City Council Ordinance 704ORDINANCE NO. 704
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
AN ORDINANCE ADOPTING AMENDMENTS TO THE FEE SCHEDULE FOR 2019
TITLE 20 OF THE MONTICELLO CITY ORDINANCE
THE CITY COUNCIL OF THE CITY OF MONTICELLO HEREBY ORDAINS.
Section 1. Title 20 — Fee Schedule shall be amended as shown in the 2019 Fee Schedule in
Attachment "A."
Section 2. The City Clerk is hereby directed to make the changes required by this Ordinance
as part of the Official Monticello City Code, Title 20 — Fee Schedule, and to
renumber the tables and chapters accordingly as necessary to provide the intended
effect of this Ordinance. The City Clerk is further directed to make necessary
corrections to any internal citations that result from said renumbering process,
provided that such changes retain the purpose and intent of the Monticello City
Code as has been adopted.
Section 3. This Ordinance shall take effect and be in full force from and after its passage
and publication. The ordinance in its entirety shall be posted on the City website
after publication. Copies of the complete Ordinance are available online and at
Monticello City Hall for examination upon request.
ADOPTED BY the Monticello City Council this 10`" day of December, 2018.
CITY OF MONTICELLO
Brian Stumpf, Mayor
ATTEST:
Jeff N City Administrator
VOTING IN FAVOR: Davidson, Fair, Gabler, Hilgart, and Stumpf
VOTING IN OPPOSITION: None
,,, iro- . L _'. -11 1 1 0 1
TITLE 20 - CHAPTER 1
DRAFT 2019 FEE SCHEDULE - CITY OF MONTICELLO
Fee Schedule Rates supersede amounts shown in city ordinances or policies which are dated prior to the fee schedule.
ANIMAL CONTROL
Boarding Fee:
Boarding Access Fee
Dog License:
Late Fee
Replacement Tag
Euthanization/Disposal Fee
Fine: Running at Large
If impounded
Permit for Keeping Fowl on Premises
Annual renewal for current permit
Permit for Keeping Honeybees on Premises
Annual Renewal of Permit
I CEMETERY
Cremation Disinterment
Flat Marker setting with 4" concrete border
Frost Charge: (excavations December through March)
Grave Excavation Fee:
Weekday
Weekend
Infant Grave Excavation - Weekday
Infant Grave Excavation - Weekend
Cremation Grave Excavation - Weekday
Cremation Grave Excavation - Weekend
Grave Purchasing Fee:
Full Grave (41x121) Flush Marker Area
Full Grave (4'x12') Raised Marker Area
Infant Grave (21x6')
Cremation Grave (4'x4')
Columbarium (includes 2 interment niche covers w/name, DOB, DOD)
Bottom niche row (row E) - 2 remains max
Middle niche rows (rows C & D) - 2 remains max
Top niche row (row A) - 2 remains max
Ossuary
Co -mingle urn placement (includes inscription and urn bag)
Veteran -co -mingle urn placement (includes inscription
and urn bag)
Service emblem
Grave Staking Fee for burials:
Staking for Monument/Marker Placement
Grave Transfer Fee:
Memorial Plaque (Bronze) Stone:
Overtime Fee (burials outside of business hours)
Plant Stand
Opening and closing/Re-opening of Niche:
Perpetual Care Fee:
New Grave Sales
Grave Sold Pre -1960
Plant stand
Monticello Fee Schedule - 2018
$16/per day + tax
$250 per entity
$20 - 2 years
$10 - 1 year
$5
$2+ tax
$40 per animal + tax $40
Licensed Unlicensed
$50 $75
Add boarding fee (plus tax)
$50
$25
$50
$25
$100
$4-75$250
$100
$400
$450
$100
$125
$80 $150
$405$200
Resident
Non -Resident
$1025 $1,050
$1225 $1,250
$1125 $1,150
$4325 $1,350
$330$340
$355$365
$560$575
8660$675
Resident
Non -Resident
$2,500
$2,600
$2,700
$2,800
$2,900
$3,000
$1,000
$950
$200
$4-35$150
$60
