Planning Commission Agenda 04-05-2016
AGENDA
REGULAR MEETING - MONTICELLO PLANNING COMMISSION
Tuesday, April 5th, 2016 - 6:00 p.m.
Mississippi Room, Monticello Community Center
Commissioners: Brad Fyle, Linda Buchmann, Sam Murdoff, John Falenschek,
Marc Simpson
Council Liaison: Charlotte Gabler
Staff: Angela Schumann, Steve Grittman (NAC), John Rued
1. General Business
A. Call to Order
B. Consideration of approving minutes
a. Special Meeting Minutes – March 2nd, 2016
b. Regular Meeting Minutes – March 2nd, 2016
C. Citizen Comments
D. Consideration of adding items to the agenda
2. Public Hearings
A. Continued Public Hearing – Consideration of a request for amendment to the
Official Zoning Map for rezoning to CCD Residential Overlay District (CCD-R) to
accommodate multiple family attached housing, including residential uses on the
ground floor as per Chapter 3.7(J) Overlay Zoning Districts of the Monticello
Zoning Code
Applicant: Masters Fifth Avenue, Inc.
B. Public Hearing – Consideration of a request for Conditional Use Permit (CUP) to
accommodate multiple family attached housing, including residential uses on the
ground floor in a proposed Central Community District-Residential (CCD-R)
District
Applicant: Masters Fifth Avenue, Inc.
C. Public Hearing – Consideration of a request for Ordinance Amendment for
rezoning to PUD, application for Development Stage Planned Unit Development
(PUD) for a multiple family attached housing project in the Central Community
District (CCD).
Applicant: Masters Fifth Avenue, Inc.
D. Public Hearing – Consideration of a request for an Amendment to Conditional
Use Permit (CUP) for Development Stage Planned Unit Development (PUD) for a
single lot development in the B-4 (Regional Business) District
JOINT PLANNING COMMISSION/CITY COUNCIL WORKSHOP
Sign Ordinance
4:30 PM - Academy Room, City Hall
Applicant: Retail Partners Monticello, LLC
3. Regular Agenda
A. Consideration to review land use and zoning for 1547 East Broadway.
B. Consideration of the Community Development Directors Report
4. Added Items
5. Adjournment
MINUTES
SPECIAL MEETING - MONTICELLO PLANNING COMMISSION AND
MONTICELLO CITY COUNCIL
Wednesday, March 2nd, 2016 - 4:30 PM - Academy Room, Monticello Community Center
Commissioners: Brad Fyle, Linda Buchmann, Sam Murdoff, Marc Simpson, John Falenschek
Council Members: Mayor Brian Stumpf, Charlotte Gabler, Tom Perrault
Absent: Lloyd Hilgart, Glen Posusta
Others: Jeff O’Neill, Angela Schumann, Steve Grittman (NAC), Bill Demeules
(EDA), Bill Tapper (EDA), Barry Fluth, Brad Hiltz, Lisa Hiltz, Joe Gruba,
Dave Krause, John Koppy
1. Call to Order
Brad Fyle called the special meeting to order at 4:30 p.m.
2. Consideration of a Planned Unit Development Concept Proposal in the Central
Community District (CCD) to accommodate multiple family attached housing,
including residential uses on the ground floor. Applicant: Master’s Fifth Avenue
Steve Grittman indicated that the purpose of the meeting is to review a Planned Unit
Development (PUD) Concept Proposal to rezone property at 3rd and Locust Streets to
allow ground floor residential housing and identify issues to be addressed as part of the
Development Stage PUD. He noted that staff had identified a number of site planning
specifications as important development considerations. These included pavement design,
sidewalk access, on-street angled parking, continuity of street lighting theme, garage
placement, garage design and materials, use of curb and landscaping to separate areas,
elevation finishes and design treatments consistent with Embracing Downtown Plan
Design guidelines, building elevations as shown on the included plans and other elements
based on final design.
Grittman pointed out that the applicant had opted to request a rezoning to Planned Unit
Development (PUD) as an alternative option to the initially submitted request to rezone
the site to Central Community District-Residential (CCD-R) Overlay District upon
learning that the proposed density exceeds the amount allowable within the CCD-R. He
suggested that rezoning to PUD would provide an opportunity to establish flexible
development standards to accommodate the 23 unit density proposed for the project.
Grittman noted that the proposal meets parking requirements for the proposed density for
multi-family housing in the downtown. There was considerable discussion related to
existing and future parking availability and traffic flow and some concern that the
proposed project might further restrict the area parking options.
There was also some concern noted that the garage configuration proposed might impact
business for those establishments which rely on visibility and access from both a front
Special Planning Commission Minutes: 03/02/16
2
entrance on Broadway and a rear entrance from the parking lot. Several alternative garage
scenarios and building configurations were suggested.
Grittman summarized that there seemed to no significant objection to ground floor
residential use on this site. He indicated that staff would consult with the applicant to
review site plan and parking options to address the issues discussed.
3. Adjournment
SAM MURDOFF MOVED TO ADJOURN THE SPECIAL MEETING AT 5:27 PM.
LINDA BUCHMANN SECONDED THE MOTION. MOTION CARRIED 8-0.
Recorder: Kerry Burri ___
Approved:
Attest: ____________________________________________
Angela Schumann, Community Development Director
MINUTES
REGULAR MEETING - MONTICELLO PLANNING COMMISSION
Wednesday, March 2nd, 2016 - 6:00 p.m. Mississippi Room, Monticello Community Center
Present: Brad Fyle, Marc Simpson, Linda Buchmann, Sam Murdoff
Absent: John Falenschek
Others: Angela Schumann, Steve Grittman (NAC), Charlotte Gabler
1. General Business
A. Call to Order
Brad Fyle called the meeting to order at 6:02 p.m.
B. Consideration of approving minutes
SAM MURDOFF MOVED TO APPROVE THE FEBRUARY 2ND, 2016 MEETING
MINUTES. LINDA BUCHMANN SECONDED THE MOTION. MOTION
CARRIED 4-0.
C. Citizen Comments None
D. Consideration of adding items to the agenda
Broadway Market Site Update (Gabler)
Cruiser’s Site Update (Simpson)
2. Public Hearings
A. Public Hearing - Consideration of a request for a Conditional Use Permit for Co-
location of a Wireless Telecommunication Service Antenna on a City Water Tower
Applicant: Verizon Wireless. Planning Case Number: 2016-003
Steve Grittman explained that the applicant had requested a Conditional Use Permit
(CUP) to allow for the construction of wireless antenna equipment on top of the water
tower and a ground equipment building at the base of the tower on City-owned property
located at 3692 School Boulevard.
Grittman indicated that the proposal complies with CUP requirements and
recommended approval of the request pending the structural engineer’s review and
approval and subject to conditions specified in Exhibit Z.
Brad Fyle opened the public hearing.
Brent Kabat from Buell Consulting introduced himself as the applicant on behalf of
Verizon. He explained that a tan aggregate pebble finish was proposed in response to a
Planning Commission Minutes: 3/02/16
2
question about building material. Kabat confirmed that he had no issues with the
conditions of approval specified in Exhibit Z.
As there were no further comments, the public hearing was closed.
Decision 1: Resolution recommending approval of a CUP for the construction of
telecommunication antenna equipment and equipment building.
SAM MURDOFF MOVED TO APPROVE RESOLUTION PC-2016-005
RECOMMENDING APPROVAL OF THE CONDITIONAL USE PERMIT
PENDING THE STRUCTURAL ENGINEER’S REVIEW AND APPROVAL AND
ON THOSE CONDITIONS IDENTIFIED IN EXHIBIT Z. LINDA BUCHMANN
SECONDED THE MOTION. MOTION CARRIED 4-0.
Exhibit Z
Conditions of Approval – Conditional Use Permit
Verizon Wireless – Jefferson Commons Water Tower
1. Structural engineer review of the support structures by the City.
2. Continued coordination with FiberNet Monticello with regard to FiberNet use
and equipment on the Water Tower.
3. Removal from the plan of the 2 proposed trees along the south fence line in
front of the existing gate.
4. Execution of a lease with the City for the site as approved by the City Council.
Grittman noted that this request will be included on the March 28th Council agenda.
B. Public Hearing – Consideration of a request for amendment to the Official Zoning
Map for rezoning to CCD Residential Overlay District (CCD-R) to accommodate
multiple family attached housing, including residential uses on the ground floor as
per Chapter 3.7(J) Overlay Zoning Districts of the Monticello Zoning Code.
Applicant: Masters Fifth Avenue, Inc. Planning Case Number: 2016 - 008
Steve Grittman summarized that staff had determined, upon initial review of the
proposal to construct ground floor residential housing on property located at 3rd and
Locust proposal, that the rezoning to CCD-R was not a viable option as the housing
density proposed exceeds the density allowable within the district.
Grittman explained that the applicant had subsequently submitted an application to
rezone the property to Planned Unit Development (PUD) which would provide some
flexibility to negotiate density and other standards. He pointed out that the Planning
Commission and City Council had met jointly to provide initial input related to moving
the proposal beyond the PUD concept stage.
Grittman noted that staff recommended tabling action on rezoning to CCD-R and
continuing the public hearing so that the alternative PUD option may be reviewed.
Planning Commission Minutes: 3/02/16
3
Brad Fyle opened the public hearing. As there were no comments, the public hearing
was closed.
Decision 1. Rezoning to add the CCD Residential Overlay District to the subject
property
LINDA BUCHMANN MOVED TO TABLE ACTION ON THE REZONING AND
CONTINUE THE PUBLIC HEARING, PENDING ADDITIONAL INFORMATION.
SAM MURDOFF SECONDED THE MOTION. MOTION CARRIED 4-0.
3. Regular Agenda
A. Consideration to review the draft Northwest Monticello Interchange Land Use
Study
Grittman outlined the conceptual land use patterns identified in his analysis of the four
interchange location scenarios proposed. The scenarios include an interchange at
Orchard Road, an interchange at CSAH 39, interchanges at both Orchard Road and
CSAH 39, and no interchange. Grittman pointed out that the Interchange Land Use
Study would provide the necessary engineering data to complete interchange design
work.
LINDA BUCHMANN MOVED TO DIRECT INCORPORATION OF ADDITIONAL
PLANNING COMMISSION COMMENTS AS STATED. SAM MURDOFF
SECONDED THE MOTION. MOTION CARRIED 4-0.
B. Community Development Director’s Report
Angela Schumann noted that the written report summarizes City Council action related
to items included on the February Planning Commission agenda.
4. Added Items
Schumann reported that no formal land use applications had been submitted for either the
Broadway Market property or the Cruiser’s property. She offered to include information
related to zoning and allowable uses for each site in the upcoming Director’s report.
5. Adjourn
MARC SIMPSON MOVED TO ADJOURN THE MEETING AT 7:00 PM. LINDA
BUCHMANN SECONDED THE MOTION. MOTION CARRIED 4-0.
Recorder: Kerry Burri __
Approved:
Attest: ____________________________________________
Angela Schumann, Community Development Director
Planning Commission Agenda – 04/05/16
1
2A. Continued Public Hearing -Consideration of a request for amendment to the
Official Zoning Map for rezoning to CCD Residential Overlay District (CCD-R) to
accommodate multiple family attached housing, including residential uses on the
ground floor as per Chapter 3.7(J) Overlay Zoning Districts of the Monticello
Zoning Code. Applicant: Masters Fifth Avenue, Inc.(NAC)
Property:Lots1-3,Block36,OriginalMonticelloPlat
Planning Case Number:2016 - 008
A.REFERENCE & BACKGROUND
Request(s):Consideration of a rezoning adding the CCD Residential
Overlay District that would accommodate the development
of a multiple family residential building in the CCD,
including ground-floor residential units.
Deadline for Decision:April 2nd, 2016, Extended to June 1, 2016
Land Use Designation:Places to Work (Comprehensive Plan)
Shopping (Embracing Downtown Monticello Plan)
Zoning Designation:CCD – Central Community District, F-1, West 25
Shopping Sub-District
The purpose of the “CCD”, Central Community District, is
to provide for a wide variety of land uses, transportation
options, and public activities in the downtown Monticello
area, and particularly to implement the goals, objectives,
and specific directives of the Comprehensive Plan, and in
particular, the Embracing Downtown Monticello report and
its Design Guidelines uses.
Current Site Use:Vacant
Surrounding Land Uses:
North:Mixed Use – Commercial, upper floor residential
East:Commercial Office
South:Parking, Commercial Retail
West:Residential, Low-Mid Density
Planning Commission Agenda – 04/05/16
2
ANALYSIS:
This application has been requested to be placed on hold, pending the outcome of the
companion PUD Rezoning and PUD Development Stage applications being heard
separately. Because it was found that the original request for 23 units on the subject site
could not be accommodated by the CCD Residential Overlay density allowances, the
applicants requested that the PUD zoning effort be pursued as a first option.
Pending the outcome of that application, the CCD Residential Overlay request will
become moot, or may be revived. At this time, staff requests that the Planning
Commission table action, and continue the hearing until the PUD request is finalized.
B.ALTERNATIVE ACTIONS
Decision 1: Rezoning to add the CCD Residential Overlay District to the subject
property.
1.Motion to recommend rezoning of the subject property by adding the CCD
Residential Overlay District.
2.Motion to recommend denial of the rezoning of the subject property by adding the
CCD Residential Overlay District.
3.Motion to table action on the Rezoning, pending additional information.
C.STAFF RECOMMENDATION
Staff recommends tabling action on the rezoning at this time, Alternative #3. As noted,
the applicant is pursuing the PUD process to allow a greater density than the base zoning
would accommodate. If the PUD request proceeds, it is unlikely that the overlay district
would be pursued further.
It is requested that the applicant provide a formal letter to the City regarding their request
for hold on this application until PUD action is complete.
D.SUPPORTING DATA
A.Staff report of March 2, 2016
B.Staff report of April 5th, 2016 (see Item 3C)
C.Monticello Zoning Ordinance, Section 3.7(J)
Planning Commission Agenda – 3/02/16
1
2B.Public Hearing – Consideration of a request for amendment to the Official Zoning Map for
rezoning to CCD Residential Overlay District (CCD-R) to accommodate multiple family
attached housing, including residential uses on the ground floor as per Chapter 3.7(J) Overlay
Zoning Districts of the Monticello Zoning Code. Applicant: Masters Fifth Avenue, Inc.(NAC)
Property:Lots1-3,Block36,OriginalMonticelloPlat
Planning Case Number:2016 - 008
A.REFERENCE & BACKGROUND
Request(s):Consideration of a rezoning adding the CCD Residential
Overlay District that would accommodate the development
of a 23-unit multiple family residential building in the
CCD, including ground-floor residential units.
Deadline for Decision:April 1, 2016
Land Use Designation:Places to Work (Comprehensive Plan)
Shopping (Embracing Downtown Monticello Plan)
Zoning Designation:CCD – Central Community District, F-1- West 25
Shopping Sub-District
The purpose of the “CCD”, Central Community District, is
to provide for a wide variety of land uses, transportation
options, and public activities in the downtown Monticello
area, and particularly to implement the goals, objectives,
and specific directives of the Comprehensive Plan, and in
particular, the Embracing Downtown Monticello report and
its Design Guidelines uses.
Current Site Use:Vacant
Surrounding Land Uses:
North:Mixed Use – Commercial, upper floor residential
East:Commercial Office
South:Parking, Commercial Retail
West:Residential, Low-Mid Density
Planning Commission Agenda – 3/02/16
2
Analysis
Project Description.The applicant initially requested a rezoning on the subject parcel to
add the CCD Residential Overlay District to allow the potential for a residential-only
project, including ground-floor residential units. However, because the proposed density
exceeds the allowances under both the CCD Residential Overlay and base CCD zoning,
the applicant is proceeding with a PUD review to ensure that the City will support the
proposed density prior to undertaking further plan development. Analysis of that
application is described in the companion report to this item.
The applicant’s proposal is intended to accommodate the construction of a multiple
family residential project on vacant property at the northeast corner of 3rd Street and
Locust Street. The property is in the CCD, and is shown on the City’s planning
documents as guided for commercial uses.
In much of the CCD, residential uses are allowed on upper floors, with the expectation
that most of the ground floor area will be reserved for commercial (primarily retail sales
or service). On the site under current zoning, ground floor residential is not allowed, with
the expectation in the Embracing Monticello plan being that the 2-block area between
Locust and Highway 25 would redevelop with anchor retail shopping development.
This land use projection does not appear to be taking place, and a more traditional mixed-
use pattern has continued. Acknowledging that some areas of the downtown would be
appropriate for residential on the ground floor, the City adopted an overlay zoning district
that could be applied to specific locations on a case-by-case basis.
The applicant sought the CCD Residential Overlay zoning to accommodate the ground-
floor residential use. In reviewing the rezoning request, it became apparent that the CCD,
including the residential overlay, would restrict density to a limit that made the proposed
project infeasible. If the parallel PUD request is pursued and eventually approved, the
site would be rezoned to PUD, and the overlay district request would be abandoned.
For comparison purposes, the various multiple family regulations accommodate the
following unit counts and density on the three-quarter acre site in question:
Zoning District Density Unit Count
CCD Base Zoning 14 – 18 units per acre 11 – 14 units
CCD Residential Overlay CCD Base, plus one unit per 9,000
square feet of lot area for ground floor
17 units, max
R-4 (High Density)
Multi-Family Residence 25 units per acre 19 units
Planning Commission Agenda – 3/02/16
3
As noted, the applicant is seeking a building of 23 units on approximately .76 acres.
The site meets most of the zoning standards that would apply to the development, with
the primary exception of the density.
Staff has noted below some of the site planning and architectural items that would
typically be encouraged as a part of this project. Because the initial rezoning application
does not entail a site plan review, the items noted below are for the purposes of
examining the suitability of the proposed building on this site. A more extensive plan
review would be undertaken with the submission of more complete documents.
Apart from the unit count, there are a handful of preliminary site planning comments that
staff would make. For the record, those are:
1.Include the City’s patterned pavement design in the sidewalks along both 3rd
Street and Locust, similar to the on-street parking areas along Walnut.
2.Extend pedestrian access sidewalk to Walnut to connect the residential to the
commercial core.
3.Extend the on-street angled parking on 3rd Street farther east (2-3 more spaces?)
4.Add street lighting to coordinate with Walnut Street theme.
5.Consider adjusting garage buildings along Dan Olsen’s property to the east back
from the existing curb by 2 feet or so.
6.Ensure that garage buildings are attractive amenities to the site – varied roof lines
and enhanced materials – the code requirement for residential in the CCD says all
walls up to 12 feet are to be brick, stone, or glass. Garage walls should not be
designed as a blank flat wall.
7.Ensure that site is separated from Landmark I by curb and landscaped area.
8.Potentially other elements based on final design.
The density issue is as follows: The base density in the code is 14 units per acre. This
can be extended to 18 units per acre based on site and building plan considerations. The
ground floor allowance permits one unit per 9,000 square feet. Adding the unit counts
together would accommodate up 17-18 units on this three-quarter acre lot.
If the project is redesigned to this unit count, the CCD Residential Overlay zoning would
be appropriate, and a Conditional Use Permit would be processed with the CCD
Residential Overlay rezoning. The Planning Commission and City Council would review
a subsequent Conditional Use Permit application, which includes all of the building, site,
and civil engineering detail.
Planning Commission Agenda – 3/02/16
4
B.ALTERNATIVE ACTIONS
Decision 1. Rezoning to add the CCD Residential Overlay District to the subject
property.
1.Motion to recommend to the City Council adoption of an ordinance rezoning the
subject property by adding the CCD Residential Overlay District.
2.Motion to recommend to the City Council the denial of an ordinance rezoning the
subject property by adding the CCD Residential Overlay District.
3.Motion to table action on the Rezoning, pending additional information.
C.STAFF RECOMMNDATION
Staff recommends tabling action on the rezoning at this time. As noted, the applicant is
pursuing the PUD process to allow a greater density than the base zoning would
accommodate. If the PUD request proceeds, it is unlikely that the overlay district would
be pursued further.
D.SUPPORTING DATA
A.Aerial Parcel Image
B.Applicant Narrative
C.Applicant Concept Proposal Plans
CHAPTER 3: ZONING DISTRICTS
Section 3.7 Overlay Zoning Districts
Subsection (J) CCD Residential Overlay District
City of Monticello Zoning Ordinance Page 187
(J) CCD Residential Overlay District
(1) Purpose
The purpose of the CCD Residential Overlay District (CCD-R) is to provide for
sites within the Central Community District that are appropriate for full use as
multiple family attached housing, including residential uses on the ground floor.
In establishing this overlay district over specific areas within the CCD, the City
finds that the goals and policies of the City’s Comprehensive Plan are being
fulfilled by ground floor residential uses, including those goals and policies
expressly applying to uses in the downtown area as may be adopted as a part of
any Downtown Revitalization Plan or similar component of the Comprehensive
Plan. Parcels shall be included in the CCD Residential Overlay District only
where the more intensive residential uses allowed by this overlay district can be
found to enhance the commercial concentration in the surrounding “CCD”
downtown area.
(2) District Application
The provisions of Section 3.7(J) shall apply to all lands within the jurisdiction of
Monticello as denoted on the official CCD Residential Overlay District map.
(3) In General
Except as stated herein, all regulations governing the CCD District shall apply to
properties within the CCD Residential Overlay District.
(4) Multi Family Dwellings
Multi-family units in the CCD Residential Overlay District shall adhere to either
the requirements for multi-family homes established in Section 5.2(C)(2)(d)(iv) of
this ordinance, or the following requirements:
(a) Multi-family units shall be in the form of apartments or condominiums, and
may be located on any floor of the building subject to the following standards:
(i) The use shall require authorization through a conditional use permit
following the provisions of Section 2.4(D) of this ordinance.
(ii) The subject parcel shall not be located in an area that does not abut
directly on any of the following roadways: Trunk Highway 25 (Pine
Street), County State Aid Highway 75 (Broadway Street), or Walnut
Street.
(iii) The proposed development of the subject parcel for multi-family units
shall not interfere with the flow of pedestrian commercial traffic in the
“CCD” area.
CHAPTER 3: ZONING DISTRICTS
Section 3.7 Overlay Zoning Districts
Subsection (K) Special Use Overlay District
Page 188 City of Monticello Zoning Ordinance
(iv) The exterior building materials for principal and accessory buildings at
ground floor level shall be consistent with commercial buildings,
including brick or concrete masonry, glass, and similar materials up to a
height of no less than twelve (12) feet from grade.
(v) Upper floor building materials (above the ground floor), may utilize
residential materials such as lapped siding.
(vi) Parking shall be provided on-site at a rate of no less than one and one-half
spaces per residential unit, unless the facility is expressly reserved for
senior citizens. No less than fifty percent of the parking shall be covered.
(K) Special Use Overlay District
(1) Restrictions on Adult Uses
With the adoption of this ordinance, the City of Monticello exercises its authority
under Minn. Stat. 617.242 Subd. 7 and declares that these regulations supercede
the provisions of Minn. Stat. 617.242. As such, adult uses as defined in this
ordinance shall be subject to the following general provisions:
(f) Adult Use – Principal activities shall be permitted only in those areas with the
BOTH required base zoning designation and the Special Use Overlay District
designation.
(g) Activities classified as obscene as defined by Minnesota Statute 617.241 are
not permitted and are prohibited.
(h) An adult use which does not qualify as an accessory use shall be classified as
an adult use/principal.
(i) Adult use/principal activities shall be prohibited from locating in any building
which is also utilized for residential purposes.
(j) Adult use/principal activities shall not be located on any parcel that abuts or
shares a property line with any of the following parcels or land uses:
(i) Residentially zoned property;
(ii) Agricultural land located in the neighboring township or in the City that is
designated in the comprehensive plan for residential use;
(iii) A licensed day care center;
(iv) A public or private educational facility classified as an elementary,
middle, junior high, or senior high school;
(v) A public library;
Planning Commission Agenda – 04/05/16
1
2B. Public Hearing - Consideration of a request for Conditional Use Permit (CUP) to
accommodate multiple family attached housing, including residential uses on the
ground floor in a proposed Central Community District-Residential (CCD-R)
District. Applicant: Masters Fifth Avenue, Inc. (NAC)
Property: Lots 1-3, Block 36, Original Monticello Plat
Planning Case Number: 2016 - 008
A. REFERENCE & BACKGROUND
Request(s): Consideration of a Conditional Use Permit pending
rezoning of the subject site adding the CCD Residential
Overlay District that would accommodate the development
of a multiple family residential building in the CCD,
including ground-floor residential units.
Monticello Zoning Ordinance Section 3.7(J)(4) requires
that multiple-family buildings in the CCD-R be authorized
through CUP.
Deadline for Decision: May 6th, 2016, extended to July 5th, 2016
Land Use Designation: Places to Work (Comprehensive Plan)
Shopping (Embracing Downtown Monticello Plan)
Zoning Designation: CCD – Central Community District, F-1, West 25
Shopping Sub-District
The purpose of the “CCD”, Central Community District, is
to provide for a wide variety of land uses, transportation
options, and public activities in the downtown Monticello
area, and particularly to implement the goals, objectives,
and specific directives of the Comprehensive Plan, and in
particular, the Embracing Downtown Monticello report and
its Design Guidelines uses.
Current Site Use: Vacant
Surrounding Land Uses:
North: Mixed Use – Commercial, upper floor residential
East: Commercial Office
Planning Commission Agenda – 04/05/16
2
South: Parking, Commercial Retail
West: Residential, Low-Mid Density
ANALYSIS:
This application has been requested to be placed on hold, pending the outcome of the
companion PUD Rezoning and PUD Development Stage applications being heard
separately. Because it was found that the original request for 23 units on the subject site
could not be accommodated by the CCD Residential Overlay density and CUP
allowances, the applicants requested that the PUD zoning effort be pursued as a first
option. The CUP will only be applicable should the CCD Residential Overlay rezoning
move forward to approval. At that time, the applicant would need to seek approval for a
proposal meeting the required CCD-R density, or request a variance.
Pending the outcome of that application, the CCD Residential Overlay request and
Conditional Use Permit will become moot, or may be revived. At this time, staff requests
that the Planning Commission table action, and continue the hearing until the PUD
request is finalized.
B. ALTERNATIVE ACTIONS
Decision 1: Conditional Use Permit (CUP) to accommodate multiple family
attached housing, including residential uses on the ground floor in a proposed
Central Community District-Residential (CCD-R) District
1. Motion to recommend approval of a Conditional Use Permit (CUP) to accommodate
multiple family attached housing, including residential uses on the ground floor in a
proposed Central Community District-Residential (CCD-R) District.
2. Motion to recommend denial of a Conditional Use Permit (CUP) to accommodate
multiple family attached housing, including residential uses on the ground floor in a
proposed Central Community District-Residential (CCD-R) District.
3. Motion to table action on the Conditional Use Permit, pending additional information.
C. STAFF RECOMMENDATION
Staff recommends tabling action on the Conditional Use Permit at this time, Alternative
#3. As noted, the applicant is pursuing the PUD process to allow a greater density than
the base zoning would accommodate. If the PUD request proceeds, it is unlikely that the
overlay district and CUP would be pursued further.
It is requested that the applicant provide a formal letter to the City regarding their request
for hold on this application until PUD action is complete.
Planning Commission Agenda – 04/05/16
3
D. SUPPORTING DATA
A. Staff report of March 2, 2016 (see Item 2A)
B. Staff reports of April 5th, 2016 (see Item 3C)
Planning Commission Agenda – 4/05/16
1
2C. Public Hearing –Consideration of a request for Ordinance Amendment for rezoning
for Development Stage Planned Unit Development (PUD) for a multiple family
attached housing project in the Central Community District (CCD). Applicant:
Masters Fifth Avenue (NAC)
Property:Lots1-3,Block36,OriginalMonticelloPlat
Planning Case Number:2016 - 015
A.REFERENCE & BACKGROUND
Request(s):Rezoning to Planned Unit Development District and PUD
Development Stage approval that would accommodate the
development of a 23-unit multiple family residential
building in the CCD.
Deadline for Decision:May 18th, 2016
Land Use Designation:Places to Work (Comprehensive Plan)
Shopping (Embracing Downtown Monticello Plan)
Zoning Designation:CCD – Central Community District, Sub-district F-1:
West 25 Shopping Sub-District
The purpose of the “CCD”, Central Community District, is
to provide for a wide variety of land uses, transportation
options, and public activities in the downtown Monticello
area, and particularly to implement the goals, objectives,
and specific directives of the Comprehensive Plan, and in
particular, the Embracing Downtown Monticello report and
its Design Guidelines uses.
The Ordinance identifies the purpose of Planned Unit
Development as follows:
The purpose of the Planned Unit Development (PUD)
zoning district is to provide greater flexibility in the
development of neighborhoods and non-residential areas in
order to maximize public values and achieve more creative
development outcomes while remaining economically
viable and marketable. This is achieved by undertaking a
process that results in a development outcome exceeding
that which is typically achievable through the conventional
zoning district. The City reserves the right to deny the PUD
Planning Commission Agenda – 4/05/16
2
rezoning and direct the developer to re-apply under the
standard applicable zoning district.
Current Site Use:Vacant
Surrounding Land Uses:
North:Mixed Use – Commercial, upper floor residential
East:Commercial Office
South:Parking, Commercial Retail
West:Residential, Low-Mid Density
ANALYSIS:
Project Description.This request is to rezone the subject property to Planned Unit
Development from its current CCD designation. In most CCD areas, the predominant
land use is intended to be commercial. An allowance is made for residential uses on
upper floors of multi-story buildings.
In this case, the applicant seeks to develop a residential-only building on the subject
property. The applicant suggests that commercial on this site is not viable, and reserving
the ground floor for commercial uses cannot be successfully built.
The downtown planning done by the City emphasizes commercial activities, with a
mixed-use component. The mixed uses include residential as noted, along with civic and
institutional uses, public open space, and existing employment-based businesses such as
Cargill. Entertainment and tourism-based business are included in this mix.
The Embracing Downtown guide plan labels the subject site as “Shopping”, and the
downtown design concept designates the site for support uses, including parking, for
larger retailing areas on adjoining land. It is noted that recent projects on the adjacent
blocks have lessened the viability of this concept plan.
It should be noted that the City’s 2008 Comprehensive Plan included the following
statements in its incorporation of the 2008 Embracing Plan: “Downtown in intended to
be an inter-connected and supportive collection of land uses . . .” and “Housing in the
Downtown can facilitate necessary redevelopment and bring potential customers directly
into the area. Housing may be free-standing or in shared buildings with street level
commercial uses”. Residential uses are encouraged throughout the downtown for many
reasons. First, they contribute to building a primary market for the retail orientation of
the downtown area. Second, residential use creates a “24-7” activity level that is
important to vibrant downtown retailing. Third, residential uses tend to be more stable
than specific commercial uses over time. Finally, residential activity encourages full-
Planning Commission Agenda – 4/05/16
3
time use of the entertainment and civic/public areas in the downtown, decreasing the
seasonal issues that are faced by some of these facilities.
Further, the zoning ordinance accommodates the potential for ground-floor residential
uses within the CCD in certain areas through the technique of an overlay zoning district.
That district is designed to be used on a case-by-case basis, when the City finds that a
specific location is not suitable for commercial, or where a more intense residential use is
compatible with the overall goals of the City’s downtown land use goals. That overlay
district approach was initially considered by the applicant on the subject property
However, the limitations of density on this .76 acre parcel were judged inadequate to
support the developer’s financial requirements. As discussed in reviewing the initial
concept residential request, it was noted that the zoning ordinance could not be read to
accommodate more than about 18 units on the site, whereas the applicant was seeking 23
units on three floors, including both dwelling units and common areas on the ground
floor. Although the proposed density exceeds the base limitations of the ordinance, most
other zoning requirements can be met by the proposed three story building.
