Planning Commission Agenda 06-03-2014
AGENDA
MONTICELLO PLANNING COMMISSION
REGULAR MEETING
Tuesday, June 3rd, 2014 - 6:00 PM
Mississippi Room, Monticello Community Center
Commissioners: Chairman Brad Fyle, Sam Burvee, Charlotte Gabler, Alan
Heidemann, Grant Sala
Council Liaison: Lloyd Hilgart
Staff: Angela Schumann, Steve Grittman - NAC, Ron Hackenmueller
1. Call to order.
2. Citizen Comments.
3. Consideration of adding items to the agenda.
4. Consideration to approve Planning Commission minutes.
a. Regular Meeting – April 1st, 2014
b. Regular Meeting - May 6th, 2014
5. Public Hearing – Consideration of a request for Comprehensive Plan Amendment to re-
guide land use from “Places to Shop” to “Places to Live”.
Applicant: City of Monticello
6. Public Hearing – Consideration of a request for Conditional Use Permit for Schools, K-
12 in an IBC (Industrial and Business Campus) District.
Applicant: Colosimo, Mike/Monticello Training Center, LLC
7. Public Hearing – Consideration of an amendment to Conditional Use Permit for Planned
Unit Development for an Outdoor Storage accessory use.
Applicant: A-MAX Self Storage
8. Public Hearing – Consideration of amendments to the Monticello Zoning Ordinance,
Chapters and Sections as follows:
Chapter 2, Section 3 (G) (1) – Pre-Application Conferences
Chapter 2, Section 4 (D) – Conditional Use Permits
Chapter 2, Section 2 (G) – Administrative Adjustments
Chapter 3, Section 2 (B), Table 3-1 – Base Zoning Districts
Chapter 3, Section 3 (D) (2) – Allowable Yard Encroachments
Chapter 3, Section 4(F) – R-2 Single and Two-Family Residence District
Chapter 4, Section 3 (C) – General Requirements for Fences and Walls
Chapter 4, Section 3 (G) – Prohibited Fences
Chapter 4, Section 5 – Signs
Chapter 4, Section 8 (F) – Residential District Garage Requirements
Chapter 4, Section 11 (C)(2) – Residential District Requirements, R-1 District
Chapter 5, Section 1 – Use Table, Table 5-1, Uses by District
Chapter 5, Section 2 (A) – General Regulations Applicable to All Uses
Chapter 8, Section 4 – Definitions
Applicant: City of Monticello
9. Consideration of analysis related to Interim Ordinance #590, an Interim Ordinance
Allowing Places of Public Assembly on a Temporary Basis as a Principal or Accessory
Use in a B-3(Highway Business) District.
10. Community Development Director’s Report
11.Adjourn.
MINUTES
REGULARMEETING-MONTICELLOPLANNINGCOMMISSION
Tuesday,April1st,2014-6PM,MississippiRoom,MonticelloCommunityCenter
Present:BradFyle,SamBurvee,CharlotteGabler,AlanHeidemann,GrantSala
Absent:None
Others:AngelaSchumann,RonHackenmueller,SteveGrittman,LloydHilgart,Darla
Weese,PeteHess,JoshuaLaFond,KevinPfeiffer,CharliePfeffer
1.Calltoorder
BradFylecalledthemeetingtoorderat6p.m.
2.CitizenComments None
3.Considerationofaddingitemstotheagenda None
4.ApprovalofPlanningCommissionminutes
a.SpecialMeeting–February24th,2014
CHARLOTTEGABLERMOVEDTOAPPROVETHEFEBRUARY24TH,2014
SPECIALMEETINGMINUTES.ALANHEIDEMANNSECONDEDTHE
MOTION.MOTIONCARRIED5-0.
b.SpecialJointPlanning-ParksCommissionMeeting–March4 th,2014
AstherewasnoquorumoftheParksCommission,thePlanningCommission
conductedthemeeting.Minuteswerenotyetavailableforconsideration.
c.RegularMeeting–March4th,2014
Minuteswerenotyetavailableforconsideration.
5.PublicHearing-Considerationofarequestforvariancetorequiredsideyard
setbacksintheWSRR(MississippiWildandScenicRecreationalRiver)Overlay
DistrictandtorequiredfrontyardsetbacksintheR-1(Single-FamilyResidence)
District,PlanningCaseNumber:2014-009
SteveGrittmanreportedthattheapplicantrequestedavariancefromsideandfrontyard
setbackrequirementsintheR-1(Single-FamilyResidence)DistrictandWSRR(Wild&
ScenicRiverRecreation)Districtinordertoconstructa20x30footattachedgarageon
theproperty.
PlanningCommissionMinutes:4/01/14
2
Grittmanindicatedthatthepropertymeetscriteriaforapprovalforavarianceasspecified
inSection2.4(C)oftheZoningOrdinanceinthattherearepracticaldifficultiesin
improvingthepropertyinareasonablemannerduetotheuniquelotconfigurationand
frontandsideyardsetbacksrequired.Theproposedgaragemeetssetbackrequirements
oftheShorelandOrdinanceandislocatedonthesideofthehousewhichisnotvisible
fromtheriverwhichisconsistentwiththeintentoftheWSRRdistrictregulations.
BradFyleopenedthepublichearing.
ApplicantDarleneWeese,of317RiverviewDrive,(Lot5,ManhattanLots)indicated
thatshehadrecentlymovedtoMonticelloandrequiresanattachedgarageforhealthand
safetyreasons.
ContractorPaulHesssaidthathe’dbuildthegarageinaccordancewithExhibitZ.
Astherewerenofurthercomments,thepublichearingwasclosed.
CharlotteGableraskedthatthepropertyaddresslistedinthestaffreportbecorrectedto
reflecttheactualpropertyaddress317RiverviewDriveintheminutes.
Decision1:Regardingtherequestforavariancefromsideandfrontyardsetback
requirementsintheWSRRDistricttobuildanattachedgarageontotheexistinghomeat
317RiverviewDrive
SAMBURVEEMOVEDTOADOPTRESOLUTION2014-033APPROVINGTHE
GARAGESETBACKVARIANCES,BASEDONTHEFINDINGSINSAID
RESOLUTIONANDSUBJECTTOTHECONDITIONSOUTLINEDINEXHIBITZ.
ALANHEIDEMANNSECONDEDTHEMOTION.MOTIONCARRIED5-0.
EXHIBITZ
WeeseGarageSetbackVariance
317RiverviewDrive,Lot5,ManhattanLots
.
1.Theapplicantprovidesbuildingelevationplansoftheproposedgarageforreviewby
Citystaffaspartofthebuildingpermitapplication.Elevationsshouldillustrate
buildingmaterials,garageheight,andgarageappearance.
2.Theapplicantsubmitslayoutplansorarevisedsurveyofthegarageprojectfor
reviewbyCitystaff.Therevisedsurveyshouldindicatethefollowing:
a.SitedrainageplanacceptabletotheCityEngineer.
b.Thelocationofadrivewaymeetingtheentranceoftheproposedgarage,and
areasofexistingdrivewaytoberenovated.Theapplicantshouldconsider
optionsforhowtheexistingdrivewaycanberenovatedwiththeintentof
reducingimpervioussurfaceonthesitetotheminimumextentnecessaryto
movevehiclestoandfromthelocationoftheproposedgarage.
c.Erosioncontrolmeasuresinthevicinityofthegarageproject.
PlanningCommissionMinutes:4/01/14
3
d.Landscaperestoration(lawnorlandscapeplantings)inareaswherethe
drivewayhasbeenrenovatedandgravelremoved.
e.StormwatermanagementtechniquesifrequiredbytheCityEngineer.
AsthePlanningCommissionisthefinalauthorityonvariances,thisitemwillnotmove
forwardtoCityCouncilforconsideration.
6.PublicHearing-ConsiderationofarequestforConditionalUsePermitforaK-12
SchoolinanR-1(SingleFamilyResidence)District.Applicant:HolySpirit
Academy,PlanningCaseNumber:2014-014
SteveGrittmansummarizedthatHolySpiritAcademy,aprivatelyfundedK-12school,
requestedaConditionalUsePermit(CUP)toallowthewestportionofSt.Henry’s
CatholicChurchbuildingtobeusedforschooluse.Thechurchbuildingislocatedat
1001East7thStreet,(Lot1,Block1,ChurchofSt.Henry1st Addition).
Theapplicationspecifiedamaximumstudentcapacityof100-150atthefacility.Based
oninitialenrollmentprojections,theschoolwillhavelittleornoimpactonsurrounding
landusesorpublicfacilities.Furthergrowthinenrollmentwouldnecessitateeither
significantchangestothesiteoramovetoalargerfacility.
Noexteriorphysicalmodificationstothesiteorbuildingareproposedandthereisno
conflictwithparkingcirculationorsupply,drop-offandpickuporloadingactivities.
Signagehasnotyetbeendesignedbutisintendedtomeetzoningrequirements.
TheproposedschoolusemeetstheperformancestandardsasoutlinedwithinSection
5.2.D(7)andcriteriaforapprovalforaconditionalusepermitasoutlinedwithinSection
2.4(D)(4)(a)oftheZoningOrdinance.
GrittmanindicatedthatR-1(Single-FamilyResidence)isaholdingdistrictforfacilities
whichareinstitutionalinnature.Churchesandschoolsarelistedasconditionalusesin
theR-1.
CharlotteGableraskedaboutthepreviouszoningofthisparcel.Grittmanindicatedthat
therevisedzoningordinancenolongeridentifiespublicassemblyasthebaseuse.Gabler
alsoaskedifsafetyconcernsrelatedtothelocationoftheplayfieldinproximitytothe
upcomingFallonAvenueoverpassconstructionprojecthadbeenaddressed.
BradFyleopenedthepublichearing.
ApplicantJoshuaLaFond,of1758IhrigAvenueinBuffalo,respondedtocommissioner
questionsandprovideddetailsrelatedtoplansfortheacademy.Hesaidthatroadway
safetyisnotexpectedtobeanissueasstudentswouldnotgatherwithinafootball’s
throwofthestreetandwouldbemonitoredduringoutdoorbreaks.Theacademyexpects
toinitiallyserve9th and10th gradepopulationandhasbudgetedfor20studentsatthis
time.Fundraisingeffortsmayboostenrollmentto40withinthenextfewyears.Seventy
PlanningCommissionMinutes:4/01/14
4
students,manyfromsurroundingcommunities,expressedinterestinattendingthe
academy.Staffplantoreviewbustransportationoptions.LaFondconfirmedagreement
withtheconditionsinExhibitZ.
Astherewerenofurthercomments,thepublichearingwasclosed.
ALANHEIDEMANNMOVEDTOAPPROVERESOLUTION2014-034
RECOMMENDINGAPPROVALOFTHECONDITIONALUSEPERMIT,BASED
ONFINDINGSINSAIDRESOLUTIONANDCONTINGENTONCOMPLIANCE
WITHTHOSECONDITIONSSPECIFIEDINEXHIBITZ.GRANTSALA
SECONDEDTHEMOTION.MOTIONCARRIED5-0.
ExhibitZ:ConditionsofApproval
St.Henry’sCatholicChurchConditionalUsePermit
1.AdetailedsignplanshallbesubmittedsubjectreviewbyCityStaffandsign
permit.
2.Futuresiteand/ormodificationsrelatedtoanintensificationoftheschoolor
churchuseshallrequireapprovalofconditionalusepermitamendment.
3.Internalbuildingmodificationsshallbesubjecttobuildingpermitasdeemed
appropriatebytheCityBuildingOfficial.
ThisitemwillgobeforetheCityCouncilontheconsentagendaattheApril7th meeting.
CharlotteGablerleftthemeetingat6:30p.m.duetoapreviouscommitment.
7.PublicHearing–ConsiderationofarequestforAmendmenttoConditionalUse
PermitforPlannedUnitDevelopmentforUnionCrossings6th Additionand
considerationofFinalPlatforUnionCrossings6th Addition,PlanningCase
Number:2014-004
RyanCompaniesrequestedthattheparcellocatedat4297th StreetEast(Lot2,Block1,
UnionCrossings5th Addition),besubdividedandthattheremainingparcelbepreserved
forafinaltenantontheeastendoftheUnionCrossingsshoppingcenter.Thiswillenable
RyanCompaniestoexecutealeasewiththeMarshallsretailstoreunderconstructionat
thesiteandpreparethenewlotforfuturedevelopment.
Grittmanexplainedthatthenewlotconsistsofabuildingsiteandanarrowstripof
propertywhichextendsintotheexistingparkinglot.Oddparcelshapesaretheresultof
lotlinesdrawntoaccommodatethegeneralizedratiobetweenamountoflandtheyown
andthesizeofthebuildingrequiredforeachtenant.
Therequestinvolvesidentifyingeasementsandconfirmingtheextensionandprovision
ofutilitiestotheeachsite.Theoperatingagreementistobeamendedtoaccommodate
referencestothenewparcel.Therearecurrentlynoplansunderwaytodevelopthe
parcel.
PlanningCommissionMinutes:4/01/14
5
AngelaSchumannexplainedthatinlineretaildevelopmentwasrequiredtobeconsistent
withthe2007PUDamendment.ShepointedoutthatcurrentPUDamendment
accommodatesthefinallotconfiguration.GrittmannotedthateachPUDamendment
establishesanewaddition.
BradFyleopenedthepublichearing.
LandscapearchitectKevinPfeifferrepresentingRyanCompaniessaidthattheremaining
parcelwouldbeabouthalfthesizeofthe18,000squarefootMarshallslot.Pfeiffersaid
thattheprivateoperationsagreementshouldcovercross-easementwithintheproperty
andthattheproposedpubliceasementforsanitarylinetotheundevelopedparcelwould
beremoved.Healsoindicatedthateachpropertyownerwouldberesponsibleforparking
lotmaintenancebasedonsquarefootage.PfeifferconfirmedagreementwithExhibitZ.
Astherewerenofurthercomments,thepublichearingwasclosed.
GRANTSALAMOVEDTOADOPTRESOLUTION2014-035,RECOMMENDING
APPROVALOFTHEPUDAMENDMENTANDFINALPLAT,BASEDON
FINDINGSINSAIDRESOLUTIONANDSUBJECTTOTHECONDITIONS
OUTLINEDINEXHIBITZ.ALANHEIDEMANNSECONDEDTHEMOTION.
MOTIONCARRIED4-0.
EXHIBITZ
PUDAmendmentandFinalPlatforUnionCrossings6th Addition
1429StreetEast,Lot2,Block1,UnionCrossings5th Addition
.
1.Theapplicantshallrevisetheplanstocomplywithallrecommendationsofthe
CityEngineerregardinggrading,drainage,andutilities,ifany.
2.Theapplicantshallprovidedocumentationofupdatedeasementsforpublicand
privatesewer,water,andaccesstothenewparcelsintheplat.
3.ExecuteadevelopmentagreementcoveringthetermsoftheCity’sPlatandPUD
approval.
8.PublicHearing–ConsiderationofanamendmenttotheMonticelloComprehensive
Plan,Chapter3asrelatedtoguidingprinciplesandlocationsforfuturehighdensity
housing.Applicant:CityofMonticello.PlanningCaseNumber:2014-015
SteveGrittmanpointedoutthat,althoughtheComprehensivePlan(CompPlan)
categorizesallresidentialdevelopmentas“PlacestoLive,”itdoesnotprovideguidance
forconsideringpotentialmulti-familyresidentiallanduseoptions.Herecommendedthat
amendingtheCompPlantoincorporatethefactorsandprinciplesjointlyidentifiedbythe
PlanningCommissionandCityCouncilwouldprovideaframeworkwithinwhichto
discusslocatingR-4(HighDensityResidence)zoningdistricts.
Grittmanbrieflyreviewedfactorsandrelatedissuesincludingreplacementlanduse,local
transportationnetwork,architecturalcompatibility,buildingmassing,adequatepublic
PlanningCommissionMinutes:4/01/14
6
facilities,proximitytolowerdensityresidentialneighborhoodsandproximitytoother
highdensityresidentialneighborhoods.
TheCompPlanlanguagewasproposedtobeamended(notedasunderlined)asfollows:
“Acompletehousingstockincludeshigherdensityresidentialareasthatconsistofmulti-family
housingtypessuchasapartmentsandcondominiums.Inthenearterm,theComprehensive
Plandoesnotanticipateexpandingtheexistingsupplyofhigherdensityhousing.Itislikelythat
Monticellowillneedadditionalhigherdensityhousingto:
Providehousingsuitedtotheneedsofanagingpopulation
FacilitateredevelopmentintheDowntownorinotherappropriatelocationsofthe
community
Providehousingneededtoattracttheworkforcerequiredtoachieveeconomic
developmentgoalsoftheCity
Higherdensityresidentiallandusesshouldbelocatedanddesignedtobecompatiblewith
nearbyresidentialormixeduses,onlotsabletoaccommodatelargerbuildingsandaddedtraffic
generation.Inaddition,sitingfactorsforhighdensityresidentialuseswillprioritizeaccessto
servicesandamenitiesincludingpublicutilities,parks,trailsandopenspace,andcommercial
and/ormedicalservices.Itwillbeimportant,whenconsideringpotentialdesignationofhigh
densityhousingdevelopment,thattheparcelsmeetthespecificstandardsofthezoningdistrict,
andsuchdevelopmentcanbeaccommodatedinaccordancewiththepoliciesinthisPlan.”
TherewassignificantdiscussionastothevalueofamendingtheCompPlantoinclude
theseconsiderationsasitdidnotseem,tosomecommissioners,asifitprovidedmuch
clarificationandwassubjecttointerpretation.Grittmanexplainedthatthe
ComprehensivePlanisintendedtoprovidebroadguidanceandthatthezoningordinance
wouldmorespecificallyaddressimplementation.
Itwasalsosuggestedthatonefactormaysometimesoutweighanotherdependingonsite
orotherconsiderations.GrittmanpointedoutthattheCityalwayshassomediscretion
overthelanduseplanandrezoningactions.Thisledtosomeagreementthattheproposed
amendmenttotheCompPlanincludelanguagetoclarifythatlandusedecisionswould
takeintoconsiderationbutnotbelimitedtothefactorsidentified.
Grittmanrespondedtoadditionalquestionsrelatedtogeneralzoningconsiderations,the
amountofundevelopedlandavailableforrezoningandthelevelofdemandforstep-up
multi-familyhousingdevelopment.
BradFyleopenedthepublichearing.Astherewerenocomments,thepublichearingwas
closed.
PlanningCommissionMinutes:4/01/14
7
SAMBURVEEMOVEDTOADOPTRESOLUTIONNO.2014-036,
RECOMMENDINGTHEAMENDMENTOFTHEMONTICELLO
COMPREHENSIVEPLANTOINCORPORATEFACTORSANDPRINCIPLESINTO
THECODETOMANAGEANDDIRECTTHELOCATIONSFORFUTUREHIGH
DENSITYHOUSINGAREAS,BASEDONFINDINGSINSAIDRESOLUTIONAND
TOINCLUDELANGUAGEASFOLLOWS,“WHILETHESECOMMENTSAND
THECOMMENTSINTHEZONINGORDINANCEAREINTENDEDTOBE
INSTRUCTIVE,THEYARENOTNECESSARILYTHEONLYFACTORSTHAT
MIGHTCOMEINTOPLAYONSPECIFICPROPERTIES”.GRANTSALA
SECONDEDTHEMOTION.MOTIONCARRIED3-1.(BradFylevotedinopposition
statingthattherewasn’tenoughguidancefortheR-4District.)
9.PublicHearing–ConsiderationofanamendmenttotheMonticelloZoning
Ordinance,Chapter3,Section4(I)asrelatedtoguidingprinciplesandlocationsfor
futureR-4(Medium-HighDensityResidence)zoningdistricts.Applicant:Cityof
Monticello,PlanningCaseNumber:2014-015
Grittmanexplainedthattheproposedzoningordinanceamendmentisacompaniontothe
CompPlanamendmentconsideredpriortothisitem.
TheproposedzoningamendmentwouldrevisethepurposestatementoftheR-4District
andspecifytheconditionsunderwhichtheCitywouldconsiderpotentialrezoningstothe
R-4.Thiswouldestablishstandardsforhighdensityhousingandcriteriatobeusedwhen
consideringsuchdevelopmentrequests.
Chapter3.4(I)ofthezoningordinanceisproposedtobeamended(notedasunderlined)
asfollows:
Thepurposeofthe“R-4”,medium-highdensityresidentialdistrictistoprovide
formediumtohighdensityhousinginmultiplefamilystructuresof13ormore
unitsperbuilding,andatdensitiesofbetween10and25unitsperacre.The
districtisintendedtoestablishhigherdensityresidentialopportunitiesinareas
appropriateforsuchhousing,tobedeterminedbytheCityonacasebycase
basis.TheCityofMonticelloshallzonelandtotheR-4Districtonlywhen,inits
solediscretion,allaspectsofthepropertysupportthepotentialusesoftheR-4
district,includinglocation,privateandpublicservices,andcompatibilitywith
existingandfuturelandusesinthearea.Inmakingadeterminationastothe
suitabilityofasiteforR-4rezoning,theCitywillprioritizethefollowingsiteand
areafactors:
ReplacementLandUses.R-4zoningfitsthefollowingzoningcategoriesand
circumstances:
LandalreadyzonedforR-3.
Landcurrentlyzonedforcommercialuses,butwhichwouldnotbe
considered“prime”commercial(theCitywouldliketoprotect
“prime”commercialareasthatshowthemostpromiseforthatusein
thefuture).