$15
Cost + $10 + sales tax
$125
$40 (includes tax)
$60 $150 Weekday
$200 Weekend
Included in grave price (Maintenance not taxable - Plant Care taxable)
$100
$40 (includes tax)
1
COMMUNITY CENTER
Membership Fees: (for new members)
Daily Pass
Junior/Senior
Adult
3 Month Membership
Junior/Senior
Adult
Dual Senior
Family
Dual Adult
Annual Membership (Paid in full Options)
Junior/Senior
Adult
Dual Senior
Family
Dual Adult
Continuous Membership (Monthly Payment Option")
Junior/Senior
Adult
Dual Senior
Family
Dual Adult
-Automatic Withdrawal
Administrative fee for start-up of new monthly
memberships (one time fee) if membership is not
cancelled
Cancellation fee - applies if within 12 months of joining
Childcare - option with Membership
Resident Rate Regular Rate
$5.75 $6 $6.75 $7
$6.75 $7 $7.75 $8
$83 $87 $101.00 $106
$116.50 $122 $141.75 $149
$136.50 $143 $167.00 $175
$204.75 $215 $231.00 $243
$M $195 $210 $221
$225.75 $237
$300 $315
$309 $324
$399 $419
$372.75 $391
$477.75 $502
$524 $550
$625 $656
$47-7 $501
$577.30 $606
Sn $23 $28 $29
3330 $35 $39 $41
$36.75 $39 $47.25 $50
$53.50 $56 $57.75 $61
$48.50 $51 $52.30 $55
$30 $30
$50 $50
ehila of: $32" -math $18/month for each child or
€6f fafrA $36/month for family
All current MCC members, including charter members, will see an increase of 5% on their membership fees
Corporate Memberships (Quarterly Rate)
JR/SR
ADULT
FAMILY
Level
$60
$80
$130
Level
$55
$73
$120
Level
$52
$69
$113
Special Passes:
Resident Rate
Regular Rate
Group X Class Pass (10 uses)
$90 $95
$10$116
Daily Pass (10 visits)
$63 $66
$73:50 $77
Special Rates:
Indoor Play Area
$3.75 $4
$5 $5.25
Public Skate - Children 5-17
--
$4
Public Skate - Adult
--
$5
Public Skate - Family
$16 $18
Twilight Swim Rates - Junior/Adult
--
$4.25 $4.50
Group Rates - Junior
--
$5.25 $5.50
Group Rates - Adult
--
$6.25 $6.50
Shower Only
--
$3.75 $4
Group X Class Drop -In
$12 $13
$15 $16
Silver Sneakers Drop -In
--
$8 $8.50
Swimming Lessons/Birthday Parties
Private Swimming Lessons
Swimming Lessons (Group)
Birthday Party Room Rental Packages
Additional rates available for
$30/Lesson for $40/Lesson for more than one student or 4
Members Nonmembers lesson packages
$COT
SAC for nii.....1.ers Members $58 for
$48 for Members Nonmembers
Resident Rate/Child Regular Rate/Child
$11-$14 depending $12-$15 depending
on package on package
Monticello Fee Schedule - 2018
2
Gymnasium Rental Rates:
$25 $50
Building Valuation $500,000 or more
$1-0$150
Gym - prime time
$60/hour
$61/hr $64/hr
$15 minimum charge for 15 minutes or less
Gym - non prime time
106% of 1997 State recommended schedule
$42/hr $44/hr
use state -mandated fee
Full Kitchen
$5
$95.50/hr $100/hr
$60/hour
Energy Fee
$15 minimum charge for 15 minutes or less
$87/hr $91/hr
$60 (per parcel)
Early set up fee
106% of 1997 State recommended schedule
$60/hr $63/hr
verify with Public Works. Contractor must arrange disconnection: 1) Sanitary sewer; 2) City water & retrieve water mater; and 3) approve
Damage Deposit
Fire Alarm/Fire Sprinkler System
1/2 ofrental fees
Master Plan Review:
Pool Rental
Mechanical Permits: Residential
$100/hr $105/hr
Commercial
Hourly Room Rental Rates (2 hour minimum required):
Resident
Regular
Non -Profit
Boom Island Room
SP $18
$19 $20
W $16
Bridge Room (full)
SM $27
$30 $32
$$22 $23
N. or S. Bridge Room
$16 $17
$48 $19
$13 $14
River Room
$13
W
$il
Warehouse Room Weekday
$29 $31
$35 $37
$22 $23
Prairie Center
$31
$37
$23
Warehouse Room - Weekend
$35 $37
W $45
