Loading...
City Council Resolution 2009-59CITY OF MONTICELLO WRIGHT COUNTY, MINNESOTA RESOLUTION NO. 2009-59 RESOLUTION ORDERING PREPARATION OF FEASIBILITY REPORT FOR CITY PROJECT NO. 100001 2010 STREET RECONSTRUCTION PROJECT WHEREAS, it is proposed to improve area 4A and a portion of area 6 as identified in the Overall Street Reconstruction Program including West River Street from Chestnut Street to Pine Street (TH 25); Front Street from Linn Street to Locust Street; Elm Street, Vine Street, Minnesota Street, and Maple Street from Broadway (CSAH 75) to West River Street; Linn Street and Locust Street from Broadway (CSAH 75) to Front Street; Walnut Street from Broadway (CSAH 75) to West River/Front Street; and Prairie Road from Nicholas Circle to Broadway (CSAH 75) by the reconstruction of streets including the construction, removal, and/or repair of pavement, curb and gutter, sanitary sewer, watermain, drainage and storm sewer improvements, sidewalk, and other necessary appurtenant work, and to assess the benefiting properties for all or a portion of the cost of the improvements, pursuant to Minnesota Statutes, Chapter 429; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF MONTICELLO, MINNESOTA: That the proposed improvement be referred to the City Engineer for study, with assistance from WSB and Associates, Inc., and that the City Engineer is instructed to report back to the Council with all convenient speed advising the Council in a preliminary way as to whether the proposed improvement is necessary, cost - effective, and feasible; whether it should best be made as proposed or in connection with some other improvement; the estimated cost of the improvement as recommended; and a description of the methodology used to calculate individual assessments for affected parcels. Adopted by the Monticello City Council this 120i day of October, 2009. (fez Clint Herbst, Mayor ATTEST: Jeff QO OyCity Administrator