With the density limitation as an obstacle, the applicant has chosen to pursue a parallel
option for a Planned Unit Development (PUD) District. Under a PUD, the City is free to
consider departures from the standard zoning regulations where the overall project design
can do a better job of achieving the City’s land use development and redevelopment
objectives in the area.
Thus, the question for the City in the present case is whether the project design proposed
by the developer meets that standard. The project now before the City is a three-story
building at the corner of Locust and 3rd Street, with a mix of common areas and
residential units on the ground floor, residential units on the upper two floors, and a
combination of open and covered parking along the north and east boundaries of the site.
In reviewing the project, staff discussion has raised concern that the project, particularly
with the detached garage structures, is inconsistent with the more urban downtown
concept, and instead is more consistent with a “suburban” style of development. The
preference would be for covered parking that is integrated into the principal structure.
The gabled-roof design of the garage buildings contributes to this concern.
Staff notes the developer’s objections to this layout in which it is stated that the increased
costs of integrated parking (whether underground or occupying the at-grade first level of
the building) are not recoverable for a building of this size.
Staff’s response to this concern is to consider a larger project of more units to offset those
additional costs. It is acknowledged that an increase in units would complicate the
parking requirements on the site, as well as increase the building height, perhaps
significantly.
As noted above, the standard for PUD zoning is whether the departures from standard
zoning leads to a project that does a better job of accomplishing the development goals
Planning Commission Agenda – 4/05/16
4
on the property in question. Staff’s suggestion in this case is that to utilize PUD zoning
to convert the site from commercial to a residential-only project, the design should better
reflect urban building design and site planning. How those goals are achieved form the
core of the issue facing the Planning Commission with this request.
The decision facing the City in this can be illustrated as follows:
Should Ground Floor Residential be built on this site?
The City Council and Planning Commission met in a joint workshop to consider the
concept of the 23-unit project, including detached garages. At the concept level the
design of the garages was not clear from the submitted plans. The discussion at the
concept review workshop indicated that the City was interested in pursuing residential on
the site as proposed, and a willingness to consider the site plan proposed by the applicant.
Planning Commission Agenda – 4/05/16
5
As noted, there were a number of issues that were discussed at the concept level. At the
workshop, the two primary site planning issues were noted - how the garage buildings
may be moved to accommodate more visibility of the commercial buildings along
Broadway, and parking supply. It was suggested that both architecture and building
materials would be important in the ongoing review of the project. Parking requirements
and proposed supply are discussed later in this report.
Additionally, there were specific elements noted that suggest a residential project on this
site would be appropriate, including the following:
•Introduction of additional residential population to the downtown;
•Design of the building floor plan emphasizing more public uses toward 3rd Street;
•Adequate parking to avoid spillover to adjoining streets or private property;
•Consistency with the direction of more recent downtown redevelopment patterns
(notwithstanding the more specific details of the Embracing Downtown plan).
•Positive transition between commercial downtown along Walnut Street on the
east, to residential areas farther to the west.
If the Planning Commission believes that either the project should be more dense and
urban in nature as discussed by staff, or ground floor uses should remain devoted to
commercial use, the Commission would not want to recommend approval of the rezoning
to PUD.
If it is the intent of City officials to allow the PUD zoning for additional density on the
site, an alternative has also been provided. This alternative incorporates the idea that the
intent is to both (1) Accommodate ground floor residential on the property; and (2)
Exceed the base density standards allowed by the CCD-Residential Overlay District.
Presuming that the PUD zoning is the preferred result, a review of the site and building
plans as proposed by the developer follows below.
PUD Development Stage - Site Plan Review
Lot Size. The Planned Unit Development District does not specify a minimum lot size.
The subject property is .76 acres in area, a total of about 32,920 square feet.
Density. As noted in the policy discussion above, the proposal contains 23 dwelling
units, a net density of about 30 units per acre, or 1,431 square feet of lot area per unit.
Using density caps in other districts as a comparison, the maximum density would be up
to 25 units per acre in the R-4 District, resulting in a maximum unit count on this site of
18 units if that district were applied here. The R-4 is designed, however, as a more
“suburban” district, with extensive areas of green space. The proposed location in the
CCD for this project is an urban site, governed by the goals and policies of the City’s
downtown planning.
Planning Commission Agenda – 4/05/16
6
Unit Size. The PUD District does not have a specific standard for residential unit sizes.
For reference, the recently adopted R-4 District utilizes a minimum of 900 square feet per
unit as its baseline. The proposed building units average 870 square feet per unit, with 13
of the 23 units larger than this threshold.
Lot Coverage. The proposed building is about 8,600 square feet in size, just over 25% of
the lot area. For comparison, the zoning ordinance requires a minimum lot coverage in
the CCD of 20%. The site plan shows about 6,000 square feet of green area, about 18%
of the lot. The garage buildings cover about 12% of the parcel. The remaining 45% is
sidewalk, parking, and driveway pavement.
Off-Street Parking. Parking supply for the site is proposed at 35 parking spaces, 16 of
which are covered in the detached garages. The plan provides for an additional 8 angle
on-street spaces along 3rd Street, and the Locust Street frontage has capacity for an
additional 4 parallel on-street spaces. (The on-street spaces are considered public
parking.) This is a total of 47 spaces available directly on or adjacent to the site, more
than 2 per unit.
The standard requirement for multiple family residential in the CCD Residential Overlay
District is 1.5 spaces per unit. The standard code requirement for multiple-family
residential senior housing is 1.0 spaces per unit. In addition, the CCD District
accommodates a reduction in this requirement when the parking area is open to public
use. It is not anticipated that the proposed lot will be open to public use, however, the
applicants indicate that they have designed the facility to serve a senior market, with an
expectation that most residents will be more than 60 years in age.
It is noted that a commercial project on this site of similar size (8,500 square feet of floor
area), would create a parking demand of at least 34 spaces for a single story building,
with restaurant use nearly doubling that requirement.
Detached Garages. As notes, the applicant has provided 16 parking spaces in two
detached garage buildings. The garage design in the plan shows a hipped roof design
with horizontal lapped siding. Staff notes that the proposed design is characteristic of a
suburban residential design, and is not consistent with the design of the principal
building, which is flat roofed with cornice treatments at the parapet, and a mix of
masonry and lapped siding.
To meet the downtown design guidelines and be consistent with the urban location, staff
suggests that the garage buildings should mimic the principal building in both design and
materials. One of the items noted in early discussions was concern related to the long flat
wall of the back side of the garage buildings. Staff believes that this wall should be
broken up through the use of alternate materials and varying building façade lines. One
option may be to break the garage buildings into three or four smaller structures.
Planning Commission Agenda – 4/05/16
7
Landscaping. A variety of planting have been proposed on the site, including plantings
along the perimeter of the site, within off-street parking areas and around the perimeter of
the building. In regard to site landscaping, the following comments are offered.
Caliper Inch Requirements.According to the Ordinance, 16 caliper inches (ACI)
of landscaping must be provided for each acre of site area, plus 2 shrubs per 10 feet
of building perimeter. Thus, the landscaping requirement for the .76 acre site would
be 12 caliper inches of trees, and a total of 84 shrubs for the 418 feet of building
perimeter. The landscaping plan shows 13.5 caliper inches of trees, and 120 shrubs,
more than the requirement.
Staff notes that this planting includes two Honeylocust overstory trees in the public
sidewalk along Locust Street. Staff and the Parks Commission would recommend
two additional hardwood trees along 3rd Street where suitable planting locations can
be found.
Ground Cover. As noted, about 18% of the site is green space, including the
planting areas and lawn grass. The applicants have noted that the landscaped areas
will be irrigated.
Buffer Yards. The City’s zoning ordinance provides for a specific buffer yard treatment,
but notes that uses in the CCD District are exempt. Nonetheless, the applicant’s plan
includes landscape plantings along the west boundary (Locust Street) where residential
uses are most likely to be developed in the future.
Building Finish Materials. The zoning ordinance provides that:
In the downtown design guidelines from the Embracing Downtown plan, buildings
are to be constructed with the first floor dominated by glass, and a minimum of 25%
of all facades of the building covered with masonry or glass material. The building
meets or exceeds these minimums at a minimum of 29% coverage. Also – the
design guidelines state “Secondary materials such as decorative concrete block,
precast panels, EIFS or standing seam metal shall be allowed on the remaining
75%”.
The applicants are seeking a departure from the limitations by incorporating lapped
siding on a portion of each wall. The Planning Commission may consider the use of
lapped siding acceptable on a residential PUD building, but should be of a durable
design. The applicants note that they intent to use “LP” siding, a suitable material
that is much more durable than vinyl or aluminum.
Each unit has access to a patio (ground floor) or deck (upper floors). The deck
fencing appears to be iron railings, but is not specified on the plan. Materials shall
be specified and be consistent with Embracing Downtown design guidelines.
Planning Commission Agenda – 4/05/16
8
Site Amenities. As shown on the site plan, an interior courtyard area is proposed to
provide an outdoor space to residents. As is typical in a downtown space, it is expected
that use will be made of the accessible public spaces and buildings in the immediate area.
The plans identify public sidewalk paving intended to reflect the design and materials
utilized in the Walnut Street streetscape, including stamped concrete paving, lighting, and
other features. The staff report recommends extension of these improvements to connect
to Walnut along 3rd Street, and an extension along Locust Street to the public sidewalk in
Landmark I (Beef O’Brady’s).
Transitional Features. In certain circumstances, the zoning ordinance imposes a
transitional requirement on development that is substantively different in intensity that
that of neighboring or facing land uses. The ordinance requires that similar features abut
each other, including parking areas, building massing, building height, or conflicting land
uses.
For the subject site, parking lots abut the property to the east and north, and lie across
Third Street to the south. The applicant has laid out the parking areas adjacent to those
abutting parking areas (east and north), along with a portion of the garage space (also
abutting to the north property line). With regard to building height, the building to the
east is 2 stories, and to north, 3 stories.
As noted, parking area dominates the property to the south. To the west, the area is
zoning CCD (F3), in which a wide variety of commercial and residential uses are
allowed, with residential uses dominated by requirements for Conditional Use Permit.
The proposed site plan appears to be consistent with the Transitional Features described
in the ordinance.
Trash/Recycling. The applicant has proposed a detached trash handling enclosure in the
northeast corner of the site which would be access from the alley to the north. The access
to the residents should be designed to create a screened entrance, rather than the open
passage now shown.
Lighting. A separate site lighting plan is not included in the plan set. Building elevations
indicate wall-mounted lighting outside the individual units.
Signage. A wall sign is proposed in the southeast corner of the building facing 3rd Street.
The total square footage of the sign is 40 square feet. Residential zones are permitted 32
square feet for project identification signs. The sign should be reduced slightly to meet
this standard.
Grading and Utilities. The submitted grading and utility plans should be subject to
review comment by the City Engineer.
Planning Commission Agenda – 4/05/16
9
Other Notes. Staff had cited some preliminary site plan and architectural items for
discussion during the concept review of the proposal with Planning Commission and City
Council, in addition to the density issue. Those were as follows:
1.Include the City’s patterned pavement design in the sidewalks along both 3rd
Street and Locust, similar to the on-street parking areas along Walnut.
2.Extend pedestrian access sidewalk to Walnut to connect the residential to the
commercial core.
3.Extend the on-street angled parking on 3rd Street farther east (2-3 more spaces?)
4.Add street lighting to coordinate with Walnut Street theme.
5.Consider adjusting garage buildings along Dan Olsen’s State Farm property to the
east back from the existing curb by 2 feet or so.
6.Ensure that garage buildings are attractive amenities to the site – varied roof lines
and enhanced materials – the code requirement for residential in the CCD says all
walls up to 12 feet are to be brick, stone, or glass. Garage walls should not be
designed as a blank flat wall.
7.Ensure that site is separated from Landmark I by curb and landscaped area.
8.Potentially other elements based on final design.
The applicant has incorporated many of these into the Development Stage PUD proposal.
However, the scale of the project, the garage buildings and some of the building design
items continue to raise an issue for staff. These issues are reflected in the divergent
options for PUD on this site. Staff’s alternative option would require the covered parking
to be incorporated into the building design. To acknowledge the applicant’s concerns
over cost, staff would encourage the accommodation of an even higher density.
Following the applicant’s option, the garages would remain detached, and the primary
issue then becomes a site planning and design issue. These issues are addressed in the
list of Exhibit Z conditions.
B.ALTERNATIVE ACTIONS
Decision 1: Consideration of a Rezoning from CCD, F-1, to Planned Unit
Development (PUD) District and Development Stage PUD to accommodate the
construction of a 23 unit multiple family residential building and associated site
improvements, parking and garage buildings.
Planning Commission Agenda – 4/05/16
10
1.Motion to adopt Resolution No. 2016 - 006 recommending approval of the
Rezoning from CCD, F-1, to PUD District, and Development Stage PUD
based on the findings in said resolution, and contingent on compliance with
the conditions listed in Exhibit Z.
2.Motion to deny adoption of Resolution No. 2016 - 006, recommending denial,
recommending that the applicant instead pursue rezoning to CCD-Residential
Overlay, based on findings identified at the public hearing.
3.Motion to deny adoption of Resolution No. 2016 - 006, recommending instead
that the current zoning (CCD, F-1) is retained and that ground floor residential
is not permitted on the subject property, based on findings identified at the
public hearing.
4.Motion to table action on Resolution No. 2016 - 006, pending submission of
additional material from the applicant, public, and/or staff.
C.STAFF RECOMMENDATION
The decision is a policy question for the City. The first issue for the Planning
Commission will be to consider this question:
1.Is the proposed project, with the conditions considered and identified by staff
and the Commission, consistent with the goals and objectives of the
Embracing Downtown Monticello planning documents, as well as the purpose
and requirements of Planned Unit Development zoning?
If so, Alternative 1, with the conditions in Exhibit Z, is the appropriate option.
Alternatives 2 and 3 provide considerations that result in a lower density (Alternative 2),
or a continued requirement for commercial on the ground floor (Alternative 3). The
applicants have stated that these alternatives are financially unfeasible, although the
initial rezoning request as accommodated by Alternative 2 is still technically active.
The applicants note that due to lack of exposure, commercial use of the subject property
is highly unlikely. It is also noted that the Embracing Downtown project envisioned that
this parcel was designated for “Shopping”, but was identified primarily as parking area in
support of a larger commercial development that would occur on adjacent property. That
project appears to be unlikely in the foreseeable future, based on other recent
development. As such, the specific requirement for commercial use of this site may be
less of an imperative that the land use concepts direct.
The applicants have further stated that staff’s interest in increasing density and requiring
parking underneath the building (rather than in detached garages) is also impractical for
reasons related to building code, as well as the fact that increased density also increases
Planning Commission Agenda – 4/05/16
11
the parking requirements for the site, spiraling the parking supply problem further
upward.
As such, the applicants have pursued the current layout, using PUD zoning to address
fiscal realities of the project.
D.SUPPORTING DATA
A.Resolution PC-2016-006
B.Aerial Parcel Image
C.Applicant Narrative
D.Site Plan
E.First Floor Plan
F.Second Floor Plan
G.Third Floor Plan
H.Building Section Plan
I.Exterior Building Elevations
J.Garage Elevations
K.Landscape Plan
L.Civil Plans, including:
a.Details
b.Grading Plan
c.SWPPP
d.Utility & Paving Plan
M.Survey
N.City Engineer’s Comment Letter
O.Monticello Comprehensive Plan – Embracing Downtown Zoning Sub-Districts
P.Monticello Comprehensive Plan –Embracing Downtown Design Guidelines,
Excerpt
Q.Monticello Comprehensive Plan – Chapter 3, Land Use, Excerpt
Z. Conditions of Approval
Planning Commission Agenda – 4/05/16
12
EXHIBIT Z
Rezoning to Planned Unit Development
and PUD Development Stage Site Plan Review
Lots 1-3, Block 36, Original Monticello Plat
Conditions of Approval
1.Redesign of the detached garage buildings to provide the following:
a.Flat-roofed design
b.Variable roof heights
c.Materials reflective of those on the principal building
d.Variable wall facades facing adjoining properties
2.Redesign of building entrance points to incorporate flat-roofed design.
3.Deck materials shall be consistent with Embracing Downtown Guidelines.
4.Provision of on-street parking along 3rd Street as noted on approved site plan.
5.Add tree planting to sidewalk along 3rd Street similar to proposed planting on Locust
Street.
6.Extend sidewalk from project to Walnut Street along 3rd Street.
7.Extend sidewalk along Locust Street to meet existing sidewalk to north.
8.Utilize sidewalk materials consistent with Walnut Streetscape improvements.
9.Ensure lapped siding is “LP”, cement board, or better, with no wood, vinyl or aluminum.
10.Revise trash enclosure to provide a visual barrier at the access point from the parking lot.
11.Provide lighting plans that meet the zoning ordinance requirements, and utilize materials
and elements consistent with Walnut Streetscape.
12.Reduce wall sign size to 32 square feet, consistent with ordinance allowances.
13.Provide a current topographic survey and prepare grading, drainage, and utility plans
consistent with the requirements and comments from the City Engineer in the Engineer’s
letter dated March 30th, 2016.
14.Other comments of the Planning Commission and Staff provided at the Public Hearing.
CITYOFMONTICELLO
WRIGHTCOUNTY,MINNESOTA
PLANNINGCOMMISSION
RESOLUTIONNO.PC-2016-006
1
RECOMMENDINGAPPROVALOF
AREZONINGTOAPLANNEDUNITDEVELOPMENTDISTRICT(PUD)
ANDAPUDDEVELOPMENTSTAGESIGNPLANAPPROVAL
RELATINGTODEVELOPMENTOFA
23UNITMULTIPLEFAMILYRESIDENTIALSTRUCTURE
WHEREAS,MastersFifthAvenuehassubmittedanapplicationforapprovaloftherezoning
ofaparceloflandfromCCDDistricttoPUD,PlannedUnitDevelopmentDistrict;and
WHEREAS,inadditiontotherequestforrezoningapproval,theapplicanthasalso
requestedapprovalofaDevelopmentStagePUDsiteplanapprovefora23unit,multi-
familyhousingdevelopment;and
WHEREAS,theproposed23unitmulti-familyapartmentcommunitywithconditionsmeets
applicableperformancestandardsoftheCity’sZoningOrdinanceandspecificallythose
applicableprovisionsoftheCity’sdowntowndevelopmentgoalsandobjectives;and
WHEREAS,thePlanningCommissionheldapublichearingonApril5,2016onthe
applicationandtheapplicantandmembersofthepublicwereprovidedtheopportunityto
presentinformationtothePlanningCommission;and
WHEREAS,thePlanningCommissionconsideredallofthecommentsandthestaffreport,
whichareincorporatedbyreferenceintotheresolution;and
WHEREAS,thePlanningCommissionoftheCityofMonticellomadethefollowing
FindingsofFactinrelationtotherecommendationofapproval:
1.TheproposedprojectcomplieswiththeintentoftheuseofPlannedUnit
DevelopmentinthattheflexibilityofferedunderPUDisutilizedtofurtherthe
objectivesfortheareawithintheCityComprehensivePlan.
2.Withconditions,DevelopmentStagePUDplansmeetallapplicablerequirementsof
theCity’sZoningOrdinance.
3.ExceptasotherwiseallowedperPUDflexibility,allapplicablerequirements
performancestandardsoftheCity’sZoningOrdinancewillbesatisfied.
4.TheadditionofresidentialunitstothedowntownisconsistentwiththeCity’s
redevelopmentobjectives.
5.Theresidentialprojectonthesubjectsitecontributestoareasonabletransitionofland
usesbetweenthecommercialcoreandresidentialneighborhoodstothewest.
6.Buildingdesign,includingcommonareasonthegroundfloor,complieswiththe
generalintenttolimitgroundfloorresidentialusesinthearea.
7.Buildingmaterials,includingextensiveglassandmasonry,isconsistentwiththe
requirementsofthezoningordinanceanddowntowndevelopmentobjectives.
CITYOFMONTICELLO
WRIGHTCOUNTY,MINNESOTA
PLANNINGCOMMISSION
RESOLUTIONNO.PC-2016-006
2
WHEREAS,thePlanningCommissionheldapublichearingtoconsiderthematteratits
regularmeetingonApril5th,2016andtheapplicantandmembersofthepublicwere
providedtheopportunitytopresentinformationtothePlanningCommission;and
WHEREAS,thePlanningCommissionhasconsideredallofthecommentsandthestaff
report,whichareincorporatedbyreferenceintotheresolution;and
NOW,THEREFORE,BEITRESOLVED,bythePlanningCommissionoftheCityof
Monticello,MinnesotathattheproposedrezoningandDevelopmentStagePUDsiteplanis
herebyrecommendedforapproval,subjecttotheconditionsasoutlinedinExhibitZofthe
staffreportofApril5th,2016.
ADOPTED this5th dayofApril,2016,bythePlanningCommissionoftheCityof
Monticello,Minnesota.
MONTICELLOPLANNINGCOMMISSION
By:_______________________________
BradFyle,Chair
ATTEST:
___________________________________________
AngelaSchumann,CommunityDevelopmentDirector
Lots 1-3, Block 36, Original Plat M onticello, 155-010-036030
C reated by : C ity of Monticello
Landmark II PUD
Master's Fifth Avenue, Inc., and BG&J Properties, LLC, (the subsequent owner/developer) is
applying for a change of use for the property at 213 3RD ST W. This will change the zoning
from CCD District to a Planned Unit Development in the CCD District to accommodate plans
for Landmark Square II, which will be developed as the West 3rd Building, a 23 unit
apartment building that will lease to residents who are in the 55 year old and older category
Background for the West 3rd Building Development:
According to the stated policy of Monticello, a mix of uses in the Downtown is desirable.
Currently there is big box retail, small space retail, office, single family housing, multi-family
housing, and commercial entities. These functions all work together to support a healthy
interactive economic system.
The West 3rd Building Development is a 23 unit apartment three story building with 16
garages and adequate parking that is designed for 55 year old and older residents . These are
residents who want to live within walking distance of shopping, restaurants, parks,
employment, and community activities. Adding this group of people to the Downtown
increases the diversity of our city, adds to the number of civic contributors, and provides
instant consumers for downtown businesses. This project will be built on the edge of the CCD
District, an ideal transition from single family homes to the West to the commercial/business
to the East.
The West 3rd Building Development contributes to an atmosphere that encourages people to
move, work and stay in Monticello. Action by the City to support this project will send a clear
signal that the market in Downtown Monticello is thriving and that it is a great place to live,
work, and play.
This project will comply with the conditions established by the city comprehensive plan. It is
anticipated that it will increase property values, add to the safety of the area, create positive
traffic, encourage other development, and be an aesthetically pleasing addition to this area.
The main reason for the Planned Unit Development is to increase density in the project. All
other codes and conditions are planned to remain the same. Having a larger number of
consumers will increase the viability of the downtown area, an area that needs more traffic,
not less.
Included in the project is street parking along 3rd street which provides parking in addition to
the already adequate site parking. This parking will be constructed to coordinate with similar
areas in the downtown.
Street lighting will coordinate with the theme designed by the city for the downtown.
Garages have been placed to allow visibility to other businesses in the area and the exteriors
of the garages will coordinate with the design standards established by the city.
This project is a great use for this site. A mix of residential, business and retail in existing
downtowns has been shown to be a concept that works well to provide a healthy economy.
In general, redevelopment in Downtown Monticello has been tough , as it has in surrounding
cities. The last building constructed in downtown in last 14 years was Walgreens--that by a
company that will acquire a site based on location alone, so price was not the primary
consideration.
Before that, Landmark Square I was built in 2002, Locust Commons strip center in 2000, and
Monticello Mall/CUB Foods in 1998, all by Master's Fifth Avenue, Inc.
Before that, the Ben Franklin/Walgreens/Schlenner Wenner building was constructed in
1987.
While several projects have been proposed on this site over the last eleven years, none has
been able to be built, mainly because of economic reasons. This may be the last best chance
for development on this site for the foreseeable future.
After approval, Master's Fifth Avenue, Inc., and BG&J Properties, LLC, (the subsequent
owner/developer) understands and is prepared to fund the project, the PUD process, the city
specifications for street and utility improvements as agreed upon, and the guarantees therein
involved.
At this time, a previous survey has been submitted with an updated survey in process.
Lighting location, style, mounting and light distribution have yet to be determined by the
architect and will be available during the final PUD application process. There are no park
areas proposed, but plans call for additional sidewalks on the property.
CO
L
E
G
R
O
U
P
AR
C
H
I
T
E
C
T
S
L
L
C
.
Project No.
16010
Issue Date
xx-xx-2016
Revision:
21
6
P
a
r
k
A
v
e
n
u
e
S
o
u
t
h
Su
i
t
e
1
0
2
Sa
i
n
t
C
l
o
u
d
,
M
N
5
6
3
0
1
(3
2
0
)
6
5
4
-
6
5
7
0
ww
w
.
c
o
l
e
g
r
o
u
p
a
r
c
h
i
t
e
c
t
s
.
c
o
m
& SPECIFICATIONS
SC
H
U
L
T
Z
E
N
G
I
N
E
E
R
I
N
G
&
S
I
T
E
D
E
S
I
G
N
PR
E
L
I
M
I
N
A
R
Y
-
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
C
I
V
I
L
C
H
E
C
K
S
E
T
-
0
3
/
0
7
/
2
0
1
6
FILLING AND GRADING
1) Rough grading of all areas within the construction limits, including adjacent transition areas shall be reasonably
smooth and compacted. The rough graded subgrade surface generally shall not be more than 6 inches above or
below the established subgrade elevations. All ditches, swales, and gutters shall be graded to drain adequately.
The subgrade shall be evenly sloped to provide drainage away from building walls in all directions at a minimum
slope of 1%. The Contractor shall provide rounded transitions at top and bottom of banks and other breaks in
grade.
2) Fill and backfill materials shall be inorganic soils free of roots, rocks, boulders, and debris.
3) Bedding material or granular backfill larger than 2" in its largest dimension shall not be allowed within 2 feet
of new underground pipes. Material larger than 3" in its largest dimension shall not be allowed within 1 foot
of subgrade elevation.
4) Imported compacted fill material shall have a maximum of 12 percent passing the #200 sieve, by weight.
The proposed fill material shall be tested by an independent testing lab for suitability as compacted fill for
this project. The Contractor shall pay for the testing services and provide a copy of the test results to the
Engineer.
5) The Contractor shall fill and grade as necessary to bring surface to required elevations, and provide all
materials necessary, whether obtained on or off the project site.
6) The Contractor shall place compacted material in uniform horizontal lifts not exceeding 8" in depth for clay
soils, and 12" in depth for sandy soils, and compact as required to achieve specified density.
7) Compaction shall be obtained with the use of vibratory rollers or rammers. During compaction, fill material
shall contain moisture content, as necessary, for the required compaction as indicated by an independent testing
laboratory. The moisture shall be uniform throughout each lift. If the material is too dry, water shall be added
with approved equipment and methods, which will not wash out fine material. If the material is too wet, it shall
be dried by harrowing, disking, blading, or other approved methods recommended by the independent testing
laboratory.
8) Areas designated for pavement in excavated (cut) areas shall be scarified to a depth of 1 foot. The Contractor
shall bring the subgrade material to optimum moisture content as indicated by the independent testing
laboratory, and compact the subgrade to the specified density listed below for soils underneath pavements.
UNFORESEEN OBSTACLES
1) The Engineer shall be contacted immediately if any unforeseen major obstacles are encountered during
excavation, such as abandoned wells, abandoned or functioning utilities, subsurface streams or rock, etc., which
would add significant expense to the Contractor.
2) The Contractor shall still be responsible for completing all work required for this project where encountered
conditions may be reasonably determined from a soils/geotechnical report and review of the project site and
contract documents.
DEWATERING
1) Surface drainage shall be provided during construction in a manner so as not to create a nuisance to
adjacent areas.
2) All excavations shall be free of water during construction within the excavations. Dewatering shall be
accomplished by pumping or trenching, and shall be conducted regardless of the cause, source, or nature of
the water.
3) Berms, cofferdams, or piling shall be provided as necessary to protect excavations.
4) Excavations shall be sloped to drain, and necessary pumps, hoses and other equipment shall be provided to
keep excavation free of water.
5) All temporary equipment used for dewatering shall be removed from the site when no longer necessary.
SUBGRADE PREPARATION
1) Finished subgrade elevations shall be as follows:
a) Bituminous pavement (parking lot): 9" below finish grade.
b) Bituminous pavement (public right-of-way): 91
2" below finish grade.
b) Concrete pavement/apron: 13" below finish grade.
c) Concrete sidewalk: 4" below finish grade (plus thickened edge).
d) Lawn areas: 4" below finish grade.
e) Planting areas: See Landscaping Plans/Details
2) The tolerance for areas to be paved shall not exceed 0.15 feet above or below plan subgrade.
3) The Contractor shall protect newly graded areas from erosion. Settlement or washing that occurs prior
to acceptance of the Work shall be repaired and grades re-established.
TOPSOIL
1) Adequate imported and/or stockpiled salvageable topsoil shall be utilized for this project.
2) Topsoil shall be free of clay lumps, roots, brush, large stones, and debris, and shall have a minimum organic
content of 5 percent.
3) Remove topsoil to its entire depth from areas, which are to be disturbed by new construction work. Existing
lawn areas, which are not in the proposed construction area(s) shall remain in place. The Contractor shall field
verify topsoil depths between any soil borings, and remove to greater depths than indicated in the soils report
if such conditions are encountered. Salvaged topsoil shall be maintained in stockpiles.
4) Stockpiled topsoil shall only be used for finish grading of new lawn areas. Excess topsoil shall be removed
from the site by the Contractor.
5) Protect all existing lawn areas, plantings, and other landscaping to remain in place. Any damaged areas shall
be replaced at the Contractor's expense.
PLAN GRADES
1) Elevations shown on the project drawings are finished grade elevations, unless noted otherwise. Elevations not
specifically indicated shall be determined by interpolation of uniform slope between spot elevations and/or contours,
or between such points and existing elevations. Adequate slope shall be constructed to provide positive drainage
away from structures.
2) If inconsistencies exist on the plans between contours and spot elevations, the spot elevations shall govern.
PROJECT CONDITIONS
1) The Contractor shall become familiar with the project site, and compare actual conditions in the field with those
shown on the project drawings. The Contractor shall contact the Engineer immediately if any inconsistencies are
found between the existing conditions and the project drawings.
2) No extra compensation will be allowed due to unusual conditions which could have reasonably been determined or
anticipated by examination of the project site and project drawings.
EARTHWORK NOTES
PROTECTION
1) The Contractor shall maintain all benchmarks, monuments and other reference points. If any are disturbed or
destroyed, they shall be replaced at the Contractor's expense.
2). The Contractor shall contact the Engineer immediately if any unknown functioning underground utilities are
discovered during the course of the project, which may interfere with construction. The Contractor shall wait for
instructions before proceeding.
3) The Contractor shall be responsible for any damage to functioning underground or overhead utility lines.
Damaged utilities shall be repaired immediately and service restored at no additional cost to the Owner.
4) The Contractor shall provide barricades, shoring and other safety measures required by OSHA.
5) The Contractor shall protect all adjacent existing facilities from damage, including, but not limited to settlement
due to excavations, erosion, etc. The Contractor shall be responsible for the repair of such damages.