$29 $31
Mississippi Room:
Private Resident
Private Regular
Business Resident
Half Room Rental
$55 $58
%6 $70
W $45
Full Room Rental
$77 $81
M $97
$64 $68
Rental event with alcohol (not weddings):
Resident
Rg
Organization
(2 hour minimum - reserve within 3 months of event)
$160/hr
$174/hr
$147/hr
Add Chapel Rental
$436 for 6 hours
$462 for 6 hours
Then $50 each additional hour
Hostess Fee:
$25/hour
Locker fees:
$10 per month per locker
(COMMUNITY DEVELOPMENT - BUILDING
County Assessor Fees: Building Valuation $499,999 or less
$25 $50
Building Valuation $500,000 or more
$1-0$150
Building Inspection (non -permit related):
$60/hour
$15 minimum charge for 15 minutes or less
Building Permit Fees:
106% of 1997 State recommended schedule
Building Permit Surcharge:
use state -mandated fee
Contractor License Check Fee:
$5
Building Permit/Records - Duplicate
$60/hour
$15 minimum charge for 15 minutes or less
Blight Processing Fee
$60 (per parcel)
Demolition Permit:
106% of 1997 State recommended schedule
Permit is issued under a building permit (follow same procedures as issuing a building permit). Prior to demolition permit issuance
verify with Public Works. Contractor must arrange disconnection: 1) Sanitary sewer; 2) City water & retrieve water mater; and 3) approve
routing for trucks and heavy equipment, (if applicable). Excavation permit may also be required.
Fire Alarm/Fire Sprinkler System
106% of 1997 State Recommended Schedule
Master Plan Review:
25% of building permit fee
Mechanical Permits: Residential
$45 $50 base + $9/fixture + state surcharge
Commercial
1.251,16 1.5% of valuation + state surcharge
Mobile Home Permit
$180
Moving Buildings:
$150 + expense + demolition permit
Plan Review:
65% of building permit fee
Plumbing Permits: Residential
$45 $50 base + $9/fixture ("Fixture" includes such things as traps, toilets,
floor drains, sinks, showers)
Commmercial
1.251,16 1.5% of valuation + state surcharge
Rental Housing License Fee:
$45/per building + $15 for each dwelling unit within the building
Rental Housing License Application/Late Fee:
Double the standard license fee
Rental Housing License Transfer Fee:
$35
Business Regular
$60 $63
$84 $89
Monticello Fee Schedule - 2018
3
Residential Building Escrow: $2,000 (Held for completion of as -built survey, boulevard trees, turf
establishment. Secures street sweeping, lot erosion control & any damage to
public improvements if all items not complete/satisfied at certificate of
occupancy)
Sign Permits: Permanent $50 for first $1,000 of value (minimum fee $50)
$10 each additional $1,000 of value
Sign Permits: Temporary $50
State Surcharge on Building Permits:
Valuation of Structure
Addition or Alteration Surcharee Computation
$1,000,000 or less
.0005 x valuation
$1,000,000 to $2,000,000
$500 +.0004 x (Value - $1,000,000)
$2,000,000 to $3,000,000
$900 +.0003 x (Value - $2,000,000)
$3,000,000 to $4,000,000
$1200 +.0002 x (Value - $3,000,000)
$4,000,000 to $5,000,000
$1400 + .0001 x (Value - $4,000,000)
Greater than $5,000,000
$1500 +.00005 x (Value - $5,000,000)
Surveys:
$15
Utility Locate Fee: Residential
$50
Commercial/Industrial
$65
COMMUNITY DEVELOPMENT - ECONOMIC DEVELOPMENT
Business Subsidy Application
$200
GMEF Loan Application
$500 minimum or 1.5% of loan amount,
whichever is greater
SCDP Loan Application
$500 minimum or 1.5% of loan amount,
whichever is greater
TIF Application
$10,000 Escrow Deposit
COMMUNITY DEVELOPMENT - PLANNING/ZONING
Administrative Home Occupation Permit
