Loading...
City Council Agenda Packet 02-10-2014AGENDA REGULAR MEETING – MONTICELLO CITY COUNCIL Monday, February 10, 2014 – 7 p.m. Mississippi Room, Monticello Community Center Mayor: Clint Herbst Council Members: Lloyd Hilgart, Tom Perrault, Glen Posusta, Brian Stumpf 1. Call to Order and Pledge of Allegiance 2A. Approval of Minutes – January 27, 2014 Special Meeting 2B. Approval of Minutes – January 27, 2014 Regular Meeting 3. Consideration of adding items to the agenda 4. Citizen comments, public service announcements, updates A. Citizen Comments: 1) Runnings Store Manager (Dennis Jensen) B. Public Service Announcements: 1) Winter Block Party/Friends of Bertram Snow Sculpture Contest (2/22) C. Updates: 1) WSB – Market Matching (John Uphoff) 5. Consent Agenda: A. Consideration of approving payment of bills for February 10th B. Consideration of approving new hires and departures for City departments C. Consideration of appointing a representative to the Monticello Planning Commission to fill a vacancy for a term to expire on 12/31/15 D. Consideration of adopting Resolution #2014-009 authorizing preparation of a feasibility study for completing public improvements for Hillside 3rd and 4th Additions (south of Monte Club Hill), City Project No. 12C008 E. Consideration of approving supplemental contribution of $100 to the Greater MN Regional Parks & Trails Coalition 6. Consideration of items removed from the consent agenda for discussion 7. Regular Agenda: A. Consideration of adopting Resolution #2014-008 approving a detour agreement with MnDOT for detouring traffic on Chelsea Road in conjunction with the I-94 reconstruction project 8. Added items 9. Adjournment City Council Special Meeting Minutes – January 27, 2014 Page 1 MINUTES SPECIAL MEETING – MONTICELLO CITY COUNCIL Monday, January 27, 2014 – 6:00 p.m. Mississippi Room, Monticello Community Center Present: Lloyd Hilgart, Tom Perrault, Glen Posusta, Acting Mayor Brian Stumpf Absent: Clint Herbst Others: Jeff O’Neill, Bret Weiss/Shibani Bisson/Tom Roushar (WSB), Chuck Keyes (Veolia Water), Lane Stewart (Automatic Systems) 1. Call to Order Acting Mayor Brian Stumpf called the special meeting to order at 6:02 p.m. 2. Purpose of Meeting: Discussion of Wastewater Treatment Facility Phosphorus Removal Facility Plan Amendment and project updates Shibani Bisson introduced this item and referenced the information on a handout provided to Council in advance.  Wastewater Treatment Facility Computer Upgrade Shibani Bisson explained that this item is on the council agenda for the regular meeting tonight and includes replacement of three computer workstations and upgrades to the SCADA control systems. The software updates will apply to the control software. Brian Stumpf asked if this includes training. Chuck Keyes explained that there should be some training on the changes to the software. Lane Stewart of Automatic Systems talked about the three components of the upgrade and how that will tie together the existing control system and new upgrades to the Wastewater Treatment Facility. Tom Perrault asked about the paragraph involving the computers and wondered if there might be some change orders. Lane explained that there would be no change orders; he was simply allowing flexibility to utilize the best technology available for their needs at the time of purchase. He also noted that one of the workstations is in their shop and they are holding off on repairs, contingent on approval of this agenda item. Tom Perrault also asked about some of the language in the terms and conditions regarding repairs and delivery. Chuck Keyes commented that they have never had an incident of the type referenced. Bret Weiss noted that these are typical terms and conditions and incorporate conditions that generally do not apply to a project of this scope.  Phosphorus Reduction Facility Plan Amendment City Council Special Meeting Minutes – January 27, 2014 Page 2 Shibani Bisson provided an update on this item. The Minnesota Pollution Control Agency (PCA) has new requirements for phosphorus reduction which was discussed previously at a council meeting. Council gave approval for city staff to review the new requirements in order to submit an amended facility plan to the PCA by March 1st, 2014. Tom Roushar of WSB provided information on reducing effluent phosphorus. He explained that there are two ways, biological or chemical, to reduce phosphorus and briefly talked about those processes. Glen Posusta asked why the city has to do this now after they have spent a lot of time and money updating the plant. Bret Weiss stated that this would not change anything that the city has already done. The state has never implemented a phosphorus limit previously. The work that the city is doing would have had to be done no matter when the city would have addressed the issue in order to maintain their NPDES permit. Bret Weiss noted that Roushar has been in contact with the manufacturer of the screwpress equipment to find the most efficient way of managing the phosphorus levels. Bret Weiss stated that they would eventually look at ways to fund the cost through user fees. There was some discussion about funding sources for future implementation costs. Tom Roushar talked about a loan through the public facilities state loan program which may be available at an interest rate about 1.5%. Glen Posusta stated that he wasn’t sure he would favor that choice in case the state would change their mind about the phosphorus reduction levels. Chuck Keyes explained that the city still has to comply with the NPDES permit requirements and those standards are not likely to change. Bret Weiss explained that the facility plan would be set up to be flexible enough to accommodate changes by the State.  Sludge Dewatering Facility Update Tom Roushar updated council on the sludge dewatering improvements including the screw press installation, which was made operational at the beginning of January. Huber, the company that did the installation, has been working with plant staff on making sure everything is working the way it was intended. There is some finishing and site work to be completed. Biosolids are now being hauled to a landfill rather than having to spread the sludge. Glen Posusta asked about creating a class A product. Bret Weiss explained that is the eventual goal but not sure that would necessarily be done at this plant as that would greatly increase the volume of biosolids output. Chuck Keyes noted that they recently received a letter from the Vonco II landfill site that they would not be able to accept product after a certain date. The city contacted them and will be able to utilize the landfill through the end of the contract (in April). Chuck Keyes is in the process of identifying a new site to accept the biosolids. Chuck Keyes reported that they are close to the biosolids output that they anticipated originally. Bret Weiss noted that both Big Lake and Buffalo have biosolids dryers and he is continuing to consider that as an option. However, at the time this was first discussed with those entities, the cost was prohibitive. City Council Special Meeting Minutes – January 27, 2014 Page 3  Aeration Blower Installation Update Tom Roushar summarized the process, which started in September 2013, when they took bids and awarded a contract. They have been working on the shop drawings which he anticipates to be finished before long. The aeration blower will then be constructed according to those drawings. The city will need to advertise for bids for installation of the aeration blower. He is looking at a timeline for completion in September 2014. Chuck Keyes explained that this will greatly enhance the processing of the biosolids once the new blower is installed.  Potential Phase 2 Improvements Bret Weiss commented that the phosphorus improvements plan will be brought to Council once the facility plan is put together. Lloyd Hilgart asked about costs for the phosphorus removal and to comment on other communities that are dealing with this. Tom Roushar feels the costs will be mainly for the biological or chemical products that will need to be purchased. He stated that it is about a 50/50 mix of biological and chemical solutions to achieve the proper phosphorus levels in communities that are addressing phosphorous levels. Bret Weiss asked how much they expect costs to increase in the coming years. Tom Roushar said they don’t expect any increases until 2018 when the new rules go into place. Glen Posusta asked about the odors near the Wastewater Treatment Facility and where they are coming from. Chuck Keyes explained that the odors are produced from the digester and there are some repairs that will be necessary in the future. 3. Adjournment GLEN POSUSTA MOVED TO ADJOURN THE SPECIAL MEETING AT 6:54 P.M. TOM PERRAULT SECONDED THE MOTION. MOTION CARRIED 4-0. Recorder: Catherine M. Shuman____ Approved: Attest: __________________________ City Administrator City Council Minutes – January 27, 2014 Page 1 MINUTES REGULAR MEETING – MONTICELLO CITY COUNCIL Monday, January 27, 2014 – 7 p.m. Mississippi Room, Monticello Community Center Present: Lloyd Hilgart, Tom Perrault, Glen Posusta, Acting Mayor Brian Stumpf Absent: Clint Herbst 1. Call to Order and Pledge of Allegiance Acting Mayor Stumpf called the meeting to order at 7:00 p.m. and declared a quorum present. The Pledge of Allegiance was recited. A moment of silence was observed for Arve Grimsmo, who passed away on Jan 20th. Arve had previously served on the city council and was mayor of Monticello from 1978 to 1988. 2A. Approval of Minutes – January 13, 2014 Special Meeting TOM PERRAULT MOVED TO ACCEPT THE JANUARY 13, 2014 SPECIAL MEETING MINUTES. LLOYD HILGART SECONDED THE MOTION. MOTION CARRIED 4-0. 2B. Approval of Minutes – January 13, 2014 Regular Meeting GLEN POSUSTA MOVED TO ACCEPT THE JANUARY 13, 2014 REGULAR MEETING MINUTES. LLOYD HILGART SECONDED THE MOTION. MOTION CARRIED 4-0. 