6 pun.
Members: Dick Frie, Jon Bogart, Richard Carlson, Dick Martie,
Rad Drageten
Staff Members: Jeff O'Neill, Gary Anderson, Wanda Kraemer
1. Call to order.
The meeting was called to order by Chairman Frie
2. (7nnaid ration or ndmpnt. to a conditinnRl use rarmit which would
allow outdoor galea in a R-2 zone. Apnli ant- Dave Peterson
Jeff O'Neill reported that Dave Peterson was requesting the City consider
approval of a request to expand the outside sales area of the car dealership.
The amendment to the CUP is needed because the existing CUP allowed an
outside sales area that is 7.8 time the area of the principal structure(s) on
site. According to the measurements provided by Peterson, the sales area
afar the expansion will be approximately 169,000 sq R (3.8 acres), which is
9.6 times the area of the principal building.
The expansion of the site as proposed appears to be consistent with the land
uses in the area and does not appear to present land use related problems.
Storm water management is not a problem due to the fact that Peterson
recently funded a City -installed storm water prgject ($43,000) that enabled
full development of his land as proposed under the CUP request.
The most significant issue relating to this request pertains to the landscaping
requirements. According to the ordinance, the site area results in the need
the 38 over story trees. This requirement can be reduced by up to 60% in
exchange for planing of shrubs an other low-level landscaping. Peterson is
supportive of meeting city landscaping requirements; however, he is
concerned about the potential of trees blocking the view of his vehicles. He
has also noted that in the near future he plana on completing a major
improvement to his show room and existing outside sales area. He is
concerned about city requirements to complete the landscaping requirements
today when its likely that within a year he will be making additional
landscaping improvements in conjunction with the planned expansion.
Chairman Frio inquired if this expansion will be the full use of the land or
will there be additional changes.
Page 1
Special Meeting Planning Commission Minutes - 6/12J95
Chairman Frie opens the public hearing.
Dave Peterson, applicant and owner Monticello Ford, states that after the
next expansion he will be out Bland at this site. He was concerned about
the landscape requirements and the trees blocking the view of his vehicles.
Also, there are many trees that could cause damage to the new vehicles.
After his lot is blacktopped, Peterson has plans of adding lighting around the
lot. The trees would be distnxbed if planted before the lighting was installed.
He did state that he would meet the requirements next year after the
expansion was completed.
Chairman Frie closed the public hearing.
Chairman Frie stated that even requiring Peterson to put in 30% of the tepees
would not be a reasonable request before the lighting was installed.
JON BOOART MADE A MOTION TO APPROVE AN AMENDMENT TO
THE CUP WHICH WOULD ALLOW AN EXPANSION OF AN OUTSIDE
SALES AREA SUBJECT TO THE FOLLOWING CONDITIONS:
ALL CONDITIONS AS IDENTIFIED BY ORDINANCE.
COMPLETION OF LANDSCAPING REQUIREMENTS
WITHIN 24 MONTHS OR UPON COMPLETION OF BULDING
EXPANSION WHICHEVER IS SOONER. APPROVAL OF THE
CUP IS BASED ON THE FINDING THAT THE USE IS
CONSISTENT WITH THE CHARACTER OF THE AREA AND
COSND3TENT WITH THE COMPREHENSIVE PLAN.
SECONDED BY RICHARD CARLSON. Motion passed
unanimously.
3. A$ia==mA.
There being no Aulher discu"on, the meeting was adjourned.
Respect" submitted,
Wanda Kraemer
Development Services Technidan
Page 9
0
BEDIUTES
REGULAR B EE ING - MONTICELLO PLANNING CO1fDUSSION
Tuesday, June 6, IM - 7 p.m.
Members: Dick Frie, Rod Dragaten, Richard Carlson, Jon Bogart, Richard Martie
Members Absent:
Staff Present: Jeff O'Neill, Gary Anderson, Steve Grittmam, Wanda Kraemer
rall to
Order-
Meefing was called to order by Chairman Frie.
RICHARD CARLSON MADE A MOTION TO APPROVE THE hf[NU PES OF
THE MAY 15, 1995 MEETING. SECONDED BY JON BOGART. MOTION
PASSED UNANIMOUSLY.
Added!W=
Chairman Dick Frie added John LeeresonlCardinal Ponds to the agenda
John Leersson had applied for the subdivision of the plat Cardinal Ponds.
The application was not processed because of the stady being done with the
waste water treatment plant.
Jeff ONeill, Assistant Administrator, explained that city staff is set to ask
council if it wants to accept any applications for annexation during this
period when the waste water treatment plant capacity is limited. ONeill
noted that perhaps council will accept applications for processing only and
delay implementation until sufficient wastewaster treatment plant capacity
has been demonstrated.
ASA i HA ring ..GefLaidarAtien of a raauaat far a pgr-king .tell And driveway
d�ai� m d_ 'h�'ea�_1�a. eermit_ A i nt RAS ti�.i
R,61ic Haaring..Cenaidaratian of A epnnaat lhr n me itis al ,m ar=t
arkir6 Allow autoida storax in sin 1.1 rasa_ ApeHmmt Rev BdUag
Jeff ONeill, Assistant Administrator, explained that Ray Schmidt requests
that the Planning Commission conaider granting his company two condition
Page 1
Planning Commission Minutes - 06.06.96
use permits, which would allow an expansion of his manufacturing facility.