$50
Community Garden Plot
$30
Comprehensive Plan Amendment
$200 + escrow (per chart)
Conditional Use Permit
$200 + Escrow (per chart)
Escrow Chart - Land Use Application Plan Review
Commercial
10-3 acres $2,000
1 unit
14-10 acres $6,000
2+ units
11+ acres $10000 $8,000
*reconciled to actual costs for staff/consulting time after decision
2% of estimated public
improvement cost or $2,000
Escrow Chart - Development & Subdivision Project
Planning Review & Administration
minimum, whichever is greater
2% of estimated public
improvement cost or $2,000
Review and Inspection
Legal Review & Administration
minimum, whichever is greater
2% of estimated public
improvement cost or $2,000
City Review & Administration
minimum, whichever is greater
3% of estimated public
improvement cost or $2,000
Engineering Review & Inspection
minimum, whichever is greater
Grading, Streets &
4% of estimated public
Utilities
improvement cost or $2,000
minimum, whichever is greater
Interim Use Permit:
Labor (for Community Development/Projects):
Planner
Engineer
Construction Inspector
Iron Monuments $300/lot
$200 + Escrow (per chart)
$165/hour $170/hour
$156/hour (maximum)
$110/ hour $111/hour (maximum)
$500 (single family)
$1000 base +
$100 per unit (up
to $10,000)
Monticello Fee Schedule - 2018
4
Landscaping Security
Letter of credit or cash based on statement of value of landscaping x 125%.
Park Dedication (residential)
An amount of land equal to eleven percent (11 %)
of the total gross land area of the plat shall be
presumptively defined as "reasonably commensurate."
In the event that the subdivider objects to the eleven
percent (11 %) standard, the City shall, at the
developer's request and expense, conduct a
specific dedication study of the park system and
the demand placed on the system by the proposed plat.
Cash -in -Lieu: 11% of fair market value of the raw land to be
platted at the time of final plat. The city may require an
appraisal to determine market value of subject land being platted.
Parking Fund (CCD District)
$4,500 per stall
Plat Subdivisions:
Preliminary Plat
$300 + escrow (per chart)
Final Plat
$50 + escrow (per chart)
Sketch Plat
$50 + $1000 escrow
Planned Unit Developments (PUDs):
Concept: $200 +,...,._,.-- (per eha-" $2,000 escrow
Development: $200 + escrow (per chart)
Final: $50 + escrow (per chart)
Adjustment $50+$1,OOOescrow
Public ROW or Easement Vacation
$200 + Escrow (per chart)
Rezoning Request:
$200 + Escrow (per chart)
Simple Subdivision/Administrative Lot Combination/
Lot Line Adjustment $200 + Escrow (per chart)
Wetland Delineation Review $50 application fee/$500 escrow
Special Home Occupation Permits: $200 + Escrow (per chart)
Special Planning Commission Meeting $350
Temporary Use Permit (waived for parades only) $50
Variance:
Single Family - Application Fee $200
- Deposit $500
All Other Applications - Application Fee $200
- Deposit $1,000
NOTE: When multiple land use applications are run concurrently, only one application fee and escrow deposit
shall be required per meeting cycle, until escrow is depleted. New escrow required per escrow chart once depleted.
ENGINEERING
Driveway Permit
GPS Locate Fee (New subdivisions)
Grading Permit:
Existing Single -Family Residential
New Single -Family Residential Development,
Multi -Dwelling, Commercial & Industrial Properties
Erosion and Sediment Control Inspection Escrow
$30 $35
$60/unit $65/unit
$75 per permit + $1,500/acre restoration surety bond.