3. Consideration of adding items to the agenda  Fred’s Auto – snow plowing (Tom Perrault) 4. Citizen comments, public service announcements a. Citizen Comments: None b. Public Service Announcements: 1) Tom Perrault announced that precinct caucuses take place on Tuesday, February 4th starting at 7 p.m. 5. Consent Agenda: City Council Minutes – January 27, 2014 Page 2 A. Consideration of approving payment of bills for January 27th. Recommendation: Approve payment of bill and purchase card registers for a total amount of $848,802.62. B. Consideration of approving new hires and departures for City departments. Recommendation: Ratify new hires and terminations for MCC and Water department. C. Consideration of adopting Resolution #2014-007 accepting a contribution for 2014 from Tom Perrault to go to the General Fund. Recommendation: Adopt Resolution #2014-007 accepting a donation of $3000 from Tom Perrault to go to the general fund. D. Consideration of approving an application for a charitable gambling permit for a raffle to be conducted the Swan River Montessori School PTO. Recommendation: Approve the application for a charitable gambling permit for a raffle to be conducted on April 12, 2014 by the Swan River Montessori School PTO. E. Consideration of authorizing replacement of three computer workstations and upgrades to the SCADA system at the Wastewater Treatment Facility. Recommendation: Authorize replacement of three computer workstation and upgrades to the SCADA system software by Automatic Systems in the amount of $40,398.00. (Vendor to utilize ST-3 for sales tax exemption.) F. Consideration of approving a two year farm lease on the biosolids farmland. Recommendation: Approve a two year lease agreement with Mark Holker, with optional third year as presented in the amount of $225 per acre totaling $33,750 annually. G. Consideration of approving an extension of a Conditional Use Permit for a Drive- Through Facility, Joint Parking and Joint Access for Broadway Market (3600 East Broadway behind O’Ryans). Applicant: SA Group Properties, Inc.. Recommendation: Approve the extension of a CUP for a Drive-through Facility, Joint Parking, and Joint Access for Broadway Market, Applicant: SA Group Properties, Inc. H. Consideration of adopting a Public Values Statement for Collaborative Stage PUD for a K-12 Educational Use in the R-3 (Medium Density Residence) District and CCD (Central Community District). Applicant: SRCS Building Company/Miller, Eric (Swan River School). Recommendation: Adopt the Public Values Statement for collaborative state PUD for a K-12 educational use in the R-3 (Medium Density Residence) District and CCD (Central Community Cistrict) for Lots 6 & 7, Block 10, Original Plat and Lots 8, 9, & 10, Block 11, Original Plat; Applicant: SRCS Building Company. City Council Minutes – January 27, 2014 Page 3 I. Consideration of approving data for submission of the 2014 Pay Equity Report. Recommendation: Approve submission to the State of Minnesota of required data for the 2014 Pay Equity Report. J. Consideration of closing FiberNet Monticello Business Office on Presidents Day 2014. Recommendation: Approve closing the FiberNet Business Office on President’s Day, February 17, 2014. K. Consideration of changing the Cemetery enterprise fund to a special revenue fund. Recommendation: Approve changing the Cemetery enterprise fund to a special revenue fund. TOM PERRAULT MOVED TO APPROVE THE CONSENT AGENDA AS PRESENTED. LLOYD HILGART SECONDED THE MOTION. MOTION CARRIED 4-0. 6. Consideration of items removed from the consent agenda for discussion No items were removed from the consent agenda. 7. Regular Agenda: A. Consideration of a waiver of the building plan review fee for Pizza Factory in accordance with the Business Expansion Incentive Pilot Program Angela Schumann reviewed this item which was tabled by Council at the January 13th meeting. Angela Schumann talked about the request for relocating the Pizza Factory and waive the plan review fee of the building permit. This would free up funds that could go toward certain relocation costs, which have a limit of $50,000. Angela Schumann pointed out that the application does meet the criteria of the program including creation or retention of jobs and redevelopment, expansion, or renewal of existing vacant commercial/industrial properties. The relocation of the Pizza Factory would redevelop the business within the CCD (Central Community District). Lloyd Hilgart confirmed that the $50,000 cap has been reached and the use of the subsidy program would free up an extra $958.83 toward relocation costs. Brian Stumpf asked if this would set a precedent. Angela Schumann explained that the business subsidy is a pilot program and when the $30,000 in funds is gone the program will end. GLEN POSUSTA MOVED FOR ALTERNATIVE #1 TO APPROVE WAIVING THE ESTIMATED $958.83 BUILDING PLAN REVIEW FEE ON THE BUILDING PERMIT FOR THE PIZZA FACTORY AS PART OF THE City Council Minutes – January 27, 2014 Page 4 BUSINESS EXPANSION INCENTIVE PILOT PROGRAM. LLOYD HILGART SECONDED THE MOTION. MOTION CARRIED 4-0. 8. Added items  Fred’s Auto snow plowing – Tom Perrault asked why this site was being plowed as there are no occupants. Jeff O’Neill explained that there are times when city staff needs to access the building and also want it accessible if someone would want to look at it for possible purchase. 9. Adjournment GLEN POSUSTA MOVED TO ADJOURN THE MEETING AT 7:09 P.M. TOM PERRAULT SECONDED THE MOTION. MOTION CARRIED 4-0. Recorder: Catherine M. Shuman ____ Approved: Attest: _______________________________ City Administrator CityCouncilAgenda:02/10/14 1 5A.ConsiderationofapprovingpaymentofbillregistersforFebruary10th (WO) A.REFERENCEANDBACKGROUND: Citystaffsubmitstheattachedbillregistersandpurchasingcardregistersforapprovalby Council.Thebillregisterscontainallinvoicesprocessedandthepurchasingcard registerscontainallcardpurchasesmadesincethelastCouncilmeeting.SubjecttoMN Statutes,mostinvoicesrequireCouncilapprovalpriortoreleasingchecksforpayment. ThedayfollowingCouncilapproval,paymentswillbereleasedunlessdirected otherwise.AcreditpurchasingagreementandpolicywasapprovedbyCouncilinitially andcardpurchasesmustcomplywiththepolicy. IfCouncilhasnoquestionsorcommentsonthebillandpurchasecardregisters,thesecan beapprovedwiththeconsentagenda.Ifrequested,thisitemcanberemovedfrom consentanddiscussedpriortomakingamotionforapproval. A1.BudgetImpact:None A2.StaffWorkloadImpact:Noadditionalworkrequired B.ALTERNATIVEACTIONS: 1.Motiontoapprovethebillandpurchasecardregistersforatotalamountof $528,389.92. 2.MotiontoapprovetheregisterswithchangesdirectedbyCouncil. C.STAFFRECOMMENDATION: CitystaffrecommendsAlternative#1or#2,perdirectionofCouncil. D.SUPPORTINGDATA: Billregisters PurchaseCardregisters User: Printed:02/05/2014 - 8:40AM Ann.Zimmerman Computer Check Proof List by Vendor Accounts Payable Batch:00203.02.2014 - 203.02.2014 AP 2/11/14 Invoice No Description Amount Payment Date Acct Number Reference Vendor:2002 ELMER ABBAS Check Sequence: 1 ACH Enabled: False 12/7/13 12/7/13 Santa - Void/Re-issue - ck# 111632 destroyed 150.00 02/11/2014 226-45127-430130 150.00Check Total: Vendor:2282 ALBIN ACQUISITION CORPORATION Check Sequence: 2 ACH Enabled: True 120145487S (3) background check 79.00 02/11/2014 226-45122-431990 79.00Check Total: Vendor:1038 APPERTS FOOD SERVICE Check Sequence: 3 ACH Enabled: False 2059063 5.25 02/11/2014 226-45122-433300 2059063 juice, fruit snacks 134.78 02/11/2014 226-45127-421460 2059063 re-sale 402.95 02/11/2014 226-45127-425410 2062482 5.25 02/11/2014 226-45122-433300 2062482 ice cream sundae cups, pizza 86.03 02/11/2014 226-45127-421460 2062482 re-sale 596.94 02/11/2014 226-45127-425410 1,231.20Check Total: Vendor:1062 BEAUDRY OIL COMPANY Check Sequence: 4 ACH Enabled: True 794134 700 gallons diesel fuel 2,627.80 02/11/2014 101-43120-421200 794174 410 gallons unleaded fuel 1,219.75 02/11/2014 101-43120-421200 794175 850 gallons kodiak diesel fuel 3,140.75 02/11/2014 101-43120-421200 794273 800 gallons diesel fuel 2,940.00 02/11/2014 101-43120-421200 794398 1003 gallons diesel fuel 3,726.15 02/11/2014 101-43120-421200 794399 719.6 gallons unleaded fuel 2,162.40 02/11/2014 101-43120-421200 15,816.85Check Total: Vendor:1065 BELLBOY CORPORATION Check Sequence: 5 ACH Enabled: True 41518200 re sale 360.00 02/11/2014 609-49750-425300 41518200 freight 36.59 02/11/2014 609-49750-433300 41518200 re sale 2,524.63 02/11/2014 609-49750-425100 AP-Computer Check Proof List by Vendor (02/05/2014 - 8:40 AM)Page 1 Invoice No Description Amount Payment Date Acct Number Reference 41536600 re sale 264.00 02/11/2014 609-49750-425300 41536600 freight 5.40 02/11/2014 609-49750-433300 41604600 re sale 112.00 02/11/2014 609-49750-425300 41604600 re sale 4,149.97 02/11/2014 609-49750-425100 41604600 freight 45.14 02/11/2014 609-49750-433300 89665600 (8) 500 sleeve assorted bags 128.94 02/11/2014 609-49754-421990 89696900 utx - (12) flip up duster - ostrich feather 120.59 02/11/2014 609-49754-421990 89696900 re-sale 36.00 02/11/2014 609-49750-425400 7,783.26Check Total: Vendor:1067 BERNICK'S Check Sequence: 6 ACH Enabled: False 60571 re sale 32.00 02/11/2014 609-49750-425400 60572 re sale 165.55 02/11/2014 609-49750-425200 61149 re-sale 746.00 02/11/2014 226-45127-425410 63190 re sale 107.20 02/11/2014 609-49750-425400 63190 re sale 65.60 02/11/2014 609-49750-425500 63191 re sale 661.50 02/11/2014 609-49750-425200 63836 (2) 12pk drinking water 6.40 02/11/2014 226-45127-421460 63836 re-sale 232.00 02/11/2014 226-45127-425410 2,016.25Check Total: Vendor:2535 BORDER STATES ELECTRIC SUPPLY Check Sequence: 7 ACH Enabled: True 906797983 (2) RG6 BNC Compr Conn/35JR; (1) Omniseal Pro XL 229.46 02/11/2014 656-49877-421800 906822243 (20) VDSL2 combo WAN Gateway; (20) HPNA 3.1 coax adapter 2,778.75 02/11/2014 656-49877-421800 906847311 (3) JAR IDE - 89-5048 RG6 BNC Compr Conn/35/JR 228.26 02/11/2014 656-49877-421800 3,236.47Check Total: Vendor:3633 RENEE BROADHEAD Check Sequence: 8 ACH Enabled: False 1/27/14 1/27/14 sub teach for core strength class 25.00 02/11/2014 226-45127-430120 25.00Check Total: Vendor:2286 KERRY BURRI Check Sequence: 9 ACH Enabled: True 1/9-1/28/14 Reimb mileage - CC agenda delivery 8.30 02/11/2014 101-41310-433100 2/7-12/5/13 Reimb mileage - CC agenda delivery; St Cloud; Brooklyn Ctr; ect. 353.62 02/11/2014 101-41310-433100 361.92Check Total: Vendor:1091 CAMPBELL KNUTSON PA Check Sequence: 10 ACH Enabled: True 2348-000G137 General 1,148.00 02/11/2014 101-41610-430400 2348-000G137 General - Carlisle Village 308.00 02/11/2014 101-41910-430400 AP-Computer Check Proof List by Vendor (02/05/2014 - 8:40 AM)Page 2 Invoice No Description Amount Payment Date Acct Number Reference 2348-000G137 General - ZTOWER - title report 70.00 02/11/2014 101-41910-430400 2348-000G137 General - BCOL Phase IV 70.00 02/11/2014 229-45202-431990 2348-000G137 General - ZZZNEP - LOA for Xcel NGP review & advise 70.00 02/11/2014 101-42500-443990 1,666.00Check Total: Vendor:1095 CARLOS CREEK WINERY INC Check Sequence: 11 ACH Enabled: False 10020 re sale 120.00 02/11/2014 609-49750-425300 10038 re sale 159.96 02/11/2014 609-49750-425300 279.96Check Total: Vendor:2213 CBS TV STATIONS Check Sequence: 12 ACH Enabled: False Jan - 14 WCCO January 2014 858.00 02/11/2014 655-49860-430920 858.00Check Total: Vendor:1098 CCG CONSULTING LLC Check Sequence: 13 ACH Enabled: True 3020-000M Periord ending 12/31/13 1,729.00 02/11/2014 655-49870-431990 3020-000M Bal Period ending 1/3/14 182.00 02/11/2014 655-49870-431990 3020-001M Period ending 1/3/14 - Operational