SPREADING TOPSOIL AND FINISH GRADING
1) Scarify subgrade to depth of 3" prior to placing topsoil. Spread topsoil evenly over complete subgrade as follows:
a) Lawn Areas on Private Property: Spread 4" lightly compacted layer of topsoil.
b) Lawn Areas in Public Right-of-way: Per City requirements
c) Planting Areas: See Landscape Plan/Details
2) Finish grade accurately within 0.15 feet of finish grades shown on the project drawings, less the thickness of any sod
where it is to be installed. Slope all grades away from buildings to provide positive drainage.
3) Prepare topsoil suitable to receive seed and/or sod. Grading of areas designated for topsoil shall be reasonably
smooth and even, and in accordance with MNDOT Spec. 2105.3G and 2574.3A4. All debris and stones exceeding
3" in diameter shall be removed from the soil surface of these areas prior to seeding. Areas compacted by vehicles
or storage of materials shall be plowed, disked and harrowed to match texture of other finish graded areas.
4) Grass seed shall be in accordance with MnDOT Spec. 3876, seed mix No. 25-131, applied at the rate of 220
pounds per acre or as indicated on the landscape plans. Mulch shall be applied and discanchored to all seeded
areas and shall meet the requirements of MnDOT Spec. 3882, Type 3 or as otherwise indicated by the Engineer.
DISPOSAL OF EXCESS WASTE MATERIALS
1) The Contractor shall remove excess excavated material, debris, and waste materials, from the
Owner's property and legally dispose of it in accordance with all governing codes.
9) The Contractor shall not place fill material when either the fill material, or the material on which it is to be
placed, is frozen. Any soft or yielding areas appearing in the fill resulting from frost, rain, or any other
reason whatsoever shall be scarified, removed, recompacted and/or otherwise rectified to the satisfaction of
the Engineer before any new fill is placed.
STANDARDS AND REFERENCES
Materials and construction methods specified in the plans reference the Minnesota Department of Transportation
(MNDOT) Standard Specifications for Construction. The Contractor shall obtain a current copy of MNDOT's Standard
Specifications for Construction and review the specification sections applicable to the plans.
It is mandatory that the Contractor be knowledgable of the applicable MNDOT specification sections during construction.
No additional compensation will be paid to the Contractor for additional work due to unfamiliarity with the applicable
specification sections.
Contractor shall refer to the geotechnical report for additional requirements and recommendations.
COMPACTION TESTS
1) Utility Trench Backfill: The Contractor's independent soils technician and approved testing laboratory shall
perform in-place density and moisture tests at random depths in trench backfill at 100 foot intervals, or
fraction thereof. Compaction of trenches shall be a minimum of 95% of the maximum dry density
(as determined by the independent testing laboratory) in lawn areas, and at depths greater than 3 feet
below areas designated for pavement. Compaction of trenches at depths within 3 feet of paved surfaces
shall be a minimum of 100% of the maximum dry density.
2) Compacted Fill Under Pavements: Compaction tests shall not be required beneath new pavements.
Adequate compaction of materials under pavements shall be determined by test rolling the subgrade, and
checking for excessive rutting. Test rolling shall be performed as per MNDOT Spec. 2111.
3) Areas exhibiting a failed compaction test shall be re-compacted and re-m tested to the satisfaction of the
Engineer prior to acceptance of the project.
4) Copies of all compaction testing and test roll observation reports shall be provided to the Engineer.
5) Optimum moisture-density relationship will be determined by testing laboratory in accordance with ASTM D698
and maximum density determination made by Method D of ASTM D698 unless otherwise noted in these
specifications.
BITUMINOUS BASE AND SURFACE COURSE
1) Mix Designation Numbers for the bituminous mixtures on this project are per MNDOT Spec. 2360
CONSTRUCTION METHODS
1) Properly clean base course and deliver hot mix asphaltic concrete in clean tight vehicles with covers if necessary.
2) Bituminous Testing:
a) Test temperature of first truck.
b) Ordinary compaction (MNDOT 2360.6C)
BITUMINOUS PAVEMENT NOTES
STANDARDS
1) Minnesota Standard Specifications for Highway Construction, most recent edition.
GRANULAR BASE COURSE
1) Compacted thickness of finished base course: 6"
2) Process material for aggregate base shall meet the requirements of MNDOT Spec. 3138, Class 5..
3) The subgrade shall be tested and observed to the satisfaction of the Engineer prior to placement of
aggregate base material. Install base material as required to accommodate new plan grades.
2) Pavement smoothness requirements will be waived for this project.
3) Density for the bituminous mixture on this project will be the ordinary compaction method (MNDOT
2360.6C).
4) Parking Lot: Bituminous Base course shall conform to MnDOT 2360, Type SPNWB330B and shall be 11
2 inches thick after
compaction. Bituminous Surface course shall conform to MnDOT 2360, Type SPWEB340B and shall be 11
2 inches thick
after compaction.
5) Public Right-of-way: Bituminous Base course shall conform to MnDOT 2360, Type SPNWB330B and shall be 2 inches
thick after compaction. Bituminous Surface course shall conform to MnDOT 2360, Type SPWEB340B and shall be 11
2 inches
thick after compaction.
5) Place no asphaltic mixture when the atmospheric temperature is below 45 degrees and falling, nor should
pavement be placed under wet conditions.
6) Mixing
a) Paving mixture: Uniform mixture of course aggregate, fine aggregate, mineral filler and asphaltic material.
b) Grading and mixing: Conform to applicable sections of the Minnesota Standard Specifications for Highway
Construction, Section 2360.
2) Lay to a smooth surface without segregation of material and attain compaction as early as possible.
Commence rolling while the material is hot, (minimum spread temperature 250 degrees F.) as soon as it will
support the roller without undue displacement or hairline cracking and continue until a minimum of 96% of
maximum has been attained, no further compression can be attained and all roller marks are eliminated.
3) The completed surface: Smooth, free of pockets that will retain water and shall not vary more than 1/16" per
foot nor more than 1/4" under a 16' straight edge. Entire surface must drain. No flat areas are permitted.
4) Perform all Work in accordance with the applicable requirements of the Minnesota Standard Specifications for
Highway Construction.
PAINTED LINES
1) Special marking paint compound especially for striping bituminous paving in one coat.
2) Manufacturers: Pratt & Lambert, Inc.; Sherwin Williams Co. or DuPont Co.
3) Colors: Use white paint for concrete and asphalt.
4) All surfaces to be painted must be thoroughly clean and dry.
5) Lay out painted lines with chalk on pavement in accordance with Project Drawings.
6) Accurately apply paint to the chalk marks, using striping machines, 4" wide stripes.
7) Apply paint in strict accordance with the manufacturer's directions.
8) Protect all paint from damage by traffic until dry.
9) Apply handicap logo at handicap stall.
FIELD QUALITY CONTROL
1) Aggregate Base Testing:
a) The granular base course shall be test rolled and observed by the Contractor's independent soils technician
as per MNDOT 2211.3C2 (Quality Compaction Method). Once the base course has been tested to the
satisfaction of the Engineer, pavement may be placed.
b) One mechanical analysis (ASTM D-422) per 500 cubic yards of base or fraction thereof.
5) Place in layers not exceeding 4" thickness (loose).
6) Compact with pneumatic or vibrating steel drum rollers.
7) After base course has been graded and compacted, thoroughly wet and slush roll with roller until
all aggregates are thoroughly embedded.
8) Allow base course to cure for a minimum of 72 hours prior to bituminous course application.
4) Wet base material to approximate optimum moisture content either prior to delivery to job site or as soon as
practical after being placed on subgrade.
CONCRETE PAVEMENT, CURB & GUTTER, AND SIDEWALK
STANDARDS
1) ACI 318, ACI 315, CRSI, ACI 301, latest adoptions.
2) Minnesota Standard Specifications for Construction, most recent edition
GRANULAR BASE COURSE MATERIAL
1) Compacted thickness of finished base: 6" - Concrete Pavement/Aprons
4" - Concrete Sidewalk
2) Base material shall consist of MNDOT 3149.2B2 Select Granular Borrow.
PORTLAND CEMENT
1) ASTM C150, Type I plus an approved air entraining agent, or Type IA air-entraining Portland cement.
WATER
1) Clean, fresh and potable, MnDOT Spec. 3906.
AIR ENTRAINING ADMIXTURES
1) ASTM C260.
2) Provide entrainment of 4 - 7 percent by volume.
OTHER ADMIXTURES
1) MnDOT Spec. 3113.
2) Calcium Chloride or materials containing chlorides or nitrates shall not be allowed.
AGGREGATES
1) Coarse: MnDOT Spec. 3137.
2) Fine: MnDOT Spec. 3126.
CONCRETE PLACEMENT
1) Place concrete as soon as possible after mixing. Place before initial set has occurred, and in no event after
it has contained its water content for more than one hour.
2) Avoid overworking concrete or allowing concrete to fall unrestricted for excessive vertical distances, and other
situations which can cause segregation of the aggregates.
3) Concrete pavements shall be placed in accordance with applicable portions of MnDOT 2301.
4) Sidewalks shall be placed in accordance with MnDOT 2521.
5) Curb and gutter shall be placed in accordance with MnDOT 2531.
PROTECTION
1) Provide adequate protection against rain, sleet and snow before and during placement and finishing of concrete.
2) Protect concrete from premature drying. Provide temporary covering as required. Keep concrete
continuously moist for 7 days.
3) Treat concrete with membrane curing compound in accordance with MnDOT 2531.3G.
COLD WEATHER CONCRETE
1) Do not place concrete when the atmospheric temperature is below 40 degrees F., or when the concrete is likely
to be subjected to freezing temperatures within 24 hours after it has been deposited unless adequate
temporary heating is provided.
2) Maintain concrete temperature of 40 to 90 degrees F. for 3 days. Protect from freezing for the following 5 days.
3) No frozen materials may be used in the concrete. Chemicals may not be used to prevent freezing unless
approved by the Engineer.
4) Perform all cold weather concreting in accord with ACI 306.
HOT WEATHER CONCRETE
1) Do not place concrete when the atmospheric temperature is above 100 degrees F.
2) Maintain concrete temperature of 40 to 90 degrees F. for 3 days. Protect from temperatures over 90 degrees
for the following 5 days.
3) Thoroughly wet dry porous surfaces before concreting.
4) Water reducing admixtures with retarding properties are required for all concrete placed when the temperature
exceeds 80 degrees F.
5) Perform all hot weather concreting in accord with ACI 305.
QUALITY CONTROL
1) The Contractor shall hire an independent testing firm to provide the following tests:
a) The independent testing technician shall perform random field testing of the fresh concrete including slump,
air content, and temperature. (ASTM C143, C173, C231 and C138). One series of the aforementioned
tests shall be performed on the first load of concrete.
b) The independent testing technician shall cast a set of four compression test cylinders for the first load of
concrete as well as 1 set for every 100 cubic yards, or fraction thereof, of concrete thereafter. Compression
tests shall be performed on one test cylinder at 7 days and two test cylinders at 28 days. The fourth test
cylinder shall be retained in the event of failing compression tests on the 28-day test cylinders.
3) Concrete Specifications:
a) 3A22: 1-2" slump, 3900 psi, 4-7% air
b) 3A32: 2-3" slump, 3900 psi, 4-7% air
c) 3Y43: 3-4" slump, 4300 psi, 4-7% air
d) Temperatures of all concrete during placement shall be 50-deg F to 90-deg F
FINISHING
1) Provide a broomed finish on exterior sidewalks and ramps unless noted otherwise.
PROPORTIONING AND DESIGN OF MIXES
1) MnDOT Spec. 2461.3
2) Concrete Classifications
a) Curb and gutter, slip-formed concrete: 3A22
b) Sidewalk, aprons, incidental concrete, manual curb & gutter: 3A32
c) Concrete pavements or aprons: 3Y43
d) Repair concrete, fast strength concrete: 3Y43
UTILITY NOTES
STANDARD SPECIFICATIONS
1) The following standard specifications shall apply to this project:
a) Minnesota Plumbing Code - MN Rules Chapter 4714 (MN Dept. of Labor and Industry-MNDLI)
b) Uniform Plumbing Code, latest edition (UPC)
c) "What you need to know about utility service connections in the 2015 Minnesota Plumbing Code"
http://www.dli.mn.gov/CCLD/PDF/pe_usc.pdf
d) City Engineers Association of Minnesota (CEAM) Standard Specifications
e) American Society for Testing Materials (ASTM)
f) American National Standards Institute (ANSI)
g) American Water Works Association (AWWA)
h) Minnesota Department of Transportation "Standard Specifications for Construction" (MN/DOT)
2) The Contractor shall comply with all local ordinances and codes
3) Certifications of all utility materials, as well as shop drawings, shall be submitted to the Engineer for review
MANHOLES AND CATCH BASINS - SANITARY AND STORM
1) Unless otherwise noted, manhole and catch basin structures shall consist of precast concrete, and meet
the requirements of Section 719.6 of the UPC (sanitary only), and Sections 2621.2C and 2621.3D of the CEAM
Standard Specifications
2) Catch basins shall be provided with the following castings:
a) Along curbline: Neenah R-3246 per City of Monticello standards
b) Isolated (in paved area): Neenah R-2553
c) Isolated (in vegetated area): Neenah R-2560-EA w/ type "C" grate
3) Manholes shall be provided with the following castings:
a) Sanitary: Neenah R-1642-A per City of Monticello standards
b) Storm: Neenah R-1642-A per City of Monticello standards
POLYVINYL CHLORIDE (PVC) PIPE AND FITTINGS - SANITARY
1) Smooth walled polyvinyl chloride pipe and fittings shall consist of SDR 26 or SDR 35 pipe, unless noted
otherwise, and meet the requirements of ASTM D3034 and Section 2621.2A5 of the CEAM Standard
Specifications
2) All pipe and fittings shall be SDR 35 for depths of up to 20 feet, and SDR 26 for depths exceeding 20'.
3) Pipe joints shall meet the requirements of Section 2621.3A3 of the CEAM Standard Specifications.
TESTING REQUIREMENTS
1) Water and sewer pipe, fittings, and appurtances shall be inspected and tested as per Sections 2611.3E-2611.3H
and 2621,3F-2621.3H of the CEAM Standard Specifications.
2) In the event of discrepancies between the testing requirements of the MN Plumbing Code and the CEAM
Standard Specifications, the most stringent will govern.
DUCTILE IRON (DIP) PIPE AND FITTINGS - WATER
1) Ductile iron pipe and fittings shall meet the requirements of Table 604.1 of the UPC, and Section 2611.2A1
of the CEAM Standard Specifications
2) Pipe joints shall meet the requirements of Section 605.5 of the UPC, and Section 2611.3B of the CEAM
Standard Specifications. Stainless steel fasteners shall be prohibited.
3) 6" pipe shall be Class 52. 8" and larger pipe shall be Class 50.
POLYVINYL CHLORIDE (C900 PVC) PIPE AND FITTINGS - WATER
1) Polyvinyl chloride pressure pipe and fittings shall meet the requirements of Table 604.1 of the UPC, and
Section 2611.2A3 of the CEAM Standard Specifications
2) Pipe joints shall meet the requirements of Section 605.4 of the UPC, and Section 2611.3B of the CEAM
Standard Specifications.
HIGH DENSITY POLYETHYLENE PIPE (HDPE) AND FITTINGS - STORM
1) HDPE pipe and fittings shall meet the requirements of ASTM F2306, and Section 2621.2A8 of the CEAM Standard
Specifications
2) Pipe joints shall meet the requirements Section 2621.3A3 of the CEAM Standard Specifications
3) Minimum wall thickness shall be 0.035 inches for 12 and 15 inch diameter pipe, and shall be 0.05 inches
for 18 and 24 inch diameter pipe.
4) HDPE storm sewer crossing above and within 10-ft of existing or proposed water main or services shall meet
the following standards per the MN plumbing code:
4" - 10" Diameter: AASHTO M252
12" - 60" Diameter: ASTM F2306
Fittings: ASTM D3212
GATE VALVES - WATER
1) Gate valves shall meet the requirements of Sections 2611.2C and 2611.3D of the CEAM Standard Specifications
HYDRANTS - WATER
1) Hydrants shall meet the requirements of Sections 2611.2B and 2611.3D of the CEAM Standard Specifications
2) Hydrants shall be Waterous WB67, or approved equal
BLOCKING AND ANCHORING - WATER
1) Water main blocking and anchoring shall meet the requirements of Section 2611.3A4 of the CEAM Standard
Specifications
2) Provide thrust reaction blocking consisting of concrete with a minimum 28 day compressive strength of 2000 psi.
3) Place between undisturbed ground and the fitting to be anchored. Place thrust blocking so that the pipe
and fitting joints are accessible for repair.
4) Mega-Lugs may be used in lieu of thrust block if allowed by local utility.
WATER SERVICE PIPE AND CURB STOPS
1) Copper tubing for water services shall meet the requirements of Table 604.1 of the UPC, and Section 2611.2D
of the CEAM Standard Specifications
2) HDPE pressure pipe for water services shall meet the requirements of ASTM D2239, ASTM D2737, ASTM D3035,
AWWA C901, CSA B137.1, and Section 2611.2D of the CEAM Standard Specifications
3) Curb stops for water services Section 2611.2D of the CEAM Standard Specifications
REINFORCED CONCRETE SEWER PIPE (RCP) AND FITTINGS - STORM
1) RCP pipe and fittings shall meet the requirements of ASTM C76, and Section 2621.2A3 of the CEAM Standard
Specifications
2) Pipe joints shall meet the requirements of Section 2621.3A3 of the CEAM Standard Specifications
3) The ASTM strength class of pipe shall be Class III unless otherwise shown on the Plans.
4) The pipe shall be drawn together by some approved method of jacking or winching. This pressure must be
maintained until sufficient backfill is placed to keep the joint from opening.
END SECTIONS - STORM
1) End sections shall be provided at all pipe inlets and outlets.
2) The end sections shall consist of material matching the material of the pipe, which it is being connected to.
Materials and joints shall be as per the specifications described above for the applicable pipe material.
3) The last 3 joints of RCP shall be tied, and the end section shall the be provided with an approved trash guard.
INSTALLATION
1) Unless otherwise noted, installation of all water and sewer pipe, fittings, and appurtenances shall be as per
the CEAM Standard Specifications.
GENERAL NOTES
CO
L
E
G
R
O
U
P
AR
C
H
I
T
E
C
T
S
L
L
C
.
Project No.
16010
Issue Date
xx-xx-2016
Revision:
21
6
P
a
r
k
A
v
e
n
u
e
S
o
u
t
h
Su
i
t
e
1
0
2
Sa
i
n
t
C
l
o
u
d
,
M
N
5
6
3
0
1
(3
2
0
)
6
5
4
-
6
5
7
0
ww
w
.
c
o
l
e
g
r
o
u
p
a
r
c
h
i
t
e
c
t
s
.
c
o
m
STANDARD DETAILS
SC
H
U
L
T
Z
E
N
G
I
N
E
E
R
I
N
G
&
S
I
T
E
D
E
S
I
G
N
PR
E
L
I
M
I
N
A
R
Y
-
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
C
I
V
I
L
C
H
E
C
K
S
E
T
-
0
3
/
0
7
/
2
0
1
6
CO
L
E
G
R
O
U
P
AR
C
H
I
T
E
C
T
S
L
L
C
.
Project No.
16010
Issue Date
xx-xx-2016
Revision:
21
6
P
a
r
k
A
v
e
n
u
e
S
o
u
t
h
Su
i
t
e
1
0
2
Sa
i
n
t
C
l
o
u
d
,
M
N
5
6
3
0
1
(3
2
0
)
6
5
4
-
6
5
7
0
ww
w
.
c
o
l
e
g
r
o
u
p
a
r
c
h
i
t
e
c
t
s
.
c
o
m
STANDARD DETAILS
SC
H
U
L
T
Z
E
N
G
I
N
E
E
R
I
N
G
&
S
I
T
E
D
E
S
I
G
N
PR
E
L
I
M
I
N
A
R
Y
-
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
C
I
V
I
L
C
H
E
C
K
S
E
T
-
0
3
/
0
7
/
2
0
1
6
BITUMINOUS PAVEMENT SECTION (PARKING LOT)
NTS1
11
2" BITUMINOUS WEARING
COURSE (MNDOT 2360 TYPE
SPWEB340B)
6" MNDOT CLASS 5
AGGREGATE BASE
APPROVED COMPACTED
SUBGRADE
11
2" BITUMINOUS BASE
COURSE (MNDOT 2360 TYPE
SPNWB330B)
TACK COAT BETWEEN
BITUMINOUS COURSES
BITUMINOUS PAVEMENT SECTION (PUBLIC R/W)
NTS2
11
2" BITUMINOUS WEARING
COURSE (MNDOT 2360 TYPE
SPWEB340B)
6" MNDOT CLASS 5
AGGREGATE BASE
APPROVED COMPACTED
SUBGRADE
2" BITUMINOUS BASE
COURSE (MNDOT 2360 TYPE
SPNWB330B)
TACK COAT BETWEEN
BITUMINOUS COURSES
CURB & GUTTER (MNDOT B612)
NTS
2" MIN. COMPACTED MNDOT
CLASS 5 AGGREGATE BASE
BELOW CURB AND GUTTER
APPROVED COMPACTED
SUBGRADE
CONCRETE
7"
6"
6"
8"
13
1
/
2
"
R3"
R3"
3
4" PER FT SLOPE
NOTES
1. FOR AREAS WHERE DRAINAGE IS DIRECTED AWAY
FROM THE CURB, THE GUTTER SHALL BE TILTED TO
DRAIN FROM THE CURB
2. CONCRETE SHALL MEET THE REQUIREMENTS OF
MNDOT CONCRETE MIX 3A22
3. MNDOT B612 CURB AND GUTTER SHALL MEET THE
REQUIREMENTS OF STANDARD MNDOT PLATE 7100
20"
3 - PARKING LOT CONCRETE APRON/PAVEMENT SECTION
NTS
7" CONCRETE
(MNDOT CONCRETE MIX 3Y43)
6" MNDOT 3149.2B2 SELECT
GRANULAR BORROW
APPROVED COMPACTED
SUBGRADE
REINFORCEMENT: #4 BARS
AT 24" O.C., EACH WAY
NOTE: PLACE CONCRETE REINFORCEMENT AT
THE MIDDLE OF THE PAVEMENT THICKNESS
4 ADA RAMP
NTS
1:10
SLO
P
E
MAX
.
6" CURB
FACE
TRUNCATED DOMES
AS PER MNDOT STD.
PLATE 7038A 1:10
SLO
P
E
MAX
.
1:
1
2
S
L
O
P
E
M
A
X
.
SI
D
E
W
A
L
K
6'
10'
6'
6'
6" CURB
FACE
5 ADA RAMP
NTS
1:12
SLO
P
E
MAX
.
6" CURB
FACE
TRUNCATED DOMES
AS PER MNDOT STD.
PLATE 7038A
SIDE
W
A
L
K
SIDE
W
A
L
K
6'
6'
6'
6'
6" CURB
FACE
1:12
SLO
P
E
MAX
.
PAVEMENT
6
CONCRETE SIDEWALK SECTION
NTS
4" CONCRETE
(MNDOT CONCRETE MIX 3A32)
4" MNDOT 3149.2B2 SELECT
GRANULAR BORROW
APPROVED COMPACTED
SUBGRADE
CONTRACTION AND EXPANSION JOINTS SHALL
BE CONSTRUCTED AS PER MNDOT SPEC.
2521.3C2
7
THICKENED EDGE SIDEWALK
NTS
6"
6"
CONTRACTION AND EXPANSION JOINTS SHALL
BE CONSTRUCTED AS PER MNDOT SPEC.
2521.3C2
PARKING
LOT
1" CHAMFER
4" CONCRETE
(MNDOT CONCRETE MIX 3A32)
4" MNDOT 3149.2B2 SELECT
GRANULAR BORROW
APPROVED COMPACTED
SUBGRADE
8
STUMP
T
T
FIBER OPTIC
STUMP
RIM = 927.55
INV. = 924.27
RIM = 927.58
INV. = 923.82
RIM = 927.80
INV. = 923.64
RIM = 927.09
INV. = 924.22
RIM = 927.34
INV. = 923.29
RIM = 927.94
INV. = 921.07
RIM = 927.28
INV. = 923.98
RIM = 928.62
INV. = 921.94
RIM = 931.14
INV. = 927.93
RIM = 931.19
INV. = 927.32
RIM = 931.29
INV. = 922.84 RIM = 931.28
INV. = 920.37
RIM = 931.22
INV. = 923.4
RIM = 930.00
INV. = 917.74
RIM = 928.82
INV. = 924.15
HOUSE
GA
R
A
G
E
HOUSE
GA
R
A
G
E
H
O
U
S
E
SH
E
D
CO
N
BI
T
.
D
R
I
V
E
W
A
Y
C
O
N
.
S
T
E
P
S
CO
N
.
S
I
D
E
W
A
L
K
BITU
M
I
N
O
U
S
D
R
I
V
E
W
A
Y
&
PARK
I
N
G
W
/
C
U
R
B
GA
R
A
G
E
BIT
.
CO
N
C
R
E
T
E
12
"15
"
12
"
12
"
12
"
S
T
O
R
M
S
E
W
E
R
12
"
STONE GRILL
COMPOST
G
A
R
A
G
E
TR
A
S
H
AP
A
R
T
M
E
N
T
&
G
A
R
A
G
E
RIM = 927.28
INV. = 923.06
T)(M
E
AS.)
49.
1
7
(
M
E
A
S
.
)
49.
0
0
(
P
L
A
T
)
1
:
16
6
.
2
0
(
M
E
A
S
.
)
16
5
.
0
0
(
P
L
A
T
)
6
:
19
9
.
0
8
(
M
E
A
S
.
)
19
8
.
0
0
(
P
L
A
T
)
1
:
1
(
33
0
.
0
0
(
P
L
A
T
)
33
3
.
2
2
(
M
E
A
S
)
BUILDING
B
U
I
L
D
I
N
G
B
U
I
L
D
I
N
G
B
U
I
L
D
I
N
G
B
U
I
L
D
I
N
G
BUILD
LO
C
U
S
T
S
T
.
T
H
I
R
D
S
T
.
RIM = 928.61
INV. = 922.10
21
"
R
C
P
S
T
O
R
M
RIM = 929.58
INV. = 925.86
18
"
R
C
P
21
"
R
C
P
S
T
O
R
M
12
"
R
C
P
S
A
N
.
12
"
R
C
P
S
A
N
.
8"
D
I
P
W
A
T
E
R
8"
D
I
P
W
A
T
E
R
INV = 922.33
(PER AS-BUILT)
8"
D
I
P
S
T
U
B
15
"
R
C
P
S
T
U
B
8"
D
I
P
/
P
V
C
S
T
U
B
INV = 921.45
24
"
R
C
P
S
T
O
R
M
30
"
R
C
P
S
T
O
R
M
24
"
V
C
P
S
A
N
.
CO
L
E
G
R
O
U
P
AR
C
H
I
T
E
C
T
S
L
L
C
.
Project No.
16010
Issue Date
xx-xx-2016
Revision:
21
6
P
a
r
k
A
v
e
n
u
e
S
o
u
t
h
Su
i
t
e
1
0
2
Sa
i
n
t
C
l
o
u
d
,
M
N
5
6
3
0
1
(3
2
0
)
6
5
4
-
6
5
7
0
ww
w
.
c
o
l
e
g
r
o
u
p
a
r
c
h
i
t
e
c
t
s
.
c
o
m
Scale: 1"=20'GRADING PLAN
0 20 40 80
SC
H
U
L
T
Z
E
N
G
I
N
E
E
R
I
N
G
&
S
I
T
E
D
E
S
I
G
N
PR
E
L
I
M
I
N
A
R
Y
-
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
C
I
V
I
L
C
H
E
C
K
S
E
T
-
0
3
/
0
7
/
2
0
1
6
PROPOSED
APARTMENT
BUILDING
FFE = 1031.60
PROPOSED
DETACHED
GARAGE
FFE = 1030.67
PROPOSED
DETACHED
GARAGE
FFE = 1030.00
8"
S
T
E
P
8"
S
T
E
P
8"
S
T
E
P
8"
S
T
E
P
PROPOSED
DETACHED
GARAGE
FFE = 1028.00
PROPOSED
DETACHED
GARAGE
FFE = 1028.67
PROPOSED
DETACHED
GARAGE
FFE = 1029.33
CB1
RIM = 927.10
INV = 923.10
142 LF
12" RCP
@ 0.45%
STMH1
RIM = 928.80
INV = 922.47
CONNECT TO EXISTING
15" RCP STUB
INV = 922.33
(FIELD VERIFY)
30 LF
12" RCP
@ 0.45%
EX
EX
EX
EX
EX
EX
EX
EX
930
93
0
93
0
93
0
930
92
8
92
8
9
2
8
GRADING NOTES:
2. EXISTING TOPOGRAPHICAL INFORMATION WAS OBTAINED FROM A TOPOGRAPHICAL
SURVEY PROVIDED BY O'MALLEY & KRON LAND SURVEYORS, COLD SPRING, MN (320) 685-5905.
3. BENCHMARK: CONTACT O'MALLEY & KRON LAND SURVEYORS
4. NOTIFY ENGINEER IMMEDIATELY IF ANY INCONSISTENCIES ARE DISCOVERED BETWEEN
ACTUAL SITE CONDITIONS AND WHAT IS SHOWN ON THE PLANS, WHICH ARE
SIGNIFICANT ENOUGH TO ALTER THE INTENT OF THE DRAWINGS.
6. THE CONTRACTOR SHALL CONTACT GOPHER ONE CALL AT (800) 252-1166 FOR A
UTILITY LOCATE PRIOR TO THE START OF CONSTRUCTION AND VERIFY LOCATIONS OF
UTILITIES BEFORE BEGINNING WORK.
7. SEE SHEET C2 FOR STANDARD DETAILS.
15. ALL PROPOSED ELEVATIONS ARE TOP OF PAVING OR GUTTER, UNLESS NOTED
OTHERWISE. PROPOSED ELEVATIONS ARE INTENDED TO PROVIDE POSITIVE DRAINAGE
TOWARDS CATCH BASINS AND/OR OUTLETS. THE CONTRACTOR SHALL BE
RESPONSIBLE TO PROVIDE THE REQUIRED ELEVATIONS, WHICH WILL PROMOTE
POSITIVE DRAINAGE THROUGHOUT THE PROJECT SITE.
1. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS INCLUDING LOCATIONS, AND RIM
AND INVERT ELEVATIONS, OF EXISTING DRAINAGE AND SANITARY STRUCTURES. LOCATION
AND SIZE OF EXISTING SANITARY, WATER, AND STORM SEWER STUBS, AND EXISTING
GRADES SHALL ALSO BE VERIFIED.
13. SPOT ELEVATIONS ARE FLOW LINE AND/OR FINISHED GRADES, UNLESS OTHERWISE
INDICATED. TOP OF CURB ELEVATIONS ARE 6" ABOVE THE FLOW LINE SPOT
ELEVATION SHOWN ON THE PLANS, UNLESS NOTED OTHERWISE.
5. IF REQUIRED BY THE MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY, THE
OWNER OR CONTRACTOR SHALL OBTAIN A PLUMBING PERMIT PRIOR TO THE
INSTALLATION OF ANY STORM SEWER UTILITIES.