No drainage calculation review required:
$150 per permit plus restoration surety bond of $3000/per acre;
$3,000 minimum escrow
Drainage calculation review required:
$350 per permit plus restoration surety bond of $3000/first acre;
$1500 each additional acre.
$300 @ X weeks of construction - sites disturbing 1 acre or more
w/NPDES construction stormwater permit
Monticello Fee Schedule - 2018
5
Land Reclamation/Mining Permit (requires Fee determined by City Council resolution + 100%
subdivision development agreement or CUP) of land restoration costs as determined by City Engineer
Public Improvement Security Letter of credit or cash based on statement of construction cost of
improvements x 125%
Right -of -Way Permits
Drops - no drawing required unless origination occurs
more than 10 feet from property to be served:
Fee without drawings
$30/25 addresses (maximum)
Fee with drawings
$30/5 addresses with drawings (maximum)
Permit Extension Fee:
$20.00
Pavement Hole Fee:
$55
Trunk Line Fee:
Base Fee (first 100 feet)
$45
Trenching (over 100 feet)
$.10/lineal foot
Boring (over 100 feet)
$.05/lineal foot
Obstruction Fee:
$45
Small Cell Wireless Fee
$45
Collocation Fees
Escrow - document Review
$1,500
Wireless Support Structure Rent
$150/year
Wireless Support Structure Maintenance
$25/year
*Fee to cover actual electricity costs needed to operate the small wireless facility, unless purchased directly from utility.
FIRE DEPARTMENT
Controlled/Prescribed Burns:
Building
Prairie or Wildland, less than 20 acres
Prairie or Wildland, 20 acres or more
Emergency Response - Incident
Non-resident
False Alarm Policy* - First Time
Second Time
Third Time or More
* Per calendar year
Fire Lock Box Fee:
Home Fire Safety Inspections (i.e. daycare/foster care)
JLICENSES/PERMITS
$2,500
$750/hour
$1,000/hour
$500 plus reimbursable expenses at cost
No charge
$250
$350
Cost+ 10%+ sales tax
$50
Burning Permit: $250 deposit
(to cover expenses, if PW/Fire Dept. are called to burn site)
Cigarette License:
Gambling License:
Liquor Administrative Fines:
First violation
Second violation, within 2 years
Third violation, within 2 years
Liquor Licenses:
1 -Day Consumption & Display
3.2 Beer, On -Sale
3.2 Beer, Off -Sale
Brew Pub Off -Sale
Brewer Taproom
Taproom, Sunday Sales
Liquor, On -Sale
On -Sale Liquor, Sunday Sales
Liquor, Setups
Monticello Fee Schedule - 2018
Tobacco licenses are issued by Wright County
Licensed through State of Minnesota; Requires Council approval
$500
$1,000
$2,000 (no mandatory revocation of license)
$25
$275/year
$100/per year
$200/per year
$500/per year
$0
$3,750/per year
$200 (Statutory limit)
$250/year
Liquor, Club (Veteran's Org).