Review; ect. 9,125.00 02/11/2014 655-49870-431990 11,036.00Check Total: Vendor:1102 CENTERPOINT ENERGY Check Sequence: 14 ACH Enabled: False 1/30/14 8000014331-5 84.72 02/11/2014 217-41990-438300 1/30/14 8000014331-5 199.86 02/11/2014 101-45201-438300 1/30/14 8000014331-5 901.47 02/11/2014 101-42200-438300 1/30/14 8000014331-5 4,327.89 02/11/2014 101-43127-438300 5,513.94Check Total: Vendor:1119 COMMISSIONER OF TRANSPORTATION Check Sequence: 15 ACH Enabled: False P00002638 12C002 - Material testing & inspectn 12/31/13 Job Cost Transfers 453.45 02/11/2014 400-43300-459010 453.45Check Total: Vendor:2935 CUSTOMIZED FIRE RESCUE TRAINING INC Check Sequence: 16 ACH Enabled: False 346 (4) NFPA1021 Fire Officer (30) hrs - J.O.; S.G.; K.K.; J.R. 1,440.00 02/11/2014 101-42200-115030 1,440.00Check Total: Vendor:1129 DAHLHEIMER BEVERAGE LLC Check Sequence: 17 ACH Enabled: True 1089545 re sale 6,912.04 02/11/2014 609-49750-425200 1089545 re sale 15.50 02/11/2014 609-49750-425400 AP-Computer Check Proof List by Vendor (02/05/2014 - 8:40 AM)Page 3 Invoice No Description Amount Payment Date Acct Number Reference 1089554 re sale 415.80 02/11/2014 609-49750-425200 1089585 re sale 24,290.00 02/11/2014 609-49750-425200 1089585 re sale 277.80 02/11/2014 609-49750-425400 1089595 re sale 1,998.30 02/11/2014 609-49750-425200 17584 re-sale 120.00 02/11/2014 609-49750-425200 17599 re sale 195.00 02/11/2014 609-49750-425200 17606 re sale 132.00 02/11/2014 609-49750-425200 34,356.44Check Total: Vendor:1134 DAY DISTRIBUTING COMPANY Check Sequence: 18 ACH Enabled: True 736079 re sale 21.50 02/11/2014 609-49750-425400 736079 re sale 743.80 02/11/2014 609-49750-425200 736997 re sale 646.05 02/11/2014 609-49750-425200 1,411.35Check Total: Vendor:1146 DONNELL INC Check Sequence: 19 ACH Enabled: False DEC2013 air time advertising "jingles" 25.00 02/11/2014 226-45122-434990 25.00Check Total: Vendor:1153 ECM PUBLISHERS INC Check Sequence: 20 ACH Enabled: True 62745 Monticello Frostbite Challenge 1/5/14 150.00 02/11/2014 609-49754-434990 68654 Health & Wellness 1/26/14 153.25 02/11/2014 226-45122-434990 69892 ZZQLTY - PHN-Dell Inc dba Quality RV 1/23/14 119.99 02/11/2014 101-41910-435200 69893 PHN - Monticello Zoning Ord 1/23/14 110.76 02/11/2014 101-41910-435200 534.00Check Total: Vendor:2821 ECONOMIC DEVELOPMENT SERVICES INC Check Sequence: 21 ACH Enabled: False Retainer Hospitality Market Analysis for Downtown (1 of 3 pmts-bal $5500) 4,500.00 02/11/2014 213-46301-431990 4,500.00Check Total: Vendor:3632 EMERGENCY RESPONSE SOLUTIONS Check Sequence: 22 ACH Enabled: False 1486 (5) Mask Bag-Multi Purpose - Orange 118.68 02/11/2014 101-42200-421990 1494 (4) Mask Bag-Multi Purpose - Red 87.85 02/11/2014 101-42200-421990 206.53Check Total: Vendor:1167 EXTREME BEVERAGE LLC Check Sequence: 23 ACH Enabled: False 896450 re sale 268.00 02/11/2014 609-49750-425400 W-880906 -44.66 02/11/2014 609-49750-425400 AP-Computer Check Proof List by Vendor (02/05/2014 - 8:40 AM)Page 4 Invoice No Description Amount Payment Date Acct Number Reference W-888948 re-sale 33.50 02/11/2014 609-49750-425400 256.84Check Total: Vendor:3102 FIBERCONNECT INCORPORATED Check Sequence: 24 ACH Enabled: True Feb 2014 February 201 Management Fee 20,000.00 02/11/2014 655-49870-430700 20,000.00Check Total: Vendor:2462 FOX TELEVISION STATIONS INC Check Sequence: 25 ACH Enabled: False KMSP Jan-14 KMSP January 2013 1,115.40 02/11/2014 655-49860-430920 1,115.40Check Total: Vendor:2462 FOX TELEVISION STATIONS INC Check Sequence: 26 ACH Enabled: False WFTC Jan-14 WFTC January 2013 214.50 02/11/2014 655-49860-430920 214.50Check Total: Vendor:3476 FS2 Check Sequence: 27 ACH Enabled: True G47367 FS2 January 2014 51.52 02/11/2014 655-49860-430920 51.52Check Total: Vendor:3634 GENEREUX FINE WOOD PRODUCTS Check Sequence: 28 ACH Enabled: False 25263.00 labor/supp men's restroom counters & sinks 2,000.53 02/11/2014 226-45122-440100 2,000.53Check Total: Vendor:1413 GOPHER STATE ONE CALL INC Check Sequence: 29 ACH Enabled: True 91634 January 2014 locates 25.38 02/11/2014 601-49440-422770 91634 January 2014 locates 25.37 02/11/2014 656-49877-422770 50.75Check Total: Vendor:1206 GRAPE BEGINNINGS INC Check Sequence: 30 ACH Enabled: False 162434 re sale 436.00 02/11/2014 609-49750-425300 162434 freight 9.00 02/11/2014 609-49750-433300 445.00Check Total: Vendor:1226 HENRY'S WATERWORKS INC Check Sequence: 31 ACH Enabled: False 16893 (1) clamp for DI/CI, long center bolt & pipe OD 197.55 02/11/2014 601-49440-422700 197.55Check Total: AP-Computer Check Proof List by Vendor (02/05/2014 - 8:40 AM)Page 5 Invoice No Description Amount Payment Date Acct Number Reference Vendor:1242 HOLIDAY CREDIT OFFICE Check Sequence: 32 ACH Enabled: True 01/18/14 tractor diesel fuel 1/14/14 25.38 02/11/2014 226-45122-421200 1/18/14 motor fuel - 1/4/14 - 1/17/14 287.46 02/11/2014 101-42200-421200 12/18/13 motor fuel - 12/3/13 - 12/17/13 76.06 02/11/2014 226-45122-421200 12/18/2013 motor fuel 12/26/13 20.21 02/11/2014 226-45122-421200 12/29/13 motor fuel - 12/19/13 - 12/29/13 172.99 02/11/2014 101-42200-421200 582.10Check Total: Vendor:2305 HOME BOX OFFICE Check Sequence: 33 ACH Enabled: True Jan - 14 HBO Bulk January 2014 509.74 02/11/2014 655-49860-430920 Jan - 14 HBO Cinemax January 2014 78.72 02/11/2014 655-49860-430920 Jan - 14 HBO January 2014 296.73 02/11/2014 655-49860-430920 885.19Check Total: Vendor:2214 HUBBARD BROADCASTING INC Check Sequence: 34 ACH Enabled: False KSTC Jan - 14 KSTC January 2014 386.10 02/11/2014 655-49860-430920 386.10Check Total: Vendor:2214 HUBBARD BROADCASTING INC Check Sequence: 35 ACH Enabled: False KSTP Jan - 14 KSTP January 2014 386.10 02/11/2014 655-49860-430920 386.10Check Total: Vendor:1259 JJ TAYLOR DISTRIBUTING Check Sequence: 36 ACH Enabled: False 2173427 re-sale 815.40 02/11/2014 609-49750-425200 2173427 freight 3.00 02/11/2014 609-49750-433300 818.40Check Total: Vendor:1263 JOHNSON BROS WHOLESALE LIQUOR Check Sequence: 37 ACH Enabled: False 1763635 re sale 210.50 02/11/2014 609-49750-425100 1763635 freight 2.78 02/11/2014 609-49750-433300 1763636 re sale 560.25 02/11/2014 609-49750-425300 1763636 freight 18.07 02/11/2014 609-49750-433300 1764802 re sale 2,868.68 02/11/2014 609-49750-425100 1764802 freight 37.40 02/11/2014 609-49750-433300 1764803 freight 65.33 02/11/2014 609-49750-433300 1764803 re sale 2,258.70 02/11/2014 609-49750-425300 1767122 freight 13.90 02/11/2014 609-49750-433300 1767122 re sale 1,015.00 02/11/2014 609-49750-425100 1768226 re sale 3,892.00 02/11/2014 609-49750-425100 AP-Computer Check Proof List by Vendor (02/05/2014 - 8:40 AM)Page 6 Invoice No Description Amount Payment Date Acct Number Reference 1768226 freight 61.63 02/11/2014 609-49750-433300 1769388 re sale 2,434.67 02/11/2014 609-49750-425100 1769388 freight 31.15 02/11/2014 609-49750-433300 1769389 re sale 3,094.85 02/11/2014 609-49750-425300 1769389 re sale 181.57 02/11/2014 609-49750-425400 1769389 freight 87.57 02/11/2014 609-49750-433300 1769390 re sale 72.99 02/11/2014 609-49750-425200 1771928 re sale 1,489.50 02/11/2014 609-49750-425100 1771928 freight 27.80 02/11/2014 609-49750-433300 1771929 re sale 666.50 02/11/2014 609-49750-425300 1771929 freight 23.63 02/11/2014 609-49750-433300 19,114.47Check Total: Vendor:2251 KARE GANNETT CO INC Check Sequence: 38 ACH Enabled: False 259-1017 KARE December 2013 867.00 02/11/2014 655-49860-430920 867.00Check Total: Vendor:1270 KENNEDY AND GRAVEN CHARTERED Check Sequence: 39 ACH Enabled: False 118027 General EDA Matters through 11/30/13 1,422.00 02/11/2014 213-46301-430400 118305 General EDA Matters through 12/31/13 - Review TIF 1-22 documents 216.00 02/11/2014 213-46522-430400 1,638.00Check Total: Vendor:3627 CHAD MICHAEL KEUSEMAM Check Sequence: 40 ACH Enabled: False 11/25/13 WCF SRU Training (Cargill to reimb) 680.00 02/11/2014 101-42200-115030 680.00Check Total: Vendor:2304 LEGACY MECHANICAL SERVICES LLC Check Sequence: 41 ACH Enabled: False 3370 utx - Plumbing - replace anode rod 220.00 02/11/2014 655-49870-440100 220.00Check Total: Vendor:1296 LITTLE FALLS MACHINE INC Check Sequence: 42 ACH Enabled: False 53011 (4) seal kits, (4) curb shoes 409.40 02/11/2014 101-43125-422450 409.40Check Total: Vendor:1303 M AMUNDSON LLP Check Sequence: 43 ACH Enabled: True 167952 re-sale 590.64 02/11/2014 609-49750-425500 167952 re-sale 200.10 02/11/2014 609-49750-425400 AP-Computer Check Proof List by Vendor (02/05/2014 - 8:40 AM)Page 7 Invoice No Description Amount Payment Date Acct Number Reference 790.74Check Total: Vendor:3631 WILLIAM MALONE Check Sequence: 44 ACH Enabled: False 12/26/13 reimb mail box supplies 20.19 02/11/2014 101-43120-421990 20.19Check Total: Vendor:1308 MARCO INC Check Sequence: 45 ACH Enabled: True 245202817 1/10-2/10/14 3,089.19 02/11/2014 702-00000-441500 245202817 utx - FNM portion 14.29% of 1/10-2/10/14 contract 686.76 02/11/2014 702-00000-441500 245202817 utx - MCC portion 14.29% of 1/10-2/10/14 contract 686.76 02/11/2014 702-00000-441500 245202817 utx - LIQ portion 7.14% of 1/10-2/10/14 contract 343.14 02/11/2014 702-00000-441500 4,805.85Check Total: Vendor:1318 JONATHAN CALEB MELLBERG Check Sequence: 46 ACH Enabled: True 1/27/14 1/27/14 City Council mtg recording 80.00 02/11/2014 101-41110-431990 80.00Check Total: Vendor:2215 METRO GOLDWYN MAYER INC Check Sequence: 47 ACH Enabled: True Jan - 14 MGM HD January 2014 40.93 02/11/2014 655-49860-430920 40.93Check Total: Vendor:1327 MIDSTATES EQUIPMENT & SUPPLY Check Sequence: 48 ACH Enabled: False 214031 maxwell nuvo (crack sealer) - (state bid contract) 14,900.48 02/11/2014 101-43120-422400 14,900.48Check Total: Vendor:2179 MINNESOTA 9-1-1 PROGRAM Check Sequence: 49 ACH Enabled: True Jan - 14 January 2014 911 Wright Co 845.64 02/11/2014 655-00000-208170 845.64Check Total: Vendor:1350 MN DNR WATERS ECO-WATER-RES Check Sequence: 50 ACH Enabled: False 2013 Fee Permit 1964-0152 Agricultural Crop Irrigation Wright County 140.00 02/11/2014 601-49440-443700 140.00Check Total: Vendor:1350 MN DNR WATERS ECO-WATER-RES Check Sequence: 51 ACH Enabled: False 2013 Fees Permit 1964-1059 Water Use (2013) Municipal/Public Water Supply 9,506.28 02/11/2014 601-49440-443700 9,506.28Check Total: AP-Computer Check Proof List by Vendor (02/05/2014 - 8:40 AM)Page 8 Invoice No Description Amount Payment Date Acct Number Reference Vendor:1351 MN FIRE SERVICE CERT BOARD Check Sequence: 52 ACH Enabled: False 2397 (2) Fire Officer I Cert Exam 150.00 02/11/2014 101-42200-443700 150.00Check Total: Vendor:1360 MN SAFETY COUNCIL Check Sequence: 53 ACH Enabled: False 26867 utx - (1) AED Onsite M5066A - Heartstart onsite pkg 1,350.00 02/11/2014 609-49754-424100 26868 (1) AED Onsite M5066A - Heartstart onsite pkg 1,350.00 02/11/2014 217-41990-424600 2,700.00Check Total: Vendor:1366 CITY OF MONTICELLO Check Sequence: 54 ACH Enabled: False Bldg Permit Elam Rent Permit pmt in Vanco directed to FNM acct 899 in error. 