12. CONTRACTOR SHALL PERFORM CALCULATIONS TO VERIFY EARTHWORK QUANTITIES.
CONTRACTOR'S BID SHALL BE BASED ON EARTHWORK CALCULATIONS COMPLETED BY
THE CONTRACTOR
NOTE: CADD FILES FOR ESTIMATING EARTHWORK QUANTITIES ARE AVAILABLE
TO CONTRACTORS FOR PREPARING BIDS. IN ORDER TO RECEIVE THE CADD FILES,
THE CONTRACTOR WILL NEED TO SIGN A HOLD-HARMLESS AGREEMENT PROVIDED
BY SCHULTZ ENGINEERING & SITE DESIGN, AND AGREE TO PAY A $50 PROCESSING
FEE. THE CADD FILES WILL BE RELEASED UPON RECEIPT OF THE CHECK
9. ALL LENGTHS OF STORM SEWER OR CULVERT PIPE SPECIFIED ON THIS PLAN INCLUDE
THE LENGTHS OF ANY ASSOCIATED FLARED END SECTIONS.
11. FINISHED ELEVATIONS OF LAWN/GREEN AREAS ADJACENT TO BUILDINGS SHALL BE
A MINIMUM OF 6" BELOW FINISHED FLOOR OR TOP-OF-BLOCK ELEVATION.
14. "EX" DENOTES EXISTING SPOT ELEVATIONS
10. TRASH GUARDS SHALL BE INSTALLED ON ALL STORM SEWER END SECTIONS.
8. HDPE STORM SEWER CROSSING ABOVE AND WITHIN 10-FT OF EXISTING OR PROPOSED
WATER MAIN OR SERVICES SHALL MEET THE FOLLOWING STANDARDS PER THE MN
PLUMBING CODE:
4" - 10" DIAMETER: AASHTO M252
12" - 60" DIAMETER: ASTM F2306
FITTINGS: ASTM D3212
SEE SHEET C6 FOR LOCATIONS OF NEW WATER MAIN AND SERVICES.
PROPOSED
DETACHED
GARAGE
FFE = 1029.40
SIDEWALK
CROSS-DRAIN
STMH2
RIM = 929.65
INV = 922.33
RETAINING WALL
LENGTH = 38-LF
HEIGHT = 0 TO 1'-8"
NOTE: CROSS-SLOPE OF SIDEWALK
AND PAVER AREAS WITHIN CITY
RIGHT-OF-WAY SHALL BE 2.0%
NOTE: CROSS-SLOPE OF SIDEWALK
AND PAVER AREAS WITHIN CITY
RIGHT-OF-WAY SHALL BE 2.0%
CO
L
E
G
R
O
U
P
AR
C
H
I
T
E
C
T
S
L
L
C
.
Project No.
16010
Issue Date
xx-xx-2016
Revision:
21
6
P
a
r
k
A
v
e
n
u
e
S
o
u
t
h
Su
i
t
e
1
0
2
Sa
i
n
t
C
l
o
u
d
,
M
N
5
6
3
0
1
(3
2
0
)
6
5
4
-
6
5
7
0
ww
w
.
c
o
l
e
g
r
o
u
p
a
r
c
h
i
t
e
c
t
s
.
c
o
m
SWPPP - NOTES
SC
H
U
L
T
Z
E
N
G
I
N
E
E
R
I
N
G
&
S
I
T
E
D
E
S
I
G
N
PR
E
L
I
M
I
N
A
R
Y
-
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
C
I
V
I
L
C
H
E
C
K
S
E
T
-
0
3
/
0
7
/
2
0
1
6
Existing Impervious Area
Proposed Impervious Area
Net Impervious Area Increase
0.20 acres
0.60 acres
0.40 acres
Receiving Surface Waters
The following surface waters could receive storm water runoff from this project, and are within 1 mile of the project site:
Surface Water Impaired
Water?
Special
Water?
Type of
Surface Water
USEPA Approved TMDL
for Impaired Water?
Comments
PROJECT INFORMATION
Project Description
This project will consist of the construction of a new 21-Unit Apartment Building, as well as detached garages, with footprints
totalling approximately 12,600 SF. Bituminous parking lot and driveway areas, and sidewalk will also be included.
Disturbed Area & Impervious Surface Tabulation
Project not subject to
SEDIMENT AND OTHER POLLUTANTS
This SWPPP has been designed mainly to provide erosion and sediment control of naturally occurring soils at this site (ie: sands, loams,
and clays). Although this SWPPP does address pollution prevention of other man-made materials, it is assumed that these materials will
consist of debris from existing structures and pavements to be demolished, or debris and chemicals (ie: fuels, new paints, etc.) resulting
from new construction.
There are no known solid wastes or hazardous materials buried below grade at this site. If such wastes or hazard materials are
discovered during construction, the SWPPP Coordinator (described below) will be responsible for notifying the Engineer. This SWPPP will
then be revised to address he presence and disposal of these additional pollutants
EROSION PREVENTION AND SEDIMENT CONTROL BMPS
Standards and References
Materials and construction methods of all BMPs included in this SWPPP shall be as per the Minnesota Department of
Transportation (MNDOT) Standard Specifications for Construction, latest edition. The Contractor and SWPPP Coordinator shall
obtain a current copy of MNDOT's Standard Specifications for Construction and familiarize themselves with the specification
sections applicable to this SWPPP, as there are several BMPs that specifically reference these sections.
The Contractor and SWPPP Coordinator shall be expected to be familiar with the applicable MNDOT specification sections
during construction. No additional compensation will be paid to the Contractor for additional work due to unfamiliarity with
these specification sections.
Temporary and Permanent Stabilization
All exposed soil areas (including stockpiles) shall be provided with temporary or permanent cover within 14 days of construction
activity temporarily or permanently ceasing in that portion of the site. Temporary or permanent drainage ditches or swales,
which drain off-site or to a surface water, and are within 200 lineal feet of the property line or surface water shall be provided
with temporary or permanent cover within 24 hours of construction. Placement of temporary or permanent cover shall be
initiated immediately upon suspension or completion of excavation operations.
Temporary Cover:
If the Contractor chooses to halt grading operations in a portion of the site (or the whole site) for a period exceeding 14 days,
and grading operations (rough or finish grading) in the affected areas has not yet been completed, temporary cover shall be
placed. Affected areas consisting of drainage ditches or swales connected to, and within, 200 lineal feet of a property line or
surface water shall be provided with temporary cover within 24 hours of connection. Depending on the Contractor's schedule,
the temporary cover shall consist of one of the following BMPs:
1). Discanchored Mulch
a). Discanchored mulch may be used in an area of the site (or the whole site) if the Contractor is halting grading operations
for a period that is relatively short, but exceeds 14 days.
b). The mulch shall be Type 3 per MNDOT Spec. 3882
c). An adequate quantity of mulch shall be evenly distributed to achieve 90% coverage of the exposed soils.
d). Mulch shall be placed as per MNDOT 2575.3F.
e). All mulch shall be disc anchored as per MNDOT 2575.3G. Prior to the placement and discanchoring of the mulch, the
soils shall be loosened and the area smooth-rough graded per MNDOT 2575.3B1.
f). Any areas that are exposed as a result of wind action after the initial mulch placement shall be covered with additional
mulch to maintain 90% coverage.
2). Temporary Seeding with Mulch
a). Temporary seeding with mulch may be used in areas of the site (or the whole site) if the Contractor is halting grading
operations for a period that is relatively long. Although mulch still needs to be applied as described above, once the
temporary seeding/turf is established, the mulch will no longer need to be maintained. The temporary seeding/turf will
require very little maintenance.
b). Prior to the sowing of temporary seed, the soils shall be loosened and the area smooth-rough graded per MNDOT 2575.3B1.
c). Contractor shall utilize Seed Mixes 100, 110, or 130 per MNDOT Spec. 3876 for temporary seeding.
d). Temporary seeding shall be sown per MNDOT Spec. 2575.3D.
e). Once temporary seeding has been sown, mulch shall be placed over the area as described above.
Permanent Cover:
Upon completion of finish grading and/or placement of topsoil, initiation of the placement of permanent cover shall begin
immediately over all exposed areas. This includes areas designated for impervious surfacing (ie: buildings, pavements/gravel
bases, sidewalks, etc.). Where the construction schedule will not allow for the placement of the permanent impervious surfacing
within 14 days of the completion of finish grading, temporary cover shall be provided in these areas, as described above, until
the permanent impervious surfacing can be constructed. Affected areas consisting of drainage ditches or swales connected
to, and within, 200 lineal feet of a property line or surface water, shall be provided with permanent cover within 24 hours of
connection.
Undisturbed Areas
If shown on the plan, the Contractor shall delineate areas that are not to be disturbed on the site. This may be done with flags,
stakes, signs, silt fence, etc., and shall be completed prior to the start of any grading operations. Regardless of the delineation
method the Contractor chooses to use, the Contractor must communicate to his/her personnel and subcontractors that these
areas are not to be disturbed and construction equipment (including trucks and personal vehicles) shall not be allowed in these
areas.
The Contractor shall minimize compaction and preserve topsoil as much as possible at the site. In pervious ("green") areas that
are not essential to the construction of the project, the Contractor shall avoid construction traffic and maintain the existing
condition of these areas.
2). Erosion Control Blanket
a). Erosion control blanket shall be placed in areas as shown on the plan included in this SWPPP. These areas shall still be
provided with permanent seeding, as described above, beneath the erosion control blanket.
b). Erosion control blanket shall meet the requirements indicated in MNDOT Spec. 3885. See plan for category(s) of erosion
control blanket.
c). Erosion control blanket shall be installed as per MNDOT Spec. 2575.3J2.
d). Erosion control blanket specified in drainage ditches and swales connected to, and within 200 lineal feet, of a property
line or surface water shall be installed within 24 hours of the completion of finish grading (including permanent seeding).
3). Riprap
a). Riprap shall be placed in areas as shown on the plan included in this SWPPP.
b). All riprap shall be underlain with Type 4 geotextile fabric. The fabric shall meet the requirements of MNDOT Spec. 3733 and
shall be installed as per MNDOT Spec. 2511.3B2.
c). Riprap materials shall meet the requirements of MNDOT Spec. 3601, and shall be Class 3, unless noted otherwise on the
plans.
d). Riprap shall be considered "Random Riprap" and shall be placed as per MNDOT Spec. 2511.
e). Although it is permitted for the riprap to be placed with machinery, it will be necessary for the Contractor to hand place
some of the riprap in order to provide a dense, well-keyed layer of stones with the least practical quantity of void space.
f). The minimum thickness of the riprap shall be 18 inches, unless otherwise noted on the plans.
g). Riprap designated at the end of pipe outlets shall be placed within 24 hours of installation of the pipe outlet end section.
h). Riprap specified in drainage ditches and swales connected to, and within 200 lineal feet, of a property line or surface
water shall be installed within 24 hours of the completion of finish grading.
Sediment Control
The following sediment control BMPs shall be implemented as part of this project:
1). Silt Fence
a). Silt fence shall be installed at the locations shown on the plan included in this SWPPP.
b). Silt fence shall be machine sliced and materials shall meet the requirements of MNDOT Spec. 3886.
c). Silt fence shall be installed as per MNDOT Spec. 2573.3C1.
d). Silt fence shall be installed prior to any upgradient grading operations, and shall remain in place and maintained
adequately until upgradient areas achieve Final Stabilization (see below)
2). Catch Basin Protection
a). WIMCO Road Drain protection devices, as manufactured by WIMCO, shall be used for catch basin protection on this
project. WIMCO can be contacted at (952)-233-3055, and their web page is www.roaddrain.com.
b). "Road Drain Top Slab" devices shall be installed at all catch basin locations immediately after placement of the catch
basin structures. "Road Drain Top Slab" devices shall remain in place and be adequately maintained until permanent
surfacing is constructed (ie: curb and gutter, pavements, and/or gravel surfacing). In areas designated for turf
establishment, "Road Drain Top Slab" devices shall remain in place until Final Stabilization of all upgradient areas is
established.
c). Upon construction of the permanent surfacing, the "Road Drain Top Slab" devices shall be replaced with the WIMCO
product specified on the plans. The WIMCO devices shall remain in place until Final Stabilization of all upgradient areas has
been established.
d). The contractor shall install and maintain the catch basin protection devices as per the manufacturer's instructions and
specifications.
3). Culvert Inlet Protection
a). Culvert inlet protection shall be provided at all culvert inlet locations immediately after construction of the culvert. See
plan included in this SWPPP for culvert inlet locations.
b). Culvert inlet protection shall consist of geotextile fabric wrapped around, and completely covering the inlet end section.
The geotextile fabric shall be the same fabric used in silt fence applications and meet the requirements of MNDOT Spec.
3886.
c). The culvert inlet protection shall remain in place and adequately maintained until Final Stabilization of all upgradient
areas has been established.
d). Culvert inlet protection shall be repaired or replaced if damaged during, or after, rain events, or if accumulated sediment
reaches 1/2 of the diameter of the culvert pipe. Repair or replacement of culvert inlet protection shall be completed within
24 hours of discovery.
4). Temporary Rock Construction Entrance
a). Temporary rock construction entrances shall be installed at the locations shown on the plan included in this SWPPP. See
detail for temporary rock entrance design.
b). If the Contractor chooses to access the site from locations other than where temporary rock entrances are specified on
the plans, additional temporary rock entrances shall be placed at these locations, as well.
c). Temporary rock entrance shall be constructed prior to the start of grading operations, and shall remain in place and be
adequately maintained until Final Stabilization has been established.
d). Temporary rock entrances shall be maintained in such a manner that the entrances prevent sediment tracking onto
adjacent streets. If a temporary rock entrance is found to be ineffective, it shall be replaced or improved within 24 hours of
discovery.
e). The Contractor has the option to place Type 4 geotextile fabric beneath the temporary rock entrance. The fabric may
extend the life of the entrance as it will reduce rock "sinking" into the underlying soils. If the Contractor chooses to use
fabric, it should meet the requirements of MNDOT Spec. 3733 and shall be installed as per MNDOT Spec. 2511.3B2.
f). If sediment tracking from the site is discovered on adjacent streets, the sediment shall be removed with a street sweeper or
other approved method within 24 hours of discovery. This shall be done throughout construction of the project. This
sediment may be returned and graded over exposed areas of the site, or disposed of off site per MPCA requirements.
The City may order street sweeping to be performed at the Contractor's or Owner's expense if City staff find that
construction activities are resulting in sediment or debris being tracked onto City streets.
5). Filter Logs
a). Filter logs shall be installed at the locations shown on the plan included in this SWPPP.
b). Filter logs shall consist of Type Wood Fiber biorolls and meet the requirements of MNDOT Spec.
3897.
c). Filter logs shall be installed as per MNDOT Spec. 2573.3J.
d). Filter logs shall be installed immediately after placement of erosion control blanket.
e). Filter logs shall remain in place for the life of the project, and shall be allowed to degrade
naturally.
g). Temporary soil stockpiles shall be placed on the site in areas upgradient from silt fence. Where the Contractor chooses to
place temporary soil stockpiles outside designated silt fenced areas, the stockpiles shall be surrounded by additional silt
fence. Under no circumstances shall temporary soil stockpiles be placed over surface waters, curb and gutter, catch basins,
culvert inlets or outlets, or ditches.
Dewatering
If dewatering of sandy subsoils is required for this project, the pump discharge shall be treated prior to
discharge off-site or into a surface water. Treatment of discharge shall be achieved with the use of a
"Dandy Dewatering Bag" (or approved equivalent), as manufactured by Dandy Products,Inc. Dandy
Products, Inc. can be contacted at (877) 307-0141, and their web page is www.dandyproducts.com.
The "Dandy Dewatering Bag" shall be installed, utilized, and maintained per the manufacturer's
instructions and specifications.
Once dewatering water has been treated, it may be discharged off-site or to a surface water. The
discharge shall be visually checked to ensure that it is relatively clean and not visibly different from any
receiving waters. If discharge is noticeably "dirty", the Engineer shall be contacted as additional
treatment methods may be necessary.
Adequate erosion control shall be provided at the point of discharge if it is located in an area with
exposed soils or established turf. This erosion control may consist of temporarily placed rip rap, or other
approved energy dissipation measures. The type of erosion control measure shall be at the
Contractor's discretion, depending on the location of the dewatering discharge and the unique site
characteristics. The erosion control measures shall be effective and shall be maintained adequately
such that no erosion occurs at the point of discharge.
Pollution Prevention Management
Solid waste accumulated during construction, including collected sediment, construction materials,
floating debris, construction debris, paper, plastics, and other solid wastes shall be disposed of in
accordance with MPCA disposal requirements:
1). Building products that have the potential to leach pollutants shall be maintained under cover
(e.g., plastic sheeting or temporary roofs) to prevent the discharge of pollutants or protected by a
similarly effective means designed to minimize contact with storm water.
2). Pesticides, herbicides, insecticides, fertilizers, treatment chemicals, and landscape materials shall
be maintained under cover (e.g., plastic sheeting or temporary roofs) to prevent the discharge of
pollutants or protected by similarly effective means designed to minimize contact with stormwater.
3). Hazardous materials, toxic waste, (including oil, diesel fuel, gasoline, hydraulic fluids, paint solvents,
petroleum-based products, wood preservatives, additives, curing compounds, and acids) shall be
properly stored in sealed containers to prevent spills, leaks or other discharge. Restricted access
storage areas shall be provided to prevent vandalism. Storage and disposal of hazardous waste or
hazardous materials shall be in compliance with Minn. R. ch. 7045 including secondary
containment as applicable.
4). Solid waste shall be stored, collected and disposed of properly in compliance with Minn. R. ch.
7035.
5). Portable toilets shall be positioned so that they are secure and will not be tipped or knocked over.
Sanitary waste must be disposed of properly in accordance with Minn. R. ch. 7041.
The Contractor shall take steps to prevent the discharge of spilled or leaked chemicals, including fuel,
from any area where chemicals or fuel will be loaded or unloaded including the use of drip pans or
absorbents unless infeasible. The Contractor shall conduct fueling in a contained area unless
infeasible. The Contractor shall ensure adequate supplies are available at all times to clean up
discharged materials and that an appropriate disposal method is available for recovered spilled
PDWHULDOV7KH&RQWUDFWRUVKDOOUHSRUWDQGFOHDQXSVSLOOVLPPHGLDWHO\DVUHTXLUHGE\0LQQ6WDW
115.061, using dry clean up measures where possible.
If the Contractor washes the exterior of vehicles or equipment on the project site, washing shall be
limited to a defined area of the site. Runoff from the washing area shall be contained in a sediment
basin or other similarly effective controls and waste from the washing activity shall be properly
disposed of. The Contractor shall properly use and store soaps, detergents, or solvents. No engine
degreasing shall be allowed on site.
The Contractor shall provide effective containment for all liquid and solid wastes generated by
washout operations (concrete, stucco, paint, form release oils, curing compounds and other
construction materials) related to the construction activity. The liquid and solid washout wastes shall
not contact the ground, and the containment shall be designed so that it does not result in runoff
from the washout operations or areas. Liquid and solid wastes shall be disposed of properly and in
compliance with MPCA rules. A sign must be installed adjacent to each washout facility that requires
site personnel to utilize the proper facilities for disposal of concrete and other washout wastes.
FINAL STABILIZATION
Final Stabilization shall be considered established once the following requirements have been achieved:
1). All soil disturbing activities at the site have been completed and all soils are stabilized by a uniform
perennial vegetative cover with a density of 70 percent of its expected final growth density over the entire
pervious surface area, or other equivalent means necessary to prevent soil failure under erosive conditions.
2). The permanent storm water management system is constructed, and is operating as designed.
Temporary or permanent sedimentation basins that are to be used as permanent water quality
management basins have been cleaned of any accumulated sediment. All sediment has been removed
from conveyance systems and ditches are stabilized with permanent cover.
3). All temporary synthetic and structural erosion prevention and sediment control BMPs have been
removed from the project site. BMPs designed to decompose on site may be left in place.
e). Silt fence shall be repaired or replaced if damaged during, or after, rain events, or if accumulated sediment on the
upstream side of the fence reaches 1/3 of the height of the fence. Repair or replacement of silt fence shall be completed
within 24 hours of discovery.
f). Portions of silt fence may be removed to accommodate short-term activities, such as vehicle passage. Short-term activities
shall be completed as quickly as possible, and new silt fence installed immediately after completion of the short-term
activity. If rainfall is imminent or forecasted in the near future, new silt shall be installed regardless of if the short term activity
has been completed or not. The Contractor is advised to schedule short term activities during dry weather as much as
practicable. No additional compensation will be paid due to additional silt fence associated with short-term activities.
Areas designated for permanent turf establishment shall be provided with one or more of the following BMPs (see plan):
1). Permanent Seeding with Mulch
a). Unless otherwise noted on the plans, all areas designated for turf establishment shall be provided with permanent seeding.
b). In addition to the plan included as part of this SWPPP, the Contractor shall verify if a Landscaping Plan has been included
in the plans by the Architect. If a Landscape Architect has specified higher quality permanent cover (ie: sod, hydroseeding,
etc.), the Contractor shall provide this permanent cover in lieu of the permanent seeding specified in this SWPPP.
c). Prior to the sowing of permanent seed, the soils shall be loosened and the area smooth-rough graded per MNDOT
2575.3B1.
d). Contractor shall utilize Seed Mix 260 per MNDOT Spec. 3876 for permanent seeding.
e). Permanent seeding shall be sown per MNDOT Spec. 2575.3D.
f). Once permanent seeding has been sown, mulch shall be placed over the area as described above (under Temporary
Cover), unless noted otherwise.
NPDES Permit
Anticipated Disturbed Area 0.76 acres
Permanent Site Drainage
Site drainage will be routed off site to public storm sewer located in the adjacent Locust Street right-of-way via new storm sewer and
sheet flow. Since new impervious surface area totals less than 1 acre, storm water management related to water quality is not included
in the project.
CO
L
E
G
R
O
U
P
AR
C
H
I
T
E
C
T
S
L
L
C
.
Project No.
16010
Issue Date
xx-xx-2016
Revision:
21
6
P
a
r
k
A
v
e
n
u
e
S
o
u
t
h
Su
i
t
e
1
0
2
Sa
i
n
t
C
l
o
u
d
,
M
N
5
6
3
0
1
(3
2
0
)
6
5
4
-
6
5
7
0
ww
w
.
c
o
l
e
g
r
o
u
p
a
r
c
h
i
t
e
c
t
s
.
c
o
m
SWPPP - DETAILS
SC
H
U
L
T
Z
E
N
G
I
N
E
E
R
I
N
G
&
S
I
T
E
D
E
S
I
G
N
PR
E
L
I
M
I
N
A
R
Y
-
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
C
I
V
I
L
C
H
E
C
K
S
E
T
-
0
3
/
0
7
/
2
0
1
6
SILT FENCE (MACHINE SLICED)
24
"
(
M
I
N
)
36
"
(
M
I
N
)
TIRE COMPACTION ZONE
NTS
FLOW
5' MINIMUM LENGTH STEEL T-POST
6' MAXIMUM SPACING
POST NIPPLES FACES AWAY FROM
GEOTEXTILE FABRIC
MACHINE SLICE
8" - 12" DEPTH
GEOTEXTILE FABRIC
3' WIDE
3 PLASTIC ZIP TIES
AT LEAST 1" APART
(50LB TENSILE)
LOCATED IN TOP 8"
OF STEEL POST
MATERIALS PER MNDOT 3886
INSTALLATION PER MNDOT 2573.3C1
1. USE PROPER EQUIPMENT SUCH THAT THE SOIL IS
SLICED, NOT TURNED OVER.
AFTER SILT FENCE INSTALLATION, COMPACT THE SOIL
IMMEDIATELY NEXT TO THE GEOTEXTILE BY DRIVING
OVER IT WITH A TRACTOR TIRE AT LEAST TWICE
2.
1
STAPLE PLASTIC
SHEETING
EVERY 5' (TYP)
1. BOTTOM OF CONCRETE WASHOUT AREA SHALL BE
10'X10'
2. CONTRACTOR SHALL REMOVE WASH LIQUID FROM
CONCRETE WASHOUT AREA AND DISPOSE OF PER
MPCA REQUIREMENTS WHEN WASHOUT AREA
BECOMES HALF FULL.
3. CONTRACTOR SHALL SELECT THE MOST OPTIMAL
LOCATION FOR THE CONCRETE WASHOUT
10 MIL PLASTIC
SHEETING LINER
PLACED WITHIN
WASHOUT AREA
1'
2'
1'
4
:
1 4:1
CONCRETE WASHOUT
NTS
CONSTRUCT BERM
AROUND ENTIRE
WASHOUT AREA
2
STUMP
T
T
FIBER OPTIC
STUMP
RIM = 927.55
INV. = 924.27
RIM = 927.58
INV. = 923.82
RIM = 927.80
INV. = 923.64
RIM = 927.09
INV. = 924.22
RIM = 927.34
INV. = 923.29
RIM = 927.94
INV. = 921.07
RIM = 927.28
INV. = 923.98
RIM = 928.62
INV. = 921.94
RIM = 931.14
INV. = 927.93
RIM = 931.19
INV. = 927.32
RIM = 931.29
INV. = 922.84 RIM = 931.28
INV. = 920.37
RIM = 931.22
INV. = 923.4
RIM = 930.00
INV. = 917.74
RIM = 928.82
INV. = 924.15
HOUSE
GA
R
A
G
E
HOUSE
GA
R
A
G
E
H
O
U
S
E
SH
E
D
CO
N
BI
T
.
D
R
I
V
E
W
A
Y
C
O
N
.
S
T
E
P
S
CO
N
.
S
I
D
E
W
A
L
K
BITU
M
I
N
O
U
S
D
R
I
V
E
W
A
Y
&
PARK
I
N
G
W
/
C
U
R
B
GA
R
A
G
E
BIT
.
CO
N
C
R
E
T
E
12
"15
"
12
"
12
"
12
"
S
T
O
R
M
S
E
W
E
R
12
"
STONE GRILL
COMPOST
G
A
R
A
G
E
TR
A
S
H
AP
A
R
T
M
E
N
T
&
G
A
R
A
G
E
RIM = 927.28
INV. = 923.06
T)(M
E
AS.)
49.
1
7
(
M
E
A
S
.
)
49.
0
0
(
P
L
A
T
)
1
:
16
6
.
2
0
(
M
E
A
S
.
)
16
5
.
0
0
(
P
L
A
T
)
6
:
19
9
.
0
8
(
M
E
A
S
.
)
19
8
.
0
0
(
P
L
A
T
)
1
:
1
(
33
0
.
0
0
(
P
L
A
T
)
33
3
.
2
2
(
M
E
A
S
)
BUILDING
B
U
I
L
D
I
N
G
B
U
I
L
D
I
N
G
B
U
I
L
D
I
N
G
B
U
I
L
D
I
N
G
BUILD
LO
C
U
S
T
S
T
.
T
H
I
R
D
S
T
.
RIM = 928.61
INV. = 922.10
21
"
R
C
P
S
T
O
R
M
RIM = 929.58
INV. = 925.86
18
"
R
C
P
21
"
R
C
P
S
T
O
R
M
12
"
R
C
P
S
A
N
.
12
"
R
C
P
S
A
N
.
8"
D
I
P
W
A
T
E
R
8"
D
I
P
W
A
T
E
R
INV = 922.33
(PER AS-BUILT)
8"
D
I
P
S
T
U
B
15
"
R
C
P
S
T
U
B
8"
D
I
P
/
P
V
C
S
T
U
B
INV = 921.45
24
"
R
C
P
S
T
O
R
M
30
"
R
C
P
S
T
O
R
M
24
"
V
C
P
S
A
N
.
CO
L
E
G
R
O
U
P
AR
C
H
I
T
E
C
T
S
L
L
C
.
Project No.
16010
Issue Date
xx-xx-2016
Revision:
21
6
P
a
r
k
A
v
e
n
u
e
S
o
u
t
h
Su
i
t
e
1
0
2
Sa
i
n
t
C
l
o
u
d
,
M
N
5
6
3
0
1
(3
2
0
)
6
5
4
-
6
5
7
0
ww
w
.
c
o
l
e
g
r
o
u
p
a
r
c
h
i
t
e
c
t
s
.
c
o
m
Scale: 1"=20'SWPPP - PLAN
0 20 40 80
SC
H
U
L
T
Z
E
N
G
I
N
E
E
R
I
N
G
&
S
I
T
E
D
E
S
I
G
N
PROPOSED
APARTMENT
BUILDING
FFE = 1031.60
PROPOSED
DETACHED
GARAGE
FFE = 1030.67
PROPOSED
DETACHED
GARAGE
FFE = 1030.00
8"
S
T
E
P
8"
S
T
E
P
8"
S
T
E
P
8"
S
T
E
P
PROPOSED
DETACHED
GARAGE
FFE = 1028.00
PROPOSED
DETACHED
GARAGE
FFE = 1028.67
PROPOSED
DETACHED
GARAGE
FFE = 1029.33
93
0
93
0
930
92
8
92
8
9
2
8
PROPOSED
DETACHED
GARAGE
FFE = 1029.40
TEMPORARY ROCK
CONSTRUCTION
ENTRANCE
TEMPORARY ROCK
CONSTRUCTION
ENTRANCE
INSTALL CATCH
BASIN PROTECTION
INSTALL CATCH
BASIN PROTECTION
INSTALL CATCH
BASIN PROTECTION
INSTALL CATCH
BASIN PROTECTION
INSTALL CATCH
BASIN PROTECTION
SOD OR CATEGORY 3
EROSION CONTROL
BLANKET
PERIMETER SILT
FENCE (TYP)
PERIMETER SILT
FENCE (TYP)
PERIMETER SILT
FENCE (TYP)
PERIMETER SILT
FENCE (TYP)
PERIMETER SILT
FENCE (TYP)
PR
E
L
I
M
I
N
A
R
Y
-
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
C
I
V
I
L
C
H
E
C
K
S
E
T
-
0
3
/
0
7
/
2
0
1
6
930
93
0
STUMP
T
T
FIBER OPTIC
STUMP
RIM = 927.55
INV. = 924.27
RIM = 927.58
INV. = 923.82
RIM = 927.80
INV. = 923.64
RIM = 927.09
INV. = 924.22
RIM = 927.34
INV. = 923.29
RIM = 927.94
INV. = 921.07
RIM = 927.28
INV. = 923.98
RIM = 928.62
INV. = 921.94
RIM = 931.14
INV. = 927.93
RIM = 931.19
INV. = 927.32
RIM = 931.29
INV. = 922.84 RIM = 931.28
INV. = 920.37
RIM = 931.22
INV. = 923.4
RIM = 930.00
INV. = 917.74
RIM = 928.82
INV. = 924.15
HOUSE
GA
R
A
G
E
HOUSE
GA
R
A
G
E
H
O
U
S
E
SH
E
D
CO
N
BI
T
.
D
R
I
V
E
W
A
Y
C
O
N
.
S
T
E
P
S
CO
N
.
S
I
D
E
W
A
L
K
BITU
M
I
N
O
U
S
D
R
I
V
E
W
A
Y
&
PARK
I
N
G
W
/
C
U
R
B
GA
R
A
G
E
BIT
.
CO
N
C
R
E
T
E
12
"15
"
12
"
12
"
12
"
S
T
O
R
M
S
E
W
E
R
12
"
STONE GRILL
COMPOST
G
A
R
A
G
E
TR
A
S
H
AP
A
R
T
M
E
N
T
&
G
A
R
A
G
E
RIM = 927.28
INV. = 923.06
T)M
E
AS.)
49.
1
7
(
M
E
A
S
.
)
49.
