Loading...
City Council Ordinance 704ORDINANCE NO. 704 CITY OF MONTICELLO WRIGHT COUNTY, MINNESOTA AN ORDINANCE ADOPTING AMENDMENTS TO THE FEE SCHEDULE FOR 2019 TITLE 20 OF THE MONTICELLO CITY ORDINANCE THE CITY COUNCIL OF THE CITY OF MONTICELLO HEREBY ORDAINS. Section 1. Title 20 — Fee Schedule shall be amended as shown in the 2019 Fee Schedule in Attachment "A." Section 2. The City Clerk is hereby directed to make the changes required by this Ordinance as part of the Official Monticello City Code, Title 20 — Fee Schedule, and to renumber the tables and chapters accordingly as necessary to provide the intended effect of this Ordinance. The City Clerk is further directed to make necessary corrections to any internal citations that result from said renumbering process, provided that such changes retain the purpose and intent of the Monticello City Code as has been adopted. Section 3. This Ordinance shall take effect and be in full force from and after its passage and publication. The ordinance in its entirety shall be posted on the City website after publication. Copies of the complete Ordinance are available online and at Monticello City Hall for examination upon request. ADOPTED BY the Monticello City Council this 10`" day of December, 2018. CITY OF MONTICELLO Brian Stumpf, Mayor ATTEST: Jeff N City Administrator VOTING IN FAVOR: Davidson, Fair, Gabler, Hilgart, and Stumpf VOTING IN OPPOSITION: None ,,, iro- . L _'. -11 1 1 0 1 TITLE 20 - CHAPTER 1 DRAFT 2019 FEE SCHEDULE - CITY OF MONTICELLO Fee Schedule Rates supersede amounts shown in city ordinances or policies which are dated prior to the fee schedule. ANIMAL CONTROL Boarding Fee: Boarding Access Fee Dog License: Late Fee Replacement Tag Euthanization/Disposal Fee Fine: Running at Large If impounded Permit for Keeping Fowl on Premises Annual renewal for current permit Permit for Keeping Honeybees on Premises Annual Renewal of Permit I CEMETERY Cremation Disinterment Flat Marker setting with 4" concrete border Frost Charge: (excavations December through March) Grave Excavation Fee: Weekday Weekend Infant Grave Excavation - Weekday Infant Grave Excavation - Weekend Cremation Grave Excavation - Weekday Cremation Grave Excavation - Weekend Grave Purchasing Fee: Full Grave (41x121) Flush Marker Area Full Grave (4'x12') Raised Marker Area Infant Grave (21x6') Cremation Grave (4'x4') Columbarium (includes 2 interment niche covers w/name, DOB, DOD) Bottom niche row (row E) - 2 remains max Middle niche rows (rows C & D) - 2 remains max Top niche row (row A) - 2 remains max Ossuary Co -mingle urn placement (includes inscription and urn bag) Veteran -co -mingle urn placement (includes inscription and urn bag) Service emblem Grave Staking Fee for burials: Staking for Monument/Marker Placement Grave Transfer Fee: Memorial Plaque (Bronze) Stone: Overtime Fee (burials outside of business hours) Plant Stand Opening and closing/Re-opening of Niche: Perpetual Care Fee: New Grave Sales Grave Sold Pre -1960 Plant stand Monticello Fee Schedule - 2018 $16/per day + tax $250 per entity $20 - 2 years $10 - 1 year $5 $2+ tax $40 per animal + tax $40 Licensed Unlicensed $50 $75 Add boarding fee (plus tax) $50 $25 $50 $25 $100 $4-75$250 $100 $400 $450 $100 $125 $80 $150 $405$200 Resident Non -Resident $1025 $1,050 $1225 $1,250 $1125 $1,150 $4325 $1,350 $330$340 $355$365 $560$575 8660$675 Resident Non -Resident $2,500 $2,600 $2,700 $2,800 $2,900 $3,000 $1,000 $950 $200 $4-35$150 $60 $15 Cost + $10 + sales tax $125 $40 (includes tax) $60 $150 Weekday $200 Weekend Included in grave price (Maintenance not taxable - Plant Care taxable) $100 $40 (includes tax) 1 COMMUNITY CENTER Membership Fees: (for new members) Daily Pass Junior/Senior Adult 3 Month Membership Junior/Senior Adult Dual Senior Family Dual Adult Annual Membership (Paid in full Options) Junior/Senior Adult Dual Senior Family