The proposed expansion calls for development of a 9,000 square foot addition
to the existing structure. The addition would be located on the north side of
the existing building and would be used primarily for loading equipment on
to trucks. City staff, along with the City Engineer, has reviewed the site
plan in detail and found that it meets site plan requirements; however, site
plan does call for a reduction in standard driveway and curb improvements,
thus creating need for conditional use permit. According to the site plan the
area proposed to be without curb appear to be in areas where the curb is not
needed for drainage or to channel traffic; therefore, a request for conditional
use permit allowing a reduction in driveway and parking standards appears
appropriate. Also, the site plan calls for development of a small outside
storage area that will be screed by a fence.
Chairman Frio opened public hearing.
Ray Schmidt, applicant, stated that he was half of Ray -Wes partnership and
his company manufactures recycling and automotive equipment. The
company is growing and needs expansion.
Chairman Frie dosed public hearing.
Frio asked Jeff ONeill, about concerns of violations regarding conditional
use permits. Are there any violations in at this site?
O'Neill stated that Brom time to time outside storage has been witnessed with
the a new conditional use permit the outside storage will need to be screened
as required by ordinance.
DICK MARTIE MADE A NOTION TO GRANT THE REQUEST FOR A
PARKING STALL AND DRIVEWAY DESIGN CONDITIONAL USE
PERMIT DUE TO FACT THAT THE CURBING PROPOSED TO BE
ELIMINATED WILL NOT AFFECT THE DRAINAGE AND BECAUSE THE
NO CURB AREA IS IN THE AREA OF FUTURE EXPANSION TD THE
PARKING LOT. SECONDED BY ROD DRAGSTON. Notion passed
unanimously.
DICK MARTIE MADE A MOTION TO APPROVE OUTSIDE STORAGE
BASED ON FINDING THAT PROPOSED OUTSIDE STORAGE IS
RELATIVELY SMALL AND WILL BE SCREENED AND MAINTAINED
ACCORDING TO THE REQUIREMENTS OUTLINED BY ORDINANCE.
SECONDED BY RICHARD CARLSON. Motion passed unanimously.
Page 2
Planning Commission Minutes - 06.06.95
P+m61ir Hearing--Cenaideration of a conditional use permit whi h would allow
^�anaien fan aimbiAnnee garage eAAnli not Monti llo.Hyg J oke Hnapital
Ibairict.
Steve Grittman reported on the ambulance garage at the Hospital Campus.
The property is subject to a long term development plan which is governed by
a Planned Unit Development. PUD permit approvals are given by
Conditional Use Permits. The Hospital District has initiated a program by
which there are ambulance employees there 24 hours a day. Formerly,
aEakdance employees were on call and required parking space immediately
adjacent to ambulance garage when they came in to respond to a request for
ambulance service. Since timing is no longer critical for the ambulance
operations, the Hospital District would like to replace two parking spaces
with enclosed ambulance garage area The concern is the increased demand
om the main employee parking area and that the Hospital should consider
replacing the lost parking spaces.
Clhairman Frie opened public hearing.
Be:b Schwientek, Hospital Administrator, reported that there would be two
parking spots eliminated but the expansion is necessary for ambulance and
storage. The storage capacity is at a maximum and even outside storage is
now being used. parking next to the garage is not a usetiil place for the
public to park because of the ambulances going back and forth. We want to
be a good neighbor and with the expansion of a 26 x 30 addition it should
help.
Frio asked if there would be more parking spaces when Mississippi Shores is
built non to hospital?
Schweintsk thought there would be a few spaces but not very many. The
hospital administration has encouraged staff to park at the end of access
road until the lot can be expanded or such time when Hart Blvd. is vacated.
Helen Wulf, a neighbor, stated she was in favor of the expansion because
there is an immediate need for inside storage and also a tree, along the
property line will be taken down by hospital. Wulf stated that there are
three spaces to park on the street that could be used.
S 6weintek explained that second floor is being renovated but parking lot
will have to wait until Wright County widens County Road 75. It would be
very costly to redesign the parking lot twice.
Page 3 0
Planning Commission Minutes - 06-096
Jeff ONeill showed a diagram of hospital concept plan and inquired about
parking stalls. He noted that the last time the parking needs were anaHzed
the complex was 16 parking stalls short. The new Commission needs to be
aware of the parking shortage before they allow two more spaces to be
removed at this time. When Hart Blvd is vacated there will be the required
parking. There was a study done in this area in 1993 and recommended that
traffic was not increased on River Street.
Schweintek, stated that contractors on site for renovation are also
contributing to the parking shortage. When the hospital is completed there
will be more spaces available.
Chairman Frie dosed public hearing.
JON BOGART MADE A MOTION TO APPROVE CONDITIONAL USE
PERMIT TO EXPAND AMBULANCE GARAGE ON MONTICELLO•BIG
LAKE HOSPITAL PROPERTY SUBJECT TO THE CONDITION OF
EXPANDING THE EXISTING PARKING WHEN COUNTY HIGHWAY 76
IMPROVEMENTS ARE MADE. SECONDED BY DICK MARTIE. Motion
passed unanimously.
9. M ma"Ast to AUM wdng of
ind:vid ,a) tenant Aiga on mma 1`9n see Aida of A dldin—AMQG5pL R:=
code requires only sign for tenant and Ending of hardship and special
condition to Justify -recommend deny - one sign per tenant
10 be HAAd--ConaidamNno of A nou"t far A vlLdAnne to Inm mera n
inn A012gra feat etas m�a_+a_A enone y Appi ataRive3
Page 4 G
Planning Commission Minutes - 06-06.98
11. Publie_ Hearinsr—Vonaiderr_atien of a =quest for a v rinnce to allow a reef coign
Awliean +v r Ctreat. Q etien
Steve Grittman, City Planner, explained the owners of the building at the
intersection of Highway 28 and River Street have applied for a series of
approvals relating to the conversion of that building , including antique
sales, some office uses, and an outdoor farmer's market cart. The site is
currently zoned Performance Zone - Mixed (PEM). This district is structured
to allow primarily residential and lower intensity commercial uses. Four of
the six applications for this property are related to the proposed signing of
building and its tenants, one is related to the operation of outdoor sales cart,
and one is for a rezoning ftun PZM to B4, Regional Business.