PlanningCommissionMinutes:4/01/14
8
ProximitytoOtherResidentialNeighborhoods.
R-4zoningmaybeallowedinproximitytoothermediumtohighdensity
residentialareas,howeverthenatureandconcentrationofexistingmulti-
familystructuresshallbecarefullyconsideredtoavoidanover
concentrationoftheseuses.
R-4zoningmaybeallowedinproximitytolowerresidentialuses,ifitis
determinedthatthehighdensitysitecanaddressthesiteandareafactors
providedhere.
ArchitecturalCompatibilityandBuildingMassing.
Inthevicinityoflowerdensityresidentialareas,R-4Districtbuildings
needtobelowerprofilewithregardstosizeandmass,orneedtobe
screenedorbufferedbydistanceandnaturalfeatures.
RequirementforAdequatePublicFacilities.Highdensityresidentialdevelopment
shallbelocatedtoprovideforthefollowingessentialservicesandamenities:
Accesstopublicparks,pathways,andopenspace,without
overburdeningthem.R-4developmentmayberequiredtoprovide
additionalfacilitiestomeettheCity’sopenspaceplanningpolicies.
Connectiontopublicutilities.
Accesstomajorstreets,orattheveryminimum,avoidanceoftraffic
generationthatwouldutilizelocalstreetsinlowerdensityresidential
areas.
Proximitytocommercialand/ormedicalservices.
Thisdistrictisintendedtoprovideexclusivelymultiplefamilyhousingasdefined
inthisordinance,asopposedtolowerdensityhousingtypessuchastownhouses,
two-familyhomes,orsinglefamilyhomes.
Grittmanpointedoutthatanapplicantwouldberequiredtohaveidentifiedaconcept
planfordevelopmentpriortosubmittingarezoningrequest.
BradFyleopenedthepublichearing.
DevelopmentbrokerCharliePfeffersuggestedthattheR-4discussionmaybe
immaterialsincethecurrentCompPlanlanguagedoesnotpointtoaneedto
developadditionalmulti-familyhousingatthistime.
Astherewerenoothercomments,thepublichearingwasclosed.
GrittmanrespondedbynotingthattheCompPlananticipatestheneedfor
additionalmulti-familyhousingmovingforwardbecausethecurrentstockis
aging.Hepointedoutthatplancallsforstep-uphousingwhichincludesan
emphasisonhigheramenitiescurrentlyunavailable.
PlanningCommissionMinutes:4/01/14
9
SAMBURVEEMOVEDTORECOMMENDORDINANCENO.594AMENDING
THER-4ZONINGDISTRICTTOINCORPORATEFACTORSANDPRINCIPLES
INTOTHECODETOMANAGEANDDIRECTTHELOCATIONSFORFUTURER-
4AREAS.ALANHEIDEMANNSECONDEDTHEMOTION.MOTIONCARRIED3-
1.(BradFylevotedinoppositionstatingthattherewasn’tenoughguidancefortheR-4
District.)
10.ConsiderationtoreviewSpecialUseOverlayDistrictlandareaanalysisandtocall
forapublichearingonrelatedamendmentstotheOfficialZoningMapfortheCity
ofMonticello
Grittmanexplainedthatlocalitiesmayregulateadultentertainmentorientedbusinesses
basedonnegativesecondaryimpactsbutarerequiredtoaccommodatesuchuseswithin
thecommunityorbesubjecttolegalchallenge.Heaskedthatthecommissioncallfora
publichearingtoreviewfindingsandobtaincitizeninputrelatedtoalandareaanalysis
recentlyconducted.ThepurposeoftheanalysisistoverifythattheCitycontinuesto
meettheintentoftheSpecialUseOverlayDistrictandthelegalrequirementsforadult
orientedusesdespitechangesintheinventoryoflotspotentiallyavailableforadultuseas
aresultofrezoningactions.GrittmanindicatedthattheCitystillseemstobein
compliancewiththeadultuserequirement.
BRADFYLEMOVEDTOCALLFORAPUBLICHEARINGONTUESDAY,MAY
6TH AT6PMTOCONSIDERAMENDMENTTOTHEOFFICIALZONINGMAP
FORTHECITYOFMONTICELLO,TOINCLUDEAMENDMENTSFORTHE
SPECIALUSEOVERLAYDISTRICT.GRANTSALASECONDEDTHEMOTION.
MOTIONCARRIED4-0.
11.CommunityDevelopmentDirector’sReport None
12.Adjournment
ALANHEIDEMANNMOVEDTOADJOURNTHEMEETINGAT7:48PM.SAM
BURVEESECONDEDTHEMOTION.MOTIONCARRIED4-0.
Recorder:KerryBurri__
Approved:
Attest:___________________________________________
AngelaSchumann,CommunityDevelopmentDirector
MINUTES
REGULAR MEETING - MONTICELLO PLANNING COMMISSION
Tuesday, May 6th, 2014 - 6 PM - Mississippi Room, Monticello Community Center
Present: Brad Fyle, Sam Burvee, Charlotte Gabler, Alan Heidemann
Absent: Grant Sala
Others: Angela Schumann, Ron Hackenmueller, Steve Grittman, Jay Moore
1. Call to order
Brad Fyle called the meeting to order at 6 p.m.
2. Citizen Comments None
3. Consideration of adding items to the agenda
Comprehensive Plan amendment (Angela Schumann)
Fleet Farm update (Charlotte Gabler)
Council action related to Swan River PUD crosswalk update (Brad Fyle)
4. Consideration to approve Planning Commission minutes
a. Special Meeting Minutes – March 4th, 2014
SAM BURVEE MOVED TO APPROVE THE MARCH 4TH, 2014 REGULAR
SPECIAL MEETING MINUTES. ALAN HEIDEMANN SECONDED THE MOTION.
MOTION CARRIED 3-0. (Charlotte Gabler abstained as she had not attended the
meeting.)
b. Regular Meeting Minutes – March 4th, 2014
ALAN HEIDEMANN MOVED TO APPROVE THE MARCH 4TH, 2014 REGULAR
SPECIAL MEETING MINUTES. BRAD FYLE SECONDED THE MOTION. MOTION
CARRIED 3-0. (Charlotte Gabler abstained as she had not attended the meeting.)
c. Regular Meeting Minutes – April 1st, 2014
The regular meeting minutes for April 1st, 2014 were unavailable at this time.
5. Public Hearing – Consideration of a request for conditional use permit for cross-
access and Preliminary and Final Plat for the Cedar Street Retail Addition, a
commercial subdivision in a B-3 (Highway Business) and B-4 (Regional Business)
District. Applicant: Oppidan. Planning Case Number: 2014-017
Planning Commission Minutes: 5/06/14
2
Steve Grittman reported that the applicant proposed to construct a 17,636 square foot
retail facility with a drive-through drop-off/donation center to be leased to Goodwill. The
development site is proposed to be located at the Cedar Street Retail Addition and is
guided Places to Shop and zoned B-3 (Highway Business District).
Oppidan requested preliminary and final plat approval and a Conditional Use Permit
(CUP) for cross access/parking. The preliminary plat combines two parcels
(155500142302, 155500142314) and subdivides another (155500142400) to create one
2.64 acre parcel. The remaining portion of the subdivided property would be platted as an
outlot for future development.
Grittman recommended approval of the preliminary plat subject to revisions delineating
required perimeter drainage and utility easements, platting of the Cedar Street right-of-
way and Dundas Road easement, and other conditions as noted in Exhibit Z.
Grittman also summarized that the cross access/parking requested meets required CUP
evaluation criteria as outlined in Section 2.4(D)(4)(a) as well as additional conditions of
approval required in Chapter 4, Section 4.8, Subsection G.(2)(iv.). Conditions of approval
are included in Exhibit Z. Grittman pointed out that the cross access/parking between
adjoining business properties will reduce the number of access drives on Cedar Street
enhancing traffic safety and facilitate vehicular circulation on the site.
In response to questions, Grittman noted that the location of this parcel would not
typically be considered an option for R-4 zoning and multi-family housing use. He also
indicated that staff had also initially questioned the proposed location of the drive though
lane on the property but had concluded that the visibility along Highway 25 was not an
aesthetic concern.
Brad Fyle opened the public hearing.
Jay Moore, representing Oppidan Investment Company of Minnetonka, described the
non-profit mission of Goodwill and responded to questions. He explained that the
location of the drive through lane is designed to increase the visibility of the donation
center because the store relies on donations as revenue. Moore noted that directional
signage will also be requested to provide for traffic control on the property. He also
acknowledged agreement with the conditions of approval listed in Exhibit Z.
As there were no further comments, the public hearing was closed.
CHARLOTTE GABLER MOVED TO ADOPT RESOLUTION 2014-048 TO
RECOMMEND APPROVAL OF THE PRELIMINARY AND FINAL PLAT, AND
CONDITIONAL USE PERMIT FOR CROSS ACCESS/PARKING BETWEEN
ADJOINING BUSINESS PROPERTIES, SUBJECT TO CONDITIONS OUTLINED IN
THE RESOLUTION. ALAN HEIDEMANN SECONDED THE MOTION. MOTION
CARRIED 4-0.
Planning Commission Minutes: 5/06/14
3
EXHIBIT Z
Conditions for Approval
Cedar Street Addition
Conditional Use Permit for Cross Parking/Access &
Preliminary Plat
1. The final plat must show required drainage and utility easements around the
perimeter of the parcel and such easements shall be dedicated to the city.
2. Encroachment agreements must be filed with the city for all areas where drive
aisles encroach on drainage and utility easements.
3. The final plat shall include the platting of the full right-of-way for Cedar Street.
4. The final plat shall include an easement through Outlot A for Dundas Road.
5. A sidewalk connection must be installed between the northeast drive access and
north property line.
6. A trail connection must be provided from the parking lot to the trail along
Highway 25.
7. Additional landscaping must be provided at the southeast corner of the property to
ensure sufficient screening of the loading area.
8. All landscaped areas must be irrigated.
9. The northeast driveway must be realigned per engineer’s requirements; if parking
spaces are removed as a result, a proof of parking area should be designated on
the site.
10. The applicant must obtain approval from easement holders for all proposed tree
and shrub plantings in easement areas.
11. Vehicular use areas on the parcel to the north must meet all required setbacks and
landscaping requirements at such time that development is proposed.
12. Future curb cut access locations between the parcel in question and the adjoining
property to the north shall be subject to review and approval by the city.
13. The proposed utility, grading, drainage, and erosion control plans are subject to
review and comment by the City Engineer. The applicant shall comply with all
recommendations of the City Engineer as provided in the comment letter dated
May 1st, 2014.
14. A shared access and maintenance agreement shall be filed by the adjoining
property owners at such time that the parcel to the north is developed.
Planning Commission Minutes: 5/06/14
4
15. The applicant shall execute a development agreement covering the terms of the
City’s Plat and CUP approval.
6. Public Hearing – Consideration of amendment to Title 10, Monticello Zoning
Ordinance, Chapter 2.4(P) – Specific Review Requirements, Planned Unit
Developments and Section 2.3 (I) relating to written notification for Planned Unit
Development applications, Planning Case Number: 2014-023
Grittman summarized that, in working through the Planned Unit Development (PUD)
process in place, staff had identified various issues which require further review and
revision. He briefly described ordinance amendments proposed to address these issues.
Staff proposed that written notification requirements for PUD applications be changed to
350 feet to be consistent with statutory notification requirements and all other City land
use application notification requirements.
Other proposed amendments to the text of 2.4(P) are listed below:
P (1) The collaborative process is replaced as moved to the Concept Stage
review – more about this change below.
P (3) Notation related to existing PUDs
P (4) Clarify that PUD may be used in any zoning district.
P (7) Reword the public values discussion as a more generalized example, and
restate the purpose of PUD design.
P (7)(e)/(g)/(j) Clearer wording
P (7)(l) Added item to specify that PUD development intensity is intended to
reflect the capacity of the land and services – possibly more, possibly less.
P (8)(b) Deletes the reference to road width as a specific PUD flexibility option –
the City has standard road width requirements based on public safety.
Road width may become an element qualifying for flexibility, but the
applicant should prove it in the design.
P (8)(b) (New) Adds some examples of flexibility by PUD, and makes the
consideration of flexibility discretionary (“may”), rather than mandatory
(“shall”).
P (9)(a) Eliminates this section on Collaborative process, moving the process and
requirements to the Concept Stage (and partially into the Development
Stage).
P (9)(a) PUD Concept Plan. This text incorporates a role for the collaborative
process at Concept Plan stage, and adds the public values requirements
here. In addition, the neighborhood meeting is specifically made optional.
Further creates a list of requirements or objectives for the Concept Plan,
which includes public hearing and comment. One of the issues raised by
the current code is the creation of a set of objectives for the PUD prior to
public hearing and comment – a potential skirting of zoning requirements
which require public comment opportunity.
P (9)(a)(iii) 4. Adds a requirement that the applicant identify development objectives
Planning Commission Minutes: 5/06/14
5
(a part of the collaborative process).
P (9)(a)(iii) 9. Adds a requirement that the applicant identify the areas in which he/she
proposes to vary from the standard zoning requirements as a part of the
application submission.
P (9)(a)(iv) 3. Adds a requirement for a public hearing at the Concept Stage review.
This hearing incorporates public notice into the early stages of the process,
and avoids later claims that the project has been too extensively developed
to change after public comment.
P (9)(b) Renames the Preliminary Plat stage as PUD Development Stage,
Preliminary Plat, and Rezoning. These are three applications being
considered after Concept review has occurred, and establish the working
development rights for the project. Staff had considered removing the plat
language from the code, but instead it is left here, essentially requiring that
PUD projects occur on platted land. The Development Stage PUD plans,
the Preliminary Plat, and the Rezoning to PUD would occur concurrently
at this stage.
P (9)(b)(iv) 3. Incorporates a requirement that staff generates a Public Values
Statement from the Concept Stage discussions, and it is then to be
considered by the Planning Commission (and then City Council) as an
initial part of the Development Stage review.
P (9)(b)(iv) 5. Rewords the findings criteria for internal consistency.
P (9)(b)(iv) 6. Adds note to this process section that directs the staff to prepare a
rezoning ordinance for review, but specifies that rezoning adoption would
be subsequent to Final Stage PUD approval.
P (9)(c) Final Stage PUD and Final Plat – requires conformance with the
Development Stage PUD and Preliminary Plat approvals, and deletes the
repealer provision on the zoning (since the zoning will not have happened
unless all other approvals are granted).
P (9)(c)(iii) Various clarifications on consistency and requirements.
P (9)(c)(iv) Adds clarification that the Final Stage PUD and Final Plat will be
reviewed and approved by the City Council, rather than the implied staff
review only. Provides that the Council may refer the Final Stage back to
the Planning Commission if appropriate.
P (10)(b) Specifies that a “PUD Adjustment” shall be treated as a change to the
Final PUD and will follow that process.
P (11) Cancellation would occur upon specific findings, including those
identified in this new language.
While many of the issues noted were housekeeping details proposed to refine the PUD
ordinance language for clarity and consistency, several were process related.
The City Attorney had recommended streamlining the current multi-stage PUD
application process to meet the 60 day legal requirement. One significant process related
amendment removes the concept review from the application process. This not only
shortens the PUD timeline but also invites public engagement before decisions are made.
Those who own property within the affected area would receive a concept review
Planning Commission Minutes: 5/06/14
6
meeting notice. The concept review meeting would differ from a public hearing in that no
action would be taken. Staff also proposed amending the PUD ordinance to conduct
processes concurrently as appropriate in view of process timeline requirements.
Brad Fyle opened the public hearing. As there were no comments, the public hearing was
closed.
CHARLOTTE GABLER MOVED TO ADOPT RESOLUTION 2014–049
RECOMMENDING APPROVAL OF THE AMENDMENTS TO SECTION 2.3 AND
2.4, REVISING THE PROCESS AND REQUIREMENTS FOR PUD IN THE
MONTICELLO ZONING ORDINANCE AND DIRECTING STAFF TO PREPARE AN
ORDINANCE FOR ADOPTION, BASED ON FINDINGS IN SAID RESOLUTION.
ALAN HEIDEMANN SECONDED THE MOTION. MOTION CARRIED 4-0.
7. Public Hearing – Consideration to recommend for the adoption the 2014 City of
Monticello Official Zoning Map
Angela Schumann provided an overview of the proposed 2014 City of Monticello
Official Zoning Map and noted the following inclusions:
Rezoning Actions
o Ordinance #581 - Rezoning 108 Cedar Street from R-2 to CCD, F-2
o Ordinance #589 - Rezoning 101 Chelsea Road from B-2 to B-4
Special Use Overlay District
o Boundary update
Shoreland District
o Boundary set by state
o Companion map including shoreland and floodplain boundaries adopted by
reference
Wild and Scenic Recreational River District
o Boundary set by state
Brad Fyle opened the public hearing. As there were no comments, the public hearing was
closed.
CHARLOTTE GABLER MOVED TO ADOPT RESOLUTION 2014-047
RECOMMENDING THE ADOPTION OF THE 2014 CITY OF MONTICELLO
OFFICIAL ZONING MAP, INCLUDING SHORELAND/FLOODPLAIN
COMPANION MAP. SAM BURVEE SECONDED THE MOTION. MOTION
CARRIED 4-0.
Planning Commission Minutes: 5/06/14
7
8. Consideration of items added to the agenda
Comprehensive Plan amendment (Angela Schumann) – At their April 28th meeting,
the City Council directed the Planning Commission to call for a public hearing to
consider a Comprehensive Plan amendment to reguide a parcel on the northeast
quadrant of County Road 18 and Meadow Oak Avenue from Places to Shop to Places
to Live. This amendment will be included as part of the June commission agenda.
Fleet Farm update (Charlotte Gabler) – Mills Fleet Farm has been notified that the
two year extension of their Conditional Use Permit (CUP) expired in August 2013.
Because Fleet Farm had, however, submitted applications consistent with a final stage
approval, it has a valid PUD which involves an expiration timeline that differs from
that of a CUP. Any substantive changes to the project require a replat and PUD
amendment.
Council action related to Swan River PUD crosswalk update (Brad Fyle) – The City
Council approved locating the crosswalk at the intersection of Maple and 5 ½ Street
as per the City Engineer’s recommendation for pedestrian safety, rather than at mid-
block, as had been proposed. Council also required that turf be utilized from the front
line of the building forward to the street for aesthetic reasons, rather than native
landscaping as had been proposed.
9. Adjournment
SAM BURVEE MOVED TO ADJOURN THE MEETING AT 7:12 PM. ALAN
HEIDEMANN SECONDED THE MOTION. MOTION CARRIED 4-0.
Recorder: Kerry Burri __
Approved:
Attest: ___________________________________________
Angela Schumann, Community Development Director
Planning Commission Agenda – 06/03/2014
1
5. Public Hearing – Consideration of a request for an amendment to the
Comprehensive Land Use Plan, changing a parcel from Places to Shop
(Commercial) to Places to Live (Residential) Applicant: City of Monticello. (NAC)
Property: Legal: Outlot A, Monticello Commerce Center Seventh
Addition
Address: NA
Planning Case Number:
A. REFERENCE & BACKGROUND
Request(s): Land Use Plan Amendment from Places to Shop
(Commercial) to Places to Live (Residential)
Deadline for Decision:
Land Use Designation: Places to Shop
Zoning Designation: B-4, Regional Business District
The purpose of the “B-4” regional business district is to
provide for the establishment of commercial and
service activities which draw from and serve customers
from the entire community or region.
Overlays/Environmental
Regulations Applicable: Freeway Bonus Sign Overlay District
Current Site Use: Vacant/Agriculture
Surrounding Land Uses:
North: I-94
East: Freeway Fields Park / Single Family Residential
(Southeast)
South: Church
West: Stormwater Pond/County Highway 18
Project Description: On April 28th, 2014, the City Council called for a
hearing on the amendment to consider whether the
subject 12.7 acre site could be appropriate for “Places
to Live” in relationship to the development of multiple
family residential units on the property, pursuant to the
recent adoption of the R-4, Multiple Family Residential
Planning Commission Agenda – 06/03/2014
2
zoning district and policy discussions on possible sites
for the new district.
ANALYSIS
When considering an amendment to the Comprehensive Land Use Plan, the
City reviews a series of common criteria. The City’s zoning ordinance
identifies specific criteria in Section 2.4 (A)(5), as follows:
(5) Approval Criteria
Recommendations and decisions on Comprehensive Plan amendments shall be
based on consideration of the following criteria:
(a) Whether the proposed amendment corrects an error or addresses the need
resulting from some changing condition, trend, or fact arising since the
adoption of the Comprehensive Plan;
(b) Whether the proposed amendment is consistent with the guiding principles of the
Comprehensive Plan;
(c) The extent to which the proposed amendment addresses a demonstrated
community need;
(d) Whether the proposed amendment will protect the health, safety, morals, and
general welfare of the public;
(e) The impacts on the natural and built environments, including air, water, noise,
stormwater management, wildlife habitat, water quality, vegetation, drainage,
streets, and other engineering design or environmental factors;
(f) Whether the proposed amendment is compatible with existing and proposed uses
surrounding the subject property; whether the proposed design and land uses are
appropriate for the land; and whether the proposed amendment will maintain or
improve compatibility among uses and ensure efficient development within the
City;
(g) Whether the proposed amendment will result in a logical, orderly and predictable
development pattern; and
(h) Whether the proposed amendment is consistent with the purpose of this
ordinance.
In reviewing these criteria, staff offers the following comments:
(a) Changing Conditions.