Dual Adult Continuous Membership (Monthly Payment Option") Junior/Senior Adult Dual Senior Family Dual Adult -Automatic Withdrawal Administrative fee for start-up of new monthly memberships (one time fee) if membership is not cancelled Cancellation fee - applies if within 12 months of joining Childcare - option with Membership Resident Rate Regular Rate $5.75 $6 $6.75 $7 $6.75 $7 $7.75 $8 $83 $87 $101.00 $106 $116.50 $122 $141.75 $149 $136.50 $143 $167.00 $175 $204.75 $215 $231.00 $243 $M $195 $210 $221 $225.75 $237 $300 $315 $309 $324 $399 $419 $372.75 $391 $477.75 $502 $524 $550 $625 $656 $47-7 $501 $577.30 $606 Sn $23 $28 $29 3330 $35 $39 $41 $36.75 $39 $47.25 $50 $53.50 $56 $57.75 $61 $48.50 $51 $52.30 $55 $30 $30 $50 $50 ehila of: $32" -math $18/month for each child or €6f fafrA $36/month for family All current MCC members, including charter members, will see an increase of 5% on their membership fees Corporate Memberships (Quarterly Rate) JR/SR ADULT FAMILY Level $60 $80 $130 Level $55 $73 $120 Level $52 $69 $113 Special Passes: Resident Rate Regular Rate Group X Class Pass (10 uses) $90 $95 $10$116 Daily Pass (10 visits) $63 $66 $73:50 $77 Special Rates: Indoor Play Area $3.75 $4 $5 $5.25 Public Skate - Children 5-17 -- $4 Public Skate - Adult -- $5 Public Skate - Family $16 $18 Twilight Swim Rates - Junior/Adult -- $4.25 $4.50 Group Rates - Junior -- $5.25 $5.50 Group Rates - Adult -- $6.25 $6.50 Shower Only -- $3.75 $4 Group X Class Drop -In $12 $13 $15 $16 Silver Sneakers Drop -In -- $8 $8.50 Swimming Lessons/Birthday Parties Private Swimming Lessons Swimming Lessons (Group) Birthday Party Room Rental Packages Additional rates available for $30/Lesson for $40/Lesson for more than one student or 4 Members Nonmembers lesson packages $COT SAC for nii.....1.ers Members $58 for $48 for Members Nonmembers Resident Rate/Child Regular Rate/Child $11-$14 depending $12-$15 depending on package on package Monticello Fee Schedule - 2018 2 Gymnasium Rental Rates: $25 $50 Building Valuation $500,000 or more $1-0$150 Gym - prime time $60/hour $61/hr $64/hr $15 minimum charge for 15 minutes or less Gym - non prime time 106% of 1997 State recommended schedule $42/hr $44/hr use state -mandated fee Full Kitchen $5 $95.50/hr $100/hr $60/hour Energy Fee $15 minimum charge for 15 minutes or less $87/hr $91/hr $60 (per parcel) Early set up fee 106% of 1997 State recommended schedule $60/hr $63/hr verify with Public Works. Contractor must arrange disconnection: 1) Sanitary sewer; 2) City water & retrieve water mater; and 3) approve Damage Deposit Fire Alarm/Fire Sprinkler System 1/2 ofrental fees Master Plan Review: Pool Rental Mechanical Permits: Residential $100/hr $105/hr Commercial Hourly Room Rental Rates (2 hour minimum required): Resident Regular Non -Profit Boom Island Room SP $18 $19 $20 W $16 Bridge Room (full) SM $27 $30 $32 $$22 $23 N. or S. Bridge Room $16 $17 $48 $19 $13 $14 River Room $13 W $il Warehouse Room Weekday $29 $31 $35 $37 $22 $23 Prairie Center $31 $37 $23 Warehouse Room - Weekend $35 $37 W $45 $29 $31 Mississippi Room: Private Resident Private Regular Business Resident Half Room Rental $55 $58 %6 $70 W $45 Full Room Rental $77 $81 M $97 $64 $68 Rental event with alcohol (not weddings): Resident Rg Organization (2 hour minimum - reserve within 3 months of event) $160/hr $174/hr $147/hr Add Chapel Rental $436 for 6 hours $462 for 6 hours Then $50 each additional hour Hostess Fee: $25/hour Locker fees: $10 per month per locker (COMMUNITY DEVELOPMENT - BUILDING County Assessor Fees: Building Valuation $499,999 or less $25 $50 Building Valuation $500,000 or more $1-0$150 Building Inspection (non -permit related): $60/hour $15 minimum charge for 15 minutes or less Building Permit Fees: 106% of 1997 State recommended schedule Building Permit Surcharge: use state -mandated fee Contractor License Check Fee: $5 