The rezoning request is important to consider first, of m it will affect the
disposition of some of the other applications. The five blocks between Linn
Street and Palm Street is split between PZM and B-4 Zoning, with PZM on
half blocks facing River Street, and B-4 on the half blocks facing Broadway.
It appears that this zoning pattern may have been established for a
transition between the more intense downtown commercial area and the R'1
District which faces most of Mississippi River. On this block the river
frontage is park land rather than residential and the long term land use of
this area may be transitioning to more of a regional commardal nab=.
The applicant also wishes to operate a farmer's market on an outdoor sales
cart along the River Street footage of this property. A more acceptable
location ibr this use would be at the northwest corner of the site because
traffic stopping on River Street.
The tour other requests relate to signage. Three of these are variance
requests, which must be subject to anon -economic haedehie to quality for
consideration.
Chairman Frie opened public hearing.
Tom Brion, River Street Station owner, inquired about sign ordinance. He
had received two information packets with different wording on the square
ibotage of signage that is allowed. Also, there was concern that the
Commission had not received all of examples and diagrams of proposal.
Page 5
Planning Commission Minutes - 06-06-95
Grittman tried to explain to applicant that the sign ordinance had been
changed and there was a section that was deleted that should not have been.
At this time, Chairman Frie called a recess for the Commission to discuss
confusion of the ordinance and to copy additional information.
The meeting was called to order and public hearing was continued.
Tracy Mikkelson, antique dealer at River street Station, stated that
antiques are a very visible impulse type of busines that need a large sign for
attention.
Tom Brion used overhead to show how the proposed signage would look and
explained that a sign is needed that can be seen by can traveling by.
Carla Dose, antique dealer, thought it was very important to keep process
going because the eigns are needed for people to know they are open.
Chairman Frie dosed public hearing.
Richard Carlson recommended that the Commission address the rezoning
and the farmer's market items fist and then discuss the signage.
DICK MARTIE MADE A MOTION TO REZONE THE RIVER STREET
STATION PROPERTY FROM PZM TO B-4 BASED ON THE FINDING
THAT THE SUBJECTS PROPERTY IS CONSISTENT WITH STRICTLY
COMMERCIAL USES. SECONDED BY ROD DRAGSTON. Motion passed
unanimously.
Next, the commission discussed open and outdoor sales i}om a wagon or cart.
The thrme:'s market was a favorable idea but the location was not ideal.
There were questions from the Commission that if the cart was located on
River Street would care be stopping and parking along River Street causing
traffic problems. Also, the proximity to the intersection of River Street and
Highway 28 would need to be considered The southwest side of property
next to parking lots would be a better location.
Mike Olson, River Street Station owner, thought the retaining wall and
boulevard would prevent the outdoor merchants from moving forward.
O'Neill stated that city does have a transient merchant license that each
vendor will be required to apply lbr.
Page 6
12.
Planning Commission Minutes - 06-0695
RICHARD DRAGSTON MADE A MOTION TO ALLOW A CONDITIONAL
USE PERMIT FOR OPEN AND OUTDOOR SALES FROM A WAGON OR
CART IN SOUTHWEST CORNER OF THE LOT. THE SPECIFIC
LOCATION IS TO BE IDENTIFIED BY CITY STAFF ON THE OFFICIAL
SITE PLAN. THE SITE FOR SALES SHALL NOT TAKE UP EXISTING
PARKING SPACES. SECONDED BY DICK MARTIE. Motion passed
unanimously.
The signs were discussed next. Jeff O'Neill stated that River Street Station
is a unique building because there is a minimum amount of wall space with a
very low roof line. River Street Station is requesting a roof sign but it needs
to be defined as to where a roof line starts.
Mike Olson explained that business would like to use manors to hang the
roof sign on.
DICK MARTIE MADE A MOTION TO ALLOW A VARIANCE FOR A ROOF
SIGN BECAUSE OF UNIQUE DESIGN OF BUILDING. NO SECOND.
The motion died due to lark of a second.
Jon Bogart stated that the item should not proceed further without better
information on the zoning requirements and its impact on sign development
options.
Richard Carlson stated that he did not want to send the wrong waves to
applicant but he also needed more information.
JON BOGART MADE A MOTION TO CONTINUE THE PUBLIC
HEARINGS ON ITEMS, 6,9, 10, AND 11 ON THE AGENDA AT A
RESCHEDULE SPECIAL MEETING AS SOON AS POSSIBLE TO
RESOLVE ISSUES BEFORE US. INFORMATION SHOULD INCLUDE
ACCURATE MEASURE FOR THE FRONTAGE AND THE NORTH SIDE;
EXAMPLES OF PROPOSED SIGNAGE; EXPLANATION OF MANSOR
SYSTEM OR ROOF BRACKET SYSTEM, ALSO AT THAT TIME AN
HOUSE KEEPING ORDINANCE FOR THE SIGN FOOTAGE ALLOWED.
A TENTATIVE DATE FOR NEXT MEETING WOULD BE MONDAY, JUNE
26, AT 5:30. SECONDED BY RICHARD CARLSON. Motion passed
unanimously.