The R-4 zoning district, accommodating higher density development, was adopted
in early 2013, five years after the Comprehensive Plan was fully updated. During
that period, the City became aware of the potential need for zoning regulations
that would permit the possibility of higher density development than that
anticipated in the general land use plan and zoning at the time. In considering
the amendment, the City found that multiple family development could be a
beneficial land use component of the City’s housing stock, provided it was
developed in a way that required high levels of development quality and site
amenities.
Planning Commission Agenda – 06/03/2014
3
In 2014, the City adopted amendments to both the R-4 zoning district and the
Comprehensive Plan identifying site characteristics and parameters that would
potentially accommodate multiple family housing. While no sites were selected
during that amendment process, the City acknowledged that the conditions
leading to the original Comprehensive Plan land use pattern have changed in two
ways – market conditions, and adequate regulatory requirements that would
ensure compatibility with other Comp Plan goals, including assurances of high-
quality development.
(b) Consistency with Guiding Principles.
The Comprehensive Plan includes, as one of its primary objectives, a baseline
requirement that going forward, new housing opportunities will be accompanied
by higher levels of development, site, and architectural quality and amenities,
leading to step-up housing choices in all categories. The Comprehensive Plan
also anticipates the need for a broad range of housing choice for its current and
future population as housing formation and family status needs changes over
time.
At the time of adoption of the Comprehensive Plan in 2008, zoning regulations
could not ensure that higher density housing allowances would meet this
principle, and as such, the subsequent update to the zoning regulations capped
housing density at a relatively low figure. With the adoption of the R-4 district,
the City is able to accommodate higher densities – in fact, capitalize on the
development opportunities that higher densities provide – to ensure consistency
with its goal of increased housing quality. In this way, a change to Places to Live
on the subject site would accommodate a zoning regime that would continue to
meet the Comp Plan principles.
(c) Community Need.
The proposed amendment would facilitate zoning consideration of high density
residential development. Because of the location of the proposed land use
change, lower densities would be inappropriate, bounded as the site is by
freeway, major collector (CSAH 18) and minor collector (Meadow Oak Avenue).
Market need is a consideration best established by private interests. However,
community need is addressed by multiple family housing in a number of ways.
First, young adults – an integral component of the community’s long term health
– often seek multiple family housing prior to making a decision to purchase
owner-occupied housing. This can be due to financial considerations, job status,
or many other factors. A lack of high quality rental options will result in the loss
of this demographic – many of whom may have grown up in the community but
leave due to lack of housing choice.
Planning Commission Agenda – 06/03/2014
4
Additionally, quality multiple family options are often attractive to both working
and retired adults who do not wish to maintain single family home ownership
responsibilities, particularly if travel (for job or recreation) takes them away from
the community for extended periods. The community’s current rental housing
stock does not adequately address this market, and losing this demographic
means the loss of a significant level of wealth.
Finally, quality rental housing is attractive to businesses and industries that wish
to provide higher-paying jobs, and can be an important component in the City’s
economic development planning. If the community does not have this housing
available, businesses may be reluctant to recruit these jobs to the area.
(d) Health, Safety, and Welfare.
The proposed change is unlikely to impact this issue, provided a potential project
adheres to the zoning regulations established by the R-4 District, and the related
objectives of the Comprehensive Plan.
(e) Impacts of Development on Environment and Infrastructure.
The subject property has been planned for development for many years.
Infrastructure in the area, including utilities and stormwater facilities, have been
developed anticipating commercial development – high levels of site coverage,
traffic, lights, building massing, and visibility. The site has been used for
agricultural purposes in the interim period, with no significant environmental
conditions evident. Traffic routing in the area, included the construction of a
roundabout at Meadow Oak Avenue and CSAH 18 to accommodate both south-
bound and north-bound turns for traffic to and from Meadow Oak. With the
closing of the east-bound freeway access from Meadow Oak a few years ago,
most traffic using this site is anticipated to flow to and from the west, through the
roundabout, regardless of land use.
(f) Land Use Compatibility.
Land Use Compatibility is an issue of greatest impact when high-intensity uses
abut - or create impacts affecting - low-intensity uses, and those impacts cannot
be mitigated by on or off-site improvements. In considering a change from
commercial uses to residential uses, it is important to understand what the
current land use would accommodate, and how those contrast with the potential
development under a new land use category.
As a commercial site zoned B-4, the 12.7 acre parcel near a freeway interchange
could accommodate commercial development that includes hotel, restaurant,
retail and office projects as permitted uses. A site of this size could accommodate
a mix of commercial development, for example, a combination of a 100 room
hotel, a fast-food restaurant, and more than 15,000 square feet of retail space.
Planning Commission Agenda – 06/03/2014
5
Building height is permitted to 30 feet, with greater height by Conditional Use
Permit. For a development of this scope, the site would likely entail 80% to 85%
impervious surface. Traffic generation from the Institute of Transportation
Engineers (ITE) manual would be estimated to be in the range of 2,500 - 3,000
daily trips from the site to the adjacent street. More intense commercial
development would also be possible, under various zoning regulations and
allowances.
If the site were to be re-guided for residential, then developed under an R-4
zoning district, the 12.7 acre parcel would accommodate a maximum of about 300
residential units. Under this zoning designation, impervious surfaces (buildings
and drive/parking areas) would cover up to about 60% of the site. Trip
generation for apartment projects of this type are estimated to average about
2,100 trips per day. The R-4 district imposes greater restrictions on both building
and parking setbacks than commercial districts, greater green space requirements
in the front yard adjoining the street, and half of its required parking to be
underground.
In considering compatibility, land use “transition” is also a common factor.
Under a land use amendment as proposed, commercial and industrial district
uses would then all be located west and north of CSAH 18, transitioning on this
site to higher density residential, with lower density residential uses to the south
and east. The neighborhood is also marked by significant areas of institutional or
public use, including church, schools, and parkland.
(g) Logical, Orderly Development Pattern.
The proposed site is relatively isolated from other development land.
As noted above, the site is surrounded by, primarily, public or institutional land
uses, and major roadways. Single family housing is located to the southeast of
the site, across Meadow Oak Avenue, but primarily utilizes a separate local street
system for its direct access. The R-4 District will have the potential for additional
pedestrian activity in the area, especially crossing CSAH 18. With the
construction of the roundabout, pedestrian accommodations and safety was
greatly improved. By providing access across CSAH 18 pedestrians can utilize the
pedestrian facilities to the west and across I-94 to the north. In considering
development pattern, the Planning Commission and City Council recently added
language to the R-4 District that summarizes potential factors for rezoning
property to the R-4 district, which could be a subsequent consideration if the land
use change is approved. Those factors are:
Replacement Land Uses. R-4 zoning fits the following zoning categories and
circumstances:
• Land already zoned for R-3.
• Land currently zoned for commercial uses, but which would not be
considered “prime” commercial (the City would like to protect
Planning Commission Agenda – 06/03/2014
6
“prime” commercial areas that show the most promise for that use in
the future).
Proximity to Other Residential Neighborhoods.
• R-4 zoning may be allowed in proximity to other medium to high
density residential areas, however the nature and concentration of
existing multi-family structures shall be carefully considered to avoid
an over concentration of these uses.
• R-4 zoning may be allowed in proximity to lower residential uses, if it
is determined that the high density site can address the site and area
factors provided here.
Architectural Compatibility and Building Massing.
• In the vicinity of lower density residential areas, R-4 District buildings
need to be lower profile with regards to size and mass, or need to be
screened or buffered by distance and natural features.
Requirement for Adequate Public Facilities. High density residential
development shall be located to provide for the following essential services
and amenities:
• Access to public parks, pathways, and open space, without
overburdening them. R-4 development may be required to provide
additional facilities to meet the City’s open space planning policies.
• Connection to public utilities.
• Access to major streets, or at the very minimum, avoidance of traffic
generation that would utilize local streets in lower density residential
areas.
• Proximity to commercial and/or medical services.
These factors would tend to support the suggestion that amending the land use
designation for the proposed site would further a logical and orderly development
pattern.
(h) Consistent with the Purpose of the Zoning Ordinance.
The purpose of the zoning ordinance is to regulate land use in a way that allows
property owners to make reasonable and beneficial use of their land, but ensure
that such use does not create an undue burden on the public or the private use
and enjoyment of surrounding properties. In urban and suburban areas, there
are a wide variety of land uses, often in close proximity – this is one of the
advantages of owning or occupying property in such a community. It is not
reasonable to expect that those uses will create zero impacts – the test is whether
the impacts are reasonably expected. In this case, the impacts would appear to be
lessened by changing the land use as proposed. The systems in place, which were
designed to accommodate commercial uses, should be able to facilitate a lower-
Planning Commission Agenda – 06/03/2014
7
impact development that would be expected under a residential scenario – even a
high-density development.
B. ALTERNATIVE ACTIONS
1. Motion to adopt Resolution 2014-059 recommending approval of an amendment
to the Monticello Comprehensive Plan changing the land use designation on the
subject parcel from Places to Shop to Places to Live.
2. Motion to deny adoption of Resolution 2014-059, based on findings to be made
by the Planning Commission.
C. STAFF RECOMMENDATION
Staff is supportive of the amendment, based on the findings and review criteria
presented in this report, as collected from the statements of the Comprehensive Plan,
Zoning Ordinance, and recent land use policy discussions at both Planning
Commission and City Council level. The only concern in this regard relates to the
status of the particular parcel of commercial land, and whether it constitutes “Prime”
Commercial. This is a relative term, and with freeway frontage and access, it could
be viewed as such. However, much of the focus on commercial land preservation
was on those parcels that front on Highway 25, rather than this site, and indeed, this
parcel was considered in the R-4 policy discussions as one that might qualify for a
residential designation.
In considering land use changes, amendments to the Comprehensive Plan require a
4/5 vote of the City Council to proceed. If a rezoning action is eventually considered
for the property, a simple majority is necessary to rezone land from commercial to
residential zoning. As an advisory body, the Planning Commission may forward its
recommendation regardless of vote count.
D. SUPPORTING DATA
A. Resolution 2014-059
B. Aerial Image of Subject Property
C. Land Use Map, Subject Property Illustration
D. Comprehensive Plan, Chapter 3
E. Comprehensive Plan, Chapter 2, Housing Type excerpt
F. Comprehensive Plan Amendments of April 28th, 2014 (Resolution 2014-036)
G. City Council Minutes, 4/28/14
CITYOFMONTICELLO
WRIGHTCOUNTY,MINNESOTA
PLANNINGCOMMISSION
RESOLUTIONNO.2014-059
MotionBy:SecondedBy:
ARESOLUTIONOFTHEMONTICELLOPLANNINGCOMMISSION
RECOMMENDINGAMENDMENTOFTHEMONTICELLOCOMPREHENSIVE
LANDUSEPLAN,REGUIDINGTHESUBJECTPROPERTYFROMPLACESTO
SHOP(COMMERCIAL)TOPLACESTOLIVE(RESIDENTIAL)
WHEREAS,theCityofMonticelloconsidersthedevelopmentofmultiplefamilyresidential
housingtobeapotentialassettotheCity’shousingstock;and
WHEREAS,theCityhasrecentlyupdatedzoningregulationsrelatingtomultiplefamily
residentiallanduses;and
WHEREAS,thedevelopmentofnewmultiplefamilyhousingwillrequireamendmentsto
theCity’slanduseplanandzoningmap;and
WHEREAS,theCityfindsthatthedesignationofoneormoresitesforsuchalandusemay
facilitatethedevelopmentofmultiplefamilyhousinginaccordancewiththeCity’splansand
regulations;and
WHEREAS,thePlanningCommissionheldapublichearingonJune3,2014onthe
applicationandtheapplicantandmembersofthepublicwereprovidedtheopportunityto
presentinformationtothePlanningCommission;and
WHEREAS,thePlanningCommissionhasconsideredallofthecommentsandthestaff
report,whichareincorporatedbyreferenceintotheresolution;and
WHEREAS,thePlanningCommissionoftheCityofMonticellomakesthefollowing
FindingsofFactinrelationtotherecommendationofapproval:
1.There-guidingofthesubjectpropertyaddressesaconditioninthecommunitythat
haschangedsincetheadoptionofthecurrentcomprehensiveplan;
2.Theproposedamendmentisconsistentwiththeguidingprinciplesofthe
comprehensiveplaninthathigh-qualityhousingisencouraged,andrequired,under
theCity’slanduseregulations;
2
3.Theproposedamendmentaddressesacommunityneedthroughtheprovisionsofa
broaderrangeofhousingopportunitiesmeetingthequalitystandardsoftheCity’s
zoningregulations;
4.TheproposedamendmentwillnotnegativelyimpacttheCity’shealth,safety,or
welfarethroughadherencetotheapplicablezoningandbuildingstandards;
5.Theproposedamendmentwillnotnegativelyimpactthebuiltornaturalenvironment
oftheCity,andcanbeservedbyexistingCityserviceandinfrastructureinthe
immediatevicinity;
6.Theproposedamendmentisconsistentandcompatiblewithsurroundinglanduses,
whichconsistprimarilyofpublicandinstitutionaluses,aswellashigh-volume
roadways;
7.Theproposedamendmentfurthersalogicalandorderlydevelopmentpatternby
capitalizingontheexistinglanduseandpublicserviceinfrastructure,andavoiding
impactstolessintenselanduses.
8.Theproposedamendmentisconsistentwiththepurposeofthezoningordinance,
whichistobothpermitandregulatelanduseinafashionthatprovidesample
opportunityforpropertyownerstoutilizetheirpropertyinabeneficialmanner,while
avoiding,minimizing,and/ormitigatingpotentialnegativeimpactsonsurrounding
lands.
NOW,THEREFORE,BEITRESOLVED,bythePlanningCommissionoftheCityof
Monticello,Minnesota,thisamendmentisrecommendedforapprovalbytheCityCouncil.
ADOPTED this3rd dayofJune,2014,bythePlanningCommissionoftheCityof
Monticello,Minnesota.
MONTICELLOPLANNINGCOMMISSION
By:_______________________________
BradFyle,Chair
ATTEST:
____________________________________________
AngelaSchumann,CommunityDevelopmentDirector
Comprehensive Plan Amendment to re-guide land use from “Places to Shop” to “Places to Live”
Outlot A, Monticello Commerce Center, Seventh Addition, PID: 155196000010
Subject
Property
Mboe!Vtf
3
Uif!gvuvsf!wjtjpo!gps!Npoujdfmmp!qspwjeft!uif!gpvoebujpo!gps!uif!
Dibqufs!Dpoufout
Mboe!Vtf!Qmbo-!jo!uvso-!qspwjeft!uif!gsbnfxpsl!gps!ipx!mboe!xjmm!cf!vtfe!
Gvuvsf!Hspxui!////////////////////////////4.3
Hspxui!Qpmjdjft!////////////////////////4.3
up!sfjogpsdf!eftjsbcmf!mboe!vtf!qbuufsot-!jefoujgz!qmbdft!xifsf!dibohf!jt!
Mboe!Vtf!Qmbo!Nbq!////////////////////4.4
offefe!boe!hvjef!uif!gpsn!boe!mpdbujpo!pg!gvuvsf!hspxui/
Mboe!Vtf!Dbufhpsjft!/////////////////4.4
Qmbdft!up!Mjwf!/////////////////////////////4.6
jodmvejoh;
Qmbdft!up!Xpsl!///////////////////////4.21
Qmbdft!up!Tipq!////////////////////////4.24
!Dpnnvojuz!joqvu!hbuifsfe!uispvhi!qvcmjd!xpsltipqt!boe!Ubtl!Gpsdf!
Epxoupxo!//////////////////////////////4.24
ejtdvttjpot/
Njyfe!Vtf!///////////////////////////////4.26
!
Qmbdft!up!Sfdsfbuf!/////////////////4.26
Qmbdft!gps!Dpnnvojuz!//////////4.26
!
Vscbo!Sftfswf!///////////////////////4.27
!Gbdupst!eftdsjcfe!jo!uif!Dpnnvojuz!Dpoufyu!dibqufs!pg!uif!Qmbo/
Joufsdibohf!Qmboojoh!Bsfb!/4.27
Qsjwbuf!Jogsbtusvduvsf!///////////4.27
!Tztufnt!qmbot!gps!usbotqpsubujpo-!tbojubsz!tfxfs!boe!xbufs!tvqqmz/
Hsffoxbz!!///////////////////////////////4.27
Gpdvt!Bsfbt!//////////////////////////////4.28
Opsuixftu!Npoujdfmmp!//////////4.28
Gsbnfxpsl!tfdujpo/!!Uif!2::7!Qmbo!eftdsjcfe!Npoujdfmmpt!mboe!vtf!
Epxoupxo!Gpdvt!Bsfb!////////4.2:
qmbo!cz!hfofsbm!ejtusjdu!pg!uif!dpnnvojuz!bt!b!nfbot!pg!buufoejoh!up!uif!
Tpvui!Dfousbm!Gpdvt!Bsfb!///4.33
Fbtu!Gpdvt!Bsfb!/////////////////////4.34
Qmbo!ftubcmjtift!b!tfqbsbuf!mboe!vtf!dibqufs!dpotjtujoh!pg!uif!gpmmpxjoh!
Fncsbdjoh!Epxoupxo!Qmbo!
dpnqpofout;
xbt!bepqufe!cz!Djuz!Dpvodjm!
sftpmvujpo!3123.122!po!Kbovbsz!:-!
!B!tfdujpo!po!Gvuvsf!Hspxui!eftdsjcft!uif!jnqmjdbujpot!pg!gvuvsf!
3123!boe!jt!jodpsqpsbufe!ifsfjo!bt!
sftjefou!hspxui!boe!uif!bnpvou!pg!hspxui!boujdjqbufe!cz!uif!Qmbo/
bo!bqqfoejy!pg!uif!Dpnqsfifotjwf!
!Mboe!Vtf!Qmbo!Nbq!)tff!Gjhvsf!4.3*!tipxt!uif!mboe!vtft!bttjhofe!
Qmbo/!
up!fbdi!qbsdfm!pg!mboe/
!Mboe!Vtf!Dbufhpsjft!gvsuifs!fyqmbjo!uif!Mboe!Vtf!Qmbo!cz!eftdsjcjoh!
qpmjdjft!eftdsjcf!uif!pckfdujwft!uibu!Npoujdfmmp!tfflt!up!bdijfwf!
uispvhi!uif!jnqmfnfoubujpo!pg!uif!Mboe!Vtf!Qmbo!boe!uif!tvqqpsujoh!
fmfnfout!pg!uif!Dpnqsfifotjwf!Qmbo/
!Gpdvt!Bsfbt!qspwjef!b!npsf!efubjmfe!ejtdvttjpo!pg!dibsbdufsjtujdt-!
hpbmt!boe!qpmjdjft!gps!lfz!bsfbt!pg!uif!dpnnvojuz/
3119!Dpnqsfifotjwf!QmboMboe!Vtf!!}!!4.2
Gvuvsf!Hspxui
Gjhvsf!4.2;!Hspxui!Usfoet!boe!Qspkfdujpot
Jo!mppljoh!up!uif!gvuvsf-!Npoujdfmmp!nvtu!opu!kvtu!
dpotjefs!uif!rvbmjujft!pg!uif!gvuvsf!dpnnvojuz-!cvu!bmtp!
uif!obuvsf!pg!hspxui/!!Bttvnqujpot!bcpvu!uif!bnpvou!
boe!qbdf!pg!gvuvsf!hspxui!bsf!jnqpsubou!qbsut!pg!uif!
gpvoebujpo!gps!uif!Dpnqsfifotjwf!Qmbo/!!Hspxui!ibt!
tfwfsbm!jnqpsubou!jnqmjdbujpot!gps!uif!Dpnqsfifotjwf!
Qmbo;
!Hspxui!qspkfdujpot!bsf!vtfe!up!qmbo!gps!uif!dbqbdjuz!
pg!nvojdjqbm!vujmjuz!tztufnt/
!Hspxui!qspkfdujpot!bsf!vtfe!up!dsfbuf!boe!nbobhf!
!Uif!tdippm!tztufn!vtft!hspxui!qspkfdujpot!up!
gpsfdbtu!fospmmnfout!boe!up!qmbo!gps!qsphsbnt!boe!
gbdjmjujft/
4.2!!tipxt!uif!qspkfdujpo!pg!gvuvsf!sftjefoujbm!hspxui!
!Nbslfu!tuvejft!vtf!hspxui!qspkfdujpot!up!bobmz{f!
bttvnfe!jo!uif!Dpnqsfifotjwf!Qmbo/!!
uif!qpufoujbm!gps!mpdbujoh!ps!fyqboejoh!cvtjofttft!
jo!Npoujdfmmp/
!
pg!mboe!offefe!up!tvqqpsu!uijt!efwfmpqnfou/
gbmmt!cfmpx!uif!33:!vojut0zfbs!bwfsbhf!gps!3112!uispvhi!
!Hspxui!beet!usjqt!up!uif!mpdbm!tusffu!tztufn/
!Bttvnqujpot!bcpvu!hspxui!jogmvfodf!uif!
gbdupst/!!Npoujdfmmp!xjmm!sfnbjo!b!eftjsbcmf!qmbdf!up!
qpmjdjft!boe!bdujpot!offefe!up!jnqmfnfou!uif!
mjwf-!buusbdujoh!cpui!cvjmefst!boe!sftjefout/!!Ipvtjoh!
Dpnqsfifotjwf!Qmbo/!!
nbslfu!dpoejujpot!xjmm!jnqspwf!gspn!uif!xfblofttft!
fyqfsjfodfe!jo!3117!boe!3118/!!!B!dpncjobujpo!