150.71 02/11/2014 655-00000-115025 150.71Check Total: Vendor:2135 MONTICELLO BASEBALL Check Sequence: 55 ACH Enabled: False 2014 Banner 2014 Baseball Season - MCC Banner @ H.S. Ballfields 300.00 02/11/2014 226-45122-434990 300.00Check Total: Vendor:1370 MONTICELLO DEPUTY REG #002 Check Sequence: 56 ACH Enabled: False Plate 106069 81 Intl IHC Sludge Truck - City ID 36 (Ins notes '82) 16.00 02/11/2014 602-49480-443700 Plate 148787 82 Ford Fire Truck - City ID 1167 16.00 02/11/2014 101-42200-443700 Plate 166352 95 Ford LS 8000 - City ID 111 16.00 02/11/2014 101-43120-443700 Plate 171352 97 Dodge Caravan - City ID 126 16.00 02/11/2014 101-42400-443700 Plate 171367 99 Ford 3/4T Pickup - City ID 203 16.00 02/11/2014 101-45201-443990 Plate 172897 99 Ford F350 - City ID 205 16.00 02/11/2014 101-45201-443990 Plate 172902 99 Ford F350 Pickup 16.00 02/11/2014 101-42200-443700 Plate 172904 99 Dodge Caravan - City ID 553 16.00 02/11/2014 101-43120-443700 Plate 172910 99 International Truck - City ID 402 16.00 02/11/2014 602-49490-443700 Plate 185675 77 Hale Trailer - City ID 135 16.00 02/11/2014 101-43120-443700 Plate 185678 06 Felling Tilt Trailer - City ID 131 16.00 02/11/2014 101-43120-443700 Plate 185681 08 Ag HMDE Trailer - City ID 153 16.00 02/11/2014 101-43120-443700 Plate 187981 86 LGCH Service Trailer - City ID 152 16.00 02/11/2014 101-43120-443700 Plate 188174 13 PJ Trailer 16.00 02/11/2014 101-45201-443990 Plate 196503 88 Danco Plus Trailer - City ID 262 16.00 02/11/2014 101-45201-443990 Plate 197485 98 Polar Tank Trailer 16.00 02/11/2014 602-49480-443700 Plate 197486 98 Towmaster Trailer - City ID 124 16.00 02/11/2014 101-43120-443700 Plate 197491 86 Dressen Trailer 16.00 02/11/2014 101-42200-443700 Plate 197492 01 Bison Trailer - City ID 263 16.00 02/11/2014 101-45201-443990 Plate 197493 99 H & S Skit T Loadmaster - City ID 261 16.00 02/11/2014 101-45201-443990 Plate 902597 01 Dodge Ram Pickup - City ID 204 16.00 02/11/2014 101-45201-443990 Plate 905275 00 Ford 1 Ton Truck - City ID 401 16.00 02/11/2014 602-49490-443700 AP-Computer Check Proof List by Vendor (02/05/2014 - 8:40 AM)Page 9 Invoice No Description Amount Payment Date Acct Number Reference Plate 910377 01 Ford F350 - City ID 178 16.00 02/11/2014 101-43120-443700 Plate 910985 02 Chev Silverado - City ID 555 (Ins notes '03) 16.00 02/11/2014 101-42400-443700 Plate 911511 03 Sterling Dump Truck - City ID 107 (Ins notes 2002) 16.00 02/11/2014 101-43120-443700 Plate 914291 03 Ford F450 - City ID 113 16.00 02/11/2014 101-43120-443700 Plate 914292 03 Ford F150 - City ID 114 16.00 02/11/2014 101-43120-443700 Plate 914293 03 Chev S10 Pickup - City ID 612 16.00 02/11/2014 101-43115-443990 Plate 914294 03 Chev 2500 Pickup - City ID 130 16.00 02/11/2014 101-43120-443700 Plate 914322 03 Ford F250 - City ID 301 16.00 02/11/2014 601-49440-443700 Plate 916002 99 Ford F550 Bucket Truck - City ID 112 16.00 02/11/2014 101-43120-443700 Plate 916071 04 Ford F450 Pickup - City ID 206 16.00 02/11/2014 101-45201-443990 Plate 919350 05 Sterling Dump Truck - City ID 110 16.00 02/11/2014 101-43120-443700 Plate 921678 05 Ford F150 Pickup - City ID 404 16.00 02/11/2014 602-49490-443700 Plate 923338 97 Jeep Cherokee - City ID 140 16.00 02/11/2014 101-43120-443700 Plate 923393 07 Ford F250 - City ID 209 16.00 02/11/2014 101-45201-443990 Plate 927928 07 Ford F150 - City ID 214 16.00 02/11/2014 101-45201-443990 Plate 929588 08 Chev Silverado Pickup - City ID 613 16.00 02/11/2014 101-43115-443990 Plate 930531 08 Sterling L8500 - City ID 109 16.00 02/11/2014 101-43120-443700 Plate 930571 08 Ford F450 - City ID 302 16.00 02/11/2014 601-49440-443700 Plate 930623 08 Ford Focus - City ID 800 16.00 02/11/2014 217-41990-443700 Plate 931644 09 Tymco 600 Sweeper - City ID 132 16.00 02/11/2014 101-43120-443700 Plate 934089 08 GMC Sierra Pickup 16.00 02/11/2014 655-49870-443700 Plate 934090 09 GMC Sierra Pickup 16.00 02/11/2014 655-49870-443700 Plate 934855 10 Ford Van 16.00 02/11/2014 655-49870-443700 Plate 934856 10 Ford Van 16.00 02/11/2014 655-49870-443700 Plate 936286 00 Sterling Dump Truck - City ID 105 16.00 02/11/2014 101-43120-443700 Plate 939962 12 Mack Hook Truck - City ID 116 16.00 02/11/2014 101-43120-443700 768.00Check Total: Vendor:3635 RICHARD MOORE Check Sequence: 57 ACH Enabled: False 2/4/14 reimb MCC memshp (belongs to silvers sneaks gives free memshp) 201.17 02/11/2014 226-45122-347910 2/4/14 reimb MCC memshp (belongs to silvers sneaks gives free memshp) 13.83 02/11/2014 226-00000-208100 215.00Check Total: Vendor:1629 MP NEXLEVEL LLC Check Sequence: 58 ACH Enabled: True 111091 (352) ft Direct bore duct; material; winter adder 3,520.00 02/11/2014 656-49877-431990 111092 (117) ft Direct bore duct; material; winter adder; ect. 1,620.00 02/11/2014 656-49877-431990 5,140.00Check Total: Vendor:2218 MUSIC CHOICE Check Sequence: 59 ACH Enabled: True Jan - 14 Music Choice January 2014 199.48 02/11/2014 655-49860-430920 AP-Computer Check Proof List by Vendor (02/05/2014 - 8:40 AM)Page 10 Invoice No Description Amount Payment Date Acct Number Reference 199.48Check Total: Vendor:2275 NATIONAL GEOGRAPHIC WILD Check Sequence: 60 ACH Enabled: True G46760 National Geographic Wild January 2014 50.00 02/11/2014 655-49860-430920 50.00Check Total: Vendor:2518 NEOFUNDS BY NEOPOST Check Sequence: 61 ACH Enabled: False 1/24/14 Account Number 7900 0440 6327 5196 1,000.00 02/11/2014 101-00000-155010 1,000.00Check Total: Vendor:1913 NEW FRANCE WINE Check Sequence: 62 ACH Enabled: False 87552 re sale 536.00 02/11/2014 609-49750-425300 87552 freight 15.00 02/11/2014 609-49750-433300 551.00Check Total: Vendor:2216 NHL NETWORK Check Sequence: 63 ACH Enabled: False Jan - 14 NHL January 2014 252.41 02/11/2014 655-49860-430920 252.41Check Total: Vendor:1687 NORTHLAND SECURITIES INC Check Sequence: 64 ACH Enabled: False 3473 November 2013 - TIF 1-6 640.00 02/11/2014 213-46506-431990 3473 November 2013 - TIF 1-39 160.00 02/11/2014 213-46539-431990 3473 November 2013 - TIF 1-22 320.00 02/11/2014 213-46522-431990 3519 December 2013 - TIF 1-6 Draft resolution and review staff report 280.00 02/11/2014 213-46506-431990 3519 December 2013 - TIF 1-22 Blight Findings and communicatoin w/leg 200.00 02/11/2014 213-46522-431990 1,600.00Check Total: Vendor:1405 OFFICEMAX INCORPORATED Check Sequence: 65 ACH Enabled: False 142204 (1) 10pk file jackets, (1) pk 3x3 color note, ect 71.93 02/11/2014 101-43110-420990 469795 (1) dz pens, (1) rm paper, batteries, ect 65.04 02/11/2014 101-43110-420990 136.97Check Total: Vendor:1411 OLSON & SONS ELECTRIC INC Check Sequence: 66 ACH Enabled: True 16667 (1) 3-phase power monitor (well #3 generator room heater) 140.85 02/11/2014 601-49440-422300 140.85Check Total: Vendor:1273 PAUSTIS & SONS WINE CO Check Sequence: 67 ACH Enabled: False AP-Computer Check Proof List by Vendor (02/05/2014 - 8:40 AM)Page 11 Invoice No Description Amount Payment Date Acct Number Reference 8434185 re sale 739.97 02/11/2014 609-49750-425300 8434185 freight 10.00 02/11/2014 609-49750-433300 749.97Check Total: Vendor:1427 PHILLIPS WINE & SPIRITS CO Check Sequence: 68 ACH Enabled: False 2547610 re sale 10,400.28 02/11/2014 609-49750-425100 2547610 freight 189.50 02/11/2014 609-49750-433300 2547611 wine 569.95 02/11/2014 609-49750-425300 2547611 freight 19.46 02/11/2014 609-49750-433300 2548361 freight 4.17 02/11/2014 609-49750-433300 2548361 re sale 385.14 02/11/2014 609-49750-425100 2548362 freight 6.95 02/11/2014 609-49750-433300 2548362 wine 288.45 02/11/2014 609-49750-425300 2550671 re sale 8,810.65 02/11/2014 609-49750-425100 2550671 freight 116.77 02/11/2014 609-49750-433300 2551483 re sale 312.03 02/11/2014 609-49750-425100 2551483 freight 3.02 02/11/2014 609-49750-433300 2551484 re sale 586.39 02/11/2014 609-49750-425300 2551484 freight 16.21 02/11/2014 609-49750-433300 2553148 re sale 3,475.65 02/11/2014 609-49750-425100 2553148 freight 50.04 02/11/2014 609-49750-433300 3519772 Refer to inv#2545351 -1.39 02/11/2014 609-49750-433300 3519772 Refer to inv#2545351 -101.00 02/11/2014 609-49750-425100 25,132.27Check Total: Vendor:1455 RED'S MARATHON Check Sequence: 69 ACH Enabled: False 1/24/14 labor/supp tires & struts 526.45 02/11/2014 217-41990-422110 526.45Check Total: Vendor:2602 RFD TV Check Sequence: 70 ACH Enabled: False 1961-1248 RFD TV December 2013 29.05 02/11/2014 655-49860-430920 29.05Check Total: Vendor:1474 PATRICIA A SALZWEDEL Check Sequence: 71 ACH Enabled: True 2/15/14 Contract 1,593.75 02/11/2014 101-42700-431200 1,593.75Check Total: Vendor:3628 SHANNON SIMON Check Sequence: 72 ACH Enabled: True 1/24/14 mileage reimbursement - 1/24/14 DMV dealer runs 12.32 02/11/2014 217-41990-433100 AP-Computer Check Proof List by Vendor (02/05/2014 - 8:40 AM)Page 12 Invoice No Description Amount Payment Date Acct Number Reference 12.32Check Total: Vendor:1490 CYNTHIA R SIMPSON Check Sequence: 73 ACH Enabled: False 894112 January 2014 Firehall cleaning 100.00 02/11/2014 101-42200-431100 100.00Check Total: Vendor:2212 SINCLAIR TELEVISION GROUP INC Check Sequence: 74 ACH Enabled: False Jan - 14 WUCW January 2014 308.88 02/11/2014 655-49860-430920 308.88Check Total: Vendor:3309 SOUTHERN WINE & SPIRITS OF MINNESOTA Check Sequence: 75 ACH Enabled: False 1123246 re sale 1,500.48 02/11/2014 609-49750-425300 1123246 freight 23.12 02/11/2014 609-49750-433300 1124320 freight 14.37 02/11/2014 609-49750-433300 1124320 re sale 824.56 02/11/2014 609-49750-425300 1126561 freight 1.25 02/11/2014 609-49750-433300 1126561 re sale 116.95 02/11/2014 609-49750-425100 1126562 re sale 1,267.23 02/11/2014 609-49750-425300 1126562 freight 17.81 02/11/2014 609-49750-433300 7618 re sale -295.23 02/11/2014 609-49750-425300 3,470.54Check Total: Vendor:1506 STRATEGIC EQUIPMENT & SUPPLY Check Sequence: 76 ACH Enabled: False 2148902 (242) stem glass w/logo 594.87 02/11/2014 609-49750-425550 2148927 ST3 - re-sale 54.77 02/11/2014 609-49750-425400 649.64Check Total: Vendor:1518 TDS TELECOM Check Sequence: 77 ACH Enabled: True 665-837-0005 Voice - nonpublished number charges 84.00 02/11/2014 655-49860-430910 665-837-0005 Voice - LNP conversion charges 20.00 02/11/2014 655-49870-432600 665-837-0005 Voice - service order charge - residential 5.00 02/11/2014 655-49870-432600 109.00Check Total: Vendor:1518 TDS TELECOM Check Sequence: 78 ACH Enabled: True 665-838-0000 Voice - service order charge - residential 5.00 02/11/2014 655-49870-432600 665-838-0000 Voice - LNP conversion charges 60.00 02/11/2014 655-49870-432600 665-838-0000 Voice - nonpublished number charges 266.00 02/11/2014 655-49860-430910 AP-Computer Check Proof List by Vendor (02/05/2014 - 8:40 AM)Page 13 Invoice No Description Amount Payment Date Acct Number Reference 331.00Check Total: Vendor:1522 THORPE