Building Permit/Records - Duplicate $60/hour $15 minimum charge for 15 minutes or less Blight Processing Fee $60 (per parcel) Demolition Permit: 106% of 1997 State recommended schedule Permit is issued under a building permit (follow same procedures as issuing a building permit). Prior to demolition permit issuance verify with Public Works. Contractor must arrange disconnection: 1) Sanitary sewer; 2) City water & retrieve water mater; and 3) approve routing for trucks and heavy equipment, (if applicable). Excavation permit may also be required. Fire Alarm/Fire Sprinkler System 106% of 1997 State Recommended Schedule Master Plan Review: 25% of building permit fee Mechanical Permits: Residential $45 $50 base + $9/fixture + state surcharge Commercial 1.251,16 1.5% of valuation + state surcharge Mobile Home Permit $180 Moving Buildings: $150 + expense + demolition permit Plan Review: 65% of building permit fee Plumbing Permits: Residential $45 $50 base + $9/fixture ("Fixture" includes such things as traps, toilets, floor drains, sinks, showers) Commmercial 1.251,16 1.5% of valuation + state surcharge Rental Housing License Fee: $45/per building + $15 for each dwelling unit within the building Rental Housing License Application/Late Fee: Double the standard license fee Rental Housing License Transfer Fee: $35 Business Regular $60 $63 $84 $89 Monticello Fee Schedule - 2018 3 Residential Building Escrow: $2,000 (Held for completion of as -built survey, boulevard trees, turf establishment. Secures street sweeping, lot erosion control & any damage to public improvements if all items not complete/satisfied at certificate of occupancy) Sign Permits: Permanent $50 for first $1,000 of value (minimum fee $50) $10 each additional $1,000 of value Sign Permits: Temporary $50 State Surcharge on Building Permits: Valuation of Structure Addition or Alteration Surcharee Computation $1,000,000 or less .0005 x valuation $1,000,000 to $2,000,000 $500 +.0004 x (Value - $1,000,000) $2,000,000 to $3,000,000 $900 +.0003 x (Value - $2,000,000) $3,000,000 to $4,000,000 $1200 +.0002 x (Value - $3,000,000) $4,000,000 to $5,000,000 $1400 + .0001 x (Value - $4,000,000) Greater than $5,000,000 $1500 +.00005 x (Value - $5,000,000) Surveys: $15 Utility Locate Fee: Residential $50 Commercial/Industrial $65 COMMUNITY DEVELOPMENT - ECONOMIC DEVELOPMENT Business Subsidy Application $200 GMEF Loan Application $500 minimum or 1.5% of loan amount, whichever is greater SCDP Loan Application $500 minimum or 1.5% of loan amount, whichever is greater TIF Application $10,000 Escrow Deposit COMMUNITY DEVELOPMENT - PLANNING/ZONING Administrative Home Occupation Permit $50 Community Garden Plot $30 Comprehensive Plan Amendment $200 + escrow (per chart) Conditional Use Permit $200 + Escrow (per chart) Escrow Chart - Land Use Application Plan Review Commercial 10-3 acres $2,000 1 unit 14-10 acres $6,000 2+ units 11+ acres $10000 $8,000 *reconciled to actual costs for staff/consulting time after decision 2% of estimated public improvement cost or $2,000 Escrow Chart - Development & Subdivision Project Planning Review & Administration minimum, whichever is greater 2% of estimated public improvement cost or $2,000 Review and Inspection Legal Review & Administration minimum, whichever is greater 2% of estimated public improvement cost or $2,000 City Review & Administration minimum, whichever is greater 3% of estimated public improvement cost or $2,000 Engineering Review & Inspection minimum, whichever is greater Grading, Streets & 4% of estimated public Utilities improvement cost or $2,000 minimum, whichever is greater Interim Use Permit: Labor (for Community Development/Projects): Planner Engineer Construction Inspector Iron Monuments $300/lot $200 + Escrow (per chart) $165/hour $170/hour $156/hour (maximum) $110/ hour $111/hour (maximum) $500 (single family) $1000 base + $100 per unit (up to $10,000) Monticello Fee Schedule - 2018 4 Landscaping Security Letter of credit or cash based on statement of value of landscaping x 125%. Park Dedication (residential) An amount of land equal to eleven percent (11 %) of the total gross land area of the plat shall be presumptively defined as "reasonably commensurate." In the event that the subdivider objects to the eleven percent (11 %) standard, the City shall, at the developer's request and expense, conduct a specific dedication study of the park system and the demand placed on the system by the proposed plat. Cash -in -Lieu: 11% of fair market value of the raw land to be platted at the time of final plat. The city may require an appraisal to determine market value of subject land being platted. Parking Fund (CCD District) $4,500 per stall Plat Subdivisions: Preliminary Plat $300 + escrow (per chart) Final Plat $50 + escrow (per chart) Sketch Plat $50 + $1000 escrow Planned Unit Developments (PUDs): Concept: $200 +,...,._,.-- (per eha-" $2,000 escrow Development: $200 + escrow (per chart) Final: $50 + escrow (per chart) Adjustment $50+$1,OOOescrow Public ROW or Easement Vacation $200 + Escrow (per chart) Rezoning Request: $200 + Escrow (per chart) Simple Subdivision/Administrative Lot Combination/ Lot Line Adjustment $200 + Escrow (per chart) Wetland Delineation Review $50 application fee/$500 escrow Special Home Occupation Permits: $200 + Escrow (per chart) Special Planning Commission Meeting $350 Temporary Use Permit (waived for parades only) $50 Variance: Single Family - Application Fee $200 - Deposit $500 All Other Applications - Application Fee $200 - Deposit $1,000 NOTE: When multiple land use applications are run concurrently, only one application fee and escrow deposit shall be required per meeting cycle, until escrow is depleted. New escrow required per escrow chart once depleted. ENGINEERING Driveway Permit GPS Locate Fee (New subdivisions) Grading Permit: Existing Single -Family Residential New Single -Family Residential Development, Multi -Dwelling, Commercial & Industrial Properties Erosion and Sediment Control Inspection Escrow $30 $35 $60/unit $65/unit $75 per permit + $1,500/acre restoration surety bond. No drainage calculation review required: $150 per permit plus restoration surety bond of $3000/per acre; $3,000 minimum escrow Drainage calculation review required: $350 per permit plus restoration surety bond of $3000/first acre; $1500 each additional acre. $300 @ X weeks of construction - sites disturbing 1 acre or more w/NPDES construction stormwater permit Monticello Fee Schedule - 2018 5 Land Reclamation/Mining Permit (requires Fee determined by City Council resolution + 100% subdivision development agreement or CUP) of land restoration costs as determined by City Engineer Public Improvement Security Letter of credit or cash based on statement of construction cost of improvements x 125% Right -of -Way Permits Drops - no drawing required unless origination occurs more than 10 feet from property to be served: Fee without drawings $30/25 addresses (maximum) Fee with drawings $30/5 addresses with drawings (maximum) Permit Extension Fee: $20.00 Pavement Hole Fee: $55 Trunk Line Fee: Base Fee (first 100 feet) $45 Trenching (over 100 feet) $.10/lineal foot Boring (over 100 feet) $.05/lineal foot Obstruction Fee: $45 Small Cell Wireless Fee $45 Collocation Fees Escrow - document Review $1,500 Wireless Support Structure Rent $150/year Wireless Support Structure Maintenance $25/year *Fee to cover actual electricity costs needed to operate the small wireless facility, unless purchased directly from utility. FIRE DEPARTMENT Controlled/Prescribed Burns: Building Prairie or Wildland, less than 20 acres Prairie or Wildland, 20 acres or more Emergency Response - Incident Non-resident False Alarm Policy* - First Time Second Time Third