Gps!uiftf!sfbtpot-!ju!jt!fttfoujbm!uibu!uif!Dpnqsfifotjwf!
pg!nbslfu!dpoejujpot-!mpdbm!qpmjdz!pckfdujwft-!boe!
Qmbo!tubuf!bttvnqujpot!pg!uif!obuvsf!pg!gvuvsf!hspxui/!!B!
dibohjoh!efnphsbqijdt!nbz!sfevdf!uif!qpufoujbm!gps!
dibmmfohf!jo!gpsfdbtujoh!gvuvsf!sftjefoujbm!efwfmpqnfou!
bdijfwjoh!boe!tvtubjojoh!ijhifs!sbuft!pg!sftjefoujbm!
dpouspm-!uif!gbdupst!uibu!efufsnjof!xifsf!qfpqmf!mjwf/!!
bdijfwjoh!uif!pckfdujwft!pg!uif!Dpnqsfifotjwf!Qmbo-!jo!
qbsujdvmbs!tffljoh!npsf!npwf!vq!ipvtjoh-!xjmm!sftvmu!
!Rvbmjuz!pg!mjgf/
jo!mftt!efwfmpqnfou!uibo!jo!qsfwjpvt!zfbst/!!!!
!Bddftt!up!fnqmpznfou/
Hspxui!Qpmjdjft
!Bwbjmbcjmjuz!pg!eftjsfe!ipvtjoh!boe!ofjhicpsippe!
pqujpot/2/!
usfoet!boe!vqebuf!hspxui!qspkfdujpot!up!tfswf!bt!b!
!
cbtjt!gps!qvcmjd!boe!qsjwbuf!qmboojoh/
!Dpnqfujujpo!gspn!puifs!qmbdft!jo!uif!sfhjpo/
3/!Pwfs!uif!mjgf!pg!uijt!Dpnqsfifotjwf!Qmbo-!hspxui!
xjmm!pddvs!xjuijo!uif!cpvoebsjft!pg!uif!dvssfou!
Hjwfo!uiftf!vodfsubjoujft-!uif!Dpnqsfifotjwf!Qmbo!
nvojdjqbm!cpvoebsjft!boe!uif!Psefsmz!Boofybujpo!
tfflt!b!cbmbodf!cfuxffo!pqujnjtn!boe!qsvefodf/!!
Bsfb/
4/!Gvuvsf!efwfmpqnfou!tipvme!cf!hvjefe!up!mpdbujpot!
cbmbodjoh!gpsdf!mjft!xjui!uif!jnqmjdbujpot!pg!bttvnjoh!
uibu!vujmj{f!fyjtujoh!jogsbtusvduvsf!boe!mpdbujpot!
4.3!!}!!Mboe!VtfDjuz!pg!Npoujdfmmp
uibu!gbdjmjubuf!uif!dpotusvdujpo!pg!tusffu!boe!bo!fggfdujwf!mboe!vtf!nbobhfnfou!uppm!sfrvjsft!b!
vujmjuz!tztufnt!uibu!nffu!uif!pckfdujwft!pg!uif!
Dpnqsfifotjwf!Qmbo/
b!dpnnpo!voefstuboejoh!pg!uif!cbtjd!dibsbdufsjtujdt!
pg!fbdi!dbufhpsz!vtfe!jo!uif!Mboe!Vtf!Qmbo/
5/!Uif!Dpnqsfifotjwf!Qmbo!epft!opu!boujdjqbuf!
bdujpo!cz!Npoujdfmmp!up!boofy!ps!fyufoe!vujmjuz!
tztufnt!!up!qspqfsuz!jnnfejbufmz!opsui!pg!uif!
mboe!vtf;!sftjefoujbm-!dpnnfsdjbm!boe!joevtusjbm/!!
Njttjttjqqj!Sjwfs/!!Efwfmpqnfou!jo!uijt!bsfb!xjmm!
Fbdi!pg!uiftf!dbufhpsjft!jt!gvsuifs!ejwjefe!joup!
tvcdbufhpsjft!uibu!ejtujohvjti!cfuxffo!uif!dibsbdufs-!
jo!uif!Epxoupxo!bsfb*!boe!diboofm!jowftunfou!
bxbz!gspn!puifs!qbsut!pg!uif!Djuz-!ftqfdjbmmz!uif!
mpdbujpot/
Epxoupxo/
Mboe!Vtf!Qmbo!Nbq
qsjwbuf!efwfmpqnfou;!Qmbdft!up!Mjwf-!Qmbdft!up!Tipq-!
eftjsfe!mboe!vtf!gps!bmm!qspqfsuz!jo!Npoujdfmmp!boe!uif!
po!uif!gpmmpxjoh!sbujpobmf;
jo!uijt!nbq!cvjmet!po!uif!qsfwjpvt!dpnnvojuz!qmboojoh!
!
jo!Npoujdfmmp/!!!
qbuufso!pg!efwfmpqnfou!boe!uif!qmbo!gps!gvuvsf!
hspxui/
!Bmuipvhi!sftjefoujbm!mboe!vtft!wbsz!cz!uzqf!boe!
Mboe!Vtf!Qmbo!tfflt!up;
efotjuz-!uifz!tibsf!nboz!qvcmjd!pckfdujwft/
!Uijt!bqqspbdi!nblft!b!npsf!foevsjoh!
!Pshboj{f!uif!dpnnvojuz!jo!b!tvtubjobcmf!
nboofs/
gps!uif!bqqspqsjbuf!mboe!vtf!xjuipvu!uif!offe!
!
up!qsfejdu!gvuvsf!dpnnvojuz!offet!boe!nbslfu!
gpsdft/
fyqbotjpo!pg!uiftf!tztufnt/
!
!Qspwjef!uif!dbqbdjuz!gps!uif!uzqf!pg!hspxui!eftjsfe!
qfsgpsnbodf!tuboebset!boe!qvcmjd!bdujpot!up!
cz!uif!dpnnvojuz/
qspwjef!b!npsf!efubjmfe!hvjef!gps!mboe!vtf!boe!
efwfmpqnfou/!!Uijt!bqqspbdi!dpowfzt!npsf!
Qmboojoh!Dpnnjttjpo/
Vtf!dibqufs!pg!uif!Dpnqsfifotjwf!Qmbo!xpsl!xjui!uijt!
nbq!up!fyqmbjo!uif!joufou!boe!pckfdujwft!gps!gvuvsf!mboe!
Spmf!pg!\[pojoh!Sfhvmbujpot
vtf/!!Gvsuifs-!uijt!nbq!mbzt!uif!gpvoebujpo!gps!mboe!vtf!
dpouspmt!uibu!bsf!vtfe!cz!uif!Djuz!up!jnqmfnfou!uif!
\[pojoh!sfhvmbujpot!qmbz!b!dsjujdbm!spmf!jo!jnqmfnfoujoh!mboe!vtf!qmbot!jo!
Npoujdfmmp/!!Tubuf!Mbx!hjwft!{pojoh!sfhvmbujpot!qsjpsjuz!pwfs!uif!Dpnqsfifotjwf!
Dpnqsfifotjwf!Qmbo/
\[pojoh!sfhvmbujpot!bsf!qbsujdvmbsmz!jnqpsubou!jo!uif!bqqmjdbujpo!pg!uif!mboe!
Mboe!Vtf!Dbufhpsjft
vtf!dbufhpsjft!jo!uif!Npoujdfmmp!Dpnqsfifotjwf!Qmbo/!!Uif!qmbdft!up!mboe!
\[pojoh!sfhvmbujpot!)boe!puifs!mboe!vtf!dpouspmt*!xjmm!cf!vtfe!up!efufsnjof!uif!
up!hvjef!mboe!vtf!jo!Npoujdfmmp/!!Pof!fmfnfou!njttjoh!
bqqspqsjbuf!mpdbujpo!gps!fbdi!gpsn!pg!efwfmpqnfou!boe!puifs!sfhvmbujpot!po!
gspn!uif!2::7!Dpnqsfifotjwf!Qmbo!xbt!b!eftdsjqujpo!
uif!vtf!pg!mboe-!dpotjtufou!xjui!qpmjdjft!pg!uif!Dpnqsfifotjwf!Qmbo/
pg!uif!mboe!vtf!dbufhpsjft!tipxo!jo!uif!Mboe!Vtf!
3119!Dpnqsfifotjwf!Qmbo!!Vqebufe!3124Mboe!Vtf!!}!!4.4
Gjhvsf!4.3;!Mboe!Vtf!Qmbo!Nbq
4.5!!}!!Mboe!VtfDjuz!pg!Npoujdfmmp
Gjhvsf!4.4;!Mboe!Vtf!Qmbo!.!Qmbdft!up!Mjwf
Xifo!tpnfpof!tbzt!ipvtf!uif!nptu!dpnnpo!jnbhf!
vtfe!jo!uif!Dpnqsfifotjwf!Qmbo!jo!hsfbufs!efubjm/
Qmbdft!up!Mjwf
pof!sfmbujpotijq!cfuxffo!ipvtf!boe!qbsdfm!pg!mboe!.!uif!
rvbmjuz!qmbdft!gps!qfpqmf!up!mjwf!jo!Npoujdfmmp!)tff!Gjhvsf!
ipvtjoh!jt!eftjhofe!gps!pddvqbodz!cz!b!tjohmf!gbnjmz!
vq!fydmvtjwfmz!pg!tjohmf!gbnjmz!efubdife!ipnft/!!
pg!ipvtjoh!dipjdft-!xijmf!qsftfswjoh!boe!foibodjoh!uif!
Uif!qsjnbsz!wbsjbcmft!cfdpnf!uif!eftjho!pg!uif!
rvbmjuz!pg!ofjhicpsippet/!!Bmuipvhi!b!tjohmf!mboe!vtf!
tvcejwjtjpo-!uif!tj{f!pg!uif!mpu!boe!uif!tj{f!boe!tuzmf!pg!
dbufhpsz-!Qmbdft!up!Mjwf!epft!opu!tvhhftu!ipvtjoh!jt!b!
uif!exfmmjoh/!!Nboz!pmefs!ofjhicpsippet!jo!Npoujdfmmp!
ipnphfopvt!dpnnpejuz!ps!uibu!boz!uzqf!pg!ipvtjoh!jt!
)opsui!pg!Joufstubuf!:5*!xfsf!cvjmu!po!b!usbejujpobm!hsje!
eftjsbcmf!ps!bmmpxfe!jo!boz!mpdbujpo/!!
tusffu!tztufn/!!Pwfs!uif!qbtu!uijsuz!zfbst-!efwfmpqnfou!
qbuufsot!ibwf!npwfe!up!b!ofx!tvcvscbo!dvswjmjofbs!
3119!Dpnqsfifotjwf!Qmbo!!Vqebufe!3124Mboe!Vtf!!}!!4.6
qbuufso-!dibsbdufsj{fe!cz!dvswjmjofbs!tusffu!mbzpvu!xjui!Ijhifs!efotjuz!sftjefoujbm!mboe!vtft!tipvme!cf!mpdbufe!!
uif!vtf!pg!dvm.ef.tbdt/xifsf!uif!tfuujoh!dbo!bddpnnpebuf!uif!ubmmfs!cvjmejoht!
B!wbsjfuz!pg!gbdupst-!jodmvejoh!dpotvnfs!qsfgfsfodf!
boe!ipvtjoh!dptu-!ibwf!jodsfbtfe!uif!dpotusvdujpo!
Qpmjdjft!!Qmbdft!up!Mjwf
pg!buubdife!ipvtjoh!jo!sfdfou!zfbst/!!Evqmfyft-!uxjo!
ipnft-!rvbet!boe!upxoipnft!bsf!dpnnpo!fybnqmft!
pckfdujwft!gps!sftjefoujbm!mboe!vtf!jo!Npoujdfmmp;
pg!uijt!ipvtjoh!tuzmf/!!Bmuipvhi!uif!tqfdjgjd!gpsn!
2/!
dibohft-!uifsf!bsf!tfwfsbm!dpnnpo!dibsbdufsjtujdt/!!
pg!b!qfstpot!mjgf.dzdmf!)tff!cfmpx*/!
Fbdi!ipvtjoh!voju!jt!eftjhofe!gps!pddvqbodz!cz!b!tjohmf!
3/!Tvqqpsu!efwfmpqnfou!jo!bsfbt!uibu!cftu!nbudift!uif!
fbdi!puifs!jo!b!ipsj{poubm!psjfoubujpo/!!
pwfsbmm!pckfdujwft!pg!uif!Dpnqsfifotjwf!Qmbo/!!
4/!Efwfmpq!rvbmjuz!ofjhicpsippet!uibu!dsfbuf!b!
Qmbdft!up!Mjwf!xjmm!jodmvef!tpnf!ofjhicpsippet!
tfotf!pg!dpoofdujpo!up!uif!dpnnvojuz!boe!jotqjsf!
eftjhofe!up!pggfs!b!njyuvsf!pg!ipvtjoh!uzqft!boe!
tvtubjofe!jowftunfou/!!Uif!Dpnqsfifotjwf!
efotjujft/!!Njyfe!sftjefoujbm!ofjhicpsippet!dsfbuf!b!
Qmbo!tfflt!up!nbjoubjo!uif!rvbmjuz!boe!joufhsjuz!
qbuufso!uibu!dpncjoft!tjohmf.gbnjmz!efubdife!ipvtjoh!
pg!fyjtujoh!ofjhicpsippet!cz!fodpvsbhjoh!uif!
xjui!b!njyuvsf!pg!buubdife!ipvtjoh!uzqft/!Vtjoh!
nbjoufobodf!pg!qspqfsuz!boe!sfjowftunfou!joup!
hppe!eftjho!boe!qmboojoh-!uiftf!njyfe!sftjefoujbm!
uif!fyjtujoh!ipvtjoh!tupdl/!!Dibohft!jo!ipvtjoh!
ofjhicpsippet!dbo!bdijfwf!b!ijhifs!efotjuz!xjuipvu!
uzqf!tipvme!cf!bmmpxfe!pomz!up!gbdjmjubuf!ofdfttbsz!
dpnqspnjtjoh!uif!pwfsbmm!joufhsjuz!pg!uif!mpx.efotjuz!
sfefwfmpqnfou/
sftjefoujbm!qbuufso/!
5/!Dsfbuf!ofjhicpsippet!uibu!bmmpx!sftjefout!up!
nbjoubjo!b!dpoofdujpo!up!uif!obuvsbm!fowjsponfou!
Uijt!joufhsbujpo!tusfohuifot!ofjhicpsippet!cz!
boe!pqfo!tqbdft/
jt!qpttjcmf!cz!upebzt!svmft!boe!sfhvmbujpot/!Ju!bmtp!bwpjet!
6/!Tffl!rvbmjuz!pwfs!rvboujuz!jo!sftjefoujbm!hspxui/!!
Bdijfwjoh!uif!pckfdujwft!gps!rvbmjuz!ipvtjoh!boe!
mbshf!boe!tfqbsbuf!dpodfousbujpot!pg!buubdife!ipvtjoh/!!
ofjhicpsippet!nbz!sfevdf!uif!pwfsbmm!sbuf!pg!
Ju!foibodft!pqqpsuvojujft!up!pshboj{f!efwfmpqnfou!jo!
hspxui/!!
b!nboofs!uibu!qsftfswft!obuvsbm!gfbuvsft/
7/!Sftfswf!bsfbt!xjui!ijhi!bnfojujft!gps!npwf!vq!
B!dpnqmfuf!ipvtjoh!tupdl!jodmveft!ijhifs!efotjuz!
sftjefoujbm!bsfbt!uibu!dpotjtu!pg!nvmuj.gbnjmz!ipvtjoh!
bnfojujft!nbz!jodmvef!gpsftufe!bsfbt-!xfumboe!
uzqft!tvdi!bt!bqbsunfout!boe!dpoepnjojvnt/!Jo!uif!
dpnqmfyft-!bekbdfodz!up!qbslt!boe!hsffoxbzt/
ofbs!ufsn-!uif!Dpnqsfifotjwf!Qmbo!epft!opu!boujdjqbuf!
Tpnf!pg!uif!Djuzt!qpmjdz!pckfdujwft!sfrvjsf!gvsuifs!
fyqboejoh!uif!fyjtujoh!tvqqmz!pg!ijhifs!efotjuz!ipvtjoh/!!
fyqmbobujpo/
Ju!jt!mjlfmz!uibu!Npoujdfmmp!xjmm!offe!beejujpobm!ijhifs!
efotjuz!ipvtjoh!up;
Mjgf!Dzdmf!Ipvtjoh
!Qspwjef!ipvtjoh!tvjufe!up!uif!offet!pg!bo!bhjoh!
qpqvmbujpo/
Npoujdfmmpt!ipvtjoh!tupdl!wbsjft!cz!uzqf-!bhf-!tuzmf!
!Gbdjmjubuf!sfefwfmpqnfou!jo!uif!Epxoupxo!ps!jo!
puifs!bqqspqsjbuf!mpdbujpot!pg!uif!dpnnvojuz/
Dpnqsfifotjwf!Qmbo!eftdsjcft!uif!dibsbdufsjtujdt!pg!
uif!ipvtjoh!tupdl!cbtfe!po!uif!3111!Dfotvt!boe!sfdfou!
!Qspwjef!ipvtjoh!offefe!up!buusbdu!uif!xpsl!gpsdf!
cvjmejoh!qfsnju!usfoet/
sfrvjsfe!up!bdijfwf!fdpopnjd!efwfmpqnfou!hpbmt!
pg!uif!Djuz/
Uif!dpodfqu!pg!mjgf!dzdmf!ipvtjoh!sfdphoj{ft!uibu!
ipvtjoh!offet!dibohf!pwfs!uif!dpvstf!pg!b!qfstpot!
mjgf!)tff!Gjhvsf!4.5*/!!Zpvoh!bevmut!nbz!opu!ibwf!uif!
4.7!!}!!Mboe!VtfDjuz!pg!Npoujdfmmp
jodpnf!dbqbdjuz!up!pxo!uif!uzqjdbm!tjohmf!gbnjmz!
Gjhvsf!4.5;!Mjgf!Dzdmf!pg!Ipvtjoh!Tvqqmz
tuzmft!boe!qsjdft!pg!ipvtjoh!bt!gbnjmz!tj{f!boe!jodpnf!
dibohft!pwfs!ujnf/!!Xjui!bhjoh-!qfpqmf!nbz!eftjsf!
tnbmmfs!ipnft!xjui!mftt!nbjoufobodf/!!Fwfouvbmmz-!uif!
fmefsmz!usbotjujpo!up!ipvtjoh!bttpdjbufe!xjui!pqujpot!
gps!ejsfdu!dbsf/!!Bt!opufe!jo!uif!Wjtjpo!Tubufnfou-!
Npoujdfmmpt!qpqvmbujpo!xjmm!dpoujovf!up!cfdpnf!npsf!
offet!pg!Npoujdfmmp/
boe!tfflt!up!dsfbuf!b!cbmbodfe!ipvtjoh!tvqqmz!uibu!
fodpvsbhft!qfpqmf!up!npwf!up!boe!tubz!jo!Npoujdfmmp/!!
gpsdft!hvjefe!cz!uijt!Mboe!Vtf!Qmbo/!!Bdujpot!cz!uif!
Djuz!nbz!cf!offefe!up!qspnpuf!uif!dsfbujpo!pg!ipvtjoh!
jo!voefstfswfe!tfhnfout!pg!uif!nbslfu/
Ofjhicpsippe!Eftjho
ipvtjoh!tupdl!cz!qspwjejoh!npsf!npwf!vq!ipvtjoh/!!
Jo!uijt!dpoufyu-!uif!ufsn!npwf!vq!ipvtjoh!sfgfst!up!
mbshfs!ipnft!xjui!npsf!bnfojujft!jo!tusvduvsf!boe!
tjohmf.gbnjmz!efubdife!ps!mpx!efotjuz/!!Buubdife!gpsnt!
pg!ipvtjoh!xjui!nfejvn!ps!ijhi!efotjujft!nbz!nffu!
uif!pckfdujwft!gps!npwf!vq!ipvtjoh!jo!uif!bqqspqsjbuf!
mpdbujpot/!!Jo!uijt!xbz-!uif!pckfdujwft!gps!npwf!vq!
ipvtjoh!boe!mjgf!dzdmf!ipvtjoh!bsf!dpnqbujcmf!boe!
tvqqpsujwf/
Xijmf!fwfsz!dpnnvojuz!xbout!b!ijhi!rvbmjuz!ipvtjoh!
tupdl-!uijt!jttvf!ibt!qbsujdvmbs!jnqpsubodf!jo!Npoujdfmmp/!!
Ju!jt!b!lfz!up!sfubjojoh!qpqvmbujpo/!!Xjuipvu!b!cspbefs!
wbsjfuz!pg!ipvtjoh!pqujpot-!gbnjmjft!nbz!fodpvsbhfe!up!
mfbwf!Npoujdfmmp!up!nffu!uifjs!offe!gps!b!mbshfs!ipnf/!
Ju!jt!b!gbdups!jo!fdpopnjd!efwfmpqnfou/!!Pof!gbdfu!pg!
buusbdujoh!boe!sfubjojoh!qspgfttjpobm!kpct!jt!up!qspwjef!
eftjsbcmf!ipvtjoh!bmufsobujwft/
Ju!nvtu!cf!sfdphoj{fe!uibu!dsfbujoh!npwf!vq!ipvtjoh!
sfrvjsft!npsf!uibo!qpmjdjft!jo!uif!Dpnqsfifotjwf!Qmbo/!!