Page 7
Planning Commission Minutes - 06-09-95
Steve Grittman, City Planner, updated the Commission on the joint meeting
results that were held with City Council, HRA, EDA, and the Parka
Commission in May. These concepts are delivered in a rough form, since it is
important that the community has the opportunity to react to them, fine tune
them, or reject them. Grittman separated the information into the following
categories:
Housing:
One idea the city might want to consider is large rural lot subdivisions.
There is a high demand for two to five acre lots. Grittman then
demonstrated on a map that the area in the southwest part of the city that
might be looked toward to develop the large residential lots. This would be
one way to attract upscale housing. Another way would be to improve parks,
trail systems, and recreational opportunities.
Economic Development:
The downtown area is going through radical changes. This is happening all
over Minnesota. The realities of contemporary shopping patterns have
retailing of traditional comparison consumer goods an activity which occurs
largely in S-type shopping centore This is not to say that downtowns will
no longer have a commercial role. Instead, that role must change to reflect
the activities which are most likely to be successful. For most small
downtowns, that role consists largely of entertainment recreation, and
service base commercial activity. Antique stores, specialty shops, theaters,
restaurants, and bars. The City's investment in this conversion can take
many forms. One would be to establish programs which assist in remodeling
projects. Another would be a community center in the prorimity to both the
downtown and the river which would provide an amenity which encourages
both the City's housing goals, and the transformation of the downtown area.
Industrial Development
The City has identified continued industrial development as a major
objective for the City's involvement Thera was a sense firom the joint
meeting that any industrial development was positive, higher investment
industry, in terms of building quality or wage levels, would be even more
weloomed. Traffic is a problem and another interchange with I-94 will be
needed. The location for this interchange is critical because there are not
likely to be fhnds fbr more than one. In addition, proper planning would
allow adequate routes for another industrial park and other development
areae without creating the congestion conflict at a later date. The location of
additional industrial land is an area that will need to be decided. If housing
Page 8
arL.
Planning Commission Minutes - 0846-96
is extended to the west, past Olson's Electric, that could be a link to an
industrial park located on west end of town. This will depend on the
interchange off of I-94.
Community Facilities
As noted in the housing discussion, community facility are finked to the
attraction of new housing growth. In the past, infisstnuture hes been
thought of mostly as concrete and iron. There is a primary role of the
municipal government to provides roads, pipes, and sewage. la&wtructare
should be thought of as any fadlity or service provided by the community as
a whole which is necessary to attract and maintain development For
industry, that infimstiructure includes solid not congested streets, and
adequate sewer and water capacity. For many though, it also includes a
labor supply, which is in critical shortage in several employment Wegories.
W r supply requires housing. and higher end labor requires higher end
housing. This means attractive, ample park and trail lands6 quality school
ficilities, and programs, and superior community recreation 11cilities and
programs.
"jM=ment
ROD DRAGSTEN MADE A NOTION TO ADJOURN THE MEETING.
SECONDED BY JON BOGART.
Respeetffilly Submitted,
Wanda Kraemer
Development Services Technician
M[NUTES
SPECIAL MEE`MG - MONTICELLO PLANNING COMMISSION
Monday, Jane 26, 1995 - T PjL
Members: Chairman Dick Frie, John Bogart, Rod Drageten, Dick Martie
Members Absent: Richard Carlson
Staff : Jeff O'Neill, Gary Anderson, Wanda Kraemer
Call to order.
Chairman Frie called the meeting to order. Frie brought to the attention of
the Commission that Items 4, 5, and 6 had been withdrawn by the applicant.
R�hli Hw ring�`nnaidwratinn of a cmmt to �nwnd Aer2inn 4-9 .2 of the
ai��a fer nrnewrden lemteei in the P7bL B.1.13-2 B-3_ S-4_ I-1_ and T -2-
t Mnntinelln Planning f`nmeninainn
Jeff O'Neill, Assistant Administrator, thanked the applicant for their
patience during the process of developing the sign system for Riverstmet
Station.
O'Neill reported that a recent series of amendments to the sign ordinance
inadvertently resulted in the removal of an important section of the sign
ordinance which needs to be reinstated in order for the River Street Station
request to proceed. Essentially, this is a housekeeping matter with the
Planning Commission being asked to reinstate language removed 6rom the
ordinance by mistake.
Chairman Frie opened the public hearing. There was no discussion W the
hearing was closed.
JON BOGART MADE A MOTION TO REINSTATE OPTION A AND
OPTION B LANGUAGE TO RETURN THE SIGN ORDINANCE TO
CONDITIONS PRIOR TO INADVERTENTLY REMOVAL OF OPTIONS A
AND B. SECONDED BY ROD DRAGSTEN. Motion passed unanimously.
O'Neill explained that Riverstreet Station is seeking a conditional uee permit
Page 1
(2)
Special Planning Commission Minutes - 06/26/95
which would allow establishment of a sign system for a building that
contains three or more business uses. Presently, Riverstreet Station
contains eight business uses, which includes an antique mall and seven office
uses. There were a number of variances that were requested associated with
the original sign plan proposed by Riverstreet Station. After further review
of the sign ordinance and site conditions, the applicant has decided to modify
the original application by utilizin6 primarily a pylon sign versus wall signs
as originally contemplated. This decision has a positive effect of allowing the
development of the sign system that needs no variances. Under the original
proposal, at least two variances were needed in order for the conditional use
permit to be approved
Riverstreet has 181 lineal feet of Frontage, which per city code, will allow 58
square feet of signage on a two-sided pylon sign. In addition there will be a
wall sign on the south side of the structure.
Chairman Fria opened the public hearing.