0
0
(
P
L
A
T
)
1
:
16
6
.
2
0
(
M
E
A
S
.
)
16
5
.
0
0
(
P
L
A
T
)
6
:
19
9
.
0
8
(
M
E
A
S
.
)
19
8
.
0
0
(
P
L
A
T
)
1
:
1
(
33
0
.
0
0
(
P
L
A
T
)
33
3
.
2
2
(
M
E
A
S
)
BUILDING
B
U
I
L
D
I
N
G
B
U
I
L
D
I
N
G
B
U
I
L
D
I
N
G
B
U
I
L
D
I
N
G
BUILD
LO
C
U
S
T
S
T
.
T
H
I
R
D
S
T
.
RIM = 928.61
INV. = 922.10
21
"
R
C
P
S
T
O
R
M
RIM = 929.58
INV. = 925.86
18
"
R
C
P
21
"
R
C
P
S
T
O
R
M
12
"
R
C
P
S
A
N
.
12
"
R
C
P
S
A
N
.
8"
D
I
P
W
A
T
E
R
8"
D
I
P
W
A
T
E
R
INV = 922.33
(PER AS-BUILT)
8"
D
I
P
S
T
U
B
15
"
R
C
P
S
T
U
B
8"
D
I
P
/
P
V
C
S
T
U
B
INV = 921.45
24
"
R
C
P
S
T
O
R
M
30
"
R
C
P
S
T
O
R
M
24
"
V
C
P
S
A
N
.
CO
L
E
G
R
O
U
P
AR
C
H
I
T
E
C
T
S
L
L
C
.
Project No.
16010
Issue Date
xx-xx-2016
Revision:
21
6
P
a
r
k
A
v
e
n
u
e
S
o
u
t
h
Su
i
t
e
1
0
2
Sa
i
n
t
C
l
o
u
d
,
M
N
5
6
3
0
1
(3
2
0
)
6
5
4
-
6
5
7
0
ww
w
.
c
o
l
e
g
r
o
u
p
a
r
c
h
i
t
e
c
t
s
.
c
o
m
Scale: 1"=20'UTILITY & PAVING PLAN
0 20 40 80
SC
H
U
L
T
Z
E
N
G
I
N
E
E
R
I
N
G
&
S
I
T
E
D
E
S
I
G
N
PR
E
L
I
M
I
N
A
R
Y
-
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
C
I
V
I
L
C
H
E
C
K
S
E
T
-
0
3
/
0
7
/
2
0
1
6
PROPOSED
APARTMENT
BUILDING
FFE = 1031.60
PROPOSED
DETACHED
GARAGE
FFE = 1030.67
PROPOSED
DETACHED
GARAGE
FFE = 1030.00
8"
S
T
E
P
8"
S
T
E
P
8"
S
T
E
P
8"
S
T
E
P
PROPOSED
DETACHED
GARAGE
FFE = 1028.00
PROPOSED
DETACHED
GARAGE
FFE = 1028.67
PROPOSED
DETACHED
GARAGE
FFE = 1029.33
PROPOSED
DETACHED
GARAGE
FFE = 1029.40
EXISTING
HYDRANT
EXISTING
HYDRANT
CONNECT TO EXISTING
8" SAN. STUB
INV = 921.45
(FIELD VERIFY)
6" PVC SAN. SERVICE
INV @ BLDG = 922.10
6"
P
V
C
@
1
.
0
5
%
6" DIP WATER SERVICE
(FIRE CONTROL)
4" DIP WATER SERVICE
W/ 4" GATE VALVE & BOX
(DOMESTIC)
6"X4" TEE
%(1'
6"
D
I
P
CONCRETE
DRIVEWAY
ENTRANCE
CONCRETE
DRIVEWAY
ENTRANCE
3-FT CONCRETE
VALLEY GUTTER
CONCRETE
PAVEMENT
CONCRETE
PAVEMENT
CONCRETE
SIDEWALK
CONCRETE
SIDEWALK
CONCRETE
SIDEWALK
ADA RAMP
(TYP)
ADA RAMP
ADA RAMPS
THICKENED EDGE
SIDEWALK
SIDEWALK
CROSS-DRAIN
CONCRETE
PATIO
B618 CURB
& GUTTER
MATCH EXISTING CURB
AND CONCRETE
DRIVEWAY
B612 CURB &
GUTTER (TYP)
B612 CURB &
GUTTER (TYP)
B612 CURB &
GUTTER (TYP)
B612 CURB &
GUTTER (TYP)
B618 CURB &
GUTTER
B618 CURB &
GUTTER
BITUMINOUS
PAVEMENT
(PUBLIC STREET)
BITUMINOUS
PAVEMENT
(PARKING LOT)
BITUMINOUS
PAVEMENT
(PARKING LOT)
BITUMINOUS
PAVEMENT
(PARKING LOT)
UTILITY AND SURFACING NOTES:
2. IF CONFLICTS ARE DISCOVERED WHERE WATER MAIN CROSSES EXISTING SANITARY
SEWER, SERVICE LINES, OR STORM SEWER, THE WATER MAIN SHALL BE RAISED OR
LOWERED APPROPRIATELY WHILE STILL MAINTAINING A MINIMUM DEPTH OF 8 FEET BELOW
FINISHED GRADE.
4. INSTALL SANITARY SEWER SERVICE LINE CLEANOUTS AS REQUIRED BY THE
MINNESOTA PLUMBING CODE
5. SEE SHEET C3 FOR STORM SEWER GRADING, AND SHEET C2 FOR MISCELLANEOUS
DETAILS RELATING TO THE PLACEMENT OF THE UTILITIES.
2. GRAVEL BASE COURSES SHALL BE ROLLED AND COMPACTED. TEST ROLLING OF THE
GRAVEL BASE SHALL BE OBSERVED BY A SOILS ENGINEER TO VERIFY STABILITY.
3. ALL EXISTING BITUMINOUS OR CONCRETE EDGES, WHICH WILL ABUT NEW BITUMINOUS
OR CONCRETE SURFACING SHALL BE SAWCUT TO OBTAIN A VERTICAL EDGE.
WATER AND SANITARY SEWER UTILITIES
1. WATER MAIN AND ANY WATER SERVICE LINES SHALL BE PLACED AT A MINIMUM DEPTH
OF 8 FEET BELOW FINISHED GRADE.
SURFACING
1. SUBGRADES SHALL BE SCARIFIED AND/OR COMPACTED AS NECESSARY TO ATTAIN
THE REQUIRED COMPACTION DESCRIBED IN THE GENERAL NOTES (SHEET C1).
TEST ROLLING OF THE SUBGRADE SHALL BE OBSERVED BY A QUALIFIED GEOTECHNICAL
ENGINEER OR TECHNICIAN. LOCATIONS EXHIBITING EXCESSIVE RUTTING (PER MNDOT
SPEC. 2111) SHALL BE REPAIRED TO THE SATISFACTION OF THE ENGINEER PRIOR TO
THE PLACEMENT OF AGGREGATE BASE. COMPACTION TESTING IN UTILITY TRENCHES SHALL BE
PERFORMED BY AN INDEPENDENT TESTING FIRM.
6. CONTRACTOR SHALL VERIFY LOCATIONS AND ELEVATIONS OF ALL EXISTING
UTILITIES PRIOR TO ANY CONSTRUCTION.
5. SEE SHEET C1 FOR SPECIFICATIONS REGARDING THE CONSTRUCTION OF PAVEMENTS,
AND CURB AND GUTTER.
3. INSULATION SHALL BE PLACED AT ALL LOCATIONS WHERE STORM SEWER CROSSES
SANITARY SEWER, WATER MAIN, OR ASSOCIATED SERVICES. INSULATION SHALL CONSIST
OF AN 8-FT X 8-FT SQUARE OF 3"-THICK RIGID INSULATION. INSULATION SHALL BE PLACED
BETWEEN THE STORM SEWER AND PIPE CROSSING WITH THE EDGES OF THE INSULATION
PARALLEL TO THE PIPING AS MUCH AS POSSIBLE.
4. EXPANSION JOINTS SHALL BE PLACED AT ALL LOCATIONS WHERE NEW CONCRETE
ABUTS EXISTING CONCRETE, AND AT ALL LOCATIONS WHERE SEPARATE CONCRETE
POURS ABUT EACH OTHER.
OWNER/CONTRACTOR SHALL OBTAIN A PLUMBING PERMIT FROM THE
MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PRIOR TO THE INSTALLATION
OF ANY SANITARY SEWER OR WATER UTILITIES. CONSTRUCTION OF SANITARY
SEWER OR WATER UTILITIES SHALL NOT COMMENCE UNTIL AFTER THE PLUMBING
PERMIT HAS BEEN OBTAINED, AND ANY AND ALL PERTINENT COMMENTS HAVE
BEEN ADDRESSED ON THE PLAN AND IN THE PROJECT SPECIFICATIONS.
7. PRIOR TO CONSTRUCTION OF SANITARY SEWER, AND ORDERING ASSOCIATED
MATERIALS, THE CONTRACTOR'S PLUMBING DESIGNER SHALL PROVIDE THE
ENGINEER WITH THE TOTAL DRAINAGE FIXTURE UNITS (DFUs) FOR THE INTERIOR
PLUMBING TO VERIFY THE CORRECT SIZING AND SLOPE OF THE SANITARY SEWER
SERVICE
CLEANOUT
RIM = 928.45
INV = 921.45
CLEANOUT
RIM = 929.60
INV = 921.68
6"
P
V
C
@
1
.
0
5
%
CUTBACK EXISTING
STUB AS NECESSARY
CONNECT TO EXISTING
8" DIP STUB
8"X6" REDUCER
%(1'6
%(1'6
NOTE: VERIFY SIZES, LOCATIONS, AND
DEPTHS OF NEW UTILITY SERVICES W/
PLUMBING PLANS
RETAINING WALL
LENGTH = 38-LF
HEIGHT = 0 TO 1'-8"
CONCRETE
SIDEWALK
CONCRETE
SIDEWALK
PAVERS (TYP)
(VERIFY W/ CITY)
PAVERS (TYP)
(VERIFY W/ CITY)
PAVERS (TYP)
(VERIFY W/ CITY)
NOTE: PUBLIC SIDEWALK &
PAVERS TO BE CONSTRUCTED
TO WALNUT STREET
STUMP
T
T
FIBER OPTIC
STUMP
RIM = 927.55
INV. = 924.27
CERTIFICATE OF SURVEY O'MALLEY & BOE LAND SURVEYORS, INC.328 SW THIRD STREET WILLMAR, MN 56201 PH. 320-235-4012 FAX 320-2214-9380210 MAIN STREET COLD SPRING, MN 56320 PH. 320-685-5905 FAX 320-685-3056 I HEREBY CERTIFY THAT THIS SURVEY, PLAN OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED LAND SURVEYOR UNDER THE LAWS OF THE STATE OF MINNESOTA.__________________________________________ REG. NO. 42300 DATE: 8-15-05 BENJAMIN C. O'MALLEY300153060INDICATES IRON MONUMENT FOUND INDICATES CATCH BASIN INDICATES MAN HOLE INDICATES WATER VALVE INDICATES HYDRANT INDICATES TREE INDICATES POWER POLE INDICATES TELEPHONE PEDESTAL INDICATES LIGHT POLESCALE IN FEETCERTIFICATE OF SURVEY PREPARED FOR THIS SURVEY IS INTENDED ONLY FOR THE BENEFIT OF THE PARTY TO WHOM IT WAS PREPARED FOR AND SHOULD NOT BE RELIED UPON BY ANY OTHER PARTY OR FOR ANY OTHER PURPOSE WITHOUT FIRST CONTACITNG THE SURVEYOR WHO DEVELOPED AND MADE THIS DRAWING.NOTE:NELSON BUILDING & DEVELOPMENT
RIM = 927.58
INV. = 923.82
RIM = 927.80
INV. = 923.64
RIM = 927.09
INV. = 924.22
RIM = 927.34
INV. = 923.29
RIM = 928.18
INV. = 924.20
RIM = 928.13
INV. = 919.35
RIM = 928.50
INV. = 921.04
RIM = 927.94
INV. = 921.07
RIM = 927.28
INV. = 923.98
RIM = 928.62
INV. = 921.94
RIM = 931.14
INV. = 927.93
RIM = 931.19
INV. = 927.32
RIM = 931.28
INV. = 920.37
RIM = 931.22
INV. = 923.4
RIM = 928.82
INV. = 924.15
RIM = 929.00
INV. = 925.22
HOUSE
GARAGE
HOUSE
GARAGE
HOUSE
SHED
CON
BIT. DRIVEWAY
CON. STEPS
CON. SIDEWALK
BITUMINOUS DRIVEWAY
&
PARKING W/ CURB
GARAGE
BIT.
CONCRETE
T
STONE GRILL
COMPOST
GARAGE
TRASH
APARTMENT
&
GARAGE
RIM = 927.28
INV. = 923.06
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
S 61°55'52" E
247.00 (PLAT)
248.75 (MEAS.)
166.33 (MEAS.)
165.00 (PLAT)
S 28°05'56" W
49.17 (MEAS.)
49.00 (PLAT)
N 61°59'48" W
166.20 (MEAS.)
165.00 (PLAT)
S 28°06'21" W
199.08 (MEAS.)
198.00 (PLAT)
N 62°06'57" W
N 28°01'00" E
330.00 (PLAT)
333.22 (MEAS)
BLOCK
THIRTY-SIX
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
B
U
I
L
D
I
N
G
BUILDING
BUILDING
Tract of land lying and being in the County of Wright, State ofMinnesota, Described as follows, to-wit:Lots 1,2,3,9,10,11,12,13,14, and 15 and the West 16.00 feet of Lot 8, allin Block Thirty-six in the TOWNSITE OF MONTICELLO as of publicrecord, Wright County, Minnesota.Subject to easements of record.Containing 1.71 acres, more or less.
LOCUST ST.
THIRD ST.
WALNUT ST.
BROADWAY ST.
RIM = 928.61
INV. = 922.10
SURVEYORS NOTE: UNDERLYING EASEMENTS MAY EXIST AND ARE NOT
SHOWN ON THIS DRAWING.
0598.SCJ
RIM = 927.79
INV. = 924.41
RIM = 931.29
INV. = 922.84
RIM = 930.00
INV. = 917.74
12" 12"
8"
12"
12" SANITARY SEWER
12"
15"
18" STORM SEWER
12"
12"
12" STORM SEWER
12"
928
928
9 2 8
928
928
928
9 2 8
928
9 2 8
928
929
9 2 9
929
9 2 9
9 2 9
929
929
9 2 9
930
930
930
930
930
930
9
3
0
930
931
931
9
3
1
9
3
1
9 3 1
9 3 1
931
9 3 1
931
932
18" STORM SEWER
RIM = 929.58
INV. = 925.86
RIM = 929.75
INV. = 921.37
RIM = 929.73
INV. = 915.66
PID #155010036011
PID #155010036010
K:\02596-200\Admin\Docs\LTR-a schumann-Landmark II 033016.doc
Infrastructure Engineering Planning Construction 701 Xenia Avenue South
Suite 300
Minneapolis, MN 55416
Tel: 763 541-4800
Fax: 763 541-1700
March 30, 2016
Ms. Angela Schumann
Community Development Director
City of Monticello
505 Walnut Street, Suite 1
Monticello, MN 55362
Re: Landmark II/The West 3rd Building – Preliminary Plan Review
City Project No. ZM5PUD
WSB Project No. 02596-200
Dear Ms. Schumann:
We have reviewed the project preliminary civil plans received on March 7, 2016, as prepared by
Cole Architects and Schultz Engineering, and offer the following comments.
1. A current topographic survey is required showing the following:
a. surface features including drainage ways, wetlands, etc
b. public utilities including pipe size, material type, depths
c. private utilities
2. Dimension the on-street parking bays and driveway access widths.
3. The 3rd Street sidewalk extension to Walnut Street shall be 6-feet wide. City staff will
review the sidewalk alignment in the field with the applicant.
4. City staff will provide information on the existing decorative street lighting and brick
pattern boulevard treatments that should extend along 3rd Street and Locust Street to
match what exists along Walnut Street.
5. The storm sewer within Locust Street was designed to accommodate runoff from the site
based on a 10-year rainfall event. Provide proposed catch basin inlet capacity
calculations. Catch basins should be designed with sufficient capacity to limit ponding to
maximum depth of 0.3 feet for a 10-year rainfall event.
6. It is encouraged to provide infiltration onsite if possible.
7. Consider adding catch basins at the driveway entrances to limit the volume of runoff
being directed to the adjacent roadways.
Ms. Angela Schumann
March 30, 2016
Page 2
K:\02596-200\Admin\Docs\LTR-a schumann-Landmark II 033016.doc
8. The elevation datum appears to be inconsistent on the grading plan when comparing the
utility elevations with the building finished floor elevation.
9. Identify all emergency overflow routes and elevations for each catch basin on the grading
plan. The EOF should be a minimum of 1.5’ below the low building opening.
10. Show the existing contours on the grading plan with a dashed, not solid, line type.
11. Proposed elevations for the drainage swale along the east property line shall be provided.
12. Top and bottom retaining wall elevations shall be provided. The retaining wall type and
color should also be provided.
13. The storm sewer elevations, pipe sizes and slopes should be shown on the utility plan.
14. Show any irrigation connections to the watermain service and show the irrigation layout
on the plans.
15. Provide the location of roof drain outlet locations or connections to the storm sewer.
16. A note should be added to the plans that the City will not be responsible for any
additional costs incurred that is associated with variations in the utility as-built
elevations. These elevations shall be verified in the field prior to construction.
17. The 6-inch water service should extend straight into the building from the stub off of
Locust Street and not extend within the boulevard area. A tee connection should be
provided inside the building with a riser for the sprinkler service. The applicant should
verify whether a 2-inch domestic service is adequate as opposed to a 4-inch service with
meter.
18. The proposed water service shall be installed with a minimum 7.5 feet of cover.
19. Sanitary sewer cleanouts are required at a maximum 70-foot interval. The footage of the
proposed sanitary sewer service shall be noted on the plans.
20. The plans should reference compliance with the City of Monticello General
Specifications and Standard Detail Plates for Street and Utility Construction.
21. A utility excavation permit must be obtained from the Public Works department prior to
commencement of utility connections.
22. Provide an as-built utility plan once construction is complete.
23. The plans need to be signed by a licensed professional engineer
Ms. Angela Schumann
March 30, 2016
Page 3
K:\02596-200\Admin\Docs\LTR-a schumann-Landmark II 033016.doc
The civil plans are preliminary and it is my understanding that more detailed construction level
plans will be provided after the Planning Commission meeting.
Please have the applicant provide a written response addressing the comments above. Final
plans will need to be submitted, reviewed, and approved prior to building permit approval.
Please give me a call at 763-271-3236 if you have any questions or comments regarding this
letter. Thank you.
Sincerely,
WSB & Associates, Inc.
Shibani K. Bisson, PE
City Engineer
cc: Steve Grittman, NAC
skb
53
Figure 22 – Design Guidelines Use Areas
Planning Commission Agenda – 04/05/2016
1
2D.Public Hearing – Consideration of a request for an Amendment to Conditional Use
Permit (CUP) for Development Stage Planned Unit Development (PUD) for a single
lot development in the B-4 (Regional Business) District. Applicant: Retail Partners
Monticello, LLC (NAC)
Property:Legal: Lot 1, Block 1, Jerry Hartung Addition.
Address: 9281 Cedar Street
Planning Case Number:2016-013
A.REFERENCE & BACKGROUND
Request(s):1. Site plan review
2. Conditional use permit PUD
Deadline for Decision:May 6, 2016
Land Use Designation:Places to Shop
Zoning Designation:PUD, with B-4 Regional Business District Overlay
The purpose of the “B-4” regional business district is to
provide for the establishment of commercial and
service activities which draw from and serve customers
from the entire community or region
Overlays/Environmental Planned Unit Development
Regulations Applicable:
Current Site Use:Vacant lot
Surrounding Land Uses:
North:B-4 Regional Business District
East:B-4 Regional Business District
South:B-4 Regional Business District
West:B-4 Regional Business District
Project Description:The applicant has proposed the construction of a new
building on a vacant lot. The lot is approximately
49,350 square feet. The proposed building will be
3,520 square feet and will contain a dentist’s office.
The site will contain 41 parking spaces and two
handicapped accessible parking spaces.
Planning Commission Agenda – 04/05/2016
2
The applicant is also applying for a conditional use
permit to amend the existing planned unit development
to allow the parking lot to connect to parking lots
located to the north and south of the proposed
development site.
The planned unit development was last amended in
2011 with the platting of the Jerry Hartung Addition.
ANALYSIS
Conditional Use Permit.
In the B-4, Regional Business District, Clinics / Medical Uses are listed as a
permitted use in the B-4 District.
The proposed dental clinic would be a reasonably expected use in a business district.
The use is compatible with the surrounding area which includes multi-tenant
commercial buildings to the south and north; and a Wal-Mart store to the east.
General Description. The building is located on the south-central part of the property,
in line with the commercial buildings to the north and south. The building will be
one story tall which is consistent with the other buildings. The site will have 43
parking stalls.
Site Landscaping. The applicant has proposed extensive landscaping around the
building and parking lot. The plan consists of deciduous trees; coniferous trees;
coniferous shrubs; sod; rock ground cover; and mulch. The materials are reflective of
those in the other portions of the PUD.
The site is 1.14 acres in area, and the perimeter of the building measures 240 linear
feet. The zoning ordinance requires 10 caliper inches of tree per acre, and 2 shrubs
per 10 feet of building perimeter. This results in a quantity requirement of 11 caliper
inches of tree planting, and 48 total shrubs. The plan proposes a total of 12.5 inches
of tree planting (plus on evergreen tree), and 95 individual shrubs and perennial
plants. The total number of shrubs and caliper inches of trees meets the requirements
of the code. The applicant has noted that this site is part of a larger PUD and the
landscaping plan is set to meet the requirements of the B-4 zoning district.
The landscaping plan also notes that the PUD has an irrigation system. The irrigation
system is intended to be expanded to this site.
Building Height. The maximum height for structures in the B-4 District is 30 feet.
The building plan shows the front façade at a maximum height of 25 feet, 6 inches,
and an average height of 22 feet, compliant with code.
Planning Commission Agenda – 04/05/2016
3
Signage. The site plan shows a wall sign on each of the four walls of the building.
While the other businesses in the PUD have two wall signs per business use (typically
one on the front of the building, and one of the back), the proposed sign plan is
consistent with the sign ordinance requirements, and compatible with the wall signage
displays in nearby buildings.
The site plan also contains a pylon sign that measures 22 feet in height. The sign is 12
feet in width by five feet in height for a total of 60 square feet which is consistent
with code maximums. However, the zoning ordinance requires that pylon signs wrap
the pole in an approved material, and the other pylon signs in the PUD utilize a
square metal framing. The proposed pylon sign for this site should be designed to be
consistent with the design utilized in the PUD.
Trash Enclosure. The site plan contains a trash enclosure on the southeast part of the
property. The enclosure is made of materials that are consistent with those of the
principal building. However, for recent development, the City has required trash
enclosures to be attached to the principal building or interior to the building,
particularly when facing a public street. The proposed location is adjacent to Cedar
Street, and would be inconsistent with recent practice.
The trash handling equipment should be relocated to an enclosure attached to the
building. In the alternative, a detached enclosure could be located in the side yard of
the property. The applicant should design an alternative consistent with these
requirements. It is noted that parking is more than adequate on the site (see below),
and the loss of a few parking spaces to accommodate a relocated trash enclosure will
still meet requirements.
Parking. The site plan includes 41 parking spaces and two accessible spaces. By
code, a building containing a clinic is required one parking space for 250 square feet
of building. Therefore, a 3,520 square foot building would be required to provide 14
parking spaces. The parking plan exceeds the required code. The parking on this site
is also designed to facilitate common access and parking with adjoining parcels. The
proposed parking plan would accommodate this cross use, and would also
accommodate any future intensification of use on the property.
Site access. The site does not have direct access onto Cedar Street. The access will
be shared with the strip mall to the north of the site. The applicant has applied for a n
amendment to conditional use permit for PUD to allow site access via the parking lot
to the north; as well as connect to the parking lot to the south of this site. Since this
plan is part of a larger PUD, staff believes that access to the site is consistent with the
original PUD plans.
Lighting Plan. The applicant has submitted a lighting plan that includes four light
poles at 27 feet in height and lights on two sides. By code, the maximum height for
lighting is 25 feet. The lighting fixtures shall match other lighting fixtures in the
PUD.
Planning Commission Agenda – 04/05/2016
4
The plan also shows that the lighting will be present across the entire parking lot and
drive aisles. The site plan shows lighting at the property line on all sides of the
property, however, the site is adjacent to other commercial retail uses in the area and
is not expected to be a concern.
Other Site Improvements. The City Engineer’s comments have been provided in a
separate letter, dated March 30, 2016. Those comments include a requirement for
verification of sanitary sewer, water, and stormwater control on and around the site.
The comments are incorporated into this report by reference, and any substantive
changes to the site plan resulting from engineering changes may require further
processing.
B.ALTERNATIVE ACTIONS
1.Motion to adopt Resolution No. PC-2016-007, approving the amendment to the
Conditional Use Permit PUD, based on findings in the resolution, and
incorporating the conditions in Exhibit Z of this report.
2.Motion to deny adoption of Resolution No. PC-2016-007, based on findings to be
identified at the hearing.
C. STAFF RECOMMENDATION
Staff recommends approval of the site plan and Conditional Use Permit Development
Stage PUD amendment, subject to the conditions as identified in Exhibit Z:
D. SUPPORTING DATA
A.Resolution PC-2016-007
B.Aerial Image
C.Applicant Narrative
D.Site Survey
E.Cover Sheet
F.Site Plan
G.Grading Plan
H.Erosion Control Plan
I.Utility Plan
J.Civil Details
K.Landscape Plan
L.Building Elevations
M.Floor Plan
N.Sign Plan
O.Lighting Plan
P.City Engineer’s Comments
Z. Conditions of Approval
Planning Commission Agenda – 04/05/2016
5
EXHIBIT Z
Amendment to Conditional Use Permit
Planned Unit Development (Development Stage)
Lot 1, Block 1, Jerry Hartung Addition.
9281 Cedar Street
.
1.The trash handling equipment shall be relocated to an area attached to, or within, the
principal building, or in a reasonable location that is not in a yard adjoining a public
street.
2.The parking lot light fixtures shall match the existing PUD in style and height.
3.Wrap the proposed freestanding sign pole to match the style of other freestanding
signs in the PUD.
4.Applicant shall provide documentation of the easement and maintenance agreement
for cross access and parking with the properties to the north and south.
5.Compliance with the requirements and comments of the City Engineer in the review
letter dated March 30, 2016.
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
PLANNING COMMISSION
RESOLUTION NO. PC-2016-007
1
RECOMMENDING APPROVAL OF
A CONDITIONAL USE PERMIT FOR A
PLANNED UNIT DEVELOPMENT AMENDMENT
WHEREAS, the applicant is proposing to construct a dental clinic on a vacant parcel, legally
described as Lot 1, Block 1, Jerry Hartung Addition; and
WHEREAS, the subject property is zoned B-4, Regional Business, in which dental clinics
are allowed as a permitted use; and
WHEREAS, the proposed parking area requires continuation of the cross-parking and access
agreement approved as a part of the original Planned Unit Development for the shopping
center located on either side of the subject parcel; and
WHEREAS, the proposed clinic and site improvements, subject to the conditions identified
in Exhibit Z, are consistent with the Zoning Ordinance requirements and original PUD
design; and
WHEREAS, the site plan is consistent with, and accommodates the cross-circulation
between commercial properties as initially envisioned; and
WHEREAS, the Planning Commission held a public hearing to consider the matter at its
regular meeting on April 5th, 2016 and the applicant and members of the public were
provided the opportunity to present information to the Planning Commission; and
WHEREAS, the Planning Commission has considered all of the comments and the staff
report, which are incorporated by reference into the resolution; and
WHEREAS, the Planning Commission of the City of Monticello makes the following
Findings of Fact in relation to the recommendation of approval:
1.The proposed amendment is consistent with the intent of the Monticello
Comprehensive Plan.
2.The proposed amendment will meet the requirements of the Monticello Zoning
Ordinance.
3.The proposed amendment will not create undue burdens on public systems, including
streets and utilities.
4.The proposed amendment will not create substantial impacts, visual or otherwise, on
neighboring land uses.
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
PLANNING COMMISSION
RESOLUTION NO. PC-2016-007
2
5.The proposed amendment is found to be consistent with the proposed and planned
improvements in the PUD.
NOW, THEREFORE, BE IT RESOLVED,by the Planning Commission of the City of
Monticello, Minnesota that the proposed Conditional Use Permit amendment is hereby
recommended for approval, with the following conditions:
1.The trash handling equipment shall be relocated to an area attached to, or within, the
principal building, or in a reasonable location that is not in a yard adjoining a public
street.
2.The parking lot light fixtures shall match the existing PUD in style and height.
3.Wrap the proposed freestanding sign pole to match the style of other freestanding
signs in the PUD.
4.Applicant shall provide documentation of the easement and maintenance agreement
for cross access and parking with the properties to the north and south.
5.Compliance with the requirements and comments of the City Engineer in the review
letter dated March 30, 2016.
ADOPTED this 5th day of April, 2016, by the Planning Commission of the City of
Monticello, Minnesota.
MONTICELLO PLANNING COMMISSION
By: _______________________________
Brad Fyle, Chair
ATTEST:
____________________________________________
Angela Schumann, CommunityDevelopment Director
Lot 1, Block 1 Jerry Hartung Addition, 155-210-001010, 9281 Cedar Street
C reated by : C ity of Monticello
1
4209 Gallatin Pike | Nashville, TN 37216 | (615) 227-5863 | www.devmgmt.com
March 17, 2016
Angela Schuman
City of Monticello Development and Planning
505 Walnut Street
Monticello, MN 55362
(763) 271‐3224
RE: Supplemental Narrative for Conditional Use and PUD Amendment Submittal
Proposed Aspen Dental
9281 Cedar Street – Lot 1 Block 1 Jerry Hartung Addition
Dear Angela,
As requested by Kerry Burri in her letter to Mr. Mark Banks, dated 03/15/16, this letter shall serve as a
supplement to the information already submitted for this project relating to the Conditional Use and PUD
Amendment requests. As per the prior applications and submittal materials, this letter is being submitted on
behalf of the proposed developer and applicant Retail Partners Monticello, LLC.
We are in receipt of the ‘Summary of Expenses/Finance Plan’ form you forwarded to me (attached to this
letter). This form provides a listing of the various costs and bonding that are typically required by an
applicant as part of developing a given project. While all categories listed will not specifically be applicable to
this project, the applicant acknowledges that there are potential costs associated with:
Trunk Area Charges relating to parks, roadways, sanitary sewer, water and storm sewer systems.
City Fees pertaining to legal, planning, engineering & inspection, and permits
Additional Letters of Credit and bonding required for landscaping, restoration & preservation and
grading work.
As noted above not all of these costs will be applicable to this project, but it is acknowledged that during the
final plan process these fees will be calculated by the city based on construction costs and other means, and
that those fees and bonds must be posted as a condition to obtaining the necessary permits for development
of this project. Please review the information we have provided with this submittal and let me know if you
have any questions or if additional information may be needed to facilitate your review and our placement on
the 04/05 agenda. Thanks for all of your help!