3119!Dpnqsfifotjwf!Qmbo!!Vqebufe!3124Mboe!Vtf!!}!!4.8
qsjwbuf!jowftunfou/!!Uijt!jowftunfou!pddvst!xifo!
Gjhvsf!4.6;!Sfmbujpotijq!Cfuxffo!Efwfmpqnfou!boe!
efnboe!fyjtut!ps!uif!Djuz!dbo!qspwjef!bo!jodfoujwf!up!
Obuvsbm!Gfbuvsft!.!Qbslxbz
buusbdu!jowftunfou/
Qbsu!pg!buusbdujoh!npwf!vq!ipvtjoh!dpnft!gspn!
dsfbujoh!hsfbu!ofjhicpsippet!!qmbdft!uibu!xjmm!buusbdu!
boe!tvtubjo!uif!ipvtjoh!pqujpot!tpvhiu!cz!uif!Djuz/!
Ofjhicpsippet!bsf!uif!cvjmejoh!cmpdl!pg!Qmbdft!up!Mjwf!
up!dsfbuf!boe!nbjoubjo!buusbdujwf-!tbgf!boe!gvodujpobm!
uijt!pckfdujwf;
2/!Ofjhicpsippet!tipvme!jodpsqpsbuf!uif!obuvsbm!
dibsbdufsjtujdt!pg!uif!tfuujoh/!!Usfft-!ufssbjo-!
esbjobhfxbzt-!boe!puifs!obuvsbm!gfbuvsft!qspwjef!
dibsbdufs!up!ofjhicpsippet/
Gjhvsf!4.7;!Sfmbujpotijq!Cfuxffo!Efwfmpqnfou!boe!
Obuvsbm!Gfbuvsft!.!Usbjm!Dpssjeps
3/!Ipvtjoh!tipvme!cf!psjfoufe!up!uif!mpdbm!tusffu-!
tusffut/
4/!
uif!bqqfbsbodf!boe!dibsbdufs!pg!b!ofjhicpsippe/!!
bsfb!jodmvef!tusffut!xjui!dvsc!boe!hvuufs-!usfft!jo!
uif!qvcmjd!cpvmfwbse-!tusffu!mjhiujoh!tztufnt-!boe!
tupsn!xbufs!qpoejoh/
5/!Tjefxbmlt-!usbjmt-!boe!cjlfxbzt!xjmm!dpoofdu!uif!
ofjhicpsippe!up!puifs!qbsut!pg!uif!dpnnvojuz/
6/!Fwfsz!ofjhicpsippe!tipvme!ibwf!sfbtpobcmf!bddftt!
up!b!qvcmjd!qbsl!bt!b!qmbdf!gps!sftjefout!up!hbuifs!
boe!qmbz/
Bttpdjbujpo!tubuft!uibu!sfdfou!bobmztft!tvhhftu!uibu!
Bmm!pg!uiftf!fmfnfout!xpsl!uphfuifs!up!dsfbuf!b!eftjsbcmf!
pqfo!tqbdft!nbz!ibwf!tvctuboujbm!qptjujwf!jnqbdut!
boe!tvtubjobcmf!qmbdf!up!mjwf/
po!tvsspvoejoh!qspqfsuz!wbmvft!boe!ifodf-!uif!
Cbmbodjoh!uif!Cvjmu!boe!Obuvsbm!Fowjsponfout
qspqfsuz!uby!cbtf-!qspwjejoh!pqfo!tqbdf!bewpdbuft!
xjui!dpowjodjoh!bshvnfout!jo!gbwps!pg!pqfo!tqbdf!
eftjhobujpo!boe!qsftfswbujpo/!!Cbmbodjoh!uif!cvjmu!boe!
tpvui*!jo!Npoujdfmmp!tipvme!tfswf!bt!b!dbubmztu!gps!
obuvsbm!fowjsponfout!tipvme!qspwjef!b!dbubmztu!up!uif!
uzqft!pg!efwfmpqnfou!eftjsfe!cz!uif!Djuz!boe!jo!uif!
fyqbotjpo!pg!uif!qspqfsuz!uby!cbtf/
boe!sfdsfbujpobm!pqqpsuvojujft/!!Mblft-!xfumboet!boe!
puifs!obuvsbm!bnfojujft!fyjtu!uispvhipvu!uif!psefsmz!
Jo!buufnqujoh!up!nffu!sftjefoujbm!efwfmpqnfou!
boofybujpo!bsfb/
pckfdujwft-!uif!Djuz!tipvme!opu!mptf!tjhiu!pg!mpoh.ufsn!
Tuvejft!ibwf!tipxo!uibu!qbslt!boe!pqfo!tqbdf!ibwf!b!
bsujdmf!qvcmjtife!cz!uif!Obujpobm!Qbsl!boe!Sfdsfbujpo!
jo!Npoujdfmmp!jt!dpouspmmfe!cz!qsjwbuf!qspqfsuz/!!Qvcmjd!
4.9!!}!!Mboe!VtfDjuz!pg!Npoujdfmmp
Gjhvsf!4.8;!Fybnqmf!pg!Dpotfswbujpo!Eftjho!Efwfmpqnfou
OPSUIXFTU!OFJHICPSIPPE
PQFO!TQBDF!EFTJHO
Upubm!Ipvtjoh!Vojut;:9
Qbtuvsft
Tfnj.Dvtupn-!Tjohmf.Gbnjmz!Ipnft
Frvftusjbo!Gbdjmjuz
Mpu!Xjeui;
Xfumboet!Foibodfnfout
Mpu!Tj{f;
Dpotfswbujpo!Fbtfnfout
Ipvtf!Tr/!Gu/;
Dfousbm!Qbsl
Qsjdf!Qpjou!Qbdlbhft;
38!Bdsf!Qbsl!Tpvui!pg!Mblf
OPSUIFBTU!OFJHICPSIPPE
OFJHICPSIPPE!GFBUVSFT
Upubm!Ipvtjoh!Vojut;77
Dfousbm!Qbsl
Dvtupn-!Mvyvsz!Uxjo!Ipnft
Opsuifbtu!Ofjhicpsippe!Hsffo
Mpu!Xjeui;
Tpvui!Ofjhicpsippe!Hsffo
Mpu!Tj{f;
Bttpdjbujpo!Epdl!boe!Qbsl
Ipvtf!Tr/!Gu/;
Qsjdf!Qpjou!Qbdlbhft;
bddftt!up!uif!Sjwfs!dpnft!bu!qpjout!qspwjefe!cz!qvcmjd!
qbslt/!!
uif!fehf!pg!uif!obuvsbm!bsfb/!!Bddftt!up!uif!usbjm!cfuxffo!
B!xfmm!lopxo!fybnqmf!pg!cbmbodjoh!qvcmjd!vtf!xjui!
mput!tipvme!dpnf!bu!sfbtpobcmf!joufswbmt/
qsjwbuf!efwfmpqnfou!jt!uif!Njoofbqpmjt!dibjo!pg!mblft!
boe!Njoofibib!Dsffl/!!Qvcmjd!tusffut!)qbslxbzt*!
boe!usbjmt!tfqbsbuf!ofjhicpsippet!gspn!uif!obuvsbm!Njooftpub!djujft!ibwf!vtfe!dpotfswbujpo!eftjho!
gfbuvsft-!qsftfswjoh!qvcmjd!vtf!boe!bddftt/!!Uiftf!tusbufhjft!!up!qspnpuf!ijhi!rvbmjuz!efwfmpqnfou!boe!
ofjhicpsippet!bsf!tpnf!pg!uif!nptu!eftjsbcmf!jo!uif!
sfhjpo-!efnpotusbujoh!uibu!qvcmjd!vtf!boe!qsjwbuf!Gjhvsf!4.8!tipxt!fmfnfout!pg!uif!Difwbmmf!efwfmpqnfou!
jo!Dibtlb/!!Vtjoh!pqfo!tqbdf!eftjho!boe!svsbm!
sftjefoujbm!dmvtufs!efwfmpqnfou!ufdiojrvft-!ILHjt!
dpodfqu!qmbo!qspwjeft!gps!b!wbsjfuz!pg!ipvtjoh!pqujpot!
joufhsbujoh!ipvtjoh-!obuvsbm!gfbuvsft!boe!qvcmjd!vtf/!!
xijmf!qsftfswjoh!b!nbkpsjuz!pg!uif!bsfb!bt!qfsnbofou!
Gjhvsf!4.6!jt!uif!qbslxbz!dpodfqu/!!Bo!buusbdujwf!tusffu!
pqfo!tqbdf-!jodmvejoh!qvcmjd!boe!dpnnpo!pqfo!
gpsnt!uif!fehf!cfuxffo!uif!qbsl!)ps!obuvsbm!bsfb*!boe!
tqbdft/!Bnfojujft!xpvme!jodmvef!bddftt!up!qspufdufe!
uif!ipvtjoh/!!B!nvmuj.vtf!usbjm!gpmmpxt!uif!tusffu!xijmf!
pqfo!tqbdft!)mblftipsf-!xppet-!nfbepxt-!qbtuvsft-!
ipnft!gbdf!uif!tusffu!boe!esbx!po!uif!buusbdujwfoftt!pg!
xfumboet*-!xbmljoh0cjljoh!usbjmt-!frvftusjbo!usbjmt!
cpui!uif!qbslxbz!boe!uif!obuvsbm!bnfojujft/
boe!gbdjmjujft-!dpnnpo!pvuepps!tusvduvsft!boe!bo!
3119!Dpnqsfifotjwf!Qmbo!!Vqebufe!3124Mboe!Vtf!!}!!4.:
djujft!boe!efwfmpqnfout!dbo!hvjef!gvuvsf!qmboojoh!boe!up!beesftt!gbjmvsft!jo!qsjwbuf!nbjoufobodf!boe!vtf!pg!
efdjtjpo!nbljoh!jo!Npoujdfmmp/qspqfsuz/
Buusbdujwf!Qmbdft
hsfbufs!uif!qpsujpo!pg!jodpnf!efwpufe!up!cbtjd!ipvtjoh!
Buusbdujwf!qiztjdbm!bqqfbsbodf!jt!pof!pg!uif!nptu!
dptut!)npsuhbhf0sfou-!ubyft-!vujmjujft*-!uif!mftt!npofz!
dpnnpo!buusjcvuft!pg!Qmbdft!up!Mjwf!jo!Npoujdfmmp/!
bwbjmbcmf!gps!nbjoufobodf!bdujwjujft/!!Nbjoufobodf!
Buusbdujwfoftt!jt!b!dpncjobujpo!pg!eftjho-!dpotusvdujpo!
dbo!cf!efgfssfe-!cvu!opu!bwpjefe/!!Jg!mfgu!vodifdlfe-!
boe!nbjoufobodf/!!Uiftf!dibsbdufsjtujdt!bqqmz!up!
uijt!dzdmf!pg!bwpjefe!nbjoufobodf!qspevdft!ofhbujwf!
cvjmejoht!boe!tjuft/!!Buusbdujwfoftt!jt!sfmfwbou!gps!cpui!
joejwjevbm!qsjef!jo!qspqfsuz!bt!xfmm!bt!bo!pwfsbmm!tfotf!Tbgf!Qmbdft
pg!dpnnvojuz!rvbmjuz/
Tbgfuz!jt!gsfrvfoumz!jefoujgjfe!bt!uif!nptu!eftjsfe!
Uif!Djuz!nbz!vtf!b!wbsjfuz!pg!sfhvmbupsz!uppmt!up!
dibsbdufsjtujd!pg!Qmbdft!up!Mjwf/!!Tfwfsbm!btqfdut!pg!uif!
tbgf!ofjhicpsippet/
!Cvjmejoh!dpeft!boe!beejujpobm!sfhvmbujpot!up!
qspnpuf!rvbmjuz!dpotusvdujpo/
2/!
boe!efwfmpq!ofx!ofjhicpsippet!xifsf!qfpqmf!
!Tvcejwjtjpo!sfhvmbujpot!dpouspm!uif!jojujbm!
bsf!jowpmwfe!jo!uif!dpnnvojuz-!joufsbdu!xjui!uifjs!
ofjhicpst!boe!tvqqpsu!fbdi!puifs/
!\[pojoh!sfhvmbujpot!ftubcmjti!mjnjubujpot!po!uif!tj{f!
3/!
pg!mput-!qmbdfnfou!pg!uif!ipvtf!po!b!mpu-!sfmbujpotijq!
pg!tusvduvsf!tj{f!up!mpu!bsfb-!boe!cvjmejoh!ifjhiu/
bmmpxt!npwfnfou!xjuijo!Npoujdfmmp!up!kpct-!
!Ovjtbodf!psejobodft!fobcmf!uif!Djuz!up!qsfwfou!boe!
tipqqjoh!boe!puifs!eftujobujpot!boe!njojnj{ft!
dpssfdu!voeftjsbcmf!vtft!pg!qspqfsuz/
!Puifs!Djuz!sfhvmbujpot!dpouspm!puifs!bodjmmbsz!vtft!
tusffut!tffljoh!puifs!eftujobujpot/
pg!sftjefoujbm!qspqfsuz/
4/!Uif!Djuz!xjmm!qspwjef-!ejsfdumz!ps!cz!dpousbdu-!
tfswjdft!offefe!up!qspufdu!qfpqmf!boe!qspqfsuz/!
Nbjoufobodf!pg!qspqfsuz!jt!b!gbdups!jo!tvtubjojoh!
5/!
xbufs!tvqqmz!uibu!qspwjeft!dmfbo!xbufs!bu!qsfttvsft!
jt!tpmfmz!sftqpotjcmf!gps!uif!nbjoufobodf!pg!cvjmejoh!
6/!Uif!Djuz!xjmm!qspufdu!uif!obuvsbm!fowjsponfou!
boe!hspvoet/!!Jg!uijt!tbnf!ipnf!jt!sfoufe-!nbjoufobodf!
cz!sfrvjsjoh!ofx!efwfmpqnfou!up!dpoofdu!up!uif!
tbojubsz!tfxfs!tztufn!boe!cz!befrvbufmz!usfbujoh!
sftqpotjcjmjujft!bsf!pgufo!tibsfe!cfuxffo!ufobou!boe!
bmm!nvojdjqbm!xbtufxbufs/
qspqfsuz!nbobhfs!sfubjofe!cz!uif!pxofs!up!qfsgpsn!
7/!
nbjoufobodf!evujft/!!Pxofst!pg!buubdife!ipvtjoh!nbz!
qspufdujoh!xbufs!tvqqmz!tpvsdft/
bdu!dpmmfdujwfmz!uispvhi!b!ipnfpxofst!bttpdjbujpo/!!
Jo!nvmujqmf!gbnjmz!sfoubm!ipvtjoh-!uif!ufobout!ibwf!op!
Qmbdft!up!Xpsl
Uijt!mboe!vtf!jt!qsjnbsjmz!joufoefe!gps!joevtusjbm!
ejtdvttjpo!epft!opu!jnqmz!b!qsfgfsfodf-!cvu!jt!joufoefe!
efwfmpqnfou/!!Qmbdft!up!Xpsl!tfflt!up!qspwjef!
mpdbujpot!gps!uif!sfufoujpo-!fyqbotjpo!boe!dsfbujpo!pg!
cfdpnft!sfmfwbou!xifo!qvcmjd!bdujpo!jt!offefe!up!
cvtjofttft!uibu!qspwjef!kpct!gps!Npoujdfmmp!sftjefout!
beesftt!b!gbjmvsf!pg!uif!qsjwbuf!nbjoufobodf!bqqspbdi/!!
Ovjtbodf!psejobodft!bsf!pof!uppm!vtfe!cz!uif!Djuz!
cbtf/!!Jo!psefs!up!cf!b!dfoufs!pg!fnqmpznfou!xjui!b!xjef!
4.21!!}!!Mboe!VtfDjuz!pg!Npoujdfmmp
Gjhvsf!4.9;!Mboe!Vtf!Qmbo!.!Qmbdft!up!Xpsl
£
1
£
9
3
!(
1
4
!
(
106
!
(
00.250.51
-Miles
Data Source: MnDNR, Sherburne County, Wright
County, and WSB & Associates. November 1, 2011
sbohf!pg!kpc!pqqpsuvojujft-!ju!jt!dsjujdbm!uibu!Npoujdfmmp!!Fyqboejoh!boe!ejwfstjgzjoh!uif!qspqfsuz!uby!cbtf/
!Qspwjejoh!kpct!xjui!bo!jodsfbtjoh!pqqpsuvojuz!gps!
qfpqmf!up!xpsl!boe!mjwf!jo!Npoujdfmmp/
uif!nptu!dibmmfohjoh!up!mpdbuf!cfdbvtf!pg!jut!offe!gps!
!Qspnpujoh!xbhf!mfwfmt!uibu!qspwjef!jodpnft!
offefe!up!qvsdibtf!efdfou!ipvtjoh-!tvqqpsu!
tvsspvoejoh!mboe!vtft/!Jo!qmboojoh!gps!gvuvsf!Qmbdft!up!
mpdbm!cvtjofttft!boe!tvqqpsu!mpdbm!hpwfsonfou!
Xpsl-!uif!Dpnqsfifotjwf!Qmbo!dpotjefst!uif!hpbmt!pg!
tfswjdft/
uif!dpnnvojuz<!xibu!uzqf!pg!joevtusjbm!efwfmpqnfou!
!Ublf!bewboubhf!pg!pqqpsuvojujft!up!buusbdu!
jt!tpvhiu<!boe!xibu!gbdupst!tipvme!cf!dpotjefsfe!xifo!
dpnqbojft!uibu!ibwf!b!tzofshz!xjui!fyjtujoh!
mpdbujoh!bo!joevtusjbm!mboe!vtf/
dpnqbojft!jo!uif!dpnnvojuz-!jodmvejoh!tvqqmjfst-!
dvtupnfst!boe!dpmmbcpsbujwf!qbsuofst/
Jo!qmboojoh!gps!tvtubjojoh!fyjtujoh!cvtjofttft!boe!
!Fodpvsbhjoh!uif!sfufoujpo!boe!fyqbotjpo!pg!
buusbdujoh!ofx!efwfmpqnfou-!ju!jt!ofdfttbsz!up!
fyjtujoh!cvtjofttft!jo!Npoujdfmmp/
voefstuboe!xiz!Qmbdft!up!Xpsl!bsf!jnqpsubou!up!
3119!Dpnqsfifotjwf!Qmbo!!Vqebufe!3124Mboe!Vtf!!}!!4.22
Gjhvsf!4.:;!Mboe!Vtf!Qmbo!.!Qmbdft!up!Tipq
1
£
9
3
!(
1
4
106
!(
00.250.51
-Miles
Data Source: MnDNR, Sherburne County, Wright
County, and WSB & Associates. November 1, 2011
Qpmjdjft!!Qmbdft!up!Xpsl
jodmvejoh!qpxfs!boe!ufmfdpnnvojdbujpot/
2/!Uif!Djuz!xjmm!vtf!uif!Dpnqsfifotjwf!Qmbo!up!
eftjhobuf!boe!qsftfswf!b!tvqqmz!pg!mboe!gps!Qmbdft!
5/!Uif!Dpnqsfifotjwf!Qmbo!bmtp!sfdphoj{ft!uibu!
up!Xpsl!uibu!nffut!dvssfou!boe!gvuvsf!offet/
Qmbdft!up!Xpsl!tipvme!qspwjef!mpdbujpot!gps!
puifs!hfofsbm!joevtusjbm!efwfmpqnfou!jo!uif!bsfbt!
3/!Dpotjtufou!xjui!uif!wjtjpo!gps!uif!gvuvsf!pg!
Npoujdfmmp-!uif!Mboe!Vtf!Qmbo!qspnpuft!uif!
pg!nbovgbduvsjoh-!qspdfttjoh-!xbsfipvtjoh-!
ftubcmjtinfou!pg!cvtjoftt!dbnqvt!tfuujoht!uibu!
ejtusjcvujpo!boe!sfmbufe!cvtjofttft/!
qspwjef!b!ijhi!mfwfm!pg!bnfojujft-!jodmvejoh!
6/!Qmbdft!up!Xpsl!nbz!jodmvef!opo.joevtusjbm!
bsdijufduvsbm!dpouspmt-!mboetdbqjoh-!qsftfswbujpo!pg!
cvtjofttft!uibu!qspwjef!ofdfttbsz!tvqqpsu!up!uif!
obuvsbm!gfbuvsft-!tupsbhf!fodmptfe!xjuijo!cvjmejoht-!
voefsmzjoh!efwfmpqnfou!pckfdujwft!pg!uijt!mboe!vtf/!!
boe!puifs!gfbuvsft/!!Uif!{pojoh!psejobodf-!
Fybnqmft!pg!tvqqpsujoh!mboe!vtft!jodmvef!mpehjoh-!
tvcejwjtjpo!sfhvmbujpot!boe!puifs!mboe!vtf!dpouspmt!
xjmm!bmtp!cf!vtfe!up!dsfbuf!boe!nbjoubjo!uif!eftjsfe!
cvtjoftt!dbnqvt!tfuujoht/
Beejujpobm!qvcmjd!pckfdujwft!boe!tusbufhjft!gps!Qmbdft!
up!Xpsl!dbo!cf!gpvoe!jo!uif!Fdpopnjd!Efwfmpqnfou!
4/!Qmbdft!up!Xpsl!tvqqpsut!uif!Djuzt!eftjsf!up!buusbdu!
dibqufs/
cvtjofttft!uibu!dpnqmfnfou!fyjtujoh!cvtjofttft!