DISTRIBUTING COMPANY Check Sequence: 79 ACH Enabled: True 756111 re sale 11,908.53 02/11/2014 609-49750-425200 801311 re sale 31.10 02/11/2014 609-49750-425400 801312 re sale 48.00 02/11/2014 609-49750-425300 801313 re sale 12,493.55 02/11/2014 609-49750-425200 802611 re sale 17,663.60 02/11/2014 609-49750-425200 42,144.78Check Total: Vendor:2252 TOWER DISTRIBUTION COMPANY Check Sequence: 80 ACH Enabled: False 344304 WGN January 2014 213.54 02/11/2014 655-49860-430920 213.54Check Total: Vendor:2268 UNIVERSAL SERVICE ADMINISTRATIVE COMPANY Check Sequence: 81 ACH Enabled: True UBDI0000672639 FiberNet Monticello Filer 499 ID: 828118 14,423.69 02/11/2014 655-49870-431970 14,423.69Check Total: Vendor:1544 US POSTAL SERVICE Check Sequence: 82 ACH Enabled: False Permit #42 Permit #42 First-Class Presort annual fee (1/2) 100.00 02/11/2014 601-49440-443700 Permit #42 Permit #42 First-Class Presort annual fee (1/2) 100.00 02/11/2014 602-49490-443700 200.00Check Total: Vendor:1550 VEOLIA WATER N AM OPERATING SERV LLC VEOLIA WATER N AM OPERATIONS INC Check Sequence: 83 ACH Enabled: False 00034514 February 2014 68,300.00 02/11/2014 602-49480-430800 00035000 Jan - Dec 2013 Cargill testing 18,664.25 02/11/2014 602-49480-430800 86,964.25Check Total: Vendor:1550 VEOLIA WATER N AM OPERATING SERV LLC VEOLIA WATER N AM OPERATIONS INC Check Sequence: 84 ACH Enabled: False 00034451 12C003 Progress Inv #13 WWTP DEEP - Upgrades PH 1 Design 751.45 02/11/2014 602-00000-165010 751.45Check Total: Vendor:1552 VIKING COCA COLA BOTTLING CO Check Sequence: 85 ACH Enabled: True 1335796 re sale 142.40 02/11/2014 609-49750-425400 1342157 re sale 242.50 02/11/2014 609-49750-425400 384.90Check Total: AP-Computer Check Proof List by Vendor (02/05/2014 - 8:40 AM)Page 14 Invoice No Description Amount Payment Date Acct Number Reference Vendor:1684 VINOCOPIA Check Sequence: 86 ACH Enabled: True 91593 re sale 208.00 02/11/2014 609-49750-425300 91593 re sale 190.58 02/11/2014 609-49750-425100 91593 re sale 136.50 02/11/2014 609-49750-425400 91593 freight 16.50 02/11/2014 609-49750-433300 92038 re sale 400.00 02/11/2014 609-49750-425300 92038 freight 12.00 02/11/2014 609-49750-433300 963.58Check Total: Vendor:3357 VUBIQUITY Check Sequence: 87 ACH Enabled: True Dec - 13 PPV and VOD December 2013 945.20 02/11/2014 655-49860-430920 945.20Check Total: Vendor:1567 WES OLSON ELECTRIC LLC Check Sequence: 88 ACH Enabled: False 6452 utx - labor - reviewed lght controls @ Mississippi Rm 65.00 02/11/2014 226-45122-440100 6452 labor - repair misc signs 162.50 02/11/2014 101-45501-422990 6452 (10) fluor lamps, (6) wire conn, ect 51.06 02/11/2014 101-45501-422990 6460 utx - labor repair light fix in Mississippi rm 325.00 02/11/2014 226-45122-440100 6462 (1) 480v motor kit 201.00 02/11/2014 601-49440-422300 6462 labor - install (1) 480v motor (well #3 generator room heater) 130.00 02/11/2014 601-49440-422300 934.56Check Total: Vendor:2651 WILSON DEVELOPMENT SERVICES LLC Check Sequence: 89 ACH Enabled: True 22812 MGFARM - Acquisition & Relocation Serv - Montgomery Frms-service 1,287.00 02/11/2014 213-46522-431990 22812 MGFARM - Acquisition & Relocation Serv - Montgomery Frms-expense 61.02 02/11/2014 213-46522-431990 1,348.02Check Total: Vendor:1572 THE WINE COMPANY Check Sequence: 90 ACH Enabled: False 351701 re sale 1,340.00 02/11/2014 609-49750-425300 351701 freight 26.40 02/11/2014 609-49750-433300 1,366.40Check Total: Vendor:1573 WINE MERCHANTS INC Check Sequence: 91 ACH Enabled: False 489034 re sale 626.44 02/11/2014 609-49750-425300 489034 freight 6.26 02/11/2014 609-49750-433300 632.70Check Total: Vendor:1209 WIRTZ BEVERAGE MINNESOTA WINE & SPIRITS Check Sequence: 92 ACH Enabled: False AP-Computer Check Proof List by Vendor (02/05/2014 - 8:40 AM)Page 15 Invoice No Description Amount Payment Date Acct Number Reference 1080136297 re sale 1,625.87 02/11/2014 609-49750-425100 1080136297 re sale 488.99 02/11/2014 609-49750-425300 1080136297 freight 39.75 02/11/2014 609-49750-433300 1080138958 re sale 4,233.90 02/11/2014 609-49750-425100 1080138958 re sale 1,208.43 02/11/2014 609-49750-425300 1080138958 freight 91.58 02/11/2014 609-49750-433300 2080028552 re sale -123.76 02/11/2014 609-49750-425300 2080028564 re sale -236.86 02/11/2014 609-49750-425100 2080028589 re sale -102.61 02/11/2014 609-49750-425100 4080001017 re sale -241.14 02/11/2014 609-49750-425100 6,984.15Check Total: Vendor:1577 WRIGHT CO AUDITOR-TREAS - ACH Check Sequence: 93 ACH Enabled: True Feb 2014 February 2014 91,250.00 02/11/2014 101-42100-430500 91,250.00Check Total: Vendor:1584 WSB & ASSOCIATES INC Check Sequence: 94 ACH Enabled: True 1010000194 General Ph 3 2013 (4th of 4) 7,500.00 02/11/2014 101-43111-430300 1010000194 General Ph 4 2013 Review MnDOT response to comments 110.00 02/11/2014 101-43111-430300 10102701153 Monticello Maps - Prelim DFIRM map; Soreland Ord buffer map 249.00 02/11/2014 101-41910-430300 149447014 ZRCFOS - Second River Crossing Study 1,846.00 02/11/2014 101-43111-430300 149458020 10C010 - Great River Trailways/Trailhead-Ph 3 Const 496.00 02/11/2014 400-43300-459010 149465015 12C003 - WWTF Sludge Dewater Fac - Wentz Assoc inv 12-085.05 3,484.50 02/11/2014 602-00000-165010 149465015 12C003 - WWTF Sludge Dewater Facility & Blower Ph 4 Const 3,645.50 02/11/2014 602-00000-165010 14947009 General WWTP 985.00 02/11/2014 602-49480-430300 14947206 Economic Development & Market Matching 4,000.00 02/11/2014 101-46500-431990 14947305 ZZPHOS - WWTF Facility Plan 1,136.00 02/11/2014 602-49480-430300 14947605 ZTOWER - Comm Tower - project mgmt 4,441.50 02/11/2014 101-41910-430300 14947705 ZZALDI - Alki Plan Review 62.00 02/11/2014 101-00000-220110 14948101 Z12PMT - 2013 Pavement Mgmt Program 903.50 02/11/2014 101-43111-430300 162751025 12C002 - 7th St (Elm to Minn) Ext 1,262.00 02/11/2014 400-43300-459010 30,121.00Check Total: Vendor:1585 XCEL ENERGY Check Sequence: 95 ACH Enabled: False 1/20/14 51-9391437-3 181.68 02/11/2014 101-41941-438100 1/20/14 MGFARM 51-0798481-0 76.15 02/11/2014 213-46522-438100 1/28/14 51-6505907-2 67.56 02/11/2014 101-43140-438100 1/28/14 51-6505908-3 17.95 02/11/2014 101-42500-438100 1/28/14 51-6505916-3 20,606.40 02/11/2014 101-43160-438100 1/29/14 51-6505905-0 6,989.44 02/11/2014 601-49440-438100 AP-Computer Check Proof List by Vendor (02/05/2014 - 8:40 AM)Page 16 Invoice No Description Amount Payment Date Acct Number Reference 27,939.18Check Total: Vendor:1586 CHRISTOPHER ZALOMSKY Check Sequence: 96 ACH Enabled: False 834 (3) name tags (Trevor, Isa, Ashlyn) 25.65 02/11/2014 226-45122-420990 25.65Check Total: Total for Check Run: Total of Number of Checks: 528,389.92 96 AP-Computer Check Proof List by Vendor (02/05/2014 - 8:40 AM)Page 17 The preceding list of bills payable was reviewed and approved for payment. Date: 2/10/14 Approved by: ___________________________________ Mayor Clint Herbst CityCouncilAgenda:2/10/2014 1 5B.ConsiderationofapprovingnewhiresanddeparturesforCitydepartments (TE) A.REFERENCEANDBACKGROUND: TheCouncilisaskedtoratifythehiringanddeparturesofemployeesthathaveoccurred recentlyinthedepartmentslisted.ItisrecommendedthattheCouncilofficiallyratifythe hiring/departureofalllistedemployeesincludingpart-timeandseasonalworkers. A1.BudgetImpact:(positionsaregenerallyincludedinbudget) A2.StaffWorkLoadImpact:Ifnewpositions,theremaybesometraining involved.Ifterminatedpositions,existingstaffwouldpickupthosehours,as needed,untilreplaced. B.ALTERNATIVEACTIONS: 1.Motiontoratifythehire/departuresoftheemployeesasidentifiedontheattached list. 2.Motiontodenytherecommendedhiresanddepartures. C.RECOMMENDATION: BystatutetheCityCouncilhastheauthoritytoapproveallhires/departures.Citystaff recommendsAlternative#1,fortheCounciltoapprovethehiresand/ordeparturesas listed. D.SUPPORTINGDATA: Listofnew/terminatedemployees Name Title Department Hire Date Class Isabel Brady Lifeguard MCC 1/3/14 PT Name Reason Department Last Day Class Katelyn Kunde Voluntary MCC 12/5/13 PT Ceili Ternes Voluntary MCC 12/20/13 PT Luke Botzek Voluntary Water 11/29/13 Seasonal NEW EMPLOYEES TERMINATING EMPLOYEES New Hire and Terms City Council 2014: 1/22/2014 CityCouncilAgenda:02/10/14 1 5C.ConsiderationofappointingarepresentativetotheMonticelloPlanning Commissiontofillavacancyforatermtoexpireon12/31/15(AS) A.REFERENCEANDBACKGROUND: CityCouncilisaskedtoappointarepresentativetofilloutatermontheMonticello PlanningCommissionforthepositionthatwasheldbyWilliamSpartz,whorecently resigned.ThePlanningCommissionreachedaconsensusrecommendationforthe approvalofAlanHeidemanntofilltheposition,withatermtoexpireonDecember31, 2015. ThePlanningCommissioninterviewedtwocandidatesfortheposition.Bothcandidates werefelttobewell-qualifiedtofillthevacantposition. Mr.HeidemannresidesintheCityofMonticelloandcurrentlyservesontheParks Commission.ParksCommissionwillhaveavacancyshouldCouncilappointMr. Heidemann,asMr.Heidemannindicatedhewouldbewillingtoresignthatpost.Interest inParksCommissionwillbediscussedwiththesecondapplicantforthePlanning Commissionposition. ThePlanningCommissionersrecognizetheirroleasadvisoryforthisappointmentand indicatedduringtheinterviewprocesstheirunderstandingthattheCityCouncilmaywish tointerviewthecandidatesseparatelypriortofinalappointmentoftheposition. B.ALTERNATIVEACTIONS: 1.MotiontoapprovetheappointmentofAlanHeidemanntotheMonticello PlanningCommissionwiththetermendingDecember31,2015. 