03-9-76 Minutes• STREETS & PARKS COMMITTEE MEETING _,. 7:3o P. M. 3/9/76 Present: Arve Grimsmo, Dale Lungwitz, Harvey Kendall., Milton Olson. Absent: Robert Rierson Also present were Howard Dahlgren, Mike Gair and Jean Burman of Howard Dahlgren and Associates. Preliminary Park Plans. Preliminary site plans were presented by Mike Gair, which included the following parks: 1. Bridge Park - East & West. 2. Ellison Park. 3. 4th St. Park. Also included in the presentation was a dimensional site plan and tree planting plan for the 4th St. park. Preliminary cost estimates for some of the park im- provements were presented. Motion by A. Grimsmo, seconded by H. Kendall, to accept preliminary park plans as presented with slight alter- ation of roadway system in the west bridge park. Concensus of commission was to proceed with pre- paration of final park proposals with detailed cost estimates of proposed improvements. Final plans will be presented to the commission on March 24 at 5:.00 P. M. A priority system for development of each park will be discussed when total cost estimates are available Jean Burman, park planner with H. Dahlgren & Assoc. has been in contact with Wright County Park Adm., Tom Johnson, in regard to future development of Montissippi Park in Monticello. Mr. Johnson has been working on a five year expenditure program for county park improvements and would like to meet with the Monticello Park Commission to discuss future development of Montissippi Park. Mr. Koenig, county engineer, will also be asked to attend the March 24 meeting to update the county's position on develop- ment of the county park road. Streets & Parks Committee March 9, 1976 Page 2 Discussion was held on the possibility of building a walkway between bridge parks and the river islands. Jean Burman will be checking with the Dept. of Natural Resources on possible state funding of such a project. Meeting adjourned. Rick Wolfst ler Adm. Asst. RW~lg • • PRELIMINARY COSTS Bridge Park West Area Parking Access and Road Surfacing Tot Lot Equipment, Earthwork, and Sand Base East Area Parking, Road and Earthwork River St. Parking and Concrete Curb Ellison Park Parking Surfacing and Earthwork Tot Lot Equipment, Earthwork, and Sand Base 4th Street Park Parking Lot Surfacing and Concrete Curbs Planting Tot Lot Wood Curbing Tot Lot Equipment, Earthwork, Sand Back Stop Spectator's Benches Player's Benches Grading $9,274.00 2,896.00 6,977.00 2,625.00 5,260.00 4,600.00 4,340.00 310.00 1,246.00 2 ,440.00 1,000.00 240.00 160.00 2,430.00 Costs listed are approximate and are based on estimates solicited from Metropolitan based companies and/or 1976 playground and park equipment catalog price lists. Estimates are not intended to be complete at this time; nor do they account for installation costs. It is assumed that the City will perform construction tasks and therefore these drawings are not completed construction bid documents. ail Pl4yariNwG~ ~~,~••P. ~'s t.F -wood C,ahrY.P, a w~ "~- ~ yam` ST. ,~~ ems- y _s_ ~~/~ : a o ~x 3a/