Sincerely,
DEVELOPMENT MANAGEMENT GROUP, LLC
Ken Knuckles
Vice President
cc: Mark Banks, Retail Partners Monticello, LLC
Charlie Vaughn, Retail Partners Monticello, LLC
1
4209 Gallatin Pike | Nashville, TN 37216 | (615) 227-5863 | www.devmgmt.com
March 4, 2016
Angela Schuman
City of Monticello Development and Planning
505 Walnut Street
Monticello, MN 55362
(763) 271‐3224
RE: Project Narrative for Conditional Use and PUD Amendment Submittal
Proposed Aspen Dental
9281 Cedar Street – Lot 1 Block 1 Jerry Hartung Addition
Dear Angela,
On behalf of the applicant, Retail Partners Development Monticello, LLC we are providing this narrative
as a supplement to the drawings, exhibits and other materials being presented relating to our request
for approval for a Conditional Use and PUD Amendment for our project. Based on the date of our
submittal we would anticipate placement on the 04/05/16 Planning Commission and subsequent 04/25
City Council agendas.
The subject property is an existing, undeveloped 1.14 acre tract otherwise known as Lot #1 Block #1 of
the Jerry Hartung Addition and is further listed as PID #155210001010. Our project proposes to develop
the site for the use of an Aspen Dental which will include a 3,520 SF single story building along with
associated site improvements. The subject site is a part of the existing PUD and has a base zoning of B‐4.
The proposed development of the site does not include a request to amend the current zoning
designation.
What follows below is our formal response to the various considerations that are a part of the City’s CU
request process:
The conditional use will not substantially diminish or impair property values within the immediate vicinity
of the subject property;
The underlying zoning on this property is B‐4 which allows the planned use by right. Additionally
this property is a part of larger development that is made up of comparable commercial and
retail uses.
The conditional use will not be detrimental to the health, safety, morals, or welfare of persons residing or
working near the use;
Aspen Dental is a nationally recognized retail‐oriented company that provides affordable dental
care to the communities they are a part of. The conduct of their day‐to‐day business does not
include chemical processing, noxious odors, load noises, etc.
The conditional use will not impede the normal and orderly development of surrounding property for
permitted uses predominant in the area;
As stated above, Aspen Dental is a nationally recognized company and is a use that is compatible
with all of the other retail uses already developed in this area.
2
4209 Gallatin Pike | Nashville, TN 37216 | (615) 227-5863 | www.devmgmt.com
The conditional use will not pose an undue burden on public utilities or roads, and adequate sanitary
facilities are provided;
The roadway and utility infrastructure in this area was constructed in anticipation of this
property being developed commercially. Further all public utilities, including sanitary sewer, are
available to the property. Additionally this particular use is a low‐volume traffic generator that
sees an average of 40 customers per day (Monday thru Friday) and therefore will not contribute
a great amount of traffic to the roadway systems on a given business day.
The conditional use can provide adequate parking and loading spaces, and all storage on the site can be
done in conformance with Coty code requirements.
The City’s minimum parking requirement for a clinic/medical service use is based on 4 spaces
per 1,000 SF of floor area. With a 3,520 SF building planned for this project we will be required to
provide a minimum of 14 spaces – our current site plan anticipates 43 spaces inclusive of any
required for handicap accessibility. Any storage associated with this use will occur inside the
building. There is a masonry trash enclosure proposed to be placed along the rear of the site and
will be designed and constructed to match the architecture of the building as well as provide an
effective and opaque screen of the trash receptacles.
The conditional use will not result in any nuisance including but not limited to odor, noise, or sign pollution.
As stated above this business will not produce any of these issues.
The conditional use will not unnecessarily impact natural features such as woodlands, wetlands, and
shorelines; and all erosion control will be properly controlled.
This site is not affected by any woodlands, wetlands or shorelines; therefore the development as
planned will have no impact on these matters. Additionally the developer will be required, by
both local and national criteria, to both provide and maintain adequate erosion control onsite
during the course of construction.
The conditional use will adhere to any applicable additional criteria outlined in Chapter 5 of the Monticello
Zoning Ordinance for the proposed use.
Our proposed development and any requests associated with required plan approvals and
permits do not include any requests for deviation or variance from any requirements noted in
the zoning ordinance.
Below is some additional information relating to Aspen Dental:
Aspen Dental operates Monday thru Friday each week, and will occasionally see patients on
Saturdays by appointment only.
Typical hours of operation are:
o Monday thru Wednesday 7:30 am to 5:30 pm
o Thursday 10:00 am to 8:00 pm
o Friday 8:00 am to 1:00 pm
A typical Aspen Dental employees 7‐8 staff that include an office manager, receptionist, doctor,
lab tech, hygienist and dental assistants.
3
4209 Gallatin Pike | Nashville, TN 37216 | (615) 227-5863 | www.devmgmt.com
Please review the information we have provided with this submittal and let me know if you have any
questions or if additional information may be needed to facilitate your review and our placement on the
04/05 agenda. Thanks for all of your help!
Sincerely,
DEVELOPMENT MANAGEMENT GROUP, LLC
Ken Knuckles
Vice President
cc: Mark Banks, RPD
Charlie Vaughn, Cherry & Associates
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report
was prepared by me or under my direct supervision
and that I am a duly Licensed Professional Engineer
under the laws of the State of Minnesota.
Todd W. McLouth - PE
20383
Project Lead
Drawn By
Checked By
Loucks Project No.16033.00
CDL
CDL
TWM
03/04/16
03/07/16
LOUCKS
W:
\
2
0
1
6
\
1
6
0
3
3
\
C
A
D
D
D
A
T
A
\
C
I
V
I
L
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
C
0
-
1
C
O
V
E
R
S
H
E
E
T
Pl
o
t
t
e
d
:
03
/
0
7
/
2
0
1
6
8
:
1
6
A
M
7200 Hemlock Lane, Suite 300
Maple Grove, MN 55369
763.424.5505
www.loucksinc.com
PLANNING
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
ENVIRONMENTAL
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
CADD QUALIFICATION
ASPEN
DENTAL
MONTICELLO, MN
RETAIL PARTNERS
DEVELOPMENT
5608 Stanford Court
Nashville, Tennessee 37215
C0-1 COVER SHEET
C2-1 SITE PLAN
C3-1 GRADING PLAN
C3-2 EROSION CONTROL PLAN
C4-1 UTILITY PLAN
C8-1 CIVIL DETAILS
L1-1 LANDSCAPE PLAN
-ALTA/ACSM LAND SURVEY
03/07/16 ZONING APPLICATION
COVER
SHEET
C0-1
Top nut of hydrant located at the northeast corner of the property. Elevation = 965.84
Existing conditions survey prepared by The Gregory Group, inc.
D.B.A. Lot Surveys Group, dated January 20, 2016 with a
revision on February 23, 2016.
Loucks makes no guarantee of the accuracy and completeness
of work prepared by others. Contractor shall notify the project
engineer of any discrepancies shown herein.
MONTICELLO, MN
GENERAL NOTES
SHEET INDEX
ZONING APPLICATION FOR:
VICINITY MAP
PUD AMENDMENT & CONDITIONAL USE PERMIT
750 OLD HICKORY BLVD
ARCHITECT
BRENTWOOD, TENNESSEE 37027
SUITE 250
e+h ARCHITECTS
LANDSCAPE ARCHITECT
stevec@eandharch.com
NASHVILLE, TENNESSEE 37215
DESIGN CONSULTANTS
OWNER / DEVELOPER
RETAIL PARTNERS DEVELOPMENT
5608 STANFORD COURT
MARK BANKS
EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN
THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE
STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE
WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED
THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002
MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES.
OWNER.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL
WARNING:
AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND
MAPLE GROVE, MINNESOTA 55369
CIVIL ENGINEER
LOUCKS, INC.
7200 HEMLOCK LANE
SUITE 300
clohr@loucksinc.com
tmclouth@loucksinc.com
TODD W. MCLOUTH, P.E.
MAPLE GROVE, MINNESOTA 55369
LOUCKS INC.
7200 HEMLOCK LANE
SUITE 300
dloken@loucksinc.com
DOUGLAS LOKEN, L.A.
ASPEN DENTAL
SUPPLEMENTAL PLAN INDEX
SITE
PROJECT BENCHMARK
STEVE COOPER, A.I.A.
mbanks@retailpartnersdev.com
TEL: 615-627-2022
TEL: 763-424-5505
TEL: 763-424-5505
TEL: 615-377-3111
NASHVILLE, TENNESSEE 37216
DEVELOPMENT MANAGER
DEVELOPMENT MANAGEMENT
4209 GALLATIN PIKE
KEN KNUCKLES
kknuckles@devmgmt.com
TEL: 615-227-5863
GROUP, LLC
CLARK D. LOHR
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report
was prepared by me or under my direct supervision
and that I am a duly Licensed Professional Engineer
under the laws of the State of Minnesota.
Todd W. McLouth - PE
20383
Project Lead
Drawn By
Checked By
Loucks Project No.16033.00
CDL
CDL
TWM
03/04/16
03/07/16
LOUCKS
W:
\
2
0
1
6
\
1
6
0
3
3
\
C
A
D
D
D
A
T
A
\
C
I
V
I
L
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
C
2
-
1
S
I
T
E
P
L
A
N
Pl
o
t
t
e
d
:
03
/
0
7
/
2
0
1
6
8
:
3
1
A
M
7200 Hemlock Lane, Suite 300
Maple Grove, MN 55369
763.424.5505
www.loucksinc.com
PLANNING
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
ENVIRONMENTAL
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
CADD QUALIFICATION
ASPEN
DENTAL
MONTICELLO, MN
RETAIL PARTNERS
DEVELOPMENT
5608 Stanford Court
Nashville, Tennessee 37215
C0-1 COVER SHEET
C2-1 SITE PLAN
C3-1 GRADING PLAN
C3-2 EROSION CONTROL PLAN
C4-1 UTILITY PLAN
C8-1 CIVIL DETAILS
L1-1 LANDSCAPE PLAN
-ALTA/ACSM LAND SURVEY
03/07/16 ZONING APPLICATION
SITE PLAN
C2-1
BENCHMARK
TOP NUT OF HYDRANT LOCATED AT THE NORTHEAST CORNER OF
THE PROPERTY. ELEVATION = 965.84
SITE NOTES
1.SETBACKS: PER PUD
2.ZONING : B4 - REGIONAL BUSINESS DISTRICT / PUD - PLANNED
UNIT DEVELOPMENT
3.PARKING SUMMARY
CITATION - ZONING ORDINANCE TABLE 4-7; CLINICS 4.0 STALLS
PER 1,000 SF
PARKING REQUIRED = 14 STALLS
PARKING PROVIDED = 40 STALLS
ADA STALLS REQUIRED = 2 STALLS
ADA STALLS PROVIDED = 2 STALLS
PROVIDED PARKING RATIO = 11.4/1000
4.SITE DATA
PARCEL DESCRIPTION: LOT 1, BLOCK 1, JERRY HARTUNG
ADDITION, WRIGHT COUNTY, MINNESOTA
WRIGHT COUNTY PARCEL ID # 155210001010
ADDRESS: 9281 CEDAR STREET, MONTICELLO, MN 55362
PARCEL AREA: 49,468 SQ. FT. OR 1.14 AC.
PROPOSED BUILDING AREA: 3,520 SQ.FT.
EXISTING IMPERVIOUS AREA: 7,672 SQ.FT. OR 15.5%
EXISTING PERVIOUS AREA: 41,796 SQ.FT. OF 84.5%
PROPOSED IMPERVIOUS AREA: 35,035 SQ.FT. OR 70.9%
PROPOSED PERVIOUS AREA: 14,333 SQ.FT OR 29.1%
PROPOSED AREA OF DISTURBANCE: 37,960 SQ.FT. OR 0.87 AC.
5.THE SITE IS NOT SUBJECT TO ANY WETLAND AREAS, BUFFERS,
AREAS OF RIGHT OF WAY DEDICATION, CONSERVATION
EASEMENTS, OR PUBLIC / PRIVATE PARKS
6.ALL PAVING, CONCRETE CURB, GUTTER AND SIDEWALK SHALL BE
FURNISHED AND INSTALLED IN ACCORDANCE WITH THE DETAILS
SHOWN PER THE DETAIL SHEET(S) AND STATE/LOCAL
JURISDICTION REQUIREMENTS.
7.ACCESSIBLE PARKING AND ACCESSIBLE ROUTES SHALL BE
PROVIDED PER CURRENT ADA STANDARDS AND LOCAL/STATE
REQUIREMENTS.
8.ALL CURB DIMENSIONS SHOWN ARE TO THE FACE OF CURB
UNLESS OTHERWISE NOTED.
9.ALL BUILDING DIMENSIONS ARE TO THE OUTSIDE FACE OF WALL
UNLESS OTHERWISE NOTED AND SHOWN FOR REFERENCE ONLY.
REFER TO ARCHITECTURAL PLANS FOR DETAILED BUILDING
LAYOUT.
10.TYPICAL FULL SIZED PARKING STALL IS 9' X 20' UNLESS OTHERWISE
NOTED.
11.BITUMINOUS IMPREGNATED FIBER BOARD TO BE PLACED AT FULL
DEPTH OF CONCRETE ADJACENT TO EXISTING STRUCTURES AND
BEHIND CURB ADJACENT TO DRIVEWAYS AND SIDEWALKS.
12.MINNESOTA STATE STATUTE REQUIRES NOTIFICATION PER
"GOPHER STATE ONE CALL" PRIOR TO COMMENCING ANY
GRADING, EXCAVATION OR UNDERGROUND WORK.
13.THE CONTRACTOR AND OWNER ARE RESPONSIBLE FOR
OBTAINING ALL NECESSARY PERMITS AND REQUIRED
NOTIFICATION PRIOR TO CONSTRUCTION.
14.SEE SITE ELECTRICAL PLAN FOR SITE LIGHTING.
GENERAL NOTE
EXISTING CONDITIONS SURVEY PREPARED BY THE GREGORY GROUP,
INC. d.b.a. LOT SURVEYS GROUP, DATED JANUARY 20, 2016 WITH A
REVISION ON FEBRUARY 23, 2016.
LOUCKS MAKES NO GUARANTEE OF THE ACCURACY AND
COMPLETENESS OF WORK PREPARED BY OTHERS. CONTRACTOR
SHALL NOTIFY THE PROJECT ENGINEER OF ANY DISCREPANCIES
SHOWN HEREIN.
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report
was prepared by me or under my direct supervision
and that I am a duly Licensed Professional Engineer
under the laws of the State of Minnesota.
Todd W. McLouth - PE
20383
Project Lead
Drawn By
Checked By
Loucks Project No.16033.00
CDL
CDL
TWM
03/04/16
03/07/16
LOUCKS
W:
\
2
0
1
6
\
1
6
0
3
3
\
C
A
D
D
D
A
T
A
\
C
I
V
I
L
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
C
3
-
1
G
R
A
D
I
N
G
P
L
A
N
Pl
o
t
t
e
d
:
03
/
0
7
/
2
0
1
6
8
:
3
0
A
M
7200 Hemlock Lane, Suite 300
Maple Grove, MN 55369
763.424.5505
www.loucksinc.com
PLANNING
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
ENVIRONMENTAL
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
CADD QUALIFICATION
ASPEN
DENTAL
MONTICELLO, MN
RETAIL PARTNERS
DEVELOPMENT
5608 Stanford Court
Nashville, Tennessee 37215
C0-1 COVER SHEET
C2-1 SITE PLAN
C3-1 GRADING PLAN
C3-2 EROSION CONTROL PLAN
C4-1 UTILITY PLAN
C8-1 CIVIL DETAILS
L1-1 LANDSCAPE PLAN
-ALTA/ACSM LAND SURVEY
03/07/16 ZONING APPLICATION
GRADING
PLAN
C3-1
BENCHMARK
TOP NUT OF HYDRANT LOCATED AT THE NORTHEAST CORNER OF
THE PROPERTY. ELEVATION = 965.84
GENERAL NOTE
EXISTING CONDITIONS SURVEY PREPARED BY THE GREGORY GROUP,
INC. d.b.a. LOT SURVEYS GROUP, DATED JANUARY 20, 2016 WITH A
REVISION ON FEBRUARY 23, 2016.
LOUCKS MAKES NO GUARANTEE OF THE ACCURACY AND
COMPLETENESS OF WORK PREPARED BY OTHERS. CONTRACTOR
SHALL NOTIFY THE PROJECT ENGINEER OF ANY DISCREPANCIES
SHOWN HEREIN.
"TW" DENOTES FINISHED GRADE AT TOP OF RETAINING WALL
"GW" DENOTES FINISHED GRADE AT BOTTOM OF RETAINING WALL
(NOT BOTTOM OF BURIED RETAINING WALL.)
GRADING NOTES
1.SPOT ELEVATIONS REPRESENT FINISHED SURFACE GRADES,
GUTTER/FLOW LINE, FACE OF BUILDING, OR EDGE OF PAVEMENT
UNLESS OTHERWISE NOTED.
2.CATCH BASINS AND MANHOLES IN PAVED AREAS SHALL BE
SUMPED 0.04 FEET. ALL CATCH BASINS IN GUTTERS SHALL BE
SUMPED 0.16 FEET. RIM ELEVATIONS SHOWN ON PLANS DO NOT
REFLECT SUMPED ELEVATIONS.
3.ALL DISTURBED UNPAVED AREAS ARE TO RECEIVE MINIMUM OF 4
INCHES OF TOP SOIL AND SEED/MULCH OR SOD. THESE AREAS
SHALL BE WATERED/MAINTAINED BY THE CONTRACTOR UNTIL
VEGETATION IS ESTABLISHED.
4.FOR SITE RETAINING WALLS "TW" EQUALS SURFACE GRADE AT
TOP FACE OF WALL (NOT TOP OF WALL), "GW" EQUALS SURFACE
GRADE AT WALL GRADE TRANSITION, AND "BW" EQUALS
SURFACE GRADE AT BOTTOM FACE OF WALL (NOT BOTTOM OF
BURIED WALL COURSES).
5.REFER TO THE REPORT OF GEOTECHNICAL EXPLORATION AND
REVIEW (PROJECT NO. B1600296, DATED MARCH 1, 2016 AS
PREPARED BY BRAUN INTERTEC CORPORATION FOR AN EXISTING
SUBSURFACE SITE CONDITION ANALYSIS AND CONSTRUCTION
RECOMMENDATIONS.
6.MINNESOTA STATE STATUTE REQUIRES NOTIFICATION PER
"GOPHER STATE ONE CALL" PRIOR TO COMMENCING ANY
GRADING, EXCAVATION OR UNDERGROUND WORK.
7.THE CONTRACTOR AND OWNER ARE RESPONSIBLE FOR
OBTAINING ALL NECESSARY PERMITS AND REQUIRED
NOTIFICATION PRIOR TO CONSTRUCTION.
8.SEE EROSION CONTROL PLAN AND NOTES AND REQUIREMENTS.
9.SEE UTILITY PLAN FOR WATER, STORM AND SANITARY SEWER
INFORMATION.
10.SEE SITE PLAN FOR CURB AND BITUMINOUS TAPER LOCATIONS.
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report
was prepared by me or under my direct supervision
and that I am a duly Licensed Professional Engineer
under the laws of the State of Minnesota.
Todd W. McLouth - PE
20383
Project Lead
Drawn By
Checked By
Loucks Project No.16033.00
CDL
CDL
TWM
03/04/16
03/07/16
LOUCKS
W:
\
2
0
1
6
\
1
6
0
3
3
\
C
A
D
D
D
A
T
A
\
C
I
V
I
L
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
C
3
-
2
E
R
O
S
I
O
N
C
O
N
T
R
O
L
P
L
A
N
Pl
o
t
t
e
d
:
03
/
0
7
/
2
0
1
6
8
:
3
2
A
M
7200 Hemlock Lane, Suite 300
Maple Grove, MN 55369
763.424.5505
www.loucksinc.com
PLANNING
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
ENVIRONMENTAL
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
CADD QUALIFICATION
ASPEN
DENTAL
MONTICELLO, MN
RETAIL PARTNERS
DEVELOPMENT
5608 Stanford Court
Nashville, Tennessee 37215
C0-1 COVER SHEET
C2-1 SITE PLAN
C3-1 GRADING PLAN
C3-2 EROSION CONTROL PLAN
C4-1 UTILITY PLAN
C8-1 CIVIL DETAILS
L1-1 LANDSCAPE PLAN
-ALTA/ACSM LAND SURVEY
03/07/16 ZONING APPLICATION
EROSION
CONTROL
PLAN
C3-2
BENCHMARK
TOP NUT OF HYDRANT LOCATED AT THE NORTHEAST CORNER OF THE PROPERTY. ELEVATION = 965.84
GENERAL NOTE
EXISTING CONDITIONS SURVEY PREPARED BY THE GREGORY GROUP, INC. d.b.a. LOT SURVEYS GROUP,
DATED JANUARY 20, 2016 WITH A REVISION ON FEBRUARY 23, 2016.
LOUCKS MAKES NO GUARANTEE OF THE ACCURACY AND COMPLETENESS OF WORK PREPARED BY
OTHERS. CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER OF ANY DISCREPANCIES SHOWN
HEREIN.
SITE PLAN LEGEND
SILT FENCE
INLET PROTECTION
EXISTING DRAINAGE BOUNDARY
EXISTING DRAINAGE PATTERN
PROPOSED DRAINAGE BOUNDARY
PROPOSED DRAINAGE PATTERN
1. INSPECT CONSTRUCTION SITE ON A DAILY BASIS AND WITHIN 24 HOURS OF A RAINFALL EVENT OF
MORE THAN 0.5 INCHES IN 24 HOUR PERIOD.
2. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH STORM EVENT. THEY MUST BE REMOVED
WHEN DEPOSITS REACH APPROXIMATELY ONE-HALF THE HEIGHT OF THE BARRIER.
3. ANY SEDIMENT REMAINING IN PLACE AFTER THE SILT FENCE OR FILTER FABRIC IS NO LONGER
REQUIRED SHALL BE DRESSED TO CONFORM WITH THE EXISTING GRADE, PREPARED AND SEEDED
WITH THE APPROPRIATE SEED MIX.
4. IN THOSE AREAS WHERE WOOD FIBER BLANKET OR OTHER SLOPE STABILIZATION METHOD HAS
FAILED, THE SLOPE SHALL BE REESTABLISHED, SEED AND TOPSOIL REPLACED, AND ADDITIONAL SLOPE
TREATMENT INSTALLED.
5. SILT FENCES SHALL BE REMOVED WHEN THEY HAVE SERVED THEIR USEFUL PURPOSE, BUT NOT
BEFORE THE UPWARD SLOPE AREA HAS BEEN PERMANENTLY STABILIZED. REMOVAL IS REQUIRED WITH
ALL TEMPORARY EROSION CONTROL FACILITIES (SEDIMENT FILTERS, HAY BALES, ETC.) ONCE SITE IS
PERMANENTLY STABILIZED BY THE BUILDER.
6. ALL PERMANENT SEDIMENTATION BASINS MUST BE RESTORED TO THEIR DESIGN AND REMOVAL OF
ALL TEMPORARY SYNTHETIC, STRUCTURAL, NON-BIODEGRADABLE EROSION AND SEDIMENT
CONTROL DEVICES AFTER THE SITE HAS UNDERGONE FINAL STABLILIZATION WITH PERMANENT
VEGETATION ESTABLISHMENT. FINAL STTABILIZATION FOR PURPOSES OF THIS REMOVAL IS 70%
ESTABLISHED COVER OVER DENUDED AREA.
7. NO CONCRETE WASHOUT ON-SITE. CONCRETE TRUCKS SHALL BE EQUIPPED WITH INTERNAL WASH
SYSTEM.
EROSION CONTROL MAINTENANCE PROGRAM
1.NO LAND DISTURBING ACTIVITY SHALL OCCUR UNTIL A CITY OF MONTICELLO BUILDING PERMIT
HAS BEEN ISSUED.
2.ALL EROSION & SEDIMENT CONTROL WORK SHALL COMPLY WITH THE CITY OF MONTICELLLO
REQUIREMENTS.
3.BEST MANAGEMENT PRACTICES (BMPS) REFER TO EROSION AND SEDIMENT CONTROL PRACTICES
DEFINED IN THE CURRENT EDITIONS OF THE MPCA PROTECTING WATER QUALITY IN URBAN
AREAS AND THE MINNESOTA CONSTRUCTION SITE EROSION AND SEDIMENT CONTROL PLANNING
HANDBOOK.
4.ALL BMPS SELECTED SHALL BE APPROPRIATE FOR THE TIME OF YEAR, SITE CONDITIONS, AND
ESTIMATED DURATION OF USE
5.A COPY OF THESE PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
6.ALL SEDIMENT AND EROSION CONTROL FACILITIES (BMPS) SHALL BE INSTALLED AND IN
OPERATION PRIOR TO LAND DISTURBANCE ACTIVITIES AND THEY SHALL BE SATISFACTORILY
MAINTAINED UNTIL CONSTRUCTION IS COMPLETED AND THE POTENTIAL FOR EROSION IS PASSED.
7.THE BMPS SHOWN ON THE PLANS ARE THE MINIMUM REQUIREMENTS FOR THE ANTICIPATED SITE
CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS
DICTATE, THE PERMITTEE/CONTRACTOR SHALL ANTICIPATE THAT MORE BMPS WILL BE NECESSARY
AND SHALL PROVIDE ALL ADDITIONAL BMPS OVER AND ABOVE THE MINIMUM REQUIREMENTS AS
MAY BE NEEDED TO PROTECT WATER AND SOIL RESOURCES.
8.THE BMPS SHALL BE INSPECTED DAILY BY THE PERMITTEE/CONTRACTOR AND MAINTAINED AS
NECESSARY TO ENSURE THEIR CONTINUED FUNCTIONING.
9.LAND DISTURBING ACTIVITIES SHALL OCCUR IN INCREMENTS OF WORKABLE SIZE SUCH THAT
ADEQUATE BMP CONTROL CAN BE PROVIDED THROUGHOUT ALL PHASES OF CONSTRUCTION.
THE SMALLEST PRACTICAL AREA SHALL BE EXPOSED OR OTHERWISE DISTURBED AT ANY ONE TIME.
10.OPERATE TRACK EQUIPMENT (DOZER) UP AND DOWN EXPOSED SLOPES LEAVING TRACK GROOVES
PERPENDICULAR TO THE SLOPE. DO NOT BACK-BLADE. LEAVE A ROUGH SURFACE TO MINIMIZE
EROSION.
11.ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED UPON COMPLETION OF BACKFILL
AND ROUGH GRADING OF THE LOT. TEMPORARY MULCH AND SEED SHALL COVER ALL EXPOSED
SOILS UNTIL FINAL LOT GRADING IS COMPLETED AND THE PERMANENT TURF (SOD OR SEED) IS
ESTABLISHED.
12.ALL STABILIZED AREAS RE-DISTURBED BY UTILITY INSTALLATIONS AND OTHER CONSTRUCTION
ACTIVITIES REQUIRE THAT TEMPORARY MULCH AND SEED BE RE-INSTALLED.
13.TEMPORARY SEED SHALL BE MNDOT MIX 130B @ 100LBS PER ACRE OR APPROVED EQUAL.
PERMANENT SEED SHALL BE MNDOT MIX 60B @ 100LBS PER ACRE OR APPROVED EQUAL.
TEMPORARY MULCH SHALL BE MNDOT TYPE I (CLEAN OAT STRAW) @ 2 TONS PER ACRE AND DISK
ANCHORED IN PLACE.
14.ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE PROPERLY DISPOSED OF
WITHIN THIRTY (30) DAYS AFTER FINAL STABILIZATION IS ACHIEVED.
EROSION CONTROL NOTES:
DRAWN 12/2013
LOUCKS PLATE NO.
3000 SILT FENCE
PRE-ASSEMBLED OR MACHINE SLICED
6"
6"
NOTES:
1.PLACE BOTTOM EDGE OF FENCE INTO 6 IN DEEP TRENCH
AND BACKFILL IMMEDIATELY.
2.POSTS SHALL BE:
x 6 FT MAX. SPACING.
x 2 IN X 2IN HARDWOOD, OR STANDARD STEEL T-TYPE
FENCE POSTS.
x 5' MIN. LENGTH POSTS, DRIVEN 2 FT INTO THE
GROUND.
3.ATTACH FABRIC TO WOOD POST WITH A MIN. OF 5, 1
INCH LONG STAPLES.
4.ATTACH FABRIC TO STEEL POST WITH A MIN. OF 3 ZIP TIES
IN TOP 8 INCHES OF FABRIC.
GEOTEXTILE FABRIC
PER MNDOT 3886
GEOTEXTILE
FABRIC PER
MNDOT 3886
HARD SURFACE PUBLIC ROAD
2' MINIMUM
1" TO 2" WASHED ROCK
6" MINIMUM
DRAWN 12/2013
LOUCKS PLATE NO.
3003ROCK ENTRANCE TO
CONSTRUCTION SITE
NOTES:
1.ROCK SIZE SHOULD BE 1" TO 2" IN SIZE SUCH AS MN/DOT CA-1 OR
CA-2 COURSE AGGREGATE. (WASHED)
2.A GEOTEXTILE FABRIC MAY BE USED UNDER THE ROCK TO PREVENT
MIGRATION OF THE UNDERLYING SOIL INTO THE STONE.
DRAWN 12/2013
LOUCKS PLATE NO.
3010INLET PROTECTION -
EXISTING STORM STRUCTURES
HIGH-FLOW
FABRIC
CURB
DEFLECTOR PLATE
OVERFLOW 1-CENTER
OF FILTER ASSEMBLY
OVERFLOW 2 - TOP
OF CURB BOX
POLYESTER
SLEEVE
MANHOLE
COVER ASSEMBLY
FILTER
ASSEMBLY
27"
27" SEDIMENT CONTROL BARRIER
2'X3' SEDIMENT CONTROL BARRIER
ROAD DRAIN HIGH-FLOW
INLET PROTECTION CURB
AND GUTTER MODEL
WIMCO ROAD DRAIN, OR APPROVED EQUAL
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report
was prepared by me or under my direct supervision
and that I am a duly Licensed Professional Engineer
under the laws of the State of Minnesota.
Todd W. McLouth - PE
20383
Project Lead
Drawn By
Checked By
Loucks Project No.16033.00
CDL
CDL
TWM
03/04/16
03/07/16
LOUCKS
W:
\
2
0
1
6
\
1
6
0
3
3
\
C
A
D
D
D
A
T
A
\
C
I
V
I
L
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
C
4
-
1
U
T
I
L
I
T
Y
P
L
A
N
Pl
o
t
t
e
d
:
03
/
0
7
/
2
0
1
6
8
:
3
4
A
M
7200 Hemlock Lane, Suite 300
Maple Grove, MN 55369
763.424.5505
www.loucksinc.com
PLANNING
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
ENVIRONMENTAL
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
CADD QUALIFICATION
ASPEN
DENTAL
MONTICELLO, MN
RETAIL PARTNERS
DEVELOPMENT
5608 Stanford Court
Nashville, Tennessee 37215
C0-1 COVER SHEET
C2-1 SITE PLAN
C3-1 GRADING PLAN
C3-2 EROSION CONTROL PLAN
C4-1 UTILITY PLAN
C8-1 CIVIL DETAILS
L1-1 LANDSCAPE PLAN
-ALTA/ACSM LAND SURVEY
03/07/16 ZONING APPLICATION
UTILITY
PLAN
C4-1
BENCHMARK
TOP NUT OF HYDRANT LOCATED AT THE NORTHEAST CORNER OF THE PROPERTY. ELEVATION = 965.84
GENERAL NOTE
EXISTING CONDITIONS SURVEY PREPARED BY THE GREGORY GROUP, INC. d.b.a. LOT SURVEYS GROUP,
DATED JANUARY 20, 2016 WITH A REVISION ON FEBRUARY 23, 2016.
