Loading...
Planning Commission Resolution 2020-007CITY OF MONTICELLO WRIGHT COUNTY, MINNESOTA PLANNING COMMISSION RESOLUTION NO. PC -2020-007 RECOMMENDING APPROVAL OF A REZONING TO "UMC PUD, PLANNED UNIT DEVELOPMENT" AND DEVELOPMENT & FINAL STAGE PLANNED UNIT DEVELOPMENT FOR UMC PUD, LOTS 1 & 2, BLOCK 1, MONTICELLO BUSINESS CENTER 61h ADDITION WHEREAS, the applicant owns property along Chelsea Road in the City of Monticello, described as Lots 1 & 2, Block 1, Monticello Business Center 6 1 Addition; and WHEREAS, the applicant has submitted a request to rezone its property to PUD, retain the two separate parcels, and develop the property as a common industrial project; and WHEREAS, the site is guided for industrial uses under the label "Places to Work" in the City's Comprehensive Plan; and WHEREAS, the proposed PUD is consistent with the long-term use and development of the property for industrial uses; and WHEREAS, the PUD is designed to accommodate the expansion of an existing industrial use that will share building and site development improvements across a common boundary; and WHEREAS, the Planning Commission held a public hearing on February 4, 2020 on the application and the applicant and members of the public were provided the opportunity to present information to the Planning Commission; and WHEREAS, the Planning Commission has considered all of the comments and the staff report, which are incorporated by reference into the resolution; and WHEREAS, the Planning Commission of the City of Monticello makes the following Findings of Fact in relation to the recommendation of approval: 1. The PUD provides an appropriate means of furthering the intent of the Comprehensive Plan for the site by putting the existing and proposed buildings to industrial use. 2. The proposed improvements on the site under the Development Stage PUD are consistent with the needs of the PUD in this location as an industrial area. 3. The improvements will have expected impacts on public services, including sewer, water, stormwater treatment, and traffic which have been planned to serve the property for the development as proposed. CITY OF MONTICELLO WRIGHT COUNTY, MINNESOTA PLANNING COMMISSION RESOLUTION NO. PC -2020-007 4.. The PUD flexibility for the project, including parcels without public street frontage, are consistent with the intent of the City's economic development objectives, as well as with the intent of the PUD zoning regulations. NOW, THEREFORE, BE IT RESOLVED, by the Planning Commission of the City of Monticello, Minnesota, that the Planning Commission hereby recommends that the Monticello City Council approves the Rezoning and Development and Final Stage PUD, subject to the conditions listed in Exhibit Z as follows: 1. Removal of the connection between the two buildings (to allow the conveyance of one of the two buildings to a send party) shall be subject to PUD amendment processing. 2. The proposed building height (50 feet) is deemed acceptable by City Officials. Access -related issues shall be subject to comment and recommendation by the City Engineer. 4. Cross access easements shall be established to accommodate shared parking and access between Lots 1 and 2. The applicant shall demonstrate compliance with the City's landscaping requirements related to the following: • Minimum caliper inch requirements. • Perimeter planting qualities. • Perimeter vehicle use area planting quantities. • Compliance with perimeter buffer standards on the south portion of the site. 6. The applicant shall provide details related to waste storage and removal activities. 7. All signs erected upon the subject site shall be subject to sign permit. The city makes specific findings that the proposed additional flagpole height of 160 feet, or other height agreed to, is supportable under the terms of the PUD. If approved, the flagpole improvement is subject to the following: a. Internal halyard system b. Compliance with city ordinance for lighting c. Submission of adequate documentation by a structural engineer, including fall/collapse design 2 CITY OF MONTICELLO WRIGHT COUNTY, MINNESOTA PLANNING COMMISSION RESOLUTION NO. PC -2020-007 d. Location as shown on the sign plan 9. The City Engineer provide comment and recommendation related to grading, drainage and utilities. 10. Compliance with the recommendations of the City Engineer's report dated January 20th, 2020. 11. Future phases of expansion within the PUD are subject to an amendment to PUD. 12. The developer shall enter into a PUD Development Agreement. 13. The property owner(s) shall petition for vacation of drainage and utility easement within impacted area. 14. Comments and recommendations of other City Staff and Planning Commission. ADOPTED this 4th day of February, 2020, by the Planning Commission of the City of Monticello, Minnesota. MONTICELLO PLANNING COMMISSION By A�*VAIA— IkA Zimpfe , Acting Chair ATTEST: �Akg I OP it Angela Schu ommunity Development Director