Membership
200 or less
201-500
501-1000
1001-2000
2001-4000
Over 4000
Micro distillery
Temporary On -Sale (Beer)
Wine, On -Sale
Wine/Strong Beer Comb. On -Sale
Wine/3.2 Beer Com. On -Sale
Mobile Food Unit
Temporary Permit
Annual Permit
Pawn Shop:
Annual license, initial
Annual renewal of current license
Transaction fee
Peddler/Solicitor Permit:
Peddler Merchant/Business Application
Peddler Merchant Permit - per person
Special Event Permit
Therapeutic Massage License
Massage Enterprise License
Massage Therapist License
Massage Enterprise/Therapist - owner operates as
therapist - one fee
Background Investigation Fee
Transient Merchant:
Annual permit, private premise
Daily Fees, operating under annual permit
Daily fees, independent merchant
Daily fees, farm/garden fruits & vegetables
Fireworks Sale
Traveling Shows
IMISCELLANEOUS ITEMS
Assessment/Property Search - full
Property Bill Search - limited
Business List
Brochures:
City resident list: (Ex. Utility Billing List)
City Labels
Comprehensive Guide Plan - Entire
Downtown Revitalization Plan
Transportation Plan
Copies: copy machine
Engineering copier
Emailed
Electronic media
$300 (Statutory limit)
$500 (Statutory limit)
$650 (Statutory limit)
$800 (Statutory limit)
$1,000 (Statutory limit)
$2,000 (Statutory limit)
$500/per year
$10/day
$275/per year
$1,200/per year
$500/per year
$10
$50
$50
$25/yr
$1.00 per transaction
$25
$25
$50
$25 (For non-profit/charitable organization)
(fee may be waived by Administration for non-profit organizations not
utilizing City services)
$100/per year
$50/per year
$100/per year
$25
$75/year
$10/day (with annual permit)
$50/day
No fee from 6/15 to 9/15 (state mandated)
$350/year
$100/fust day; $50/day for each day thereafter
$30
Free
Free
Free
$0.25/page + sales tax
$.50/sheet + sales tax
$32 plus tax
$15 plus tax
$50 plus tax
$.25 per copy + sales tax
$.50/square foot + sales tax ($2 minimum)
$35.00/hour + sales tax (minimum 1/4 hour)
$10.00 + cost of media + sales tax
Monticello Fee Schedule - 2018
7
Delinquent Certification Processing Fee:
$75 per parcel
Minimum Account Balance of $50 $75
Processed once a year
Delinquent List
$10 + tax (each)
Deposits on City Repair Projects
$100-$300 (depending on est. value of work)
Library Room Rental
$30 per rental
Maps: City map (24" X 36")
$3 + sales tax
City map (11" X 17")
$1 + sales tax
Zoning map (24" X 36")
$3 + sales tax
State maps
$.55 + sales tax
Wright County maps
$3 + sales tax
Notary:
$3 each
Signs:
Current listed price + 10% handling charge + tax
Commercial, non-city initiated proclamations
$50
City Ofdinaaees:
Zoning Brdinanee
City Code
Sanitary Suver
AssessmentPahey
City Maps
Meeting AgendasAfinutes
PARKS
Memorials:
Bench
$1,500 (includes tax, delivery, installation)
Tree
$300 (includes tax, delivery, installation)
Facility Rental Fees:
Baseball/Softball Field Rental* (no lights)
Residents
$25 per hour per field
Non-resident
$35 per hour per field
Field Lighting*
Residents
$15 per hour per field
Non-resident
$20 per hour per field
*these fees are for individuaWgroups to use the city facility for practice or an informal game.
Tournament Field Rental (includes lights as needed)
up to 3 days
$90 per field
extended days
$10 per field for each additional day
Park Rental Rates:
Resident Non-Resident
Ellison Gazebo
$110 $135
Ellison Log Shelter
$110 for 6 hrs $135 for 6 hrs
West Bridge Park Shelter/Warming House
$110 for 6 hrs $135 for 6 hrs
West Bridge Picnic Shelter
$110 for 6 hrs $135 for 6 hrs
Pioneer Park
$110 for 6 hrs $135 for 6 hrs
Groveland Park Picnic Shelter
$110 for 6 hrs $135 for 6 hrs
Otter Creek
$55 for 6 his $80 for 6 hrs
East Bridge Wedding Gazebo
$110 for 6 hrs $135 for 6 hrs