LOUCKS MAKES NO GUARANTEE OF THE ACCURACY AND COMPLETENESS OF WORK PREPARED BY
OTHERS. CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER OF ANY DISCREPANCIES SHOWN
HEREIN.
UTILITY NOTES
1. ALL SANITARY SEWER, STORM SEWER AND WATERMAIN UTILITIES SHALL BE FURNISHED AND
INSTALLED PER THE REQUIREMENTS OF THE SPECIFICATIONS,THE MINNESOTA PLUMBING CODE,
THE LOCAL GOVERNING UNIT , AND THE STANDARD UTILITIES SPECIFICATION OF THE CITY
ENGINEERS ASSOCIATION OF MINNESOTA (CEAM), 2013 EDITION.
2.ALL UTILITY PIPE BEDDING SHALL BE COMPACTED SAND OR FINE GRANULAR MATERIAL. ALL
COMPACTION SHALL BE PERFORMED PER THE REQUIREMENTS OF THE CEAM SPECIFICATION AND
THE GEOTECHNICAL REPORT.
3.ALL CONNECTIONS TO EXISTING UTILITIES SHALL BE PERFORMED PER THE REQUIREMENTS OF THE
STATE AND LOCAL JURISDICTIONS. THE CITY DEPARTMENT OF ENGINEERING AND BUILDING
INSPECTIONS DEPARTMENT AND THE CONSTRUCTION ENGINEER MUST BE NOTIFIED AT LEAST 48
HOURS PRIOR TO ANY WORK WITHIN THE PUBLIC RIGHT OF WAY, OR WORK IMPACTING
PUBLIC UTILITIES.
4.ALL STORM SEWER , SANITARY SEWER AND WATER SERVICES SHALL TERMINATE 5' FROM THE
BUILDING FACE UNLESS OTHERWISE NOTED.
5.A MINIMUM OF 18 INCHES OF VERTICAL SEPARATION AND 10 FEET OF HORIZONTAL SEPARATION
IS REQUIRED FOR ALL STORM SEWER, WATERMAIN AND SANITARY SEWER UTILITES UNLESS
OTHERWISE NOTED.
6.ALL NEW WATERMAIN AND SERVICES MUST HAVE A MINIMUM OF 8.0 FEET OF COVER. EXTRA
DEPTH MAY BE REQUIRED TO MAINTAIN A MINIMUM 18" VERTICAL SEPARATION TO SANITARY OR
STORM SEWER LINES. THE CONTRACTOR SHALL FIELD ADJUST WATERMAIN TO AVOID CONFLICTS
WITH SANITARY SEWER, STORM SEWER, AND SERVICES AS REQUIRED. INSULATION OF WATER
AND SANITARY SEWER LINES SHALL BE PROVIDED WHERE 8.0 FEET MINIMUM DEPTH CAN NOT BE
ATTAINED.
7.PROPOSED PIPE MATERIALS:
WATERMAIN COPPER TYPE K 3/4" TO 1-1/2" DIAMETER
SANITARY SEWER PVC SDR 35 4" DIAMETER
8.ALL SANITARY SEWER WYES, TEES AND SERVICES SHALL BE X" PVC SDR 35.
9.ALL PORTIONS OF THE STORM SEWER SYSTEM, INCLUDING CATCH BASINS, LOCATED WITHIN 10
FEET OF THE BUILDING OR WATER SERVICE LINE MUST BE TESTED ACCORDANCE WITH
MINNESOTA RULES, PART 4715.2820
10.ALL JOINTS AND CONNECTIONS IN THE STORM SEWER SYSTEM SHALL BE GASTIGHT OR
WATERTIGHT (SEE MINNESOTA RULES, PART 4715.0700). APPROVED RESILIENT RUBBER JOINTS
MUST BE USED TO MAKE WATERTIGHT CONNECTIONS TO MANHOLES, CATCHBASINS, AND OTHER
STRUCTURES.
11.HIGH-DENSITY POLYETHYLENE (HDPE) STORM DRAINS MUST COMPLY WITH MINNESOTA RULES,
PART 4715.0540:
a.PIPES 4-INCH TO 10-INCH IN SIZE MUST COMPLY WITH AASHTO M252.
b.PIPES 12-INCH TO 60-INCH IN SIZE MUST COMPLY WITH ASTM F2306.
c.ALL FITTINGS MUST COMPLY WITH ASTM D3212.
d.WATER-TIGHT JOINTS MUST BE USED AT ALL CONNECTIONS INCLUDING STRUCTURES.
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report
was prepared by me or under my direct supervision
and that I am a duly Licensed Professional Engineer
under the laws of the State of Minnesota.
Todd W. McLouth - PE
20383
Project Lead
Drawn By
Checked By
Loucks Project No.16033.00
CDL
CDL
TWM
03/04/16
03/07/16
LOUCKS
W:
\
2
0
1
6
\
1
6
0
3
3
\
C
A
D
D
D
A
T
A
\
C
I
V
I
L
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
C
8
-
1
C
I
V
I
L
D
E
T
A
I
L
S
Pl
o
t
t
e
d
:
03
/
0
7
/
2
0
1
6
8
:
4
5
A
M
7200 Hemlock Lane, Suite 300
Maple Grove, MN 55369
763.424.5505
www.loucksinc.com
PLANNING
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
ENVIRONMENTAL
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
CADD QUALIFICATION
ASPEN
DENTAL
MONTICELLO, MN
RETAIL PARTNERS
DEVELOPMENT
5608 Stanford Court
Nashville, Tennessee 37215
C0-1 COVER SHEET
C2-1 SITE PLAN
C3-1 GRADING PLAN
C3-2 EROSION CONTROL PLAN
C4-1 UTILITY PLAN
C8-1 CIVIL DETAILS
L1-1 LANDSCAPE PLAN
-ALTA/ACSM LAND SURVEY
03/07/16 ZONING APPLICATION
CIVIL
DETAILS
C8-1
STANDARD GUTTER
8"A
6"
13.5"
1
2" RAD.
24"B624
B618 18"
B612 12"
CURB
TYPE "A"
MIN. OF 4" AGG. BASE
UNDER CURB (IF TOTAL
THICKNESS OF SECTION
ALLOWS)
3/8 " LIP
3" RAD.
1
3
3" RAD.
AGG. BASE
VARIES
PAVEMENT SECTION VARIES
SEE PAVEMENT SECTION DETAIL
SLOPE GUTTER TO
MATCH PARKING LOT
DRAINAGE
(3/4" PER FT. TYP.) TIP
GUTTER OUT AS REQ'D
DRAWN 1/2014
LOUCKS PLATE NO.
2009B6 STYLE CONCRETE
CURB AND GUTTER
MINIMUM 1'
BEHIND BACK
OF CURB
7"
SPECIFICATION NOTES:
1.UPON COMPLETION, CURBING SHOULD BE SPRAYED WITH A
MEMBRANE CURING COMPOUND PER MNDOT 3754.
2.EXPANSION JOINTS AT MAX. SPACING OF 200'.
3.CONSTRUCT IN ACCORDANCE WITH MNDOT 2531.
TOOLED RADIUS EDGE
PAVEMENT ELEVATION
VARIES
CONC. SIDEWALK SLAB
BASE MATERIAL
6"6"
6" MIN.
MAX. 2% SLOPE AWAY
FROM BUILDING
(TYP.)
4"
4"
PAVEMENT
SECTION
DRAWN 1/2014
LOUCKS PLATE NO.
2017INTEGRAL CURB
AND WALK
6"
6"
2" BIT. WEAR COURSE,
MN/DOT 2360 SPWEA240B
TACK COAT, MN/DOT 2357
2" BIT. NON-WEAR COURSE,
MN/DOT 2360 SPNWB230B
8" AGG. BASE, CLASS 5 OR 2 MN/DOT 3138
SURFACE COMPACTION
FINISHED GRADE
DRAWN 1/2014
LOUCKS PLATE NO.
2030STANDARD BITUMINOUS
PAVEMENT SECTION
PAVEMENT SECTION BASED ON
GEOTECHNICAL REPORT BY BRAUN
INTERTEC CORPORATION, DATED
MARCH 1,2016
1'
-
0
"
ACCESSIBLE ROUTE
L
SE
E
P
L
A
N
9'-0"
20
'
-
0
"
C
DRAWN 1/2014
LOUCKS PLATE NO.
2035TYPICAL ADA PARKING
HANDICAP SIGN (TYP)
(SIGN TO COMPLY WITH MSBC
1341.0502.7 AND MINNESOTA STATUES
169.346)
9'-0"9'-0"9'-0"
4" WIDE PAINTED LINES,
18" O.C., @ 45 TRAFFIC WHITE
(AISLE TO CONTAIN THE
DESIGNATION "NO PARKING"
COMPLYING WITH MSBC 1341.0502)
4" WIDE PAINTED
LINES, TRAFFIC
WHITE
48
"
M
I
N
.
30"
DRAWN 1/2014
LOUCKS PLATE NO.
2023CONCRETE SPLASH BOX
DRAWN 1/2014
LOUCKS PLATE NO.
2034CONCRETE SIDEWALK
SECTION
4" CONCRETE WALK
MN/DOT 2521
4" GRANULAR MATERIAL
MN/DOT 3149
VAN
ACCESSIBLE
12" DIA.
DRAWN 1/2014
LOUCKS PLATE NO.
2037TYPICAL ADA PARKING
SIGN / BOLLARD COMBO
12x18" STANDARD HANDICAP
PARKING SIGN WITH SEPARATE 'VAN
ACCESSIBLE' PANEL. GREEN, WHITE,
AND BLUE ON REFLECTIVE
BACKGROUND. USE HDWR PER SIGN
SUPPLIER'S RECOMMENDATIONS.
HC SIGNAGE PER MINNESOTA
RULES 1341.0502
12x6" STANDARD 'VAN
ACCESSIBLE' PANEL. GREEN
ON WHITE RELECTIVE
BACKGROUND
2" DIA. 6' LONG MIN.
GALVANIZED SCHEDULE 40
STEEL PIPE. EMBED IN CONCRETE
FILLED BOLLARD
6" DIA. SCHEDULE 40
GALVENZIED STEEL PIPE 6'
LONG MINIMUM
HEAVY DUTY HDPE DOME TOP
DECORATIVE SLEEVE BLUE IN COLOR.
AVAILABLE FROM
BOLLARDSNSLEEVES.COM OR EQUAL.
COMPACTED OR
UNDISTURBED SUBGRADE.
NOTES:
1.BOLLARDS TO BE PLACED 12" BEHIND
BACK OF CURB.
2.MAINTAIN PLUMB UNTIL CONCRETE IS
SUFFICIENTLY CURED.
3.HOLD CONCRETE FOOTING BELOW
GRADE OF FINISHED CONCRETE TO
CREATE FINAL PAVING PATTERN AS
SHOWN ON PLANS.
NOTES:
1.RISER PIPE SHALL BE EXTENDED ABOVE
GROUND LEVEL INTIALLY & THEN CUT BACK
TO MATCH FINAL GRADE (BY OTHERS)
2.CLEANOUT TO BE COVERED WITH A CASTING.
NEENAH R-1970 OR APPROVED EQUAL.
DRAWN 12/2013
LOUCKS PLATE NO.
4006CLEAN-OUT STRUCTURE
THREADED CAP & PLUG
RISER
100' MAX
LONG SWEEP
45BEND
WYE
CONCRETE OR
CONCRETE BLOCK
COMPACTED GRANULAR
MATERIAL OR CONCRETE
COMPACTED BACKFILL
NEENAH R-1970 CASTING OR APPROVED
EQUAL, SET ON COMPACTED BACKFILL.
NOTE:
GRANULAR MATERIALS FURNISHED FOR USE IN FOUNDATION, BEDDING, ENCASEMENT, OR BACKFILL
CONSTRUCTION SHALL CONFORM TO THE FOLLOWING REQUIREMENTS:
x FOUNDATION MATERIALS SHALL HAVE 100% PASSING THE 1 1/2" SIEVE AND A MAXIMUM OF 10%
PASSING THE No. 4 SIEVE. NOT LESS THAN 50% OF THE MATERIAL RETAINED BY THE No. 4 SIEVE SHALL
HAVE ONE (1) OR MORE CRUSHED FACES. HARD, DURABLE CRUSHED CARBONATE QUARRY ROCK MAY
BE USED FOR FOUNDATION MATERIALS.
x BEDDING AND ENCASEMENT MATERIALS FOR FLEXIBLE PIPE SHALL MEET THE REQUIREMENTS OF
MNDOT SPECIFICATION 3149.2B1, GRANULAR BORROW, EXCEPT THAT 100% SHALL PASS THE ONE
INCH (1") SIEVE.
x BACKFILL MATERIALS SHALL CONSIST OF SUITABLE EXISTING TRENCH MATERIALS, EXCEPT AS
OTHERWISE SPECIFIED. SUITABLE MATERIAL SHALL BE DEFINED AS A MINERAL SOIL FREE OF FOREIGN
MATERIALS (RUBBISH, ORGANICS & DEBRIS), FROZEN CLUMPS, OVERSIZE STONE, ROCK, CONCRETE OR
BITUMINOUS CHUNKS, AND OTHER UNSUITABLE MATERIALS THAT MAY DAMAGE PIPE, PREVENT
THOROUGH COMPACTION, OR INCREASE THE RISKS OF SETTLEMENT.
DRAWN 12/2013
LOUCKS PLATE NO.
4008PLASTIC PIPE
BEDDING
PLASTIC
PIPE
18"18"PIPE
WIDTH ENCASEMENT
BEDDING
FOUNDATION
(MAY NOT BE
REQUIRED)
12"
6"
BACKFILL
COMPACTED
AS SPECIFIED
EXCAVATED TRENCH
WIDTH
LOUCKS
W:
\
2
0
1
6
\
1
6
0
3
3
\
C
A
D
D
D
A
T
A
\
L
A
N
D
S
C
A
P
E
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
L
1
-
1
L
A
N
D
S
C
A
P
E
P
L
A
N
Pl
o
t
t
e
d
:
03
/
0
7
/
2
0
1
6
8
:
5
3
A
M
7200 Hemlock Lane, Suite 300
Maple Grove, MN 55369
763.424.5505
www.loucksinc.com
PLANNING
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
ENVIRONMENTAL
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
CADD QUALIFICATION
ASPEN
DENTAL
MONTICELLO, MN
RETAIL PARTNERS
DEVELOPMENT
5608 Stanford Court
Nashville, Tennessee 37215
C0-1 COVER SHEET
C2-1 SITE PLAN
C3-1 GRADING PLAN
C3-2 EROSION CONTROL PLAN
C4-1 UTILITY PLAN
C8-1 CIVIL DETAILS
L1-1 LANDSCAPE PLAN
-ALTA/ACSM LAND SURVEY
03/07/16 ZONING APPLICATION
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report
was prepared by me or under my direct supervision
and that I am a duly Licensed Landscape Architect
under the laws of the State of Minnesota.
Douglas D. Loken - LA
45591
Project Lead
Drawn By
Checked By
Loucks Project No.16033.00
CDL
DDL
DDL
03/04/16
03/07/16
LANDSCAPE
PLAN
L1-1
FRONT ELEVATION
NOT TO SCALE
MONTICELLO, MN
PROPOSED
TWO BRENTWOOD COMMONS
750 OLD HICKORY BLVD.
SUITE 250
BRENTWOOD, TN 37027
P.615.377.3111
F.615.377.0978
www.eandharch.com
E + H ARCHITECTS P.C.
9320 CEDAR ST.
MARCH 15, 2016
0'-0" AFF
FIN. FLOOR
19'-8" AFF
T.O. COPING
3'-4" AFF
T.O. STONE VENEER
13'-0" AFF
T.O. AWNING
10'-0" AFF
T.O. STOREFRONT
8'-0" AFF
B.O. LIGHT FIXTURE
CLEAR ANODIZED
ALUMINUM
STOREFRONT BY
KAWNEER
"MEDITERRANEAN BLUE
#4652" CLOTH AWNING
SYSTEM BY SUNBRELLA
"VAN DYKE #110" EIFS
VENEER W/ SCORED
V-GROOVE JOINTS
(SANDPEBBLE FINE
FINISH)
"SIENNA" DRYSTACK
STONE VENEER BY
DUTCH QUALITY STONE
"ELECTRIC BLUE" METAL
COPING BY FIRESTONE
UNA-CLAD PRODUCTS
LIGHT FIXTURE
20'-8" AFF
T.O. COPING
25'-6" AFF
T.O. COPING
CAST STONE
WATERTABLE
"KOKO BROWN"
RUNNING BOND
BRICK VENEER
BY ACME
"KOKO BROWN" BRICK
ROWLOCK BY ACME
"CLOVER #450" EIFS
VENEER W/ SCORED
V-GROOVE JOINTS
(SANDPEBBLE FINE
FINISH)
SIGNAGE BY OTHERS
(4'-1 1
2" X 22'-0")
(90.75 SQ. FT.)
22'-0"
4'
-
1
1
/
2
"
LEFT ELEVATION
NOT TO SCALE
MONTICELLO, MN
PROPOSED
TWO BRENTWOOD COMMONS
750 OLD HICKORY BLVD.
SUITE 250
BRENTWOOD, TN 37027
P.615.377.3111
F.615.377.0978
www.eandharch.com
E + H ARCHITECTS P.C.
9320 CEDAR ST.
MARCH 15, 2016
0'-0" AFF
FIN. FLOOR
3'-4" AFF
T.O. STONE
8'-0" AFF
B.O. LIGHT
"MEDITERRANEAN BLUE
#4652" CLOTH AWNING
SYSTEM BY SUNBRELLA
"VAN DYKE #110" EIFS
VENEER W/ SCORED
V-GROOVE JOINTS
(SANDPEBBLE FINE
FINISH)
"SIENNA" DRYSTACK
STONE VENEER BY
DUTCH QUALITY STONE
"ELECTRIC BLUE" METAL
COPING BY FIRESTONE
UNA-CLAD PRODUCTS
LIGHT FIXTURE
20'-8" AFF
T.O. COPING
25'-6" AFF
T.O. COPING
CAST STONE
WATERTABLE
"KOKO BROWN"
RUNNING BOND
BRICK VENEER
BY ACME
"CLOVER #450" EIFS
VENEER W/ SCORED
V-GROOVE JOINTS
(SANDPEBBLE FINE
FINISH)
13'-0" AFF
T.O. AWNING
10'-0" AFF
B.O. AWNING
SIGNAGE BY OTHERS
(4'-1 1
2" X 22'-0")
(90.75 SQ. FT.)
22'-0"
4'
-
1
1
/
2
"
20'-7" AFF
T.O. HVAC UNIT
(APPROXIMATE)
19'-8" AFF
T.O. COPING &
HVAC UNIT (APPROX.)
"KOKO BROWN" BRICK
ROWLOCK BY ACME
HVAC UNIT HVAC UNIT
RIGHT ELEVATION
NOT TO SCALE
MONTICELLO, MN
PROPOSED
TWO BRENTWOOD COMMONS
750 OLD HICKORY BLVD.
SUITE 250
BRENTWOOD, TN 37027
P.615.377.3111
F.615.377.0978
www.eandharch.com
E + H ARCHITECTS P.C.
9320 CEDAR ST.
MARCH 15, 2016
0'-0" AFF
FIN. FLOOR
3'-4" AFF
T.O. STONE VENEER
13'-0" AFF
T.O. AWNING
8'-0" AFF
B.O. LIGHT FIXTURE
"MEDITERRANEAN BLUE
#4652" CLOTH AWNING
SYSTEM BY SUNBRELLA
"VAN DYKE #110" EIFS
VENEER W/ SCORED
V-GROOVE JOINTS
(SANDPEBBLE FINE
FINISH)
"SIENNA" DRYSTACK
STONE VENEER BY
DUTCH QUALITY STONE
"ELECTRIC BLUE" METAL
COPING BY FIRESTONE
UNA-CLAD PRODUCTS
LIGHT FIXTURE
20'-8" AFF
T.O. COPING
25'-6" AFF
T.O. COPING
CAST STONE
WATERTABLE
"KOKO BROWN"
RUNNING BOND
BRICK VENEER
BY ACME
"KOKO BROWN" BRICK
ROWLOCK BY ACME
"CLOVER #450" EIFS
VENEER W/ SCORED
V-GROOVE JOINTS
(SANDPEBBLE FINE
FINISH)
10'-0" AFF
B.O. AWNING
SIGNAGE BY OTHERS
(4'-1 1
2" X 22'-0")
(90.75 SQ. FT.)
22'-0"
4'
-
1
1
/
2
"
20'-7" AFF
T.O. HVAC UNIT
(APPROXIMATE)
19'-8" AFF
T.O. COPING &
HVAC UNIT (APPROX.)
HVAC UNIT HVAC UNIT
REAR ELEVATION
NOT TO SCALE
MONTICELLO, MN
PROPOSED
TWO BRENTWOOD COMMONS
750 OLD HICKORY BLVD.
SUITE 250
BRENTWOOD, TN 37027
P.615.377.3111
F.615.377.0978
www.eandharch.com
E + H ARCHITECTS P.C.
9320 CEDAR ST.
MARCH 15, 2016
0'-0" AFF
FIN. FLOOR
19'-8" AFF
T.O. COPING
3'-4" AFF
T.O. STONE VENEER
13'-0" AFF
T.O. AWNING
8'-0" AFF
B.O. LIGHT FIXTURE
"VAN DYKE #110" EIFS
VENEER W/ SCORED
V-GROOVE JOINTS
(SANDPEBBLE FINE
FINISH)
"SIENNA" DRYSTACK
STONE VENEER BY
DUTCH QUALITY STONE
"ELECTRIC BLUE" METAL
COPING BY FIRESTONE
UNA-CLAD PRODUCTS
CAST STONE
WATERTABLE
"KOKO BROWN"
RUNNING BOND
BRICK VENEER
BY ACME
"KOKO BROWN" BRICK
ROWLOCK BY ACME
"CLOVER #450" EIFS VENEER
W/ SCORED V-GROOVE JOINTS
(SANDPEBBLE FINE FINISH)
"MEDITERRANEAN BLUE
#4652" CLOTH AWNING
SYSTEM BY SUNBRELLA
10'-0" AFF
B.O. AWNING
20'-8" AFF
T.O. COPING
SIGNAGE BY OTHERS
(2'-10" X 19'-0")
(53.8 SQ. FT.)
19'-0"
2'
-
1
0
"
LEFT PERSPECTIVE
NOT TO SCALE
MONTICELLO, MN
PROPOSED
TWO BRENTWOOD COMMONS
750 OLD HICKORY BLVD.
SUITE 250
BRENTWOOD, TN 37027
P.615.377.3111
F.615.377.0978
www.eandharch.com
E + H ARCHITECTS P.C.
9320 CEDAR ST.
MARCH 15, 2016
RIGHT PERSPECTIVE
NOT TO SCALE
MONTICELLO, MN
PROPOSED
TWO BRENTWOOD COMMONS
750 OLD HICKORY BLVD.
SUITE 250
BRENTWOOD, TN 37027
P.615.377.3111
F.615.377.0978
www.eandharch.com
E + H ARCHITECTS P.C.
9320 CEDAR ST.
MARCH 15, 2016
REAR PERSPECTIVE
NOT TO SCALE
MONTICELLO, MN
PROPOSED
TWO BRENTWOOD COMMONS
750 OLD HICKORY BLVD.
SUITE 250
BRENTWOOD, TN 37027
P.615.377.3111
F.615.377.0978
www.eandharch.com
E + H ARCHITECTS P.C.
9320 CEDAR ST.
MARCH 15, 2016
REAR PERSPECTIVE
NOT TO SCALE
MONTICELLO, MN
PROPOSED
TWO BRENTWOOD COMMONS
750 OLD HICKORY BLVD.
SUITE 250
BRENTWOOD, TN 37027
P.615.377.3111
F.615.377.0978
www.eandharch.com
E + H ARCHITECTS P.C.
9320 CEDAR ST.
MARCH 15, 2016
FRONT ELEVATION
NOT TO SCALE
MONTICELLO, MN
PROPOSED
TWO BRENTWOOD COMMONS
750 OLD HICKORY BLVD.
SUITE 250
BRENTWOOD, TN 37027
P.615.377.3111
F.615.377.0978
www.eandharch.com
E + H ARCHITECTS P.C.
9320 CEDAR ST.
MARCH 15, 2016
0'-0" T.O. CONC. SLAB
7'-0" T.O. CMU CAP
6'-8" T.O. CMU BLOCK
LEFT ELEVATION
NOT TO SCALE
RIGHT ELEVATION
NOT TO SCALE
REAR ELEVATION
NOT TO SCALE
GATES, BOLLARDS &
HARDWARE PAINTED
TO MATCH "VAN DYKE
#110" EIFS
4" CMU CAP PAINTED
TO MATCH "VAN
DYKE #110 EIFS"
RUNNING BOND
SPLITFACE CMU
BLOCK TO MATCH
"KOKO BROWN"
BRICK BY ACME
0'-0" T.O. CONC. SLAB
7'-0" T.O. CMU CAP
6'-8" T.O. CMU BLOCK
GATES, BOLLARDS &
HARDWARE PAINTED
TO MATCH "VAN DYKE
#110" EIFS
4" CMU CAP PAINTED
TO MATCH "VAN
DYKE #110 EIFS"
RUNNING BOND
SPLITFACE CMU
BLOCK TO MATCH
"KOKO BROWN"
BRICK BY ACME
0'-0" T.O. CONC. SLAB
7'-0" T.O. CMU CAP
6'-8" T.O. CMU BLOCK
GATES, BOLLARDS &
HARDWARE PAINTED
TO MATCH "VAN DYKE
#110" EIFS
4" CMU CAP PAINTED
TO MATCH "VAN
DYKE #110 EIFS"
RUNNING BOND
SPLITFACE CMU
BLOCK TO MATCH
"KOKO BROWN"
BRICK BY ACME
0'-0" T.O. CONC. SLAB
7'-0" T.O. CMU CAP
6'-8" T.O. CMU BLOCK
4" CMU CAP PAINTED
TO MATCH "VAN
DYKE #110 EIFS"
RUNNING BOND
SPLITFACE CMU
BLOCK TO MATCH
"KOKO BROWN"
BRICK BY ACME
FRONT PERSPECTIVE
NOT TO SCALE
MONTICELLO, MN
PROPOSED
TWO BRENTWOOD COMMONS
750 OLD HICKORY BLVD.
SUITE 250
BRENTWOOD, TN 37027
P.615.377.3111
F.615.377.0978
www.eandharch.com
E + H ARCHITECTS P.C.
9320 CEDAR ST.
MARCH 15, 2016
NOT TO SCALE
NOT TO SCALE NOT TO SCALE
FRONT PERSPECTIVE
REAR PERSPECTIVE REAR PERSPECTIVE
CL
302103127
Btqfo!Efoubm
Npoujdfmmp-!NO
E0G!Tjohmf!Qpmf!Qzmpo
QspkfduMpdbujpoKpc!EftdsjqujpoEsbxjoh!$Esbxo!CzEbufNjttjoh!Jogp/Bqqspwbm
Qbhf!2!pg!2
112`BtqfoEfoubm`Npoujdfmmp
2'-0"
END VIEW
CH
T
T
UEUE
CE GRAPHICS:
A
Y
Y
AINT TO MA
Y ELECTRICAL
UE VINYL W/
TED W/ 800mA HIGH OUTPUT
AINER P
UORESCENT LAMPS
AINERS )
UE
ALL STEEL PIPE SUPPOR
CH SW 6965 HYPER BLCH SW 6965 HYPER BL
CES W/ 1ST SURF
TUMINAT
A
UMINUM CABINET
Y ILL
UMINUM RET
TION
CTOR TO MAKE FINAL
TED AL
.D. .322 W
A
VICE FURNISHED TO SIGN B
YLIGHT WHITE FL
A
AINTED TO MAAINTED TO MA
ABRICAOCAL SIGN ORDINANCES
24” DIA. x 7’-0” DEEP CONCRETE PIERFOUND
FPUNDERGROUND PRIMARSERL
( FILLER AND 2” RETWHITE LEXAN F3M# 3630-167 BRIGHT BLSHOW THRU WHITE COPY AND BORDER2”x 2” ALSW 6965 HYPER BLINTERNALLD8.625" OPCUSTOMER'S ELECTRICIAN - SIGN CONTRACONNECTION AS DETERMINED
B
SCALE: ¼" = 1'-0"
.