2.Motiontonotapprovetheappointment. C.STAFFRECOMMENDATION: TheMonticelloPlanningCommissionrecommendsAlternative#1toappointAlan HeidemanntothePlanningCommission. Onanadministrativenote,currently,CityCode2-1-1doesnotallowPlanning Commissionerstoserveinanyotherpublicoffice.However,atanupcomingmeeting, theCityCouncilwillbeaskedtoconsideranamendmenttothePlanningCommission ordinancetoallowPlanningCommissionerstoserveinnon-electedpositionsonother Cityboardsorcommittees. CityCouncilAgenda:02/10/14 2 D.SUPPORTINGDATA: Application–AlanHeidemann CityCode,Title2,Chapter1-PlanningCommission MONTICELLO CITY CODE TITLE II / Chapter 1 / Page 1 CHAPTER 1 PLANNING COMMISSION SECTION: 2-1-1: Composition 2-1-2: Organization; Meetings 2-1-1: COMPOSITION: The Planning Commission shall consist of five members appointed by the Council. No member of the Planning Commission shall hold any other public office in the City. All members shall be appointed for three year terms; however, said term may be terminated earlier by the Council. One member shall hold office until December 31, 2000; two members shall hold office until December 31, 2001 and two members shall hold office until December 31, 2002. Annually thereafter, appointments shall be made for the term of three years. Said terms are to commence on the day of appointment. Vacancies during the terms shall be filled by the Council for the unexpired portion of the term. Every appointed member shall, before entering upon the discharge of his duties, take an oath that he will faithfully discharge the duties of his office. All members who attend at least one monthly meeting shall receive compensation of $50.00 for that month. (1/10/00, #337) All members who attend a special meeting, requested by an applicant who pays a special meeting fee set by the City, shall receive additional compensation of $50 for each special meeting attended. (11/22/99, #336) 2-1-2: ORGANIZATION; MEETINGS: The Commission shall elect a chairman from among its appointed members for a term of one year, and the Commission may create and fill such other offices as it may determine. The Planning Commission shall hold at least one regular meeting each month. This meeting shall be held on the first Tuesday. Regular meetings shall commence at 7:00 p.m. Hearings shall be heard as soon thereafter as possible. The Planning Commission shall adopt rules for the transaction of business and shall keep a record of its resolutions, transactions, and findings, which record shall be a public record. CityCouncilAgenda:2/10/14 1 5D.ConsiderationofadoptingResolution#2014-009authorizingpreparationof feasibilityreportforcompletingpublicimprovementsforHillsideFarm3rd and4th Additions,CityProjectNo.12C008 (AS/SB) A.REFERENCEANDBACKGROUND: StaffisrequestingCouncilauthorizationtoprepareaFeasibilityReportaddressingthe completionofrequiredpublicimprovementsforHillsideFarm3rd and4th Addition. Theseimprovementswereoriginallyintendedtobecompletedbytheprojectdeveloper, TrisonDevelopment.However,thedeveloperhasallowedthelotstogotaxforfeitand thelettersofcreditforthedevelopmentarenolongervalidfordrawtocompletethe improvements. StaffisrequestingthattheCityCouncilproceedwithauthorizingafeasibilityreportwith theintenttopubliclybidandcompletethepublicimprovementsasaspecialassessment project.Thecostfortheseimprovementsisintendedtobeassessedagainstthe47vacant andbenefittingpropertieswithinHillsideFarm3rd and4th Additions. TheCityhadpreviouslyfiledanAffidavitofDefaultagainsttheHillside3rd and4th Additionasrelatedtotheseimprovements,puttingthedeveloperandanyfuture purchaseroflotsonnoticethatthedeveloperhadnotmettherequiredtermsofthe developmentagreementforHillsideFarms3rd and4th Additions.Thisdefault,andthe incompletenatureofthedevelopment,rendersthelotsinthetwoadditionsunbuildable untilsuchtimeastherequiredimprovementsarecompleted. Theremainingpublicimprovementsincludethefinalliftofpavementonthe development’sinternalstreets,sidewalkconstructionalongDeerStreetandBison Avenue,utilityadjustments,clustermailboxplacement,trailconstructionalongFenning Avenueadjacenttothedevelopment,internaltrailextensionnorthofDeerStreetonthe eastsideofthedevelopment,siltfenceremoval,cleanup,andotherassociated appurtenantwork. TheFeasibilityReportwilladdressthelocationandscopeoftheproposedimprovements, estimatedcosts,availablefundingsources,apreliminaryprojectschedule,anda determinationastothenecessity,feasibilityandcost-effectivenessoftheproject. Asnoted,the47vacantlotsinHillside3rd and4th Additionaretaxforfeitandarenowin theStateofMinnesota’sname.WrightCountyadministersthemanagementandsaleof thesepropertiesonbehalfoftheState,andtheAuditor’sOfficehasindicatedthatit intendstoauctionthepropertiesinlatespringorearlysummer.Indiscussingthe remainingpublicimprovementsanddevelopmentstatusofthelots,theCityAttorney recommendscertifyingtheassessmentsandcompletingtheimprovementsassoonas possible,whilethereisonelotowner(theState)andwhiletheassessmentsfortheproject canbeincludedwithinthecountyauctionsaleprice.Theimprovementswouldbe completedthissummershortlyaftertheassessmentsarecertified.TheAttorneyalso CityCouncilAgenda:2/10/14 2 indicatedthattheCitymaybeabletorequestthattheTaxForfeitCommitteesellalllots asone,sothatonlyoneownerorentitywillpurchaseallthelots. Inregardtothepaymentofassessmentsforthisproject,theWrightCountyAttorney’s OfficehasindicatedthatiftheCityisabletolevythespecialassessmentforthispublic improvementprojectaftertaxforfeiturebutpriortoauction,thenewlyassignedspecial assessmentsmustbeincludedintheauctionbasesalevalue.Thisisincontrasttoany existingspecialassessmentsontheproperties,whichbystatestatutemustbecancelled. Asrelatedtoexistingspecialassessments,atthepresenttimeeachofthe30undeveloped lotsinHillsideFarm3rd Additionhasexistingunpaidspecialassessmentsof$8,961each, andthe17lotsinHillsideFarm4th Additionhave$12,072.26eachinunpaidspecial assessments.(Thesespecialassessmentsareprimarilyfortrunkareachargesandpark dedication.)Again,anyspecialassessmentleviedpriortotaxforfeiturewillbe cancelled.So,whiletheCountyTaxForfeitCommitteecannotguaranteethattheauction valueofthelotswillincludetheseexistingspecialassessmentvalues,thepastspecial assessmentsshallbepaidoutofanyrevenuefromthelotsale.Itshouldbenotedthatthe City’spreviously-certifiedspecialassessmentsarepaidfirstoutofrevenuefromthetax forfeitsale.Assuch,theCitywillworkwiththeCountyTaxForfeitCommitteetoset thelotvaluehighenoughtorecovernotonlythenewspecialassessments,butalsoas muchaspossibleofthepreviousspecialassessments.Anyauctionrevenueafterthe paymentofspecialassessmentsisthensplitamongtaxingjurisdictionsbasedona statute-definedformula.TheCitywillalsonotifytheCountythatitwillrecertifyany existingunpaidspecialassessmentsafterauctionsale,ifthevalueatauctionisnot enoughtocoverthepastspecialassessments. A1.BudgetImpact:Thepreliminarycostestimateforconstructingimprovementsis approximately$250,000,whichincludesconstructioncosts,10%contingencyand 20%indirectcosts.Thisisanunbudgetedimprovementproject.Thisestimate resultsinapproximately$5,300innewspecialassessmentstoeachundeveloped lot. StaffrecommendsusingtheCapitalProjectFundtofundtheprojectupfront, withthatsourcebeingpaidbackvialotsalerevenue. A2.StaffWorkloadImpact:WSBandin-houseengineeringstaffwillpreparethe FeasibilityReport.WSBestimatesafeeofapproximately$5,000tocompletethe report,whichwillultimatelybeincorporatedintothetotalprojectcostsandfinal assessmentamount. B.ALTERNATIVEACTIONS: 1.MotiontoadoptResolution#2014-009authorizingpreparationoffeasibility reportforcompletingpublicimprovementsforHillside3rd and4th Additionsata costofapproximately$5,000. CityCouncilAgenda:2/10/14 3 2.MotiontodenyadoptionofResolution#2014-009atthistime. C.STAFFRECOMMENDATION: CitystaffrecommendsapprovingAlternative#1.Itiscriticaltothebuild-outofthese lotsandthecompletionoftheHillsideFarmdevelopmentthatthepublicimprovements becompletedfortheseparcels.Aspreviouslynoted,theCityAttorneyhasrecommended completionoftheimprovementswhilethereisoneownertoassessandtheabilityto completetheprojectpriortodemandforbuild-out. Itshouldbenotedthattheproposedpublicimprovementsincludethecompletionofa segmentoftheFenningAvenuepathwayadjacenttothedevelopment.Thecompletion ofthispathwaysegmentwasoriginaltotheHillsideFarmdevelopmentplan.However, staffalsointendstobringforward,atafutureCouncilmeeting,optionsforcompletionof theFenningpathwayfromthenorthsideoftheHillsideFarmdevelopmentthroughtoits connectionpointonthenorthsideoftheMonteClubHillatSpiritHills.Citystaffhad presentedoptionstotheCityinapreviousfeasibilitystudy,notingthatthispathway segmentisacriticalconnectingroutefortheRollingWoodsandHillsideFarms developmentstolocalschoolsandtotheSchoolBoulevardpathwaysystem,representing animportantpedestriansafetyimprovement. D.SUPPORTINGDATA: Resolution#2014-009 AerialimageofHillsideFarm3rd &4th Additions AffidavitofDefault StateDelinquentRealPropertyTaxesGuidebook,Excerpts CITYOFMONTICELLO WRIGHTCOUNTY,MINNESOTA RESOLUTIONNO.2014-009 AUTHORIZINGTHEPREPARATIONOFAFEASIBILITYREPORT FORCOMPLETIONOFPUBLICIMPROVEMENTSFOR HILLSIDE3RD AND4TH ADDITIONS CITYPROJECTNO.12C008 WHEREAS,itisproposedtoimprovethefinalliftofpavementonthedevelopment’sinternal streets,sidewalkconstructionalongDeerStreetandBisonAvenue,utilityadjustments,cluster mailboxplacement,trailconstructionalongFenningAvenueadjacenttothedevelopment, internaltrailextensionnorthofDeerStreetontheeastsideofthedevelopment,siltfence removal,cleanup,andothernecessaryappurtenantwork,andtoassessthebenefittingproperties foralloraportionofthecostoftheimprovements,pursuanttoMinnesotaStatutes,Chapter429. NOWTHEREFORE,BEITRESOLVEDBYTHECITYCOUNCILOFMONTICELLO, MINNESOTA:ThattheproposedimprovementbereferredtoWSB&Associates,andthatthey areinstructedtoreportbacktotheCouncilwithallconvenientspeedadvisingtheCouncilina preliminarywayastowhethertheproposedimprovementisnecessary,cost-effective,and feasible;whetheritshouldbestbemadeasproposedorinconnectionwithsomeother improvement;andtheestimatedcostoftheimprovementasrecommended. ADOPTEDBY theMonticelloCityCouncilthis10th dayofFebruary,2014. CITYOFMONTICELLO ________________________________________ ClintHerbst,Mayor ATTEST: ____________________________________ JeffO’Neill,CityAdministrator CityCouncilAgenda:02/10/14 1 5E.Considerationofapprovingsupplementalcontributionof$100totheGreaterMN RegionalParks&TrailsCoalition (AS) A.REFERENCEANDBACKGROUND TheCityCouncilisaskedtocontributeanadditional$100totheGreaterMNParks& TrailsCoalition(GMRPTC)overandabovethebaseannualmembershipduesof$225.00 for2014. TheCityofMonticellohasbeenamemberoftheCoalitionsinceitsinceptionandhas budgetedthebasemembershipfeeintheParksbudgeteachyear.However,for2014,the CityCouncilisaskedtofundinadditionanewoptional“check-off”ontheannual membershipform.Thisoptionalcontributionisintendedspecificallytoassistthe CoalitioninfundingcontinuedgovernmentrelationseffortsattheStatelegislature. AstheCouncilmayrecall,theGreaterMNRegionalParksandTrailsCoalitionwas formedinparttoencourageandsupporteffortstobalancegrantfundsavailabletoparks andtrailsingreaterMinnesota.Thisincludesfundingmadeavailablethroughthe2008 MinnesotaCleanWater,LandandLegacyProgram.DuetoGMRPTCefforts,parksand trailsingreaterMinnesotahavemaintainedfeetonthegroundatthecapital,ensuring accesstoover$8millioningrantfundsavailablein2014and2015. GreaterMinnesotaparksandtrailshaveonlybeenabletomaintainthisfundingleveldue totheworkofCoalitionmembersandaconsultinggovernmentrelationsrepresentative. Thisworkresultedin20%oftheLegacyPark&Trailsalestaxesgoingexclusivelyto GreaterMinnesotajurisdictions.Previously,GreaterMinnesota’s80countiesand numerouscitieshadtocompetewiththeMetropolitanRegionforthe14%oftheLegacy Park&TrailFundsdesignatedtoa“statewide”grantprogram. Inaddition,theCoalition’seffortshaveresultedinachangeinmatchformulaforLegacy grants,allowingforaStatematchofupto90%ofagrantapplication’sprojectcost.This onlyhappenedbecauseoftheGreaterMinnesotaRegionalParks&TrailsCoalition’s workattheLegislatureinthe2011session. ItisexpectedthatMetroactivistsandtheirlobbyistswillcontinuetoflextheirmuscleat thecapitalforalargerpercentageofgrantfundsthancurrentlyallotted (at40%Metro/ 40%DNR/20%GreaterMN).Iftheysucceed,itwillbeattheexpenseofGreater Minnesotacountiesandcities. TheoptionalcontributionwillsupporttheCoalition’scontinuedfundingofthe governmentrelationsconsultant,keytokeepingtheabove-mentionedfundingformulas. TheCityofMonticellohasbeenamemberoftheGreaterMNParksandTrailsCoalition sinceitsinceptionin2011andtheCityhasdirectlybenefitedfromtheGMRPTCefforts. Infact,theCityofMonticelloandWrightCounty’scooperativegrantapplicationshave beenthesinglelargestrecipientofLegacyParkandTrailgrantsforboththe2012and 2013grantingcycles. 