Time or More * Per calendar year Fire Lock Box Fee: Home Fire Safety Inspections (i.e. daycare/foster care) JLICENSES/PERMITS $2,500 $750/hour $1,000/hour $500 plus reimbursable expenses at cost No charge $250 $350 Cost+ 10%+ sales tax $50 Burning Permit: $250 deposit (to cover expenses, if PW/Fire Dept. are called to burn site) Cigarette License: Gambling License: Liquor Administrative Fines: First violation Second violation, within 2 years Third violation, within 2 years Liquor Licenses: 1 -Day Consumption & Display 3.2 Beer, On -Sale 3.2 Beer, Off -Sale Brew Pub Off -Sale Brewer Taproom Taproom, Sunday Sales Liquor, On -Sale On -Sale Liquor, Sunday Sales Liquor, Setups Monticello Fee Schedule - 2018 Tobacco licenses are issued by Wright County Licensed through State of Minnesota; Requires Council approval $500 $1,000 $2,000 (no mandatory revocation of license) $25 $275/year $100/per year $200/per year $500/per year $0 $3,750/per year $200 (Statutory limit) $250/year Liquor, Club (Veteran's Org). Membership 200 or less 201-500 501-1000 1001-2000 2001-4000 Over 4000 Micro distillery Temporary On -Sale (Beer) Wine, On -Sale Wine/Strong Beer Comb. On -Sale Wine/3.2 Beer Com. On -Sale Mobile Food Unit Temporary Permit Annual Permit Pawn Shop: Annual license, initial Annual renewal of current license Transaction fee Peddler/Solicitor Permit: Peddler Merchant/Business Application Peddler Merchant Permit - per person Special Event Permit Therapeutic Massage License Massage Enterprise License Massage Therapist License Massage Enterprise/Therapist - owner operates as therapist - one fee Background Investigation Fee Transient Merchant: Annual permit, private premise Daily Fees, operating under annual permit Daily fees, independent merchant Daily fees, farm/garden fruits & vegetables Fireworks Sale Traveling Shows IMISCELLANEOUS ITEMS Assessment/Property Search - full Property Bill Search - limited Business List Brochures: City resident list: (Ex. Utility Billing List) City Labels Comprehensive Guide Plan - Entire Downtown Revitalization Plan Transportation Plan Copies: copy machine Engineering copier Emailed Electronic media $300 (Statutory limit) $500 (Statutory limit) $650 (Statutory limit) $800 (Statutory limit) $1,000 (Statutory limit) $2,000 (Statutory limit) $500/per year $10/day $275/per year $1,200/per year $500/per year $10 $50 $50 $25/yr $1.00 per transaction $25 $25 $50 $25 (For non-profit/charitable organization) (fee may be waived by Administration for non-profit organizations not utilizing City services) $100/per year $50/per year $100/per year $25 $75/year $10/day (with annual permit) $50/day No fee from 6/15 to 9/15 (state mandated) $350/year $100/fust day; $50/day for each day thereafter $30 Free Free Free $0.25/page + sales tax $.50/sheet + sales tax $32 plus tax $15 plus tax $50 plus tax $.25 per copy + sales tax $.50/square foot + sales tax ($2 minimum) $35.00/hour + sales tax (minimum 1/4 hour) $10.00 + cost of media + sales tax Monticello Fee Schedule - 2018 7 Delinquent Certification Processing Fee: $75 per parcel Minimum Account Balance of $50 $75 Processed once a year Delinquent List $10 + tax (each) Deposits on City Repair Projects $100-$300 (depending on est. value of work) Library Room Rental $30 per rental Maps: City map (24" X 36") $3 + sales tax City map (11" X 17") $1 + sales tax Zoning map (24" X 36") $3 + sales tax State maps $.55 + sales tax Wright County maps $3 + sales tax Notary: $3 each Signs: Current listed price + 10% handling charge + tax Commercial, non-city initiated proclamations $50 City Ofdinaaees: Zoning Brdinanee City Code Sanitary Suver AssessmentPahey City Maps Meeting AgendasAfinutes PARKS Memorials: Bench $1,500 (includes tax, delivery, installation) Tree $300 (includes tax, delivery, installation) Facility Rental Fees: Baseball/Softball Field Rental* (no lights) Residents $25 per hour per field Non-resident $35 per hour per field Field Lighting* Residents $15 per hour per field Non-resident $20 per hour per field *these fees are for individuaWgroups to use the city facility for practice or an informal game. Tournament Field Rental (includes lights as needed) up to 3 days $90 per field extended days $10 per field for each additional day Park Rental Rates: Resident Non-Resident Ellison Gazebo $110 $135 Ellison Log Shelter $110 for 6 hrs $135 for 6 hrs West Bridge Park Shelter/Warming House $110 for 6 hrs $135 for 6 hrs West Bridge Picnic Shelter $110 for 6 hrs $135 for 6 hrs Pioneer Park $110 for 6 hrs $135 for 6 hrs Groveland Park Picnic Shelter $110 for 6 hrs $135 for 6 hrs Otter Creek $55 for 6 his $80 for 6 hrs East Bridge Wedding Gazebo $110 for 6 hrs $135 for 6 hrs Lions Den/Gazebo $300 Monticello Fee Schedule - 2018 8 PUBLIC WORKS Disease Replacement Tree $50 per property Chipping: $M $60 + tax per 1/2 hour or part thereof for the first 2 hours S85 $90 + tax per 1/2 hour or part thereof for the next hour No more than 3 hours per year per property Cone Replacement: Cost + $10 + sales tax Construction Inspection (City or Engineer) $110/ our— $115/hour Labor (no equipment): $65.00/hour - regular business hours Rate will be increased if response required outside of regular hours Rodding is no longer in service $415g1;,:µ c:-puA tleree€€er- e cNmt✓&� piekup Sidewalk Snow & Ice Control $50.00 per lot - 1st Offence $75.00 per lot - 2nd Offence $100.00 per lot - maximum after 2nd Offence $100.00 Mobilization Charge per Offence at Staff Discretion Sweeping: Utility Excavation Permit Fee (water, wastewater, stormwater) (Bonding and Insurance required) Vac/Sewer Jet: Other Equipment (including operator): Large Front End Loaders Mid Size Loaders Backhoe Loader Motor Grader Skid Steere Dump Truck Pickup or 1 -ton Truck (SANITARY SEWER Sewer Rates: 1st 1,000 gallons Over 1,000 gallons Sewer Rates: Special Cases Industrial Sewer Rates: All Usage (effective July 1, 2018) BODS: TSS: Testing Sewer Discharge Environmental Fee (all sewer customers): Sewer and Water Combination Permit: Sewer Access Charge: Residential - Single Family All others per unit equivalent Trunk Sanitary Sewer: Residential Unit Non -Residential Meadow Oaks Lift Station Trunk Area Charge Waste Water Discharge Permit: 10,000 to 15,000 GPD 15,001 to 25,000 GPD 25,001 to 50,000 GPD 50,001 to 100,000 GPD over 100,000 GPD 5130 $135/hour-includes operator $105 S290/heur f _ efie ,._,._ tef- n- ......., ine Two operators are required $350 $365/hour for two operators & machine $155/hour $105/hour $155/hour $155/hour $105/hour $105/hour $65Hhour $95/hour $8.75 minimum $9 minimum (2.86% increase) $5.6311,0000 gallons $5.77/1,000 gallons (2.49%) $10 per month X number of people in household $3397 $3.485/1,000 gallons + sales tax (2.59% increase) $0.366 $0.376/lb. + sales tax (2.73% increase) $0.504 $0.517/lb. + sales tax (2.58% increase) Actual costs + 10% 2% of sewer bill $127 (residential) $130 (residential) $ 27 plus tax (commercial) $130 plus tax (commercial) $4�� X90/u nit $4,315/unit $4,'� 190/unit $4,315/unit $1,431/unit $1,488/unit (4% increase) $3� 587/aeri $3,730/acre (4% increase) $2,754/acre $50 annually $100 annually $150 annually $250 annually $300 annually Monticello Fee Schedule - 2018 9 (STORM SEWER Trunk Storm Sewer Fees: Alternate Ponding Area - Residential Alternate Ponding Area - Commercial Alternate Ponding Area - Industrial I WASTE ITEMS Garbage Service Fees All residential garbage with cart service 1st Container 2nd Container Cart Transfer Fee Garbage Cart Replacement (if lost or stolen): 38 gallon 60 gallon 90 gallon Recycle Cart Replacement (if lost or stolen): 35 gallon 64 gallon 90 gallon Recycle Additional cart pickup Storage Bins (red, yellow, blue) I WATER Hydrant Rates for Contractors: (#1, #2 and #3 