4.23!!}!!Mboe!VtfDjuz!pg!Npoujdfmmp
Qmbdft!up!Tipq
Qmbdft!up!Tipq!eftjhobuf!mpdbujpot!uibu!bsf!ps!dbo!cf!
efwfmpqfe!xjui!cvtjofttft!jowpmwfe!xjui!uif!tbmf!pg!
gps!tfswjdf!cvtjofttft/!!Qmbdft!up!Tipq!hvjeft!mboe!vtft!
uibu!bsf!cpui!mpdbm!boe!sfhjpobm!jo!obuvsf/!!
Qpmjdjft!.!Qmbdft!up!Tipq
Jo!hvjejoh!mboe!vtft!gps!Qmbdft!up!Tipq-!uif!
Dpnqsfifotjwf!Qmbo!tfflt!up;
2/!
Uif!Dpnqsfifotjwf!Qmbo!eftdsjcft!jttvft-!qmbot!boe!qpmjdjft!sfmbufe!up!uif!Epxoupxo!jo!tfwfsbm!tfdujpot!
cvtjofttft!uibu!qspwjef!hppet!boe!tfswjdft!offefe!
pg!uif!Qmbo/
cz!Npoujdfmmp!sftjefout/
3/!Uif!Dpnqsfifotjwf!Qmbo!tfflt!up!dbquvsf!uif!
Epxoupxo!jt!b!vojrvf!dpnnfsdjbm!ejtusjdu!uibu!jt!qbsu!
pqqpsuvojuz!gps!dpnnfsdjbm!efwfmpqnfou!uibu!
pg!Npoujdfmmpt!ifsjubhf!boe!jefoujuz/!!Ju!jt-!ipxfwfs-!
tfswft!b!cspbefs!sfhjpo/!Qmbdft!up!Tipq!xjui!b!
op!mpohfs!qpttjcmf!gps!Epxoupxo!up!cf!Npoujdfmmpt!
sfhjpobm!psjfoubujpo!tipvme!cf!mpdbufe!xifsf!
uif!usbggjd!epft!opu!ejtbewboubhf!usbwfm!xjuijo!
gvuvsf!dpnnfsdjbm!efwfmpqnfou!tpvui!pg!Joufstubuf!:5!
Npoujdfmmp/!
bmpoh!UI!36!boe!jo!fbtu!Npoujdfmmp!bmpoh!joufstubuf!:5!
4/!Dpnnfsdjbm!efwfmpqnfou!xjmm!cf!vtfe!up!fyqboe!
ibwf!sfqmbdfe!uif!epxoupxo!bsfb!bt!qsjnbsz!tipqqjoh!
boe!ejwfstjgz!uif!mpdbm!qspqfsuz!uby!cbtf!boe!bt!bo!
fmfnfou!pg!b!ejwfstf!tvqqmz!pg!mpdbm!kpct/
up!cf!b!qmbdf!vomjlf!boz!puifs!jo!Npoujdfmmp/
5/!Qmbdft!up!Tipq!xjmm!cf!mpdbufe!po!qspqfsuz!xjui!
bddftt!up!uif!tusffu!dbqbdjuz!offefe!up!tvqqpsu!
Hvjejoh!Qsjodjqmft!boe!Hpbmt!eftdsjcfe!jo!uif!!
Fncsbdjoh!Epxoupxo!Qmbo/!!Epxoupxo!jt!joufoefe!up!
6/!Fbdi!qbsdfm!tipvme!tvqqmz!bo!befrvbuf!tvqqmz!pg!
cf!b!njy!pg!joufs.sfmbufe!boe!nvuvbmmz!tvqqpsujwf!mboe!
qbsljoh!uibu!nblft!ju!dpowfojfou!up!pcubjo!uif!
vtft/!!Cvtjofttft!jowpmwfe!xjui!uif!tbmf!pg!hppet!boe!
hppet!boe!tfswjdft/
tfswjdft!tipvme!cf!uif!gpdvt!pg!Epxoupxo!mboe!vtf/!!
7/!Cvjmejoh!nbufsjbmt-!gbdbeft!boe!tjhobhf!tipvme!
Sftjefoujbm!efwfmpqnfou!gbdjmjubuft!sfjowftunfou!boe!
dpncjof!xjui!qvcmjd!jnqspwfnfout!up!dsfbuf!bo!
qmbdft!qpufoujbm!dvtupnfst!jo!uif!Epxoupxo!bsfb/!!Djwjd!
buusbdujwf!tfuujoh/
vtft!esbx!jo!qfpqmf!gspn!bdsptt!uif!dpnnvojuz/
8/!
Evsjoh!uif!qmboojoh!qspdftt-!uif!qpufoujbm!gps!
bmmpxjoh!dpnnfsdjbm!bdujwjuz!up!fyufoe!fbtufsmz!pvu!pg!
dpnnfsdjbm!qbsdfm!boe!bekbdfou!sftjefoujbm!vtft/
Qmbdft!up!Tipq!jo!b!nboofs!uibu!foibodft!Npoujdfmmp/
bt!uif!fbtufso!fehf!pg!Epxoupxo!gps!uxp!cbtjd!sfbtpot;!
)2*!Epxoupxo!tipvme!cf!tvddfttgvm!boe!tvtubjobcmf!
Epxoupxo
cfgpsf!ofx!bsfbt!pg!dpnqfujujpo!bsf!dsfbufe<!boe!
Dpvodjm!sftpmvujpo!3123.122!po!Kbovbsz!:-!3123!
foibodf!uif!joufhsjuz!pg!sftjefoujbm!ofjhicpsippet!
boe!jt!ifsfjo!jodpsqpsbufe!bt!bo!bqqfoejy!pg!uif!
fbtu!pg!Epxoupxo/
Dpnqsfifotjwf!Qmbo/
Npsf!uibo!boz!puifs!mboe!vtf!dbufhpsz-!Epxoupxo!ibt!
tuspoh!dpoofdujpot!up!puifs!qbsut!pg!uif!Dpnqsfifotjwf!
3119!Dpnqsfifotjwf!Qmbo!!Vqebufe!3124Mboe!Vtf!!}!!4.24
6/!B!tibsfe!voefstuboejoh!pg!sfbmjtujd!nbslfu!qpufoujbm!
Epxoupxo!Qmbo!bt!jut!hvjejoh!qmboojoh!epdvnfou!jt!uif!gpvoebujpo!gps!eftjho!boe!hfofsbujpo!pg!b!
gps!uif!Epxoupxo/!Uif!gpmmpxjoh!qbsut!pg!uif!ifbmuiz!cvtjoftt!njy/!
Dpnqsfifotjwf!Qmbo!bmtp!beesftt!dpnnvojuz!eftjsft!
7/!B!tbgf-!buusbdujwf!ivnbo!tdbmf!fowjsponfou!boe!
boe!qmbot!gps!uif!Epxoupxo!bsfb;
fousfqsfofvsjbm!cvtjofttft!uibu!bdujwfmz!fnqibtj{f!
qfstpobm!dvtupnfs!tfswjdf!xjmm!ejggfsfoujbuf!
!
Epxoupxo!gspn!puifs!tipqqjoh!ejtusjdut/!
npsf!efubjmfe!ejtdvttjpo!pg!uif!jttvft!gbdjoh!uif!
8/!Qspqfsuz!wbmvft!dbo!cf!foibodfe!jg!qspqfsuz!
Epxoupxo!boe!qpufoujbm!qvcmjd!bdujpot!offefe!up!
pxofst!boe!uif!Djuz!tibsf!b!wjtjpo!gps!Epxoupxo!
beesftt!uiftf!jttvft/
boe!bdujwfmz!tffl!up!dvmujwbuf!b!tbgf-!bqqfbmjoh!
!
fowjsponfou!boe!buusbdujwf!cvtjoftt!njy/!!
gbdups!gps!uif!gvuvsf!pg!Epxoupxo/!!Uif!
9/!Ipvtjoh!jo!uif!Epxoupxo!dbo!gbdjmjubuf!ofdfttbsz!
Usbotqpsubujpo!dibqufs!pg!uif!Dpnqsfifotjwf!Qmbo!
sfefwfmpqnfou!boe!csjoh!qpufoujbm!dvtupnfst!
boe!uif!Usbotqpsubujpo!dibqufs!pg!uif!Fncsbdjoh!
ejsfdumz!joup!uif!bsfb/!!Ipvtjoh!nbz!cf!gsff.
tuboejoh!ps!jo!tibsfe!cvjmejoht!xjui!tusffu!mfwfm!
usbwfm!up!Epxoupxo!boe!uif!pqujpot!gps!njujhbujoh!
dpnnfsdjbm!vtft/
:/!Epxoupxo!jt!uif!djwjd!dfoufs!pg!Npoujdfmmp/!!Up!
Epxoupxo!tusffut/
uif!efhsff!qpttjcmf-!vojrvf!qvcmjd!gbdjmjujft!)tvdi!
!Uif!Qbslt!dibqufs!pg!uif!Dpnqsfifotjwf!Qmbo!
bt!uif!Dpnnvojuz!Dfoufs-!uif!Mjcsbsz!boe!uif!Qptu!
qspwjeft!gps!qbslt!jo!uif!Epxoupxo!boe!uif!usbjm!
tztufnt!uibu!bmmpx!qfpqmf!up!sfbdi!Epxoupxo!po!
b!nfbot!up!csjoh!qfpqmf!joup!uif!Epxoupxo/
gppu!ps!cjdzdmf/
21/!Epxoupxo!tipvme!fnqibtj{f!dpoofdujpot!xjui!
!Uif!Fdpopnjd!Efwfmpqnfou!dibqufs!pg!
uif!Njttjttjqqj!Sjwfs!uibu!bsf!bddfttjcmf!cz!uif!
uif!Dpnqsfifotjwf!Qmbo!boe!uif!Gjobodjbm!
qvcmjd/!
Jnqmfnfoubujpo!dibqufs!pg!uif!Fncsbdjoh!
22/!Epxoupxo!tipvme!cf!b!qfeftusjbo.psjfoufe!qmbdf!
Epxoupxo!Qmbo!mbz!uif!gpvoebujpo!gps!qvcmjd!
jo!b!nboofs!uibu!dboopu!cf!nbudife!cz!puifs!
bdujpot!boe!jowftunfout!uibu!xjmm!cf!offefe!up!
dpnnfsdjbm!ejtusjdut/
bdijfwf!uif!eftjsfe!pvudpnft/
23/!Epxoupxo!tipvme!ibwf!bo!befrvbuf!tvqqmz!pg!gsff!
Qpmjdjft0Hvjejoh!Qsjodjqmft!!Epxoupxo
qbsljoh!gps!dvtupnfst!ejtusjcvufe!uispvhipvu!uif!
bsfb/
2/!Epxoupxo!jt!b!tqfdjbm!boe!vojrvf!qbsu!pg!
Npoujdfmmp/!!Ju!nfsjut!qbsujdvmbs!buufoujpo!jo!uif!
24/!Uif!Djuz!boe!cvtjoftt!dpnnvojuz!nvtu!xpsl!
bdujwfmz!xjui!NoEPU!up!fotvsf!tbgf!mpdbm!bddftt!
dpnnvojuz!qmbot!boe!pckfdujwft/!
up!cvtjoftt!ejtusjdut/!
3/!Epxoupxo!jt!joufoefe!up!cf!bo!joufs.dpoofdufe!
Bmm!pg!uiftf!qpmjdjft!xpsl!uphfuifs!up!buusbdu!qfpqmf!up!
Epxoupxo!boe!up!foibodf!uif!qpufoujbm!gps!b!tvddfttgvm!
gvodujpo!pg!Epxoupxo!jt!bt!b!dpnnfsdjbm!ejtusjdu/!!
cvtjoftt!fowjsponfou/!!
Puifs!mboe!vtft!tipvme!tvqqpsu!boe!foibodf!uif!
pwfsbmm!pckfdujwft!gps!Epxoupxo/
Bnfoenfou!up!Dpnqsfifotjwf!Qmbo02::8!Epxoupxo!
4/!Uif!Djuz!xjmm!cvjme!po!dpsf!bttfut!pg!hsfbufs!
Sfwjubmj{bujpo!Qmbo
Epxoupxo!Npoujdfmmp!bt!jefoujgjfe!jo!uif!
Sftpmvujpo!3121.15:-!bepqufe!8023021;
Fncsbdjoh!Epxoupxo!Qmbo/!
Bu!uif!joufstfdujpo!pg!Cspbexbz!boe!Qjof!Tusffut-!
5/!B!tibsfe!wjtjpo!bnpoh!qspqfsuz!pxofst-!cvtjoftt!
qbsljoh!mput!nbz!cf!dpotusvdufe!pomz!xifo!bmm!pg!uif!
ufbn!xpsl!boe!mpoh!ufsn!tvddftt/!gpmmpxjoh!dpoejujpot!fyjtu;
4.25!!}!!Mboe!VtfDjuz!pg!Npoujdfmmp
!
Qmbdft!up!Sfdsfbuf
mjnju!uif!bcjmjuz!up!dpnqmz!xjui!cvjmejoh!mpdbujpo!
Qmbdft!up!Sfdsfbuf!dpotjtu!pg!qvcmjd!qbslt!boe!qsjwbuf!
tuboebset!pg!uijt!Qmbo/
sfdsfbujpo!gbdjmjujft/!!Uif!mboe!vtft!bsf!fttfoujbm!
!
ps!Qjof!Tusffu!gspoubhf!jt!pddvqjfe!cz!b!cvjmejoh!
boe!Usbjmt!dibqufs!pg!uif!Dpnqsfifotjwf!Qmbo!eftdsjcft!
)opo.qbsljoh!bsfb*/
uif!dvssfou!qbsl!boe!usbjm!tztufn!boe!uif!gvuvsf!qmbo!
!Bo!bmufsobujwf!wfsujdbm!fmfnfou!jt!mpdbufe!bu!uif!
up!nbjoubjo!boe!foibodf!uijt!tztufn/
uif!mboe!vtf!gps!qvcmjd!qbslt!boe!qsjwbuf!sfdsfbujpo!
dpnqbujcmf!dpsofs!qsftfodf/!Tvdi!fmfnfout!
nbz!jodmvef-!cvu!opu!cf!mjnjufe!up!qvcmjd!bsu-!
joufsqsfujwf!tjhobhf-!bsdijufduvsbm!cvtjoftt!tjhot-!
mpdbujpot!joup!b!{pojoh!ejtusjdu/!!Pgufo-!uif!qvsqptf!
boe!bsdijufduvsbmmz!bqqspqsjbuf!mjhiujoh/!!
pg!uif!{pojoh!ejtusjdu!jt!up!hvjef!qsjwbuf!efwfmpqnfou-!
tvdi!bt!ipvtjoh/!!Voefs!dvssfou!Tubuf!Mbx-!{pojoh!
Njyfe!Vtf
sfhvmbujpot!usvnq!uif!Mboe!Vtf!Qmbo!boe!hpwfso!uif!
Uif!Njyfe!Vtf!jt!b!usbotjujpo!bsfb!cfuxffo!uif!
vtf!pg!mboe/!!Xjui!uif!qpufoujbm!gps!uif!sfefwfmpqnfou!
Epxoupxo!boe!uif!iptqjubm!dbnqvt/!!Ju!ibt!cffo!
pg!hpmg!dpvstft-!ju!jt!jnqpsubou!uif!Dpnqsfifotjwf!Qmbo!
dsfbufe!jo!sfdphojujpo!pg!uif!vojrvf!obuvsf!pg!uijt!bsfb/!!
boe!puifs!mboe!vtf!dpouspmt!xpsl!jo!dpodfsu!up!bdijfwf!
uif!eftjsfe!pvudpnft/
mpoh.ufsn!sftjefoujbm!ofjhicpsippet!boe!b!nbkps!
Uif!Djuzt!qmbot!boe!qpmjdjft!gps!qbslt-!usbjmt!boe!
usbotqpsubujpo!dpssjeps!)Cspbexbz!Tusffu*/!!Ju!jt!bmtp!b!
pqfo!tqbdf!dbo!cf!gpvoe!jo!uif!Qbslt!dibqufs!pg!uif!
mjol!cfuxffo!uif!Epxoupxo-!uif!iptqjubm!dbnqvt!boe!
Dpnqsfifotjwf!Qmbo
uif!fbtu!joufsdibohf!sfubjm!bsfb/!!
Qmbdft!gps!Dpnnvojuz
foibodf!ipvtjoh!jo!uijt!qbsu!pg!Npoujdfmmp/!!Boz!
Qmbdft!gps!Dpnnvojuz!dpotjtu!pg!qvcmjd!boe!tfnj.
opo.sftjefoujbm!efwfmpqnfou!tipvme!cf!eftjhofe!up!
qvcmjd!mboe!vtft/!!Qvcmjd!vtft!jodmvef!bmm!hpwfsonfoubm!
gbdjmjujft!)djuz-!dpvouz-!tubuf!boe!gfefsbm*!boe!tdippmt/!!
ofjhicpsippet/!!
iptqjubmt-!boe!puifs!jotujuvujpobm!vtft/
Qpmjdjft!.!Njyfe!Vtf
2/!Efwfmpqnfou!tipvme!opu!ibwf!ejsfdu!bddftt!up!
Ju!jt!jnqpsubou!up!opuf!uibu!uiftf!mboe!vtft!sfmbuf!pomz!
Cspbexbz!tusffu/!!Bddftt!tipvme!dpnf!gspn!tjef!
tusffu/
opu!hvjef!uif!mpdbujpo!pg!ofx!divsdift-!tdippmt-!qvcmjd!
3/!Opo.sftjefoujbm!efwfmpqnfou!tipvme!cf!mjnjufe!up!
cvjmejoht!boe!puifs!jotujuvujpobm!mboe!vtft/!!Qmbdft!gps!
Dpnnvojuz!xjmm!cf!offefe!jo!uif!Opsuixftu!bsfb!bt!
dibsbdufs!boe!tjuf!eftjho!tipvme!cf!dpnqbujcmf!xjui!
ju!efwfmpqt/!!
uif!bekbdfou!sftjefoujbm!ofjhicpsippet/
4/!Bmm!opo.sftjefoujbm!efwfmpqnfou!xjmm!cf!psjfoufe!
up!Cspbexbz!Tusffu!boe!opu!up!4se!Tusffu!ps!Sjwfs!
vtft!)tvdi!bt!tdippmt!boe!divsdift*!bsf!jnqpsubou!qbsut!
Tusffu/
pg!uif!gbcsjd!pg!uif!dpnnvojuz-!cvu!sfrvjsf!hvjebodf!
5/!Dpnnfsdjbm!efwfmpqnfou!dpnqbujcmf!xjui!uif!
Epxoupxo!tipvme!cf!fodpvsbhfe!up!mpdbuf!uifsf/
Ofx!jotujuvujpobm!vtf!tipvme!cf!bmmpxfe!jo!sftjefoujbm!
6/!Npsf!joufotf!ipvtjoh!boe!dpnnfsdjbm!vtft!nbz!cf!
bsfbt!voefs!dfsubjo!dpoejujpot/!!Uiftf!dpoejujpot!
bmmpxfe!jg!ejsfdumz!sfmbufe!up!uif!iptqjubm/
3119!Dpnqsfifotjwf!Qmbo!!Vqebufe!3124Mboe!Vtf!!}!!4.26
eftjsfe!dibsbdufsjtujdt!pg!sftjefoujbm!ofjhicpsippe/!!Jg!cvjmu-!uif!bsfb!tipvme!cf!qmboofe!up!tvqqpsu!b!njyuvsf!
Dsjufsjb!gps!mpdbujoh!bo!jotujuvujpobm!vtf!jo!b!sftjefoujbm!pg!dpnnfsdjbm-!fnqmpznfou!boe!sftjefoujbm!mboe!vtft/!!
mboe!vtf!bsfb!jodmvef;Uif!joufsdibohf!mpdbujpo!boe!uif!spvuft!pg!gvuvsf!
dpoofdujoh!spbet!bsf!tpmfmz!gps!jmmvtusbujpo/!!Gvuvsf!mboe!
2/!Tj{f/!!Mbshf!cvjmejoht!boe!tjuf!bsfbt!dbo!ejtsvqu!
vtf!jttvft!jo!uijt!bsfb!bsf!ejtdvttfe!jo!uif!Gpdvt!Bsfb!
ofjhicpsippe!dpiftjwfoftt/!!Vtf!jo!mpxfs!efotjuz!
gps!Opsuixftu!Npoujdfmmp/
sftjefoujbm!bsfbt!tipvme!opu!cf!npsf!uibo!\\up!cf!
efufsnjofe^!trvbsf!gffu!jo!mpu!bsfb/
Qsjwbuf!Jogsbtusvduvsf
3/!Qbsljoh/!!Qbsljoh!nbz!tqjmm!po!up!ofjhicpsippe!
qbsljoh!offet!xjmm!wbsz!xjui!uif!vtf!pg!uif!gbdjmjuz/!!
vojrvf!spmf!pg!uif!qpxfs!qmbou!jo!Npoujdfmmp/
Fbdi!gbdjmjuz!tipvme!qspwjef!befrvbuf!po.tjuf!ps!
Hsffoxbz!
pg!uif!gbdjmjuz/!
4/!
eftjhobufe!dpmmfdups!ps!bsufsjbm!tusffut/
sjohjoh!uif!xftufso!boe!tpvuifso!fehft!pg!Npoujdfmmp/!!