2 A1.BudgetImpact:TheParksDepartmenthasavailablebudgetresourcesforthe $225annualmembershipfeefor2014.TheParksDepartmentbudgethas adequatefundsforthe$100optionalcontribution. Asthebudgetamountisunder$500forboththeannualmembershipand contribution,infutureyears,staffwillbudgetforthisoptionalcontribution expense,therebyeliminatingseparateCouncilactionforeachyear.However,as thisisanewprogramassociatedwiththeGMRPTCmembership,stafffeltit importanttobringforwardforCouncilreviewseparatefrombudgeted membership. Indirectly,theworkoftheCoalitioncontinuestopositivelyimpacttheCity’s fundingoftheBertramChainofLakesRegionalParkproject.Overtime,the 90%Statematchwith10%localmatchgrantsreceivedbytheCityandCounty havereducedbothentity’srequiredlocalmatch,whichwasoriginallysetat1/3 eachfortheState,CityandCounty. A2.StaffImpact:None. B.ALTERNATIVEACTIONS 1.Motiontoapproveasupplementalcontributionof$100totheGreaterMN RegionalParks&TrailsCoalitioninadditionto2014basemembershipfeeof $225. 2.Motiontotableactionforfurtherresearchanddiscussion. C.STAFFRECOMMENDATION StaffrecommendsAlternative#1above.StaffbelievesthattheGreaterMinnesota RegionalParksandTrailsCoalition’sgovernmentrelationseffortshavebeen instrumentaltoprotectingandenhancinggreaterMinnesota’sopportunitiesforParksand TrailsLegacyFunding.Thechangetograntfundingformulashasdirectlybenefittedthe City’sparkandtrailgrantapplicationwork.ContinuedworkbyGMRPTCwillnotonly keeptheopportunitiesgainedinplace,butalsoassistinrestoringandincreasingother grantopportunities,suchasfundingfortheDNROutdoorRecreationGrantProgramand theLocalTrailsConnectionsProgram,bothofwhichMonticellohasappliedtoand receivedfundingfrominthepast. D.SUPPORTINGDATA GreaterMNRegionalParks&TrailsCoalition2014MembershipInformation Interim Executive Committee: Current Nominations Improving the quality of life for the citizens of Minnesota by providing recreational opportunities, promoting Improving the quality of life for the citizens of Minnesota by providing recreational opportunities, promoting legislative funding opportunities, and networking regional parks and trails throughout Greater Minnesota.legislative funding opportunities, and networking regional parks and trails throughout Greater Minnesota. GREATER MINNESOTA REGIONAL PARKS & TRAILS COALITION (GMRPTC) Why should you join? Because GREATER MINNESOTA REGIONAL PARKS & TRAILS COALITION was suc- cessful in 2013 in insuring that 20% of the funds from the 42.5 million or 8.4 million was avail- able for parks and trails in Greater Minnesota increasing the allocation from 14% in 2012. Because GREATER MINNESOTA REGIONAL PARKS & TRAILS was successful in con- vincing the 2013 Legislature to establishe in statute The Greater Minnesota Parks and Trails Commission. This will ensure that funding recommendations will be made by people from Greater Minnesota. Because there are continued threats to the progress that was made last year from the metro area that would like to reduce the 20% formula in 2015 and the GREATER MINNESOTA RE- GIONAL PARKS & TRAILS COALITION’S response to protect the funding must be strong and timely. Because two state funded programs administered by the DNR Outdoor Recreation Grant Pro- gram and The Local Trails Connections Program have not been fully funded in the last few years the GREATER MINNESOTA REGIONAL PARKS & TRAILS COALITION’S will work to restore that source of funding for communities during the next two legislative sessions. Without your membership in the GREATER MINNESOTA REGIONAL PARKS & TRAILS COALITION the availability of funding from the current Legacy Park & Trail Funding alloca- tion will likely diminish. While local resources continue to decrease, your membership fee will be justified by greatly increasing the opportunities to secure grant funding for Park & Trail related projects benefiting your community. Sincerely, John Ongaro – Region 1, Duluth Dave Akre– Region 2, East Grand Forks Brad Green – Region 3, Detroit Lakes Peter Theisman– Region 4, Stearns Vacant - Region 5, Vacant - Region 6, Laird Mork - Chair, Chisago County Marcia Larson— Vice Chair Bemidji City Angela Schumann- Sec./Treasurer, Monticello City Chairman Greater Minnesota Parks and Trails Coalition, Parks Director Chisago County INVOICE Due Date 2/ 10/2014 Greater MN Regional Parks & Trails Coalition % Angela Schumann, AICP Community Development Director City of Monticello www.ci.monticello.mn.us 763-271-3224 2014 Membership Form The GMRPTC is moving forward to fund government affairs representation that will build key leg- islative support and bring equity to Greater Minnesota from Legacy and other Park & Trail fund- ing sources. To cover related costs and to become a voting member of the GMRPTC your mem- bership fee is required by January 31, 2014 Organization Name __________________________________________________________ Contact Name ______________________________________________________________ Address ___________________________________________________________________ City _____________________________________ State _______ Zip _____________ Phone ________________________________________ House Dist. ____ Senate Dist ____ E-Mail _____________________________________________________________________ Please make checks payable to GMRPT Coalition Please mail completed form and check to GMRPT Coalition: Attn: Angela Schumann AICP 505 Walnut Street - Monticello, Minnesota - 55362 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2014 Membership Fees are based on population as follows, Please check the appropriate box: ___ $150 for jurisdictions with a population base of 10,000 or less ___ $225 for jurisdictions with a population base of 10,001 to 25,000 ___ $300 for jurisdictions with a population base of 25,001 or more ___ $30 for personal / individual membership ___ $125 for non-profit group membership ___ $350 for corporate membership ___ Optional Donation Total enclosed $ _____________ CityCouncilAgenda:02/10/14 1 7A.ConsiderationofadoptingResolution#2014-008approvingadetouragreementwith MnDOTfordetouringtrafficonChelseaRoadinconjunctionwiththeI-94 reconstructionproject (SB) A.REFERENCEANDBACKGROUND: I-94ProjectDescription AsCouncilisaware,MnDOTwillbereconstructingI-94toreplacethedeteriorated pavementandtoaddresssafetyconcernsrelatedtotrafficweavingissuesbetweenTH25 andCSAH18astrafficmergesontothefreeway.MnDOTrepresentativeswillbeatthe Councilmeetingpresentingtheproject.Staffhasspentasignificantamountoftimewith MnDOTdiscussingtheprojectandconcernsrelatedtopotentialtrafficimpactstothe community.Weanticipatethatwhileconstructioncauseschangesinthewaywetravel temporarily,MnDOTwillmakeeveryefforttomitigatetheseconcernsduring construction.Theoutcomeofthisprojectwillresultinasafermodeoftravelspecifically astrafficmergesontothefreewayfromMonticello. Ingeneral,theprojectwillreplacetheconcretepavementonI-94andincludeswidening intothecentermedian,installingaconcretebarrierbetweeneastboundandwestbound insidelanes,separatingtheeastboundTH25rampandloopfrommainlinetrafficwitha raisedconcretebarrier,constructinganeastboundaccelerationlane,andconstructinga westboundauxiliarylanebetweentheentranceloopatCSAH18andexitrampatTH25. TheprojectalsoincludesreconstructingthepavementforallrampsandloopsattheTH 25/I-95InterchangeandreplacingpavementwheretheCSAH18looprampstieintoI-94. PedestrianrampimprovementswillbecompletedattheNErampandtheTH25/ OakwoodAvenueintersection.AdedicatedrightturnlanetonorthboundTH25willbe addedattheNEofframp.Theprojectincludesa20-foothighnoisewall970feetin lengthbeconstructedalongtheBluffsApartmentcomplexonthenorthsideofI-94.As previouslybroughttotheCouncil,batterybackupswillbeaddedatthesignalsalongTH 25fromOakwoodDriveto7th Street. Staging,rampclosures,anddetoursfortheprojectaregenerallydescribedbelow. EnclosedwiththesupportingdataisadraftofthepowerpointpresentationMnDOTwill present,alongwithdetourplansthatdescribethedifferentconstructionstagesand associatedclosuresanddetourroutesfortheproject. Theprojectwillbestagedtokeeptwolanesoftrafficineachdirectionopen duringdaytimehours. Thewestboundlaneswillbereconstructedfirst,withtrafficshiftedtothe eastboundlanesfromapproximatelyMay1toJuly1.(referredtoasStage2) Theeastboundlaneswillbereconstructednextwithtrafficshiftedovertothenew westboundlanesfromapproximatelyJuly1toSeptember1.(referredtoasStage 3) CityCouncilAgenda:02/10/14 2 Amajorityoftherampclosuresanddetoursareanticipatedtotakeplacebetween May1andSeptember1.Allclosuresanddetourswillrequireadvancenotice (typically7days). AccesstoandfromeastboundI-94: o TheeastboundonrampandloopfromTH25toeastboundI-94willbe closedforthedurationoftheprojectasthereislimitedmergingspace whenalltrafficisshiftedtotheeastboundlanesandinordertoconstruct themedianbarriertoseparatemergingtraffic.Trafficwillbedetouredvia ChelseaRoadtotheeastboundon-rampatCSAH18. o TheeastboundonrampfromCSAH18willbeopenatalltimes. o OnlyoneoftheeastboundI-94offramps,eitheratTH25orCSAH18, willbeclosedatatime.Theywillnotbeclosedconcurrently. AccesstoandfromwestboundI-94: o ThewestboundonramptoI-94fromCSAH18willbeclosedforthe durationoftheprojectforconstructionofthewestboundlanesandthereis limitedmergingspacewhenalltrafficisshiftedtothenewwestbound lanes. o Foramaximumperiodof30days,thewestboundonramptoI-94from TH25willalsobeclosedtoreconstructtheramp.AccesstowestboundI- 94willbedetouredtoCSAH75totheinterchangeinHasty.Initially, MnDOTwasproposingtohavethisdetourinplacefor90days;however staffraisedconcernsovertheimpactswiththis,andthecontractorhas stagedtheprojectaccordinglytokeeptheclosurelimitedto30dayswhen therampisreconstructed. o ThewestboundI-94offramptoTH25willbeclosedduringStage2. o ThewestboundofframptoCSAH18willbeopenatalltimes. StaffhasalsodiscussedthefollowingitemswithMnDOTrelatedtotheproject: EmergencyvehicleaccesstoI-94whenbothoreitherinterchangesareclosed. Theprojectcontractstipulatesthatthecontractoristoprovideaccessto emergencyvehiclesatalltime.MnDOThasindicatedtheywillprovidea passablelanefromeitherinterchangeifemergencyaccessisneededoremergency vehiclescouldturnaroundoutsideoftheprojectlimitsinthegrassmedianonI- 94. Therewillbeanobviousimpacttolocalbusinesseswiththeconstructionand trafficdetoursthatcanbeviewedasbothpositiveandnegative.MnDOThas indicatedthattheywillhaveadesignatedpersonactingasaliaisontothe businessesandhaslaunchedacommunicationsplanasdescribedbelowtonotify businessesduringconstruction.Signageandcommunicationarethekeytoolsto makingthisasmoothtransition. Directionalsignagewillbeprovidedtothedowntownbusinessareaalongthe detourroutes.Thiswillconsistofthelargeorangesignsthatwillhavelanguage suchas“ToMonticelloBusiness”or“ToTH25Businesses”. CityCouncilAgenda:02/10/14 3 MnDOThasindicatedthattheywillmakemodificationstosignalsystems,such asadjustingtiminglengths,etc.andwillprovideadditionaltrafficsignageas neededfortheprojectbasedonhowtrafficoperatesduringconstruction. MnDOThaslaunchedawebsiteforthisproject: http://www.dot.state.mn.us/d3/monti/andwillprovidedetaileddetourmaps, brochurestotheCity,businesses,otherstakeholders,emailupdates,pressreleases totheMonticelloTimes,StarTribune,newsnetworks,etc.CityStaffhave alreadypostedlinksontheCity’sFacebookpagetoMnDOT’swebsiteforthis projectanditisonthewebsitescrollandwillcontinuetobeincontactwith MnDOTduringthecourseoftheproject. Individualstakeholders(i.e.Hoglandbuscompany,RiverRider,Hospital,Xcel Energy,Cargill,otherhighusers,tonameafew)willbecontacteddirectlyby MnDOTabouttheproject. Thefollowingmeetingshavebeenscheduledtopresenttheproject. February10@7p.m.,MonticelloCityHall–PresentationofprojecttotheCity Council-CouncilconsiderationofapprovingDetourAgreement February11@7a.m.,MonticelloCityHall–InformationalMeeting: Presentationofprojecttothebusinesscommunity,hostedbyIEDC. February18(datetentative)–MonticelloChamberofCommerceLuncheon- Presentationoftheproject March 3from5:00p.m.to6:30p.m.