ARE ALL TAXABLE IF COMMERCIAL) $3,832 (net sere) $3,985 (net acre) (4% increase) $3,926 per acYe $4,083 per acre (4% increase) $7,871 per aere $8,185 per acre (4% increase) $9,197 per acre $9,564 per acre (4% increase) $3 $7 + 9.75% tax per month $13 + 9.75% tax per month $30 Cost + Tax + $10.00 Cost + Tax + $10.00 Cost + Tax + $10.00 Cost + Tax + $10.00 Cost + Tax + $10.00 Cost + Tax + $10.00 $0.00 $10 includes sales tax (until sold out) 1. All contractors must obtain a permit from the Water Superintendent. The permit fee is $500. This permit will define the hydrant to be used and provides a tally sheet for water usage. 2. The following rates shall apply: Up to 3,000 gallons $35 minimum. $40 minimum Over 3,000 gallons $3 97f 000 gaHens $4.09/1,000 gallons 3. The following deposits shall be taken for use of City equipment (no exceptions): Hydrant Wrench $50$100 2-1/2" fill hose $100 $150 1-1/2" fill hose with 2-1/2" adapter $100 $150 2-1/2" hydrant meter $1000 $1,500 3/4" and small meter $100 $250 Nozzle S-50$75 *If equipment is returned within 10 days of permit expiration in good condition, the full amount for --moo, ..ate use use of meter deposit less 10% per month and equipment, less ° , shall be refunded less water consumption at rates shown above. Industrial Water Rate, Mtr 1 (effective July 1, 2018) All usage $2.050 $2.110/1,000 gallons + sales tax (2.93% increase) Irrigation Water Rate - Resid, Twnhms & Comm: first 1,000 gallons $6.950 $7.10 minimum + sales tax (2.16% increase) 1,001-10,000 gallons $1700 $1.74/1,000 gallons + sales tax (2.35% increase) 10,001-33,000 gallons $1.970 $2.02/1,000 gallons + sales tax (2.54% increase) over 33,000 gallons $2:150 $2.21/1,000 gallons + sales tax (2.79% increase) (if metered separately, no quarterly minimum base rate is applied to irrigation meters with zero usage) Final Bill Processing Fee $20 Manual meter reading (per month for customers refusing radio reading equipment) $20 Delinquent sprinkling meter turn-off $25 Delinquent sprinkling meter turn -on $25 Monticello Fee Schedule - 2018 10 Res/Comm Water: 0-1,000 gallons first 1,000 gallons 1,001-10,000 gallons 10,001-33,000 gallons over 33,000 gallons Minimum Bill for Malfunctioning Meter Trunk Water Charge: Little Mountain Booster Station Trunk Area Charge Water Access Charge: 1" line 1-1/4" line 1-1/2" line 2" line 3" line 4" line 6" line 8" line Water Availability Charge: (For those who have city water available but choose not to hook up) Water Meters: 5/8" meter 3/4" meter 1" meter 1 1/2" meter 2" meter + up 1 "x3/4" meter valves 1"x1" meter valves Water meter replacement due to preventable damage Water Shut Off, then Turned On: Water Violations (sprinkling): 1st Violation 2nd Violation Each Subsequent Violation Accounts Receivable Interest Charge on Miscellaneous Account Receivable Utility Bill Utility Bill Penalty - Monthly Utility - Ebill Discount Utility - ACH Payment Discount $6950 $7.10 minimum + sales tax (2.16% increase) $1.700 $1.74/1,000 gallons + sales tax (2.35% increase) $1.970 $2.02/1,000 gallons + sales tax (2.54% increase) $2.150 $2.21/1,000 gallons + sales tax (2.79% increase) $150 after 3rd contact attempt. $ ^"'-eside tial unit $1,103/acre residential (4% increase) $2,652/aer-e non residential $2,758/acre non-residential (4% increase) $2,329/acre $833 + materials $1,266 + materials $1,518 + materials $1,997 + materials $2,498 + materials $3,291 + materials $4,143 + materials $5,440 + materials $40.25$41 (billed in July) Service no longer offered $355 + sales tax $390 + sales tax $490 + sales tax $790 + sales tax Cost + $50 + sales tax $55 + sales tax $60 + sales tax Cost + Labor (1 hour minimum) $50.00 ($25 on/$25off) + delinquency (taxable if non -res.) No Fee $50 $100/per violation 1.5% monthly ° 5% of past due amount, except September penalty 0% $0.50 $1.00 Monticello Fee Schedule - 2018 11