Tom Brion, owner Riverstreet Station, wanted to clarify that the CUP would
allow three or more signs on one property.
O'Neill stated that three or more signs would be correct. It is time that the
Commission looked at the entire sign ordinance to make sure it is up to date.
There have been many changes in the last 15 years, especially in the
downtown area, and time should be taken to review our sign ordinance
during the comprehensive planning procedure.
There was an agreement among the commissioners to study the sign
ordinance at the nma comprehensive plan meeting in July.
Chairman Me closed the public hearing.
JON BOGART MADE A MOTION TO APPROVE THE CONDITIONAL USE
PERMIT ALLOWING A SIGN SYSTEM WITH THREE OR MORE
BUSINESS USES BASED ON THE FINDING THAT THE SIGN SYSTEM
PROPOSED IS CONSISTENT WITH CITY CODE IN ALL RESPECTS AND
IS CONSISTENT WITH THE CHARACTER OF THE BUSINESS IN
WHICH IT IS LOCATED. SECONDED BY DICK MARTIE. Motion passed
unanimously.
j�`endnLad PubLir He mqufmt to allnw thn
Page' 2
0
Special Planning Commission Minutes - 06/28195
6. ('n*+finuad ■hHe Annring..Lonaidwmfien of a rwm,oat fnr a varianew to Ilom
a reef ffig��mliranL i L:W:u.,:x`
l�
The Planning Commission agreed that the July meeting should be on
Wedoesdsy. July 6th. at T.p.m. becw of the 4th dJuly holiday.
There being no further discussion the meeting was adjourned
RespecdWly submitted,
Wanda Kraemer
Development Services Te&ni ian
Page 3
6i)
Planning Commission Agenda • 8/1/95
A RF.FF.RF.NCI? AND SAC [3ROTJbM:
A Glorious Church requests a renewal of their conditional use permit
allowing development of a church facility. This is an item that the two new
Planning Commission mombera are not familiar with. For the three
longstanding members of the Planning Commission, this is a familiar
request, as A Glorious Church received their original approval for a
conditional use permit in 1980 and received a renewal of the conditional use
permit in May of 1994. Due to the fact that it has been over a year since A
Glorious Church received their moat -recent approval, it is necessary for the
organization to come before the Planning Commission and City Council again
to request an update or renewal of the conditional use permit.
Acom*ng to Dan Gassier, there have been no major changes to the plan as
proposed; therefore, the application material provided with the previous
approval is submitted with the current request. There is one change from
the previous request. As you may recall, A Glorious Church requested that
the paving portion of the project be delayed until a year after the building of
the facility is completed. Gassler has indicated that the church has funds
available to complete the entire project; therefore, he is not asking to be
allowed to delay construction of the paved surface.
B. LLTL.RNATIVF. ACTIONS:
Motion to approve conditional use permit based on the conditions and
findings noted in the approval granted on May 3, 1994, which are as
follows:
A. City approval of a parking lot, landscaping, and screening plan.
Adequate screening of the parking lot area from abutting
residential use and landscaping must be provided. The screen
must be at least 6 ft high and achieve 90% opacity. The screen
must consist of either a berm, solid fence, or landscape
plantings. Installation of the parking lot screen shall ooear at
such time that the adjoining residential property is platted
(now).
B. City approval of drainage plan must be obtained prior to
issuance of a building permit,
Planning Commission Agenda - 8/1/98
C. City approval of landscaping plan must be obtained prior to
issuance of a building permit. The landscaping plan should
include 30 overstory trees to be planted along the perimeter of
the developed portion of the property and spaced approximately
38 R apart. Additional development will precipitate additional
plantings.
D. City approval of exterior treatment of structure moat be
obtained to ensure compatibility with the neighborhood. Steel
exterior materials shall be limited to % of the available wall
surface.
This alternative could be approved based on the finding that the
church facility as proposed with conditions as attached is consistent
with the comprehensive plan and is compatible with the existing and
fhture ehameter of the adjoining &1 zone.
2. Motion to deny the conditional use permit.
(_ STAFF F[!O NDATfON:
Staff recommends alternative 01.
D_ Si7PPORTINO DATA
Application materials; Meeting minutes from previous approvals.
C
E Noww ~
•t. /�
.-0 ewA- IL%,46:q-
e
...-NeT HoI.)TICFLLAO EXIT
TO rwirj avrjr-t)
9
O '� LOTLI00b CIA OV -C- VA
'?v-opcg." LAoc-t&.r%0P3 Ll►IfOUT
SGA -LIE C• Fkm 1
i
✓
•1rQ,66b - � �,,,, •/ , .gt
i
r
� Pa„ppob� p�t�va�!►a
WM� cow
UO
ua"N V�Ng
ti
comcE,,-, r - viEw FROM LAsr END OF RROPERrY,
Lobj<jt44 wE5r ON i4vVY. V 39
-....,, 1'�_1!`" .. a r'��'.�.,.�,� . �..,,�"'.-�L.. � •�-...
w
2
t d' wA %7-% RG.�zv�v sec-'r. tO AGi.O .IOVS. . GIJVRGt-Z
W
3 P. ti.o ► Ptd.t�t , . PC-2
S{.fsLfi �� c 100'
. � uCNTItS4A ¢ta.41N�WL tCMH15�oV
4
c
I I � � /
`, �i✓,
{
�C
rn
IOL
1%
0
coAl, Council Minutes - 5/23/94
f.onside;-ation pf a conditional use Hermit aIIowmr a Fhurch f wility to
operate in an &1 zone. Ammlicant. A Glorious Church..