60 SQ.FT
12'-0"
ON - OPTION 4
YL
19½"
D/F P
(1) REQUIRED - MANUFACTURE & INSTALL
5'-0"
6" RADIUSCORNERS
..A.H22'-0" O
0.1 0.2 0.3 0.4 0.6 0.8 0.9 1.0 1.1 1.4 1.6 1.5 1.2 1.0 1.0 0.9 0.7 0.6 1.7 1.7 1.5 1.2 1.1 0.9 0.7 0.5 0.4 0.2
0.1 0.2 0.3 0.4 0.6 0.9 1.1 1.2 1.4 1.8 2.1 2.0 1.5 1.2 1.2 1.1 0.8 0.6 2.0 2.2 1.8 1.5 1.2 1.0 0.8 0.6 0.4 0.2
0.1 0.2 0.3 0.5 0.7 1.0 1.3 1.4 1.7 2.0 2.3 2.2 1.9 1.5 1.4 1.2 0.9 0.7 0.6 0.5 0.6 0.8 1.0 1.2 1.5 1.8 1.9 2.0 1.8 1.6 1.3 1.1 0.8 0.6 0.4 0.2
0.1 0.2 0.3 0.5 0.8 1.3 1.6 1.8 2.0 2.1 2.2 2.3 2.1 1.8 1.8 1.5 1.1 0.8 0.6 0.5 0.7 0.9 1.2 1.5 1.8 2.0 2.0 2.0 2.0 2.0 1.6 1.3 1.0 0.7 0.4 0.3
0.1 0.2 0.3 0.6 1.0 1.5 2.0 2.2 2.0 2.2 2.8 2.4 2.1 2.0 2.2 1.8 1.3 0.8 0.6 0.5 0.7 1.1 1.5 1.9 2.2 2.2 2.4 2.7 2.3 2.2 2.1 1.7 1.3 0.8 0.5 0.3
0.2 0.2 0.4 0.6 1.0 1.6 2.2 2.3 2.1 2.5 3.1 2.8 2.2 2.2 2.3 1.9 1.3 0.8 2.1 2.8 3.0 2.3 2.2 2.3 1.8 1.3 0.8 0.5 0.3
0.2 0.3 0.4 0.7 1.0 1.5 1.9 2.1 2.2 2.4 2.6 2.6 2.3 2.1 2.0 1.7 1.3 0.8 2.2 2.2 2.5 2.2 2.2 2.0 1.6 1.2 0.8 0.5 0.3
0.2 0.3 0.4 0.7 1.0 1.5 1.8 1.9 2.3 2.6 2.8 2.8 2.5 2.1 1.9 1.6 1.2 0.8 2.2 2.2 2.2 2.2 2.0 1.7 1.4 1.1 0.8 0.5 0.3
0.2 0.3 0.5 0.7 1.1 1.5 1.8 1.9 2.2 2.8 3.3 3.1 2.4 2.0 1.9 1.7 1.3 0.8 2.3 2.5 2.7 2.2 1.9 1.6 1.4 1.1 0.7 0.5 0.3
0.2 0.3 0.5 0.7 1.1 1.5 1.9 2.0 2.2 2.8 3.3 3.0 2.5 2.1 2.0 1.8 1.4 0.9 2.5 2.8 2.8 2.3 2.0 1.7 1.5 1.1 0.8 0.5 0.3
0.2 0.3 0.5 0.7 1.1 1.5 1.8 1.9 2.2 2.8 3.3 3.1 2.5 2.0 1.9 1.8 1.4 1.1 0.9 0.7 0.8 0.9 0.9 1.0 1.3 2.6 2.7 2.5 2.2 1.9 1.7 1.4 1.1 0.8 0.5 0.3
0.2 0.3 0.5 0.7 1.0 1.5 1.8 1.9 2.2 2.7 2.9 2.9 2.5 2.0 1.9 1.7 1.4 1.1 0.9 1.0 1.0 1.1 1.1 1.3 2.3 2.8 2.6 2.3 1.9 1.8 1.6 1.3 0.9 0.7 0.5 0.3
0.2 0.3 0.4 0.7 1.0 1.5 1.9 2.1 2.3 2.5 2.5 2.6 2.4 2.1 2.1 1.8 1.4 1.1 0.9 1.0 1.2 1.3 1.3 1.6 2.3 2.7 2.6 2.2 1.8 1.7 1.5 1.1 0.8 0.6 0.4 0.3
0.2 0.2 0.4 0.6 1.1 1.6 2.1 2.2 2.1 2.3 2.9 2.5 2.2 2.2 2.3 1.9 1.4 1.0 0.9 1.1 1.3 1.6 1.7 2.0 2.3 2.2 2.4 2.2 2.0 1.9 1.5 1.1 0.8 0.5 0.4 0.2
0.1 0.2 0.4 0.6 1.0 1.6 2.1 2.3 2.1 2.4 3.1 2.7 2.1 2.2 2.4 1.9 1.4 1.0 0.9 1.1 1.5 1.9 2.0 2.1 2.1 2.7 2.3 2.1 2.0 2.1 1.7 1.2 0.7 0.5 0.3 0.2
0.1 0.2 0.3 0.5 0.9 1.3 1.7 1.9 2.0 2.1 2.3 2.3 2.0 1.9 1.9 1.6 1.3 1.0 0.9 1.2 1.7 2.2 2.2 2.1 2.5 2.9 2.6 2.1 2.1 2.3 1.8 1.2 0.7 0.4 0.3 0.2
0.1 0.2 0.3 0.5 0.8 1.1 1.4 1.6 1.8 2.1 2.2 2.3 2.0 1.7 1.6 1.4 1.1 0.9 0.9 1.1 1.5 1.9 2.0 2.0 2.1 2.5 2.3 2.0 1.9 1.9 1.5 1.1 0.7 0.4 0.2 0.2
0.1 0.2 0.3 0.4 0.7 1.0 1.2 1.2 1.5 1.9 2.2 2.1 1.6 1.3 1.3 1.2 1.0 0.8 0.8 1.0 1.3 1.6 1.7 1.9 2.1 2.1 2.2 2.0 1.7 1.6 1.3 0.9 0.6 0.4 0.2 0.2
0.1 0.2 0.3 0.4 0.6 0.8 1.0 1.0 1.2 1.5 1.8 1.6 1.3 1.1 1.1 1.0 0.9 0.7 0.7 0.9 1.1 1.3 1.3 1.6 1.9 2.3 2.1 1.7 1.3 1.2 1.1 0.8 0.5 0.3 0.2 0.1
0.1 0.2 0.2 0.4 0.5 0.7 0.8 0.8 0.9 1.1 1.3 1.2 1.0 0.9 0.9 0.8 0.7 0.7 0.7 0.8 1.0 1.1 1.1 1.3 1.6 1.9 1.7 1.4 1.1 1.1 0.9 0.7 0.5 0.3 0.2 0.1
WLS13006 ASPEN DENTAL MONTICELLO, MN PM: HOLLY PLEASE EMAIL US FOR PRICING AT WLS@WLSLIGHTING.COM
Symbol Qty Label Lumens LLF Description Lum. Watts
4 A N.A.0.950 WLS-CLXM-5E-LED-SS-CW 27' POLE 3' BASE 182.5
Luminaire Schedule
Calculation Summary
Label Units Avg Max Min Avg/Min Max/Min PtSpcLr PtSpcTb
10 10PARKING SUMMARY Fc 1.89 3.3 0.4 4.73 8.25
Based on the information provided, all dimensions and luminaire locations
shown represent recommended positions. The engineer and/or architect
must determine applicability of the layout to existing or future field
conditions.
This lighting pattern represents illumination levels calculated from
laboratory data taken under controlled conditions utilizing current
industry standard lamp ratings in accordance with Illuminating
Engineering Society approved methods. Actual performance of any
manufacturer's luminaire may vary due to variation in electrical voltage,
tolerance in lamps and other variable field conditions.
REVISIONS
Rev #Date BY:800-633-8711DATE -3/3/16ASPEN DENTALMONTICELLO, MNWLS-13006scale: 1"=20'1919 WINDSOR PLACEFORT WORTH, TX 76110www.wlslighting.comPM:HOLLYBY: J.P.SHEET 1 OF 1
SERIESCLX
HOUSING - One-piece, die-formed aluminum housing contains factory prewired driver.
Wiring access door (with safety lanyard) located underneath.
OPTICAL UNIT - Clear tempered at glass lens permanently sealed to weather-tight
aluminum optic frame creates an IP65 rated optical unit (includes pressure-stabilizing
breather). Optic frame recessed into housing cavity and sealed to the housing with one piece
EPDM gasket.
EXPECTED LIFE - Minimum 60.000 hours to 100.000 hours depending upon the ambient
temperature of the installation location.
LEDS - Select high-brightness LEDs in Cool White (5000K nominal), or Neutral White
(4000K nominal) color temperature, 70 CRI (nominal).
DISTRIBUTION / PERFORMANCE - Types III, FT, 5 and enhanced 5E and FTE. Exceptional
uniformity creates bright environment at lower levels. Internal Louver (IL) option available for
improved backlight control without sacricing street side performance for FT distribution.
ELECTRICAL - Two-stage surge protection (including separate surge protection built into
electronic driver) meets Location Category C Low. Available with universal voltage power
supply 120-277 VAC (50/60Hz input), and 347-480 VAC. Optional button-type photocells
(PCI) are available in 120, 208, 240, 277 or 347 volt (supply voltage must be specied).
DRIVER - Available in SS (Super Saver) and HO (High Output) drive currents. Components
are fully encased in potting material for moisture resistance. Driver complies with FCC
standards. Driver and key electronic components can easily be accessed.
MOUNTING - Use with 5” traditional drilling pattern. An extruded radius 8” arm is shipped
standard and compatible with all xture mounting congurations. The xture may also be
mounted to 3”-5” round poles using the round pole plate adaptor accessory (RPP), which
must be ordered separately.
OPERATING TEMPERATURE - -40°C to +50°C (-40°F to +122°F)
FINISH - Fixtures are nished with WLS DuraGrip ® polyester powder coat nishing process.
The DuraGrip nish withstands extreme weather changes without cracking or peeling, and
is guaranteed for ve full years.
WARRANTY - WLS LED xtures carry a limited 5-year warranty.
LISTING - ETL listed to U.S. and Canadian safety standards. Suitable for wet locations.
SPECIFICATIONS
Approved By:Project Name:
Location:Date:
800.633.8711 www.wlslighting.com1919 Windsor Place Fax: 817.735.4824 Fort Worth, TX 76110
WLS LIGHTING SYSTEMS
Specications subject to change without notice. 01 Rev. 1/16
LED AREA
DIMENSIONS
ARRA
Funding Compliant American Made
American Innovation
IP67
Suitable for wet locations
19-5/16”
(490mm)
34-5/16
(871mm)
11-3/16”
(284mm)
7/8”
(23mm)1-15/16”
(49mm)
4-7/8”
(123mm)15o
HOUSE SIDE SHIELD
16-1/2”
(419mm)
6-3/4”
(171mm)
4-7/8”
(124mm)
16-5/16”
(414mm)
27-11/16”
(703mm)
9”
(228mm)
1-15/16”
(49mm)
7/8”
(23mm)
4-7/8”
(123mm)18o
HOUSE SIDE SHEILD
13 - 1/2”
(343mm)
4-1/4”
(108mm)
4-1/8”
(104mm)
CLXM
CLXS
Mounting
CLX LED AREA
ORDERING INFORMATION
UE - Universal
Voltage
(120-277)
347 - 480
SS - Super Saver
HO - High Output
CLXS
CLXM
CLXL
ORDER :
LED
WLS-CLX
SERIES DISTRIBUTION SOURCE CURRENT TEMPERATURE VOLTAGE FINISH OPTIONS ACCESSORIES
LIGHT DRIVE COLOR LINE LUMINAIRE
FOOTNOTES:
SERIES
CLXM 5 LED SS CW UE BRZ NO NA
(EXAMPLE ORDER)
PCR - Photoelectric
Control Receptacle
NO - No Options
BRZ - Bronze
BLK - Black
PLT - Platinum Plus
BUF- Bu
WHT - White
SVG - Satin Verde
Green
GPT - Graphite
MSV - Metallic
Silver
CC - Custom Color
3 - Type III
5 - Type V
FP - Forward Throw
5E - Type V Enhanced
FPE - Forward Throw
Enhanced
5 - Type V
FP - Forward Throw
FPL - Forward Optic
Rotated for D180 (left)
FPR - Forward Optic
Rotated for D180(Right)
5E - Type V Enhanced
FPE - Forward Throw
Enhanced
SELECT APPROPRIATE CHOICE FROM EACH COLUMN TO FORMULATE ORDER CODE. Refer to example below.
Approved By:Project Name:
Location:Date:
800.633.8711 www.wlslighting.com1919 Windsor Place Fax: 817.735.4824 Fort Worth, TX 76110
Specications subject to change without notice. 01 Rev. 1/16
CW - Cool White
(5250°K nom.)
NW - Neutral
White
(4100°K nom.)
GS - Glare Shield
PC - Photocell
RPP - Round Pole
Plate
WM - Wall Mount
Plate
RA - Radius Arm
UB - Upsweep Bracket
for round or
square poles
SF - Single Fusing
DF - Double Fusing
NA - No Accessories
1- Photocell must be ordered separately - see Accessories.
Type FT Type 5
11400 11400 97
15500 15700 140
9200 9300 97
12100 12200 140
SS
HO
SS
HO
LIGHT OUTPUT - CLXS
Lumens (Nominal)Watts(Nominal)CoolWhiteNeutralWhite Type FT Type 5
22800 22900 193
30900 31100 278
18400 18500 193
24100 23900 278
SS
HO
SS
HO
LIGHT OUTPUT - CLXM
Lumens (Nominal)Watts
(Nominal)CoolWhiteNeutralWhiteLE FT AND RIGHT VERSIONS OF TYPE FT REFLECTORS (TOP VIEW)
Use Type
FT-L
(left)
Use TypeFT-R
(right)
pole
Area to be Lit
Note: Optics are not eld-rotatable. For D180 Forward
Throw installations specify left (FT-L) and/or right
(FT-R) side mounting. Orientation is based on standing
at the pole and looking out at the area to be lit.
LUMINAIRE EPA CHART - CLX
Single
D180°
D90°
T90°
TN120°
Q90°
0.4
0.8
0.6
1.4
1.4
1.6
Note: House Side Shield adds to xture
EPA. Consult Factory.
K:\02596-210\Admin\Docs\LTR-a schumann-Aspen DentaI 033016.doc
Infrastructure Engineering Planning Construction 701 Xenia Avenue South
Suite 300
Minneapolis, MN 55416
Tel: 763 541-4800
Fax: 763 541-1700
March 30, 2016
Ms. Angela Schumann
Community Development Director
City of Monticello
505 Walnut Street, Suite 1
Monticello, MN 55362
Re: Aspen Dental – Preliminary Plan Review
Lot 1, Block 1 Jerry Hartung Addition
City Project No. ZASPEN
WSB Project No. 02596-210
Dear Ms. Schumann:
We have reviewed the project preliminary civil plans received on March 7, 2016, as prepared by
Loucks, Inc., and the Alta survey as prepared by Lot Surveys, and offer the following comments.
1. Confirm that conditions have been met per previous plat approval by MnDOT for the
site.
2. Any work within MnDOT right of way will require obtaining a right of way permit from
them.
3. It is assumed that the existing catch basins and storm sewer on the site and the adjacent
site were designed to accommodate runoff from the site based on a 10-year rainfall event.
Provide proposed catch basin inlet capacity calculations. Catch basins should be
designed with sufficient capacity to limit ponding to maximum depth of 0.3 feet for a 10-
year rainfall event.
4. The storm sewer system along Cedar Street and TH 25 was designed to accommodate
runoff from the site for a 10-year event. The downstream regional ponding was designed
to provide storm water management, including rate control, water quality and infiltration
for the site.
5. Identify all emergency overflow routes and elevations for each catch basin on the grading
plan. The EOF should be a minimum of 1.5’ below the low building opening.
6. Provide the location of roof drain outlet locations or connections to the storm sewer.
7. Show the irrigation layout on the construction plans.
Ms. Angela Schumann
March 30, 2016
Page 2
K:\02596-210\Admin\Docs\LTR-a schumann-Aspen DentaI 033016.doc
8. There is an additional sanitary sewer service manhole south of what is shown on the
plans that serves the Buffalo Wild Wings site- see attached utility as-built. The watermain
service stub is located in close proximity to this manhole.
9. The existing water service stub is 8-inch per City as-builts, not 6-inch as noted on the
plans.
10. A note should be added to the plans that the City will not be responsible for any
additional costs incurred that is associated with variations in the utility as-built
elevations. These elevations shall be verified in the field prior to construction.
11. Proposed invert elevations should be noted where the water and sewer services cross.
12. The proposed water service shall be installed with a minimum 7.5 feet of cover.
13. The plans should reference compliance with the City of Monticello General
Specifications and Standard Detail Plates for Street and Utility Construction.
14. Applicable City standard detail plates should be included in the plans.
15. A utility excavation permit must be obtained from the Public Works department prior to
commencement of utility connections.
16. Provide an as-built utility plan once construction is complete.
17. The plans need to be signed by a licensed professional engineer
Please have the applicant provide a written response addressing the comments above. Final
plans will need to be submitted, reviewed, and approved prior to building permit approval.
Please give me a call at 763-271-3236 if you have any questions or comments regarding this
letter. Thank you.
Sincerely,
WSB & Associates, Inc.
Shibani K. Bisson, PE
City Engineer
cc: Steve Grittman, NAC
skb
PlanningCommissionAgenda–04/05/2016
1
3A.Considerationtoreviewlanduseandzoningfor1547EastBroadway (AS)
A.REFERENCE&BACKGROUND
PlanningCommissionrequestedinformationastotheComprehensivePlanlanduse
designationandzoningdesignationforthesubjectsite.Supportingdataincludesthe
requestedinformation.
B.SUPPORTINGDATA
A.AerialImage
B.MonticelloComprehensivePlan–Chapter3,LandUse–LongRangeLand
UseMap
C.MonticelloZoningOrdinance–Chapter5,Excerpt
D.MonticelloOfficialZoningMap
1547 Ea st Bro adw a y
City Bou nd ar y
March 2 5, 2 016
Map Po wer ed by DataLink fro m WS B & Ass ociates
1 inch = 188 fee t
Sou rce: Esri, Digita lG lo be , Ge oE ye, E arthst arGeographics, CNES/A irbus DS, USDA,US GS, A EX, Get ma ppin g, A erog rid , IG N, IGP,swissto po , a nd the GIS User Community
£¤10 £¤10
Æÿ25
!(14
!(11
!(43
!(50
!(68
!(5!(81
§¨¦
94
Æÿ25
!(75
!(18
!(117
!(3 9
!(106
!(37!(1 3 1
0 0.5 10.25
Miles-
June 9, 2014Data Source: MnDNR, Sherburne County, Wright County, and WSB & Associates. Land Use Plan
Amended by City Council Resolution 2014-062, June 9, 2014
Legend
Places to Live
Places to Shop
Places to Work
Places to Recreate
Places for Community
Downtown
Mixed Use
Interchange Planning Area
Urban Reserve
Infrastructure
Rivers and Streams
Public Waters Inventory
Wetlands (National & Public Waters Inventories)
Potential Greenway
Potential Interchange
Future Bridge
Existing Arterial or Collector Road
Proposed Arterial or Collector Road
Powerline
Monticello City Boundary
Orderly Annexation Area
CHAPTER 5: USE STANDARDS
Section 5.1 Use Table
Subsection (A) Explanation of Use Table Structure
City of Monticello Zoning Ordinance Page 315
CHAPTER 5: USE STANDARDS
5.1 Use Table
(A) Explanation of Use Table Structure
(1) Organization of Table 5-1
Table 5-1 organizes all principal uses by Use Classifications and Use Types.
(a) Use Classifications
The Use Classifications are: Agricultural Uses; Residential Uses; Civic and
Institutional Uses; Office Use; Commercial Uses; and Industrial Uses. The
Use Classifications provide a systematic basis for assigning present and future
land uses into broad general classifications (e.g., residential and commercial
uses). The Use Classifications then organize land uses and activities into
specific “Use Types” based on common functional, product, or physical
characteristics, such as the type and amount of activity, the type of customers
or residents, how goods or services are sold or delivered and site conditions.
(b) Use Types
The specific Use Types identify the specific uses that are considered to fall
within characteristics identified in the use Classifications. For example;
detached dwellings, parks and recreational areas, and schools are “Use Types”
in the Single Family Residence District.
(2) Symbols used in Table 5-1
(a) Permitted Uses = P
A “P” indicates that a use is permitted by right, subject to compliance with all
other applicable provisions of this ordinance. Uses may be subject to special
regulations as referenced in the “Additional Requirements” column.
(b) Conditionally Permitted Uses = C
A “C” indicates that a use is permitted provided the City can establish
conditions necessary to ensure the use is compatible to the proposed location
and surrounding properties. Inability of the City to establish conditions to
adequately control anticipated impacts is justification for denial of a
conditionally permitted use. Conditional Uses may also be subject to special
regulations as referenced in the “Additional Requirements” column.
CHAPTER 5: USE STANDARDS
Section 5.1 Use Table
Subsection (A) Explanation of Use Table Structure
Page 316 City of Monticello Zoning Ordinance
(c) Interim Permitted Uses = I
An “I” indicates that a use may be permitted for a brief period of time
provided certain conditions are met, and a specific event or date can be
established for discontinuance of the use. Inability of the City ]o establish
conditions to adequately control anticipated impacts is justification for denial
of an interim permitted use. Interim Permitted Uses may also be subject to
special regulations as referenced in the “Additional Requirements” column.
(d) Prohibited Uses = Shaded Cells
A shaded cell indicates that the listed use is prohibited in the respective base
zoning district.
(e) Unlisted Uses
If an application is submitted for a use that is not listed in Table 5-1, the
Community Development Department is authorized to classify the new or
unlisted use into an existing Use Type that most closely fits the new or
unlisted use. If no similar use determination can be made, the use will be
considered prohibited in which case an amendment to the ordinance text
would need to be initiated to clarify if, where, and how a proposed use could
be established.
TABLE 5-1: USES BY DISTRICT
Use Types
“P” = Permitted
“C” = Conditionally
Permitted
“I” = Interim Permitted
Base Zoning Districts
Additional
Requirements A
O
R
A
R
1
R
2
T
N
R
3
R
4
M
H
B
1
B
2
B
3
B
4
C
C
D
I
B
C
I
1
I
2
Agricultural Uses
Agriculture P P P P P P P P P P P P
*SE
E
T
A
B
L
E
5
-1A
P P P 5.2(B)(1)
Agricultural Sales P 5.2(B)(2)
Community Gardens P P P P P P P P P 5.2(B)(3)
Stables C 5.2(B)(4)
CHAPTER 5: USE STANDARDS
Section 5.1 Use Table
Subsection (A) Explanation of Use Table Structure
City of Monticello Zoning Ordinance Page 317
TABLE 5-1: USES BY DISTRICT (cont.)
Use Types
“P” = Permitted
“C” = Conditionally
Permitted
“I” = Interim Permitted
Base Zoning Districts
Additional
Requirements A
O
R
A
R
1
R
2
T
N
R
3
R
4
M
H
B
1
B
2
B
3
B
4
C
C
D
I
B
C
I
1
I
2
Residential Uses 5.2(C)(1)
Attached Dwelling Types 5.2(C)(2)(a)
- Duplex P C
*SE
E
T
A
B
L
E
5-1A
5.2(C)(2)(b)
- Townhouse C P 5.2(C)(2)(c)
- Multiple-Family C P C C 5.2(C)(2)(d)
Detached Dwelling P P P P P P None
Group Residential
Facility, Single Family P P P P P 5.2(C)(3)
Group Residential
Facility, Multi-Family C C C 5.2(C)(3)
Mobile & Manufactured
Home / Home Park C C C P C 5.2(C)(4)
Civic & Institutional Uses
Active Park Facilities
(public) P P P P P P P P P P P P
*SE
E
T
A
B
L
E
5-1A
P P P None
Active Park Facilities
(private) P P P P P P P 5.2(D)(1)
Assisted Living Facilities C P C 5.2(D)(2)
Cemeteries C C C C C C C 5.2(D)(3)
Clinics/Medical Services C P P C None
Essential Services P P P P P P P P P P P P P P P None
Hospitals C P P C 5.2(D)(4)
Nursing/Convalescent
Home C C C C C C C C C P P 5.2(D)(5)
Passenger Terminal C C C C None
Passive Parks and Open
Space P P P P P P P P P P P P P P P None
Place of Public Assembly C C C C C P C 5.2(D)(6)
Public Buildings or Uses C C C C C C C P C C P P C P P 5.2(D)(7)
Schools, K-12 C C C C C C I I 5.2(D)(8)
Schools, Higher
Education C None
Utilities (major) C C C 5.2(D)(9)
Office Uses
Offices P P C P * P P P 5.2(E)
CHAPTER 5: USE STANDARDS
Section 5.1 Use Table
Subsection (A) Explanation of Use Table Structure
Page 318 City of Monticello Zoning Ordinance
TABLE 5-1: USES BY DISTRICT (cont.)
Use Types
“P” = Permitted
“C” = Conditionally
Permitted
“I” = Interim Permitted
Base Zoning Districts
Additional
Requirements A
O
R
A
R
1
R
2
T
N
R
3
R
4
M
H
B
1
B
2
B
3
B
4
C
C
D
I
B
C
I
1
I
2
Commercial Uses
Adult Uses
*SE
E
T
A
B
L
E
5-1A
P P 3.7(K)
Auction House C 5.2(F)(2)
Auto Repair – Minor C C P P 5.2(F)(3)
Automotive Wash Facilities P C 5.2(F)(4)
Bed & Breakfasts C C C C C 5.2(F)(5)
Boarding House C 5.2(F)(6)
Brew Pub P P 5.2(F)(7)
Business Support Services P P P P P None
Commercial Lodging C P P 5.2(F)(8)
Communications/Broadcasting P P P P 5.2(F)(9)
Convenience Retail C P P P 5.2(F)(10)
Country Club C 5.2(F)(11)
Day Care Centers C C P P C 5.2(F)(12)
Entertainment/Recreation,
Indoor Commercial P C C C 5.2(F)(13)
Entertainment/Recreation,
Outdoor Commercial C C C C 5.2(F)(14)
Financial Institution P C P 5.2(F)(15)
Funeral Services P P 5.2(F)(16)
Kennels (commercial) C 5.2(F)(17)
Landscaping / Nursery
Business P 5.2(F)(18)
Personal Services C P P P P P 5.2(F)(22)
Production Brewery or
Micro-Distillery without
Taproom
P P 5.2(G)(10)
Production Brewery or
Micro-Distillery with
Taproom or Cocktail Room
C C C C C 5.2(F)(24)
5.2(G)(11)
Recreational Vehicle Camp
Site C C 5.2(F)(25)
Repair Establishment C P P 5.2(F)(26)
Restaurants C P P 5.2(F)(27)
Retail Commercial Uses
(other) P P P 5.2(F)(28)
Specialty Eating
Establishments C P P P 5.2(F)(29)
CHAPTER 5: USE STANDARDS
Section 5.1 Use Table
Subsection (A) Explanation of Use Table Structure
City of Monticello Zoning Ordinance Page 319
TABLE 5-1: USES BY DISTRICT (cont.)
Use Types
“P” = Permitted
“C” = Conditionally
Permitted
“I” = Interim Permitted
Base Zoning Districts
Additional
Requirements A
O
R
A
R
1
R
2
T
N
R
3
R
4
M
H
B
1
B
2
B
3
B
4
C
C
D
I
B
C
I
1
I
2
Vehicle Fuel Sales C C C
SE
E
T
A
B
L
E
5
-1A
5.2(F)(30)
Vehicle Sales and Rental C C 5.2(F)(31)
Veterinary Facilities
(Rural) C 5.2(F)(32)
Veterinary Facilities
(Neighborhood) C C C 5.2(F)(32)
Wholesale Sales P P P None
Industrial Uses
Auto Repair – Major C
*SE
E
T
A
B
L
E
5-1A
P P 5.2(G)(1)
Bulk Fuel Sales and
Storage P P 5.2(G)(2)
Contractor's Yard,
Temporary I I I 5.2(G)(3)
Extraction of Materials I I I 5.2(G)(4)
General Warehousing C C P P 5.2(G)(5)
Heavy Manufacturing C 5.2(G)(6)
Industrial Services C P None
Land Reclamation C C C C C C C C C C C C C C C 5.2(G)(7)
Light Manufacturing P P P 5.2(G)(8)
Machinery/Truck Repair
& Sales P P 5.2(G)(9)
Recycling and Salvage
Center C C 5.2(G)(10)
Self-Storage Facilities P C P 5.2(G)(11)
Truck or Freight
Terminal C P P 5.2(G)(12)
Waste Disposal &
Incineration C 5.2(G)(13)
Wrecker Services C P 5.2(G)(14)
TABLE 5-1A: CENTRAL COMMUNITY DISTRICT (CCD) USES
Use Types
“P” = Permitted
“C” = Conditionally Permitted
“I” = Interim Permitted
Sub-Districts
Exceptions Additional
Requirements F-1 F-2 F-3 L
Brew Pub P P P P none 5.2(F)(7)
Commercial Day Care C C C C none 5.2(F)(12)
Commercial Lodging P P C none 5.2(F)(8)
County Hwy 75
Chelsea Rd
State Hwy 25
85t h St N E
9 0t h St N E
Linn St
Pine St
7th St
Scho o l B lvd
Riverview Dr
Cedar St
W River St
M
a
r
v
i
n
R
d
Jason Ave
Du nd as Rd
W Broadway St
Hart Blvd
Coun
try
La
Hau
g Ave
N
E
Elm St
W 4th St
Fen
nin
g Ave
NE
O
akw
oo
k
Dr
Mal lar d La
95th St NE
Fallon Ave
N
E
Edm
o
n
so
n
A
ve N
E
Mississippi Dr
5th St
Country Club Rd
Sandberg Rd
Pel
i
c
a
n
L
a
F a l c o n D r
Fen
nin
g Ave
Walnut St
O
ak R
id
ge
D
r
Oriole
L
a
Clu b View Rd
Broadway St
Hillc rest Rd
E River St
Headman La
M
i
l
l
T
r
a
il
L
a
Falco
n Ave
N
E
Wright StBenton St
Elwo
o
d
Rd
Ramsey St
6th St
River Mill Dr
W ildw ood Way
Hilltop Dr
Mil l Run Rd
O a k V i e w L a
Farm
ste
ad Ave
Mar tin D r
4th St E
3rd St E
Re
d
R
oc
k L
a
Gilla
rd
Ave
N
E
Maple St
Fallo n Dr
Willow St
View La E
Grey
St
on
e Ave
Marvin Elwood Rd
Fieldcrest Cir
Fairw
ay
D
r
Jason Ave NE
Vine St
M e a d o w L a
Jerry Liefert Dr
Praire Rd
Sta rl ing Dr
Palm St
Unk
no
w
n o
r
N
o
S
tr
e
et
nam
e
Fallon Ave
Golf Course Rd
Falcon Ave
Ke vin Lo ng ley D r
Craig La
Re
d
O
a
k
L
a
Front St
5th St W
Th o ma s Pa rk D r
Locust St
M o c k i n g b ir d La
W 3rd St
East
wo
o
d C
ir
Briar O aks Blv d
F
a
r
m
s
te
a
d
D
r
Henipin St
Ei
d
e
r
L
a
Dayton St
Oak La
Ri ver F ore st D r
Me ado w Oak A ve
Kampa Cir
O
a
k
R
i
d
g
e
C
i
r
Mi l l C t
Ri ver R id g e La
Garrison Ave
Oakview Ct
Du
nd
as C
ir
Ke
nn
eth
La
Otter Cree
k Rd
Minnesota St
Eagle
C
ir
Crocus La
Meadow Oak La
Stone Ridge D r
Chestnut St
1 2 0 t h S t N E
Darrow Ave NE
Diam o nd D r
Peb ble B roo k D r
W
idge
on
L
a
Washington St
Bunker C
ir
Homestead Dr
Th
o
ma
s Cir
E
n
d
i
c
o
t
t
T
r
Center Cir
Oak View Cir
Sand
tra
p C
ir
Co un try Ci r
Che yen C t
Old Territoral Rd
Tana
ger C
ir
Hillcrest Cir
O sp r ey Ct
Acorn Cir
Balboul Cir
S
w
allo
w
C
ir
Ri v e r sid e C ir
Me
ado
w
O
ak
Ct
Matthew Cir
E O a k D r
S t o n e R id g e C ir
Oakw
oo
d
D
r
Meadow Oak Ave NE County Hwy 75
Hart Blvd
Mar
vin
Rd
Marvin Rd
Wright St
90th St N E
Cedar St
Minnesota St
01
City of MonticelloOfficial Z oning Map
3-22-16
:
Leg end
BAS E Z O N IN G D ISTR IC TS
Resi dent ia l D is tric ts
-- L ow Re sid en tia l De n siti es
-- Me di um Res ide n tial De ns itie s
-- H ig h Re sid en tial De ns itie s
Bus in ess D ist ri ct s
Indu st ri al D is trict s
O TH E R
Wa ter
A-O
R-A
R-1
T-N
R-2
R-P UD
R-3
R-4
B-1
B-2
B-3
B-4
CCD
IBC
I-1
I-2
M-H
Mi ss iss ippi Wi ld, Sc eni c & R ec O verlay Dis tric t
OV E RLAY D IST RIC T S
Per f orm a n ce Ba sed O verla y Di stric t
!
!!!
!!!
Sh orela n d Dis tric t
Speci al U se O verla y Dis tric t
!
!!!
!!!
Fr eeway Bo nu s Sign D istrict
PUD s
Swan River01
Planning Commission Agenda: 04/05/16
1
3B. Community Development Director’s Report.
Planning Commission Recommendations
The City Council took the following action on March 25th as related to items on the March
agenda of the Planning Commission:
Consideration of a request for a Conditional Use Permit for Co-location of a Wireless
Telecommunication Service Antenna on a City Water tower.
Applicant: Verizon Wireless.
Council action: Council approved the Conditional Use Permit. Council also approved
the corresponding lease agreement for the antenna.