Lions Den/Gazebo
$300
Monticello Fee Schedule - 2018
8
PUBLIC WORKS
Disease Replacement Tree $50 per property
Chipping: $M $60 + tax per 1/2 hour or part thereof for the first 2 hours
S85 $90 + tax per 1/2 hour or part thereof for the next hour
No more than 3 hours per year per property
Cone Replacement: Cost + $10 + sales tax
Construction Inspection (City or Engineer) $110/ our— $115/hour
Labor (no equipment): $65.00/hour - regular business hours
Rate will be increased if response required outside of regular hours
Rodding is no longer in service
$415g1;,:µ c:-puA tleree€€er- e cNmt✓&� piekup
Sidewalk Snow & Ice Control $50.00 per lot - 1st Offence
$75.00 per lot - 2nd Offence
$100.00 per lot - maximum after 2nd Offence
$100.00 Mobilization Charge per Offence at Staff Discretion
Sweeping:
Utility Excavation Permit Fee (water, wastewater, stormwater)
(Bonding and Insurance required)
Vac/Sewer Jet:
Other Equipment (including operator):
Large Front End Loaders
Mid Size Loaders
Backhoe Loader
Motor Grader
Skid Steere
Dump Truck
Pickup or 1 -ton Truck
(SANITARY SEWER
Sewer Rates: 1st 1,000 gallons
Over 1,000 gallons
Sewer Rates: Special Cases
Industrial Sewer Rates: All Usage (effective July 1, 2018)
BODS:
TSS:
Testing
Sewer Discharge Environmental Fee (all sewer customers):
Sewer and Water Combination Permit:
Sewer Access Charge:
Residential - Single Family
All others per unit equivalent
Trunk Sanitary Sewer:
Residential Unit
Non -Residential
Meadow Oaks Lift Station Trunk Area Charge
Waste Water Discharge Permit:
10,000 to 15,000 GPD
15,001 to 25,000 GPD
25,001 to 50,000 GPD
50,001 to 100,000 GPD
over 100,000 GPD
5130 $135/hour-includes operator
$105
S290/heur f _ efie ,._,._ tef- n- ......., ine Two operators are required
$350 $365/hour for two operators & machine
$155/hour
$105/hour
$155/hour
$155/hour
$105/hour
$105/hour
$65Hhour $95/hour
$8.75 minimum $9 minimum (2.86% increase)
$5.6311,0000 gallons $5.77/1,000 gallons (2.49%)
$10 per month X number of people in household
$3397 $3.485/1,000 gallons + sales tax (2.59% increase)
$0.366 $0.376/lb. + sales tax (2.73% increase)
$0.504 $0.517/lb. + sales tax (2.58% increase)
Actual costs + 10%
2% of sewer bill
$127 (residential) $130 (residential)
$ 27 plus tax (commercial) $130 plus tax (commercial)
$4�� X90/u nit $4,315/unit
$4,'� 190/unit $4,315/unit
$1,431/unit $1,488/unit (4% increase)
$3� 587/aeri $3,730/acre (4% increase)
$2,754/acre
$50 annually
$100 annually
$150 annually
$250 annually
$300 annually
Monticello Fee Schedule - 2018
9
(STORM SEWER
Trunk Storm Sewer Fees:
Alternate Ponding Area - Residential
Alternate Ponding Area - Commercial
Alternate Ponding Area - Industrial
I WASTE ITEMS
Garbage Service Fees
All residential garbage with cart service
1st Container
2nd Container
Cart Transfer Fee
Garbage Cart Replacement (if lost or stolen):
38 gallon
60 gallon
90 gallon
Recycle Cart Replacement (if lost or stolen):
35 gallon
64 gallon
90 gallon
Recycle
Additional cart pickup
Storage Bins (red, yellow, blue)
I WATER
Hydrant Rates for Contractors:
(#1, #2 and #3 ARE ALL TAXABLE IF COMMERCIAL)
$3,832 (net sere) $3,985 (net acre) (4% increase)
$3,926 per acYe $4,083 per acre (4% increase)
$7,871 per aere $8,185 per acre (4% increase)
$9,197 per acre $9,564 per acre (4% increase)
$3 $7 + 9.75% tax per month
$13 + 9.75% tax per month
$30
Cost + Tax + $10.00
Cost + Tax + $10.00
Cost + Tax + $10.00
Cost + Tax + $10.00
Cost + Tax + $10.00
Cost + Tax + $10.00
$0.00
$10 includes sales tax (until sold out)
1. All contractors must obtain a permit from the Water Superintendent. The permit fee is $500.
This permit will define the hydrant to be used and provides a tally sheet for water usage.