Assistant Administrator ONeill informed City Council that A Glorious
Church requests that Council grant a conditional use permit allowing a
church facility to develop in an A-1 zone. The request is nearly identical to
the request approved by the City Council on November 13, 1890. O'Neill
noted that the only aspect of the site plan proposal for the fu ity that has
changed since the previous approval is a request that installation of parking
and landscaping be deferred one construction season subsequent to the
season in which the church facility is built. ONeill noted that the Planning
Commission recommended approval of the conditional use permit request as
requested. It was their view that this precedent allowing deferral of
parking and landscaping is acceptable because it is limited to church
facilities in R-1 zones and does not apply to other institutional and
commercial developments in other zoning districts.
Warren Smith noted that the City loses its leverage to require parking lot
and landscaping improvements on an occupancy permit is granted. Dan
Gasaler recognized Smith's concern but noted that his congregation has had
success with its find raising relating to development of the church. It has
paid off the cost of the property and associated assessments and is now in
position to develop the facility. Gassler expressed his confidence that finds
will be available to complete the parking lot and landscaping within the
requirements of the conditional use permit as proposed by the Planning
Commission.
After discussion. a motion was made by Shirley Anderson and seconded by
Clint Herbst to approve the conditional use permit request as recommended
by the Planning Commission with the additional requirement that an
easement be provided to convey storm water from the south edge of the
property to the County Road 38 ditch system. The precise location of the
easement is to be defined jointly by City staff and church representatives.
Motion carried unanimously.
��:-'�
Planning Commission Agenda - 5/3/94
S. Public Hepriiny—Consideration of p conditional ase uermit p Rogzng
a church facility to operate in an R-1 zone. Anulicant A Glorious
Church. Q.O.)
A. REFERENCE AND BACKGROUND:
Planning Commission is asked to consider granting a conditional use permit
allowing A Glorious Church to develop a church facility at a location along
East 39. The request is nearly identical to the request approved by the City
Council on November 13, 1990. Those of you that were on the Planning
Commission at that time recall that the request was reviewed and approved
by the Planning Commission on November 7, 1990.
The only aspect of the site plan and proposal for the facility that has
changed is the request by the church that they be allowed to install the
parking and landscaping during the construction season su�� end to the
season in which the church facility is built. Due to limitations m obtaining
bank finandrLg for church facilities, it is difficult for the church organisation
to gather the fiords necessary to do the church construction and the
completion of the site improvements simultaneously.
Allowing the development to occur without developing parking immediately
would be precedent -setting; however, according to the Planner, the
precedent would be limited to church facilities in the R-1 zone. The
precedent could not be applied to justify deferral of parting and landscaping
improvements for a business in a B-3 zone. Nonetheless, allowing deferral
of parking acid landscaping does set a precedent for other churches
developing is R zones, and perhaps the Planning Commission does not want
to open up this door. I do not have a complete recollection of what the City
has done with other churches; however, I do recall that the Baptist Church
an 4th Street was allowed to defer completion of their parking facility for a
number of yeare; however, they were not allowed to operate without
installation of a screening fence, which they did construct.
B. ALTERNATM ACTIONS:
Q I ` VrI Motioa to approve the conditional use request with the following
0'% conditions (same as 11/7/90 except for "E"):
40, / A. City approval of a parking lot, landscaping, and screening plan.
N11166 Adequate screening of the parking lot area from abutting
residential uses and landscaping must be provided. The screen
must be at least 6 ft high and achieve 90% opacity. The screen
Planning Commission Agenda - 5/3/94
must consist of either a berm, solid fence, or landscape
plantings. Installation of the parking lot screen shall occur at
such time that the adjoining residential property is platted
B. City approval of drainage plan must be obtained prior to
issuance of a building permit.
C. City approval of landscaping plan must be obtained prior to
issuance of a building permit. The landscaping plan should
include 30 overstory trees to be planted along the perimeter of
the developed portion of the property and spaced approximately
35 ft apart. Additional development will precipitate additional
plantings.
D. City approval of exterior treatment of structure must be
obtained to ensure compatibility with the neighborhood. Steel
/ exterior materials shall be limited to 1/2 of the available wall
/ surface.
/ E. IQatall ion of -parking lot facilities and landscaping may be
defer f ed �o the construction season following occupancy of the
church faMty. \.
This alternative could be approved based on the finding that the
church facility as proposed with conditions as attached is consistent
with the comprehensive plan and is compatible with the existing and
future character of the adjoining R-1 zone.
Motion to deny the conditional use request.
Planning Commission should select this alternative if it does not
agree with the finding as noted under alternative 01. Planning
Commission could take the strict view that the landscaping and
parking should be installed simultaneous to development of the
church. Since the City cannot obtain a financial guarantee that these
improvements will be put in place, there is no way except for the
word of the church that the City can force installation of
improvements required under the ordinance. By allowing the
development to occur without assurance that these items will be
completed and by allowing occupancy of the structure before these
items are completed, the City loses much of the power it has to
assure completion of improvements without needing to take legal
action.
(03
Planning Commission Agenda - 5/3/94
C. STAFF RECOb11MENDATION:
Staff recommends alternative #1 with regard to the deferral of the
installation of parking and landscaping, etc. It is our view that the
precedent set by allowing the deferral of these improvements has been set
by previous action and that the risk of setting a city-wide precedent that
could be applied to industrial/commercial uses is not significant. Finally,
this alternative is sensitive to the financial constraints of churches and may
represent a reasonable compromise allowing a church to develop within its
finandal constraints without eliminating important City landscaping and
parking requirements.
Copy of meeting minutes—previous application.