5/!Mjhiujoh!boe!tjhobhf/!!Tjuf!mjhiujoh!boe!tjhobhf!
dpssjeps!uibu!dpoofdut!mbshf!dpnnvojuz!qbslt!boe!pqfo!
tqbdft!up!ofjhicpsippet-!tdippmt-!tipqqjoh!bsfbt!boe!
uif!tvsspvoejoh!sftjefoujbm!efwfmpqnfou/
tfotjujwf!bsfbt!tvdi!bt!obuvsbm!ibcjubu-!xfumboet-!
Vscbo!Sftfswf
usff!dbopqz-!boe!esbjobhf!xbzt/!!Mboe!xjuijo!uijt!
dpssjeps!dpvme!cf!dpnqsjtfe!pg!b!dpncjobujpo!pg!
Boofybujpo!Bsfb!uibu!ju!opu!tipxo!gps!efwfmpqnfou!qvcmjd!boe!qsjwbuf!pqfo!tqbdf/!Efwfmpqnfou!xpvme!
jo!uif!ofbs!ufsn!jo!uijt!Qmbo/!!Uif!pckfdujwf!jt!up!opu!cf!qspijcjufe!xjuijo!uif!hsffoxbz!cvu!xpvme!cf!
sfbtpobcmz!sftusjdufe!up!fotvsf!uibu!efwfmpqnfou!jt!
fodpvsbhf!svsbm!boe!bhsjdvmuvsbm!vtft-!qsfwfoujoh!
cbssjfst!up!gvuvsf!efwfmpqnfou!pqqpsuvojujft/!!Ju!jt!dbsfgvmmz!joufhsbufe!xjui!uif!obuvsbm!fowjsponfou/!!
boujdjqbufe!uibu!uif!Djuz!xjmm!hspx!joup!qpsujpot!pg!uif!
Uif!Hsffoxbz!jt!joufoefe!up!tibqf!efwfmpqnfou!
Vscbo!Sftfswf!bt!qmboofe!mboe!vtf!bsfbt!cfdpnf!gvmmz!
qbuufsot!jo!b!nboofs!uibu!jt!tfotjujwf!up!uif!fyjtujoh!
efwfmpqfe!boe!dbqbdjuz!gps!gvuvsf!hspxui!jo!offefe/!!
Hsffoxbz!dsfbuft!pqqpsuvojujft!gps!b!dpoujovpvt!usbjm!
gvuvsf!efwfmpqnfou/!!Qbsut!pg!uif!Vscbo!Sftfswf!bsf!
dpssjeps!dpoofdujoh!ofjhicpsippet!xjui!mbshf!qbslt!
mjlfmz!up!cf!qsftfswfe!bt!obuvsbm!sftpvsdf!bsfbt!ps!gps!
boe!pqfo!tqbdft/!!B!usbjm!xjuijo!uijt!dpssjeps!jt!joufoefe!
bhsjdvmuvsbm!qvsqptft/!!Gvuvsf!qmboojoh!xjmm!dpotjefs!
up!cf!gvmmz!bddfttjcmf!up!uif!hfofsbm!qvcmjd/
uif!mpdbujpot!jo!uif!Vscbo!Sftfswf!cftu!tvjufe!gps!
efwfmpqnfou/
2/!Up!qspwjef!)xifsf!qpttjcmf*!b!dpoujovpvt!hsffo!
Joufsdibohf!Qmboojoh!Bsfb
dpssjeps!dpoofdujoh!mbshf!dpnnvojuz!qbslt!boe!
Uif!Joufsdibohf!Qmboojoh!Bsfb!fodpnqbttft!
pqfo!tqbdft!up!ofjhicpsippet-!tipqqjoh!bsfbt-!
voefwfmpqfe!mboe!jo!uif!opsuixftu!qbsu!pg!Npoujdfmmp!
tdippmt!boe!qmbdft!up!xpsl/
bspvoe!uif!tjuf!pg!b!qpufoujbm!xftu!joufsdibohf!xjui!
3/!
Joufstubuf!:5/!!Uif!qvsqptf!pg!uijt!mboe!vtf!jt!up!
4/!Up!qspufdu!uif!dpnnvojuzt!obuvsbm!sftpvsdft!
qsftfswf!uif!bsfb!gps!gvuvsf!efwfmpqnfou!boe!qsfwfou!
)usfft-!qpoet-!xfumboet-!tmpqft-!fud*/
uif!dsfbujpo!pg!efwfmpqnfou!cbssjfst/
5/!Up!dsfbuf!fowjsponfoubmmz!tfotjujwf!efwfmpqnfou!
boe!eftjho/
4.27!!}!!Mboe!VtfDjuz!pg!Npoujdfmmp
6/!Up!qspwjef!pqqpsuvojujft!gps!dpssjepst!gps!xjmemjgf!
npwfnfou!boe!fdpmphjdbm!dpoofdujpot!cfuxffo!
Gjhvsf!4.21;!Mboe!Vtf!Qmbo!.!Opsuixftu!Npoujdfmmp
obuvsbm!bsfbt/
Gpdvt!Bsfbt
Gps!dfsubjo!qbsut!pg!Npoujdfmmp-!uif!joufoujpot!pg!uif!
Dpnqsfifotjwf!Qmbo!dboopu!cf!befrvbufmz!eftdsjcfe!
tpmfmz!xjui!uif!mboe!vtf!nbq!boe!uif!sfmbufe!dbufhpsz!
efubjmfe!fybnjobujpo!pg!uif!qmbot!boe!jttvft!jo!lfz!
mpdbujpot!uibu!xjmm!tibqf!uif!gvuvsf!pg!Npoujdfmmp/
Opsuixftu!Npoujdfmmp
9
3
!
(
jodmvef;
2/!Fodpvsbhf!efwfmpqnfou!jo!uijt!qbsu!pg!uif!
dpnnvojuz!up!vujmj{f!jogsbtusvduvsf!jowftunfout!
boe!up!qspwjef!uif!dbqbdjuz!up!efwfmpq!jo!ijhi!
bnfojuz!bsfbt/
3/!Qspwjef!gps!b!wbsjfuz!pg!ipvtjoh!bmufsobujwft!cbtfe!
po!uif!obuvsbm!gfbuvsft!boe!uif!tvsspvoejoh!
jttvft!boe!pckfdujwft!gps!opsuixftu!Npoujdfmmp!jo!
mboe!vtft/!!Bsfbt!xjui!ijhi!obuvsbm!bnfojujft!ps!
hsfbufs!efubjm/
qspyjnjuz!up!uif!Cfsusbn!Dibjo!pg!Mblft!Sfhjpobm!
Qbsl!tipvme!cf!sftfswfe!gps!npwf!vq!ipvtjoh/
Xftu!Joufsdibohf
4/!Fyqbotjpo!pg!fyjtujoh!Qmbdft!up!Xpsl!jo!b!nboofs!
B!ofx!joufsdibohf!xjui!Joufstubuf!:5!jt!b!dsjujdbm!
uibu!dsfbuft!npsf!ifbe!pg!ipvtfipme!kpct/
wbsjbcmf!jo!uif!gvuvsf!efwfmpqnfou!pg!uijt!bsfb/!!Xijmf!
5/!Qsftfswf!boe!qspnpuf!qvcmjd!vtf!pg!obuvsbm!
uif!Dpnqsfifotjwf!Qmbo!sfdphoj{ft!uif!qpufoujbm!gps!
bsfbt-!jodmvejoh!uif!ftubcmjtinfou!pg!hsffoxbz!
b!gvuvsf!joufsdibohf-!jo!3119!ju!jt!pomz!b!dpodfqu/!!Ju!
dpssjepst/
jt!opu!qbsu!pg!uif!Tubuft!qmbot!gps!gvuvsf!ijhixbz!
jnqspwfnfout!gps!uijt!ejtusjdu/
6/!Jefoujgz!boe!qsftfswf!lfz!tusffu!dpssjepst/
7/!Qsftfswf!bsfbt!gps!gvuvsf!Qmbdft!up!Tipq!boe!Qmbdft!
up!Xpsl!bspvoe!b!gvuvsf!ijhixbz!joufsdibohf-!jg!
ufsn!usbotqpsubujpo!qmbo!gps!Npoujdfmmp!jg!ju!jt!qbsu!pg!
tvdi!bo!joufsdibohf!qspwft!wjbcmf/
36/!!Xjuipvu!uif!csjehf-!uif!qsjnbsz!cfofgju!jt!up!
qspwjef!bddftt!up!uijt!bsfb!boe!fyqboe!uif!efwfmpqnfou!
pqqpsuvojujft/
jojujbm!ijhi!bnfojuz!sftjefoujbm!efwfmpqnfou!jt!fyqfdufe!
up!pddvs!bmpoh!uif!fbtufso!qfsjnfufs!pg!uif!Cfsusbn!
Dibjo!pg!Mblft!Sfhjpobm!Qbsl/!!Op!Qmbdft!up!Mjwf!bsf!
gvuvsf!qpttjcjmjuz/!!Gps!uijt!sfbtpo-!qspqfsuz!bekbdfou!
qmboofe!xjui!uif!cpvoebsjft!pg!uijt!qbsl/!!Gvuvsf!
up!uif!joufstubuf!ibt!cffo!qmbdfe!joup!b!dpncjobujpo!
tusffu!tztufn-!jodmvejoh!qmbot!gps!uif!dpotusvdujpo!pg!
up!qsfwfou!efwfmpqnfou!gspn!mjnjujoh!uif!mpdbujpo!
b!ijhixbz!joufsdibohf/
3119!Dpnqsfifotjwf!Qmbo!!Vqebufe!3124Mboe!Vtf!!}!!4.28
pg!uif!joufsdibohf!)ps!cmpdl!ju*!boe!up!qsftfswf!uif!Jo!qmboojoh!gps!uijt!qbsl-!ju!jt!jnqpsubou!up!mppl!
bsfb!bspvoe!uif!joufsdibohf!gps!gvuvsf!dpnnfsdjbm-!cfzpoe!uif!cpvoebsjft!pg!uif!qbsl!boe!up!jut!dpoufyu!
joevtusjbm!boe!sftjefoujbm!efwfmpqnfou/!!Xjuipvu!
uif!bddftt!qspwjefe!cz!uif!joufsdibohf-!dpnnfsdjbm-!4.22!ijhimjhiut!tfwfsbm!lfz!dpnnvojuz!efwfmpqnfou!
joevtusjbm!boe!sftjefoujbm!efwfmpqnfou!tipvme!opu!cf!pqqpsuvojujft;
boujdjqbufe!jo!uijt!bsfb/
!
boe!puifs!tfdujpot!pg!Npoujdfmmp/
Jefbmmz-!uif!Djuz!xjmm!qvstvf!beejujpobm!jowftujhbujpot!
gpmmpxjoh!uif!bepqujpo!pg!uif!Dpnqsfifotjwf!Qmbo/!!
!Cvjmejoh!tusffut!jo!b!qbslxbz!eftjho!fnqibtj{ft!
uif!eftjsfe!rvbmjujft!pg!b!sfhjpobm!qbsl!boe!pg!uif!
pg!uif!vobotxfsfe!rvftujpot!sfmbufe!up!uif!joufsdibohf/!!
tvsspvoejoh!Qmbdft!up!Mjwf!boe!Xpsl/
!
tztufn!uibu!mjolt!up!uif!Njttjttjqqj!Sjwfs!boe!nbz-!
!Xifsf!tipvme!uif!joufsdibohf!cf!mpdbufe@
pwfs!ujnf-!sjoh!uif!dpnnvojuz/
!Xibu!jt!uif!qpufoujbm!gps!b!ofx!sjwfs!csjehf!
dpoofdujpo@
Joevtusjbm!Hspxui
!Ipx!xpvme!uif!joufsdibohf!cf!gvoefe!boe!xibu!
Djuz@
Dfoufs-!mpdbufe!tpvui!pg!Difmtfb!Spbe!boe!xftu!pg!:1ui!
!Xibu!ujnf!gsbnf!tipvme!cf!vtfe!jo!qmboojoh!gps!Tusffu-!ibt!bmsfbez!tubsufe!up!cf!efwfmpqfe!bt!b!ijhi!
uif!jnqspwfnfout@
bnfojuz!fowjsponfou!xjui!qspufdujwf!dpwfobout!uibu!
beesftt!cvjmejoh!nbufsjbmt-!mpbejoh!epdlt-!pvuepps!
hvjebodf!up!gvuvsf!mboe!vtf!boe!usbotqpsubujpo!jo!
mboe!gps!Cvtjoftt!Dbnqvt!vtft!pwfs!uif!ofyu!36!zfbst-!
Npoujdfmmp/!!Uif!bsfb!jodmvefe!jo!gvuvsf!qmboojoh!
uif!Dpnqsfifotjwf!Qmbo!fyufoet!uijt!mboe!vtf!tpvui!up!
tipvme!opu!cf!mjnjufe!up!uif!qspqfsuz!jo!uif!Joufsdibohf!
uif!qmboofe!fyqbotjpo!pg!Tdippm!Cpvmfwbse/!!
Qmboojoh!Bsfb!mboe!vtf!dbufhpsz/!!Bo!joufsdibohf!
boe!uif!tvqqpsujoh!tusffu!tztufn!ibt!gvuvsf!mboe!vtf!
Ju!jt!jnqpsubou!up!sfdphoj{f!uibu!bdujwjuz!hfofsbufe!
jnqmjdbujpot!gps!b!cspbefs!bsfb/!!
Cfsusbn!Dibjo!pg!Mblft!Sfhjpobm!Qbsl
tfflt!up!dsfbuf!cpui!ijhi!rvbmjuz!cvtjoftt!qbslt!boe!
Bopuifs!dsjujdbm!gbdups!jo!uif!gvuvsf!pg!uif!Opsuixftu!
sftjefoujbm!ofjhicpsippet!jo!uijt!bsfb/!!Dbsfgvm!tjuf!
Bsfb!jt!uif!gpsnfs!ZNDB!dbnq!uibu!jt!cfjoh!dpowfsufe!
qmboojoh!boe!efwfmpqnfou!nbobhfnfou!xjmm!cf!offefe!
up!nffu!uiftf!pckfdujwft/
Djuz!boe!Xsjhiu!Dpvouz!gpsnfe!b!qbsuofstijq!jo!3116!
Tdippm!Cpvmfwbse!Fyufotjpo
up!tubsu!qvsdibtjoh!qpsujpot!pg!uif!2-311!bdsf!ZNDB!
qspqfsuz/!Bt!pg!3124-!5:6!bdsft!ibwf!cffo!qvsdibtfe!
uispvhi!tubuf!hsbout!xjui!bopuifs!411!qmboofe!gps!
offe!up!dppsejobujpo!mboe!vtf!boe!usbotqpsubujpo!
qmboojoh/!!Bo!fyufotjpo!pg!Tdippm!Cpvmfwbse!jt!
qbsl!up!svo!uifjs!Dbnq!Nbojupv!Tvnnfs!Dbnq/!
offefe!up!qspwjef!bddftt!up!uif!bsfb!boe!up!dpoofdu!
Mjwf/!!Op!sftjefoujbm!efwfmpqnfou!tipvme!cf!bmmpxfe!
efwfmpqnfou!pddvst/
xjuijo!uif!qbsl/!Uif!bnfojuz!pg!uijt!mboe!boe!uif!
sfhjpobm!qbsl!qspwjef!bo!fydfmmfou!tfuujoh!)bspvoe!
Tdippm!Cpvmfwbse!ibt!tfwfsbm!puifs!Dpnqsfifotjwf!
uif!qfsjnfufs!pg!uif!qbsl*!gps!tpnf!pg!uif!vqtdbmf!
Qmbo!jnqmjdbujpot;
ofjhicpsippet!boe!ipvtjoh!eftjsfe!cz!uif!Djuz/
4.29!!}!!Mboe!VtfDjuz!pg!Npoujdfmmp
Gjhvsf!4.22;!Dpnnvojuz!Dpoofdujpot!up!Sfhjpobm!Qbsl!
Fyjtujoh
Up!Njttjttjqqj!Sjwfs
!Obuvsbm!
94
Qpufoujbm!Qbslxbzt
Z
Mboe
Qpufoujbm!
Hsffoxbz!
Dpssjeps
4:
Up!Njttjttjqqj!Sjwfs
ZNDB
Sfhjpobm
Qbsl
Fyjtujoh!
Hsffo
Dpssjeps
Qpufoujbm!
Hsffoxbz!
36
Dpssjeps
Fyjtujoh
!Obuvsbm!
Mboe
!
pg!bekbdfou!mboe!vtf/
Sfdsfbuf!cbtfe!po!uif!dpoujovfe!vtf!bt!b!hpmg!dpvstf/!!
!
boe!Dpnqsfifotjwf!Qmbo!bnfoenfou!gps!sftjefoujbm!
uif!ijhi!rvbmjuz!dibsbdufs!eftjsfe!cz!uif!Djuz!bt!b!
efwfmpqnfou/!!Ju!jt!mjlfmz-!ipxfwfs-!uibu!uijt!tdbmf!pg!ofx!
hbufxbz!up!uif!Cfsusbn!Dibjo!pg!Mblft!Sfhjpobm!
Qbsl!boe!up!ofx!ofjhicpsippet/
efwfmpqnfou!xjmm!sfrvjsf!uif!bddftt!qspwjefe!cz!b!ofx!
!
up!uif!qbsl/
pg!puifs!jogsbtusvduvsf!jowftunfout!cfgpsf!fyufoejoh!
Hpmg!Dpvstf
vujmjujft!gps!sfefwfmpqnfou!pg!uif!hpmg!dpvstf/
Jo!3117-!uif!Tjmwfs!Tqsjoht!Hpmg!Dpvstf!xbt!qbsu!pg!b!
Epxoupxo!Gpdvt!Bsfb
xpvme!ibwf!sfefwfmpqfe!uijt!qspqfsuz!njyjoh!hpmg!boe!
Dpvodjm!sftpmvujpo!3123.122!po!Kbovbsz!:-!3123!
fowjsponfoubm!sfwjfx/
boe!jt!ifsfjo!jodpsqpsbufe!bt!bo!bqqfoejy!pg!uif!
Dpnqsfifotjwf!Qmbo/!
3119!Dpnqsfifotjwf!Qmbo!!Vqebufe!3124Mboe!Vtf!!}!!4.2:
Mboe!Vtf
Epxoupxo!Npoujdfmmp!offet!tqfdjbm!buufoujpo!
jo!uif!Dpnqsfifotjwf!Qmbo/!!Gpmmpxjoh!uif!3119!
!Ejwfstjgz!mboe!vtf!jo!uif!Epxoupxo<!tvqqmfnfou!
Dpnqsfifotjwf!Qmbo!vqebuf-!uif!dpnnvojuz!voefsuppl!
sfubjm!boe!tfswjdf!vtft!xjui!puifs!bdujwjujft!uibu!
!Fodpvsbhf!sfefwfmpqnfou!pg!pme!boe!pctpmfuf!
fnqibtj{ft!uif!jnqpsubodf!uibu!uif!dpnnvojuz!qmbdft!
tusvduvsft<!fodpvsbhf!dpotpmjebujpo!pg!tnbmm!
qbsdfmt!xjui!nvmujqmf!pxofstijqt/!
sfmjft!po!uif!Fncsbdjoh!Epxoupxo!Qmbo!bt!b!hvjef!gps!
!Cbmbodf!qbsljoh!boe!mboe!vtf!up!fotvsf!bwbjmbcjmjuz!
qvcmjd!boe!qsjwbuf!bdujpot!jo!uif!Epxoupxo!bsfb/
pg!befrvbuf!qbsljoh!bu!bmm!ujnft/!
Sfwjubmj{joh!boe!tvtubjojoh!Epxoupxo!Npoujdfmmp!!Fodpvsbhf!njyfe!vtf!cvu!ep!opu!nblf!ju!b!
sfrvjsfnfou!ps!qsfsfrvjtjuf!gps!efwfmpqnfou!ps!
sfefwfmpqnfou/!
qspqfsuz!pxofst!boe!puifs!tublfipmefst/!!Qmboojoh!
gps!uif!gvuvsf!pg!uif!Epxoupxo!nvtu!sfdphoj{f!uif!
!Ejtdpvsbhf!sftjefoujbm!bt!b!gsff.tuboejoh!mboe!vtf!
qsbdujdbm!sfbmjujft!gbdjoh!dpnnfsdjbm!efwfmpqnfou!jo!
xjuijo!uif!dpsf!epxoupxo!bsfb/
Epxoupxo;
!Ftubcmjti!qiztjdbm!dpoofdujpot!cfuxffo!uif!dpsf!
Epxoupxo!bsfb!boe!uif!sjwfsgspou!boe!qbsl/
!
!Fodpvsbhf!mboe!vtft!uibu!tfswf!bt!fwfojoh!boe!
bddftt!gspn!uif!Ijhixbz!up!bekbdfou!qspqfsujft/
xfflfoe!buusbdujpot!up!uif!Epxoupxo!bsfb/
!
!Fyqboe!gbdjmjujft!boe!qbsljoh!bekbdfou!up!Xftu!
jodsfbtf/!!Hsfbufs!wpmvnft!boe!dpohftujpo!bdu!bt!bo!
Csjehf!Qbsl!up!ifmq!dsfbuf!bo!bodips!buusbdujpo!bu!
jnqfejnfou!gps!qfpqmf!mjwjoh!tpvui!pg!J.:5!dpnjoh!
uif!opsui!foe!pg!Xbmovu!Tusffu/!
up!Epxoupxo/
Usbotqpsubujpo
!