2. The following rates shall apply:
Up to 3,000 gallons
$35 minimum. $40 minimum
Over 3,000 gallons
$3 97f 000 gaHens $4.09/1,000 gallons
3. The following deposits shall be taken for use of City
equipment (no exceptions):
Hydrant Wrench
$50$100
2-1/2" fill hose
$100 $150
1-1/2" fill hose with 2-1/2" adapter
$100 $150
2-1/2" hydrant meter
$1000 $1,500
3/4" and small meter
$100 $250
Nozzle
S-50$75
*If equipment is returned within 10 days of permit
expiration in good condition, the full amount for --moo, ..ate use use of meter deposit less 10% per month
and equipment, less °
, shall be refunded less water consumption at rates shown above.
Industrial Water Rate, Mtr 1 (effective July 1, 2018)
All usage
$2.050 $2.110/1,000 gallons + sales tax (2.93% increase)
Irrigation Water Rate - Resid, Twnhms & Comm:
first 1,000 gallons
$6.950 $7.10 minimum + sales tax (2.16% increase)
1,001-10,000 gallons
$1700 $1.74/1,000 gallons + sales tax (2.35% increase)
10,001-33,000 gallons
$1.970 $2.02/1,000 gallons + sales tax (2.54% increase)
over 33,000 gallons
$2:150 $2.21/1,000 gallons + sales tax (2.79% increase)
(if metered separately, no quarterly minimum base rate is applied to irrigation meters with zero usage)
Final Bill Processing Fee
$20
Manual meter reading (per month for customers
refusing radio reading equipment)
$20
Delinquent sprinkling meter turn-off
$25
Delinquent sprinkling meter turn -on
$25
Monticello Fee Schedule - 2018
10
Res/Comm Water: 0-1,000 gallons
first 1,000 gallons
1,001-10,000 gallons
10,001-33,000 gallons
over 33,000 gallons
Minimum Bill for Malfunctioning Meter
Trunk Water Charge:
Little Mountain Booster Station Trunk Area Charge
Water Access Charge: 1" line
1-1/4" line
1-1/2" line
2" line
3" line
4" line
6" line
8" line
Water Availability Charge:
(For those who have city water available but
choose not to hook up)
Water Meters: 5/8" meter
3/4" meter
1" meter
1 1/2" meter
2" meter + up
1 "x3/4" meter valves
1"x1" meter valves
Water meter replacement due to preventable damage
Water Shut Off, then Turned On:
Water Violations (sprinkling):
1st Violation
2nd Violation
Each Subsequent Violation
Accounts Receivable
Interest Charge on Miscellaneous Account Receivable
Utility Bill
Utility Bill Penalty - Monthly
Utility - Ebill Discount
Utility - ACH Payment Discount
$6950 $7.10 minimum + sales tax (2.16% increase)
$1.700 $1.74/1,000 gallons + sales tax (2.35% increase)
$1.970 $2.02/1,000 gallons + sales tax (2.54% increase)
$2.150 $2.21/1,000 gallons + sales tax (2.79% increase)
$150 after 3rd contact attempt.
$ ^"'-eside tial unit $1,103/acre residential (4% increase)
$2,652/aer-e non residential $2,758/acre non-residential (4% increase)
$2,329/acre
$833 + materials
$1,266 + materials
$1,518 + materials
$1,997 + materials
$2,498 + materials
$3,291 + materials
$4,143 + materials
$5,440 + materials
$40.25$41
(billed in July)
Service no longer offered
$355 + sales tax
$390 + sales tax
$490 + sales tax
$790 + sales tax
Cost + $50 + sales tax
$55 + sales tax
$60 + sales tax
Cost + Labor (1 hour minimum)
$50.00 ($25 on/$25off) + delinquency (taxable if non -res.)
No Fee
$50
$100/per violation
1.5% monthly
° 5% of past due amount, except September penalty 0%
$0.50
$1.00
Monticello Fee Schedule - 2018
11