(2
co4b�,
Council Minutes - 11/13/90
outlines the formula and method for use of the sale
proceeds to finance payment of assessment debt
against the original parcel.
Motion carried unanimously.
3. Consideration of a conditional use mermit which would allow
operation of a church facility in an R-1 (sinale family
residential) zone. Amolicant, A Glorious Church.
Assistant Administrator O'Neill informed Council that the
Planning Commission has recommended approval of the
conditional use permit subject to the following conditions:
1. Planning Commission review and approval of parking lot,
landscaping, and screening plan; adequate screening of
parking lot area from abutting residential uses; and
landscaping must be provided. The screen must be at
least six feet high and achieve 90% opacity. The screen
may consist of either berm, solid fence, or landscape
planting. installation of the parking lot screen shall
occur at such time that the adjoining residential
property is eligible for issuance of a building permit.
3. City approval of drainage plan.
3. Planning Commission review and approval of landscaping
plan.
4. Planning Commission review and approval of exterior _
treatment of structure to ensure compatibility with
neighborhood. Steel exterior material shall be limited
to one-half of the available wall surface unless
otherwise approved by the Planning Commission.
After discussion, motion was made by Fran Fair, seconded by
Shirley Anderson, to approve the conditional use permit along
with conditions noted based on the finding that church
development as proposed with the conditions as attached is
consistent with the comprehensive plan and is compatible with
the existing and future character of the adjoining R-1 zone.
Kotion carried unanimously.
Page 5
✓. Planning Commission Minutes - 11/7190
Public Hearinq--A conditional use request to allow a church
facility in an R-1 (single family residential) zone.
Applicant, A Glorious Church.
Jeff O'Neill, Assistant Administrator, explained to the
Planning Commission members and the public A Glorious Church's
request to allow a church facility in an R-1 (single family
residential) zone. Mr. O'Neill explained through a video
presentation how a church facility located on a portion of
this subdivided unplatted tract of land would be reflected
with the surrounding residential properties and residential
zoning around it. He went on to explain how the landscaping
requirements and parking lot screening requirements would
affect this property with the proposed use of a church
facility on the property.
Acting Chairperson, Cindy Lemm, opened the meeting for input
from the public. A Glorious Church representatives were
present to answer any questions that the Planning Commission
members may have on their proposed project.
With no further input from the public, Acting Chairperson,
Cindy Lemm, then closed the public hearing and opened the
meeting for input from the Planning Commission members.
Planning Commission members discussed how the property would
be screened and how the proposed landscaping would remain as
is or subject to their approval at tonight's meeting.
Commission members felt this would be a good use for the
property and had no, problem with the church being located at
this property.
With no further input from Planning Commission, a motion was
made by Richard Carlson, seconded by Richard Martie, to_
approve the conditional use request with the following
conditions:
City approval of the parking lot landscaping and
screening plan. Adequate screening of the parking lot
area from abutting residential uses and landscaping must
be provided. The screen must be at least 6 feet high and
achieve 90% opacity. The screen may consist of either a
berm, solid fence, or landscape plantings. Installation
of the parking lot screen shall occur at such time that
the adjoining residential property is platted.
City approval of drainage plan must be obtained prior to
Issuance of a building permit.
C. City approval of landscaping plan must be obtained prior
to issuance of a building permit. The landscaping plan
should include 30 overstory trees to be planted along the
perimeter of the developed portion of the property and
` spaced approximately ]S feet apart. Additional
development will precipitate additional plantings.
D. City approval of exterior treatment of structure must be
obtained to insure compatibility with the neighborhood.
Steel exterior materials shall be limited to one-half of
the available wall surface.
r
Planning Commission Minutes - 11/7/90
The above conditions were subject to the conditions that prior
to a building permit application, the applicant must come back
to the Planning Commission members for review of the following
conditions:
a. City approval of a parking lot landscaping and screening
plan. Adequate screening of parking lot area from
abutting residential uses and landscaping must be
provided. The screen must be at least 6 feet high and
achieve 90% opacity. The screen may consist of either a
berm, solid fence, or landscape planting. Installation
of the parking lot screen shall occur at such time that
the adjoining residential property is platted.
b. City approval of drainage plan prior to issuance of
building permit.
C. City approval of the landscaping plan prior to issuance
of building permit. The landscaping plan shall include
30 overstory trees to be planted along the perimeter of
the developed portion of the property and spaced
approximately 35 feet apart. Additional development to
precipitate additional plantings.
d. City approval of exterior treatment of structure to
insure compatibility with neighborhood. Steel exterior
materials shall be limited to one-half of the available -
wall surface.
Motion carried unanimously, with Dan McConnon absent.
Reason for approval:
I. Church development at this site is consistent with the
comprehensive plan.
2. Church development at this site is consistent with the
geographical area involved.
3. Church development will not tend to or actually
depreciate the area.
4. Church development is consistent with the character of
the surrounding area.
30
a.
Planning Commission Agenda - 8/IM
. (J.O.)
Tony Emmerich, representing Ocello, LLC, requests preliminary plat
approval of the plat entitled Monticello Business Center. Following is a brief
description of the plat as proposed followed by alternatives for action.
LAND USE ilK
The lot configuration identified on the plat is identical to all conceptual plans
presented to the City on which previous zoning map amendments have been
based. The plat encompasses an area of 110 acres and is split into O lots.
Each of the individual lots will be platted as outlots in this phase of
development. Subsequent to this initial platting of the area into outlots, each
individual outlot is likely to be platted as a single lot or subdivided into
smaller lots at the time of development.
The plat consists of a lots, Outlets A -F. Outlots A and F are located between
Cedar Street and State Highway 25 and encompass approximately 15 acres.