-PublicInformationalMeeting(open house)atMonticelloCityHall.Thecontractor,ShaferContracting,willattendthe meeting. DetourAgreement ChelseaRoad,fromTH25toCSAH18,willbethedesignatedcitystreetdetourroutefor theprojecttoaccesstheCSAH18interchangewhentheinterchangeatTH25isclosed. Statestatute161.25allowsfortheStatetodetourtrafficontoapublicstreetoranother highwayandmaintainitassuchforthedurationofthedetourandthenmustrestorethe roadwaytoasgoodaconditionaspriortothedetour.Concernsbetweenagenciesin definingtheconditionoftheroadwayandrestorationpracticesledMnDOTtocompletea DetourManagementStudyin1990thatformulatesacompensationmethodandvalueto applytothedetourroutes.TheGasTaxMethodisproposedtobeusedtocompensatethe CityfortheincreaseintrafficonChelseaRoadforthedurationofthedetour.This methodtakesthegastaxrevenuetheStatewouldhavegeneratedfromtrafficaccessing thefreewayandprovidesittotheCityfortheactualfreewaytrafficbeingdetoured.This methodandtheproposeddetouragreementareusedinlieuoftheStatehavingto“restore theroadwaytoasgoodaconditionaspriortothedetour”perstatute.Thecitywould waivethisstatutoryrequirementbyexecutingtheproposeddetouragreement. CityCouncilAgenda:02/10/14 4 Thedetouragreementincludesthesekeypoints: Compensation: o MnDOTwillcompensatetheCityatanestimatedat$7,039basedongas taxrevenuemadebyactualtrafficvolumeincreaseswhenthedetourisin effect(estimatedfromMay1toSeptember1,2014).Trafficcountson ChelseaRoadwillbetakenpriortoconstructionandduringconstruction todeterminetheincreaseintrafficvolumes.Staffrecognizesthatother collectorroadwayswillseeanincreaseintraffic. o TheCouncilcanconsiderhavingtrafficcountstakenattheCity’sexpense on7th Streetand/orSchoolBoulevardforexample,tojustifyanincreasein trafficduringthedetour.MnDOThasindicatedthatcompensationtothe Citywillbemadeusingthesamemethodforanyjustifiedincreasetraffic whenthedetourisineffect. TrafficImpacts: o TheestimatedtrafficvolumeincreaseonChelseaRoadis9,535vehicles perday.ThecurrentdailyaveragetrafficvolumeonChelseaRoadis 3,800vehiclesperday.Thisisasignificantincreaseintrafficandthe current2lanescanaccommodatetheincreasetraffic.Concernswithside streetsaccessingChelseaRoadandadditionalsignageortrafficcontrol neededwillbemonitoredbyMnDOTandaccommodationsmade. o ThereisasegmentofChelseaRoadfromEdmonsonAvenuetoThomas ParkDrivethatisinpoorcondition.Staffhasconcernsthatthissegment mayrequirereconstructionsoonerthanlaterbasedontheincreased volumeoftrafficproposedwiththeproject.Itisdifficulttodetermine whattheimpactwouldbefortheshorttermandlongtermandfurther pavementtesting,consistingofpavementdeflectiontestingbeforeand aftertheprojectwouldbetimeconsumingandcost-prohibitivegiventhis smallsegmentofroadway. o ItshouldbenotedthattheincreaseintrafficprojectedonCSAH75is estimatedat9,000vehiclesperday.WrightCountyhasalreadyapproved asimilardetouragreementwithMnDOTfortheproject. o Itisimportanttopointoutthattheabove-notedincreasesintrafficarejust anestimate,driverswilllikelyfindotherroutestonavigatearoundthe closuresandthetrafficvolumescouldbeloweronthedetourroutes. Maintenance: o MnDOTwillperformanynecessarypavementpatchingandordinary maintenanceonChelseaRoad.MnDOTvideotapedthepavementon ChelseaRoadandwilldosoagainafterconstructiontoassistin determiningifpatchingisneeded. A1.BudgetImpact:TheCitywillbecompensatedapproximately$7,039forthe increaseintrafficprojectedonChelseaRoad.Theactualamountwillbe determinedafterconstructionisoverandwillbebasedonactualincreasein trafficvolumesanddurationofthedetour. CityCouncilAgenda:02/10/14 5 A2.StaffWorkloadImpact:StaffhasspenttimeworkingwithMnDOTtoaddress ourconcernsandwilldosoduringconstructiontoassistinkeepingtheresidents andbusinessesinMonticelloinformed. B.ALTERNATIVEACTIONS: 1.MotiontoadoptResolution#2014-008approvingadetouragreementwith MnDOTfordetouringtrafficonChelseaRoadinconjunctionwiththeI-94 reconstructionproject. 2.MotiontodenyadoptionofResolution#2014-008atthistime. Ifthisalternativeischosen,MnDOTstillhastheauthoritytoimplementthe detouronChelseaRoad.TheCitywillthenneedtoworkwithMnDOTto determinewhatrepairsontheroadareneededbasedonthevisibledamageonthe roadway.Thismethodhasbeenproventobemoredifficultandsubjective. C.STAFFRECOMMENDATION: StaffrecommendsAlternative#1.Thedetouragreement,usingthegastaxrevenue,isa simplermethodofcompensationwhilestillprovidingreasonablecompensation. StaffhasspentasignificantamountoftimewithMnDOTdiscussingtheprojectand concernsrelatedtopotentialtrafficimpactstothecommunity.Staffwillbeasproactive aspossiblewithMnDOTinidentifyingconcernsinadvanceoftheprojectandwill providesupportindevelopmentofthecommunicationsprogramforMnDOTandthe City. Weanticipatethatwhileconstructioncauseschangesinthewaywetraveltemporarily, MnDOTwillmakeeveryefforttomitigatetheseconcernsduringconstruction.The outcomeofthisprojectwillresultinasafermodeoftravelspecificallyastrafficmerges ontothefreewayfromMonticello. D.SUPPORTINGDATA: A.Resolution#2014-008 B.MnDOTDetourAgreement C.DraftMnDOTpowerpointpresentation D.Constructionstagingdrawings(stage2&3) 1990DetourManagementStudyavailableatCityHall CITYOFMONTICELLO WRIGHTCOUNTY,MINNESOTA RESOLUTIONNO.2014-008 APPROVINGAROUTEDETOURAGREEMENTWITHTHEMINNESOTA DEPARTMENTOFTRANSPORTATIONINCONJUNCTIONWITHTHE I-94RECONSTRUCTIONPROJECT WHEREAS,theStateofMinnesotaisplanningaroutedetourthroughtheCityofMonticelloin conjunctionwiththeI-94ReconstructionProjectNo.8680-158; NOW,THEREFOREBEITRESOLVED,thattheCityofMonticelloenterintoMn/DOT AgreementNo.05154withtheStateofMinnesota,DepartmentofTransportationforthe followingpurposes: ToprovideforpaymentbytheStatetotheCityforuseofChelseaRoadasanI-94detour routeduringthecontractconstructiontobeperformedupon,along,andadjacenttoTrunk HighwayNo.94fromwestofT.H.25toeastofWrightCSAH18inMonticellounder StateProjectNo.8680-158(T.H.94). BEITFURTHERRESOLVED thattheMayorandCityAdministratorareherebyauthorizedto executetheAgreementandanyamendmentstotheAgreement. ADOPTEDBY theMonticelloCityCouncilonthe10th dayofFebruary,2014. CITYOFMONTICELLO __________________________________ ClintHerbst,Mayor ATTEST: ______________________________________ JeffO’Neill,CityAdministrator CITYOFMONTICELLO WRIGHTCOUNTY,MINNESOTA RESOLUTIONNO.2014-008 CERTIFICATION STATEOFMINNESOTA COUNTYOFWRIGHT Iherebycertifythattheforegoingisatrueandcorrectcopyofaresolutiondulypassed, adoptedandapprovedbytheMonticelloCityCouncilattheirscheduledmeetingonFebruary10, 2014,andrecordedinminutesofsaidmeeting. ____________________________________ JeffO’Neill,CityAdministrator NotaryPublic:_______________________________ Date:___________________________ (STAMP) Hwy 25 to Wright CR 18 in Monticello DRAFT Deteriorated Pavement Merge issues between CSAH 18 and TH 25 interchanges on Westbound I-94 Merge issues with traffic entering Eastbound I-94 from the TH 25 loop and ramp Need for Project Reconstruct into center median Install concrete raised median barrier between EB and WB lanes Install storm sewer to drain median to ditches Replace all pavement Reconstruct ramps at TH 25 Add wide inside shoulders Add WB auxiliary lane between CSAH 18 and TH 25 Separate EB loop and ramp from mainline I- 94 Build noise barrier on north side of I-94 at Monticello Bluffs apartment complex Bids opened December 2013 Awarded to Shafer Construction January 2014 Construction start: April 1st (weather permitting) Construction complete: November 1st 55mph speed limit in the work zone 4 lanes of traffic open during daytime ◦Single lane closures at night during stages 1 and 4 WB off ramp at CSAH 18 open at all times EB on ramp at CSAH 18 open at all times About this project Stage 1: ◦Night work ◦Single lane closures ◦Build crossovers between EB and WB lanes for traffic switches ◦Add temporary widening to EB shoulders, and short section of WB shoulder ◦Add temporary widening in the center median Stage 1 – Prep Work Construct temp crossovers and widen shoulders N Stage 2 ◦All traffic switched to EB lanes ◦WB on-loop from CSAH 18 closed for the entire project ◦WB off-ramp at TH 25 closed to reconstruct the ramp and add a turn lane ◦WB on-ramp closed for reconstruction – detour via CSAH 75 to Hasty interchange ◦Ramp and Loop from TH 25 closed ◦Contractor builds new WB lanes and shoulders ◦Contractor installs storm sewer and raised median barrier Stage 2 – Reconstruct WB Access WB I-94 at Hasty (30 day detour) Access EB I-94 Thru town Closed N Stage 2 – WB TH 25 ramp detour WB I-94 access at Hasty (30 day detour) EB I-94 access Thru Town Closed N Maximum of 30 days! Stage 3 ◦All traffic switched to new WB lanes ◦EB exits at TH 25 and CSAH 18 closed but not at the same time ◦Keep WB TH 25 on ramp open ◦Contractor building new EB lanes and barrier separating the EB TH 25 loop and ramp from mainline Stage 3 – Reconstruct EB Ramp access thru town Closed Alternate closures Similar to TH 101 EB at Rogers Night Work Single lane closures Remove crossovers and temporary widening Stage 4 – Wrap up Remove crossovers Construction depends on contractor schedule Kirk Allen, Construction Project Supervisor ◦Kirk.allen@state.mn.us ◦Office 320-223-6535 J.P. Gillach, Information Officer ◦James.gillach@state.mn.us ◦Office 218-828-5706 Stay connected Project Web mndot.gov/d3/monti/ Travel Info 511 511mn.org Project email updates mndot.gov