Tbeee lots will be toned for BM*rhway business uses.
Outlots B and E are located east of Cedar Street and internal to the overall
site. Outlots B and E encompass about 44 acres and are designated for B4
uses. The B4 district is the regional commercial zoning designation, which
allows a wide variety of commercial uses.
Oudot C is located in the northeast corner of the property and encompasses
91.4 acres. This lot is designated for business campus uses, which is an area
for light manufacturing. Outlot D is located in the southeast corner of the
plat and encompasses 21.2 aces and is designated for PZM uses, which
allows a combination of commercial and residential uses.
A design of the plat is aftted by the presence of three major utility
easements extending diagonally across the site. Along the southern
boundary of the site is an NSP easement on which a power line is located.
Diagonally through the center of the site is an Amoco gas line easement, a
portion of which is utilised as the alignment for School Boulevard. The third
Planning Commission Agenda - 8/1/96
easement is a UPA power line easement cutting across the northwestern
corner of the property. This line separates the business campus from
regional commercial uses.
ADJACENT LAND USSR
To the south of the site is the Kjellberg East Trailer Park. The preliminary
plat as proposed calls for ending Cedar Street at a location that is slightly
offset firom the Kjellberg Trailer Park fiontage road. It is suggested that the
plat may need to be modified to allow the Kjellberg Trailer Park and the
Cedar Street frontage road to be connected, thus allowing residents of the
trailer park to use the Cedar Street fiontage road, thus reducing unnecessary
traffic on Highway 25.
County Road 117 is the boundary on the east side between the Monticello
Business Center and the Klein Farms development area. Directly south of
School Boulevard and east of 117 across fiom the PZM portion of the Ocello
plat is the proposed location of a 16 -acre park. North of School Boulevard,
County Road 117 becomes the boundary between the light industrial
business campus area and an area designated on the Klein Farms plan as an
R -PUD, which is a medium density housing development. To the northwest
of the Ocello plat is land zoned for heavy industrial uses. To the northeast is
land zoned for regional business uses. Both types of zoning districts do not
appear to create significant conflicts in land use.
State Highway 28 makes up the western boundary of the plat. Currently,
there is no specific land use designation for the agricultural land directly
across Highway 28. It has been speculated that this land should be used for
industrial or commercial uses. As you may know, the City owns
approximately 60 acres across f1om the plat. One of the goals of the
comprehensive plan will be to identity proper land uses in the area directly
across Brom the Ocello plat.
Ul UJff SYMMS
A portion of the utility system supporting the plat are being installed with
the School Boulevard project. The School Boulevard project, which is
currently underway, consists of construction of the entire segment of School
Boulevard Brom County Road 117 to State Highway 25. In addition to
construction of the roadway, sanitary sewer and water trunk systems are
being installed underneath School Boulevard along its dill length and are
Planning Commission Agenda - 8/1/95
being extended underneath State Highway 25 for future access by ifjellberg
West Mobile Home Park. Finally, a sanitary sewer line is being extended to
within 300 R of the Kjellberg East Mobile Home Park along the lot line
between Outlot E and Outlot D.
Development of Ceder Street and subsequent development of internal utility
systems serving each outlot will be designed and installed separately with
the development of each oudot.
The grading plan that has been submitted with the preliminary plat
application has been updated by the comprehensive storm sewer plan
prepared by the City Engineer. When the preliminary plat was submitted in
early 1995, it was determined at that time that there was insufficient data on
which to base a grading plan. At that time, the City was not sure as to which
direction the storm water should flow from this site. In order to gain a better
handle on proper design of the storm sewer system for this area, the City
Council authorized preparation of a comprehensive atom sewer study for the
area, which the developer fueled in ita entirety. The storm sewer study
revealed that the most efficient way to manage the storm water i}vm this
area is to create a system of ponds and trunk storm sewer facilities to convey
water in a northwesterly direction toward the low land north and west of the
site. Under the storm water plan as proposed, storm water from the Ocello
site would end up in the large wetland area east of Highway 26. The overall
plan calls for extending trunk storm sewer underneath the freeway, thus
providing an outlet for the wetland area.
In summary, the grading plan information as identified in the preliminary
plat has been superseded by the comprehensive storm sewer done by the City
Engineer. All grading of individual parcels done in conjunction with
subsequent development of the site must be done incrementally and in a
manner that would allow discharge of water 6om the site to the north end
west.
PROPOSED KODWICATIONS TO THE PLAT
The preliminary plat fails to show easements necessary along the perimeter
of each outlot. This aspect needs to be corrected.
It is also suggested that the Cedar Street right-of-way be increased in width
i}om 60 ft to 80 ft along the area south of School Boulevard.
Planning Commission Agenda - 8/1/95
Finally, School Boulevard road right-of-way should be widened to 100 R
between Cedar street and Highway 25.
B_ LTERNATM ACTIONS:
I. Motion to approve the preliminary plat of the Monticello Business
Center subject to completion of the following modifications:
I. Provide all necessary easements along lot perimeters as
required by ordinance.
2. Widen Cedar Street from 6o R to 8o R. and widen School
Boulevard to 100 R between Highway 25 and Cedar Street.
S. Adjust Cedar Street alignment to enable connection to the
KJellberg Trailer Park frontage road.
2. Motion to deny approval of the preliminary plat.
Staff recommends alternative 01. It is our view that the plat as prepared
provides a basic template from which future subdivision can occur. Roadway
alignment and easements are consistent with the design of the utilities that
are now being installed. It is our view that the preliminary plat should,
therefore, be approved subject to the changes as noted.