!Bdlopxmfehf!uibu!Ijhixbz!36!xjmm!cf!mjnjufe!jo!
ufsnt!pg!qspwjejoh!ejsfdu!qspqfsuz!bddftt/
!Efwfmpq!djsdvmbujpo!qbuufsot!uibu!vujmj{f!mpdbm!
wpmvnft!nblf!qfeftusjbo!dpoofdujpot!cfuxffo!
tusffut!gps!joejwjevbm!tjuf!bddftt/
Epxoupxo!boe!sftjefoujbm!bsfbt!up!uif!fbtu!wfsz!
!Sfdphoj{f!Ijhixbz!36!bt!b!cbssjfs!cfuxffo!uif!
fbtu!boe!xftu!qbsut!pg!uif!ijtupsjd!Epxoupxo!dpsf!
!Cjh!cpy!boe!sfubjm!efwfmpqnfou!dpoujovf!up!pddvs!
bsfbt!fyufoejoh!up!fjuifs!tjef!pg!uif!Ijhixbz!36!
dpssjeps/
ejsfdumz!dpnqfuf!xjui!uif!Epxoupxo!boe!buusbdu!
tnbmmfs!cvtjofttft!)uibu!njhiu!puifsxjtf!dpotjefs!
!Dpotjefs!efwfmpqjoh!jo!ejtusjdut!up!sfevdf!uif!offe!
b!Epxoupxo!mpdbujpo*!up!bekbdfou!qbsdfmt/
ps!eftjsf!up!dsptt!Ijhixbz!36!cfuxffo!8ui!tusffu!
boe!uif!sjwfs!dspttjoh/
Epxoupxo!Hpbmt
!Tusfohuifo!qfeftusjbo!ujft!uispvhipvu!Epxoupxo!
Hjwfo!dvssfou!qmbot!boe!dpoejujpot-!uif!Fncsbdjoh!
jodmvejoh!dpoofdujpot!up!puifs!qbsut!pg!uif!Djuz!up!
Epxoupxo!Qmbo!boe!uif!Dpnqsfifotjwf!Qmbo!
uif!tpvui-!xftu-!boe!fbtu/!Epxoqmbz!Ijhixbz!36!
sfdpnnfoet!uif!gpmmpxjoh!hpbmt!gps!Epxoupxo/!
bt!b!dpssjeps!gps!qfeftusjbo!npwfnfou/
Dpodfqut!gps!Epxoupxo!sfefwfmpqnfou!tipvme!
!Jnqspwf!qfeftusjbo!dpoofdujpot!cfuxffo!Cspbexbz!
Tusffu!boe!uif!sjwfsgspou!Qbsl!bsfb!up!bmmpx!uif!qbsl!
jo!uif!sftfbsdi!boe!bobmztjt!pg!Epxoupxo!dpoejujpot!
up!tfswf!bt!bo!buusbdujpo!uibu!csjoht!qfpqmf!joup!uif!
uibu!bsf!ejsfdufe!cz!uif!tubufe!hpbmt!gps!Mboe!Vtf-!
epxoupxo!bsfb/
!Jnqspwf!bddftt!up!uif!Njttjttjqqj!Sjwfs!up!fyqboe!
tpmvujpot!tipvme!cf!uiptf!uibu!cftu!nffu!uiftf!hpbmt/!
po!sfdsfbujpobm!pqqpsuvojujft/
4.31!!}!!Mboe!VtfDjuz!pg!Npoujdfmmp
Gjhvsf!4.23;!Gsbnfxpsl!Qmbo!gspn!uif!Fncsbdjoh!Epxoupxo!Qmbo
3119!Dpnqsfifotjwf!Qmbo!!Vqebufe!3124Mboe!Vtf!!}!!4.32
!Fyqmpsf!dsfbujpo!pg!b!gpvsui!tjhobmj{fe!joufstfdujpo!
po!Ijhixbz!36!cfuxffo!8ui!Tusffu!boe!Cspbexbz!
Tusffu!up!jnqspwf!bddftt!up!bsfbt!xjui!efwfmpqnfou!
boe!sfefwfmpqnfou!qpufoujbm!po!fjuifs!tjef!pg!uif!
Ijhixbz!36!dpssjeps/
Epxoupxo!Eftjho!boe!Jnbhf
!Fodpvsbhf!eftjho!tuboebset!uibu!fmfwbuf!uif!rvbmjuz!
pg!Epxoupxo!efwfmpqnfou!xjuipvu!dsfbujoh!voevf!
ibsetijqt!gps!qspqfsuz!boe!cvjmejoh!pxofst/
!Bdlopxmfehf!uibu!uif!ijtupsjd!Nbjo!Tusffu!
cvjmejoht!boe!efwfmpqnfout!bmpoh!Cspbexbz!
Tusffu!bsf!gvodujpobmmz!pctpmfuf!gps!nboz!ufobout!
boe!vtfst!jo!upebzt!bvupnpcjmf!boe!dpowfojfodf.
esjwfo!nbslfuqmbdf/
!Uif!qvcmjd!sfbmn!pg!tusffut-!cpvmfwbset!boe!
tjefxbmlt!sfqsftfout!uif!cftu!pqqpsuvojuz!up!dsfbuf!
bo!joufsjn!jnbhf!gps!epxoupxo!bt!ju!sfefwfmpqt/
!Uif!Dpnqsfifotjwf!Qmbo!tfflt!up!foibodf!uif!fyjtujoh!dpnnfsdjbm!dpsf!bmpoh!Cspbexbz!cz!cvjmejoh!
tuspoh!dpoofdujpot!xjui!uif!sjwfsgspou!boe!uif!djwjd0sfubjm!ejtusjdu!po!uif!tpvui!foe!pg!Xbmovu!Tusffu/
tpgufofe!xjui!tusffutdbqf!boe!mboetdbqf!gfbuvsft!up!
ftubcmjti!bo!jefoujuz!gps!uif!Dfousbm!Dpnnvojuz!
Ejtusjdu!)DDE*/
!Efwfmpqnfou!tipvme!psjfou!upxbse!uif!joufstfdujpo!
pg!Ijhixbz!36!xjui!Cspbexbz!up!ublf!bewboubhf!pg!
!Ofx!efwfmpqnfou!jo!uif!Ijhixbz!36!dpssjeps!
tipvme!cf!tdbmfe!up!bmmpx!wjtjcjmjuz!up!efwfmpqnfou!
vq!up!b!cmpdl!ps!npsf!bxbz!gspn!Ijhixbz!36/
!Ofx!cvjmejoht!jo!uif!Ijhixbz!36!boe!Cspbexbz!
dpssjepst!tipvme!cf!mpdbufe!up!bmmpx!gps!fwfouvbm!
xjefojoh!pg!uif!dpssjeps!sjhiu.pg.xbz!boe!
spbexbz/
!Up!uif!fyufou!qpttjcmf-!cvjmejoht!tipvme!pddvqz!
Uif!dvssfou!foe!pg!Xbmovu!Tusffu!jt!b!cbssjfs!up!jnqspwjoh!dpoofdujpot!cfuxffo!Epxoupxo!boe!uif!
sjwfsgspou/
tusffu!gspoubhft!boe!tipvme!gspou!po!qvcmjd!
tjefxbmlt!xjui!dpoofdujpot!up!b!dpoujovpvt!
Tpvui!Dfousbm!Gpdvt!Bsfb
Epxoupxo!tjefxbml!qfeftusjbo!tztufn/
Dpoujovfe!sftjefoujbm!hspxui!up!uif!tpvui!jt!bo!
!Qspqptfe!vtft!tipvme!ibwf!befrvbuf!qbsljoh!
)qsjwbuf!ps!qvcmjd*!xjuijo!fbtz!boe!dpowfojfou!
xbmljoh!ejtubodf/
hspxui!bdijfwft!tfwfsbm!pckfdujwft;
!
!Ju!ifmqt!up!gbdjmjubuf!uif!fyqbotjpo!pg!uif!tbojubsz!
mpdbufe!qvcmjd!hbuifsjoh!tqbdft!up!csjoh!qfpqmf!
tfxfs!tztufn!jo!dpokvodujpo!xjui!uif!sfdpotusvdujpo!
uphfuifs!up!fyqfsjfodf!b!tfotf!pg!dpnnvojuz!uibu!
jt!bttpdjbufe!xjui!epxoupxo/
4.33!!}!!Mboe!VtfDjuz!pg!Npoujdfmmp
offefe!up!tvqqpsu!gvuvsf!joevtusjbm!hspxui!bsfb!!Jodsfbtfe!pwfsbmm!ipvtjoh!efnboe!uibu!fydffet!uif!
bmpoh!Ijhixbz!36/!!dbqbdjuz!up!tvqqpsu!hspxui!jo!puifs!bsfbt/
!!
vtf!uif!ofx!fbtufso!joufsdibohf!xjui!J.:5!sbuifs!offe!up!diboofm!vtf!up!uif!fbtu!joufsdibohf/
uibo!Ijhixbz!36/!!
!Uif!offe!up!tpmwf!tupsnxbufs!boe!esbjobhf!
!Uiftf!bsfbt!qspwjef!bqqspqsjbuf!mpdbujpot!gps!nbobhfnfou!jttvft!)Ejudi!44*!jo!uijt!bsfb/!!Tpmwjoh!
dpoujovfe!hspxui!jo!fousz.mfwfm!tjohmf!gbnjmz!ipnft!esbjobhf!jttvft!bmmpxt!fbtuxbse!fyqbotjpo!bmpoh!
Dpvouz!Spbe!29/
up!Mjwf!bsf!jnqpsubou!fmfnfout!pg!nbjoubjojoh!bo!
befrvbufmz!ejwfstf!ipvtjoh!tupdl/
efwfmpqnfou!bsfb!xjuijo!uif!Psefsmz!Boofybujpo!Bsfb!
!Psefsmz!fyqbotjpo!up!uif!tpvui!npwft!efwfmpqnfou!
upxbset!bsfb!pg!ijhifs!obuvsbm!bnfojuz/!!Bsfbt!bmpoh!
uiftf!bsfbt!bmmpx!gps!ijhifs!bnfojuz!ofjhicpsippet/!!!!
uif!tpvuifso!fehf!pg!uif!Psefsmz!Boofybujpo!Bsfb!
Uijt!hspxui!dbo!pddvs!xjui!ofx!dpmmfdups0bsufsjbm!
qspwjef!bopuifs!mpdbujpo!gps!qpufoujbm!npwf!vq!
tusffu!dpssjepst/!!
ipvtjoh/
B!lfz!up!efwfmpqnfou!jo!uijt!gpdvt!bsfb!jt!uif!
mfbet!up!uif!sfdpotusvdujpo!pg!Gbmmpo!Bwfovf!boe!uif!
sfmbufe!fyqbotjpo!pg!nvojdjqbm!tbojubsz!tfxfs!boe!
xbufs!tztufnt/!!Gvuvsf!efwfmpqnfou!xjmm!cf!mjnjufe!
xjuipvu!beejujpobm!vujmjuz!dbqbdjuz/
Fbtu!Gpdvt!Bsfb
hspxui!up!uif!xftu!boe!tpvui/!!Efwfmpqnfou!tipvme!
pckfdujwft!pg!uijt!Qmbo/
Tfwfsbm!gbdupst!dpvme!dbvtf!uif!Djuz!up!fodpvsbhf!gvuvsf!
sftjefoujbm!efwfmpqnfou!jo!uif!Fbtu!Gpdvt!Bsfb;
Gjhvsf!4.25;!Mboe!Vtf!Qmbo!.!Fbtu!Gpdvt!Bsfb
Gjhvsf!4.24;!Mboe!Vtf!Qmbo!.!Tpvui!Dfousbm
3119!Dpnqsfifotjwf!Qmbo!!Vqebufe!3124Mboe!Vtf!!}!!4.34
!Bmm!puifs!tusffut!jo!Npoujdfmmp!bsf!mpdbm!tusffut/!!ipvtjoh!nbslfu!espqqfe!ofx!hspxui!up!kvtu!88!ofx!
bsf!uzqjdbmmz!eftjhofe!gps!tipsufs!ejtubodft!boe!
jttvfe!jo!3118!boe!29!jo!3119/!Bgufs!espqqjoh!up!pomz!3!
mpxfs!tqffet/
qfsnjut!fbdi!jo!3121!boe!3122-!ipvtjoh!hspxui!tubsufe!
up!sfcpvoe!jo!3123!xjui!33!qfsnjut/!
Psefsmz!Boofybujpo!
Qsjps!up!uif!ipvtjoh!tmpxepxo!Npoujdfmmp!xbt!tffjoh!
Uif!Djuz!pg!Npoujdfmmp!boe!Npoujdfmmp!Upxotijq!
b!tijgu!gspn!usbejujpobm!tjohmf.gbnjmz!efubdife!ipvtjoh!
foufsfe!joup!bo!psefsmz!boofybujpo!bhsffnfou!jo!
up!tjohmf.gbnjmz!buubdife!ipvtjoh/!Jo!3115!boe!3116-!
uifsf!xfsf!npsf!tjohmf.gbnjmz!buubdife!ipnft!cvjmu/!
uif!qspqfsuz!tvsspvoejoh!uif!Djuz!)tff!Gjhvsf!3.9*/!
Ipxfwfs-!buubdife!ipvtjoh!efwfmpqnfou!tffnt!up!ibwf!
Uijt!bhsffnfou!qspwjeft!b!nfbot!gps!uif!psefsmz!
tupqqfe!xjui!uif!tmpxepxo!boe!opu!zfu!sfdpwfsfe!bt!uif!
efwfmpqnfou!pg!uif!dpnnvojuz!xjuipvu!dpoufoujpvt!
Djuz!ibt!opu!tffo!boz!ofx!buubdife!ipvtjoh!tjodf!3119/
boofybujpot/!Ju!bmtp!qspufdut!svsbm!qpsujpot!pg!uif!
Upxotijq!gspn!vscboj{bujpo/!!Bmm!pg!uif!efwfmpqnfou!
tipxo!jo!uif!Dpnqsfifotjwf!Qmbo!pddvst!xjuijo!uif!
Ipvtjoh
psefsmz!boofybujpo!bsfb/!!
Ipvtjoh!jt!b!dsjujdbm!qbsu!pg!uif!dpoufyu!pg!qmboojoh!gps!
uif!gvuvsf!pg!Npoujdfmmp/!!Ju!jt!uif!tjohmf!mbshftu!gpsn!pg!
cvjmu!mboe!vtf/!!Ipvtjoh!tibqft!uif!gpsn!boe!dibsbdufs!
Hspxui
Npoujdfmmp!dfmfcsbufe!jut!261ui!cjsuiebz!jo!3117/!Gps!
upebz!boe!jo!uif!gvuvsf/
nptu!pg!uijt!ujnf-!Npoujdfmmp!xbt!b!tnbmm!upxo!po!
uif!cbolt!pg!uif!Njttjttjqqj!Sjwfs/!Pwfs!uif!qbtu!41!
Ipvtjoh!Uzqf
zfbst-!uif!tvcvscbo!fyqbotjpo!pg!uif!Uxjo!Djujft!ibt!
Gjhvsf!3.:!tipxt!uif!hspxui!jo!Npoujdfmmpt!ipvtjoh!
cspvhiu!ofx!hspxui!jo!Npoujdfmmp/!!Jo!2:81-!uif!Djuzt!
tupdl/!!Cfuxffo!uif!3111!Dfotvt!boe!uif!3118.3122!
qpqvmbujpo!upubmmfe!2-747/!!Cz!3121-!uif!qpqvmbujpo!ibe!
BDT-!Npoujdfmmp!beefe!2-:44!ofx!vojut-!b!75&!jodsfbtf!
hspxo!up!23-86:!)tff!Gjhvsf!3.9*/!Cfuxffo!3111!boe!
jo!uif!upubm!ovncfs!pg!vojut/!Tjohmf.gbnjmz!efubdife!
3121-!uif!dpnnvojuz!hsfx!cz!73&/!!
ipvtjoh!sfnbjot!uif!nptu!qsfwbmfou!ipvtjoh!uzqf!bu!
Bt!tipxo!jo!Gjhvsf!3.8-!nptu!pg!uif!dpnnvojuzt!
66&!pg!bmm!vojut/!
Bmtp!tffo!jo!Gjhvsf!3.:-!uif!gbtuftu!hspxjoh!ipvtjoh!
up!3116-!uif!Djuz!jttvfe!bo!bwfsbhf!pg!32:!ofx!ipvtjoh!
uzqf!cfuxffo!3111!boe!uif!3118.3122!BDT!xbt!
qfsnjut!qfs!zfbs/!Jo!3117-!uif!pwfsbmm!tmpxepxo!jo!uif!
Gjhvsf!3.8;!Cvjmejoh!Qfsnjut!gps!Ofx!Ipvtjoh
Gjhvsf!3.7;!Qpqvmbujpo!Usfoet!2:81.3121
250
14,000
224
12,759
12,000
200
184
10,000
156
147
145
150
130
7,868
126
8,000
100
82
6,000
4,941
67
48
4,000
50
31
2222
18
12
1,83010
9
1,6366
2,00022
0000
0
2000200120022003200420052006200720082009201020112012
0
19701980199020002010
Single-family detachedSingle-family attached
3.9!!}!!Dpnnvojuz!DpoufyuDjuz!pg!Npoujdfmmp
Gjhvsf!3.:;!Ipvtjoh!Uzqf
qspqpsujpo!pg!uiftf!vojut!pg!bmm!vojut!
sptf!gspn!8&!jo!2::1!up!27&!jo!
3,000
2,713
uif!3118.3122!BDT/!Tjohmf.gbnjmz!
2,500
2,000
1,771
tusvduvsf!uibu!ibt!pof!ps!npsf!xbmmt!
1,500
fyufoejoh!gspn!uif!hspvoe!up!uif!
All Housing Units
sppg!tfqbsbujoh!ju!gspn!bekpjojoh!
903
1,000
790
775
tusvduvsft/!Dpnnpo!gpsnt!bsf!
479
447
395
500347
209210
156
145
131
126
109
92
uxjoipnft-!upxoipnft-!ps!spx!
53
0
ipvtft/
1-unit detached1-unit attached2 to 4 units5 to 9 units10 or more unitsMobile home, trailer,
or other
B!dpnqbsjtpo!pg!Npoujdfmmp!up!
199020002007-2011
Xsjhiu!Dpvouz!boe!uif!Uxjo!Djujft!
TNTB!jo!Gjhvsf!3.21!tipxt!uibu!uif!
dpnnvojuz!ibt!hfofsbmmz!uif!tbnf!
Gjhvsf!3.21;!Sfhjpobm!Ipvtjoh!Uzqf!Dpnqbsjtpo!)3118.3122!BDT*
njy!pg!ipvtjoh!vojut!bt!uif!Uxjo!
90%
uibo!Xsjhiu!Dpvouz-!xijdi!jt!up!cf!
78%
80%
fyqfdufe!hjwfo!jut!svsbm!obuvsf/
70%
61%
60%
55%
Uif!3118.3122!BDT!jefoujgjft!
50%
31&!pg!uif!qpqvmbujpo!bt!mjwjoh!jo!
40%
All Housing Units
30%
sfoubm!ipvtjoh!vojut/!Pwfs!ibmg!pg!
20%16%
15%
bmm!sfoufst!mjwf!jo!tusvduvsft!xjui!
11%
11%
9%
8%
10%
5%
5%
4%4%
3%
2%
2%2%2%
2%
2%
1%
1%
1%
0%
npsf!uibo!6!vojut-!xijmf!pof.uijse!
0%
1-unit, 1-unit, 2 units 3 or 4 units 5 to 9 units 10 to 19 units 20 or more Mobile home
detachedattachedunits
ejtusjcvujpo!pg!sfoufst!jo!Npoujdfmmp!
MonticelloWrightTwin Cities SMSA
jt!tjnjmbs!up!uif!Uxjo!Djujft!TNTB/
Bhf!pg!Ipvtjoh
Gjhvsf!3.22;!Sfhjpobm!Ipvtjoh!Uzqf!boe!Ufovsf!Dpnqbsjtpo!)3118.3122!BDT*
Hjwfo!uif!hspxui!pg!Npoujdfmmp-!
ipvtjoh!tupdl!jt!sfmbujwfmz!ofx-!90%
85%
80%
ftqfdjbmmz!xifo!dpnqbsfe!up!uif!
73%
72%
70%
Uxjo!Djujft!TNTB/!Pof.uijse!pg!
2011
60%
uif!ipvtjoh!tupdl!jo!uif!3118.3122!
-
2007
50%
BDT!xbt!cvjmu!jo!3111!ps!mbufs!!)tff!
-
40%
Gjhvsf!3.23*/!Pomz!35&!pg!bmm!vojut!
30%
xfsf!cvjmu!cfgpsf!2:81/!Sfoubm!
20%
vojut!ufoe!up!cf!pmefs!xjui!51&!pg!
All Housing Units
13%
12%
8%
7%
7%
10%
bmm!sfoubm!vojut!cfjoh!cvjmu!cfgpsf!
4%
3%
2%2%
1%
1%
1%
0%0%
0%
0%
2:81!bt!dpnqbsfe!up!pomz!29&!pg!
Owner SFRenter SFOwner 2 to 4Renter 2 to 4Owner 5 or moreRenter 5 or more
pxofe!vojut/
MonticelloWrightTwin Cities SMSA
3.21!!}!!Dpnnvojuz!DpoufyuDjuz!pg!Npoujdfmmp
Planning Commission Agenda – 06/03/14
1
6. Public Hearing – Consideration of a request for Conditional Use Permit for Schools,
K-12 (Monticello Alternative Learning Program/Turning Point) in an IBC
(Industrial and Business Campus) District. Applicant: Colosimo, Mike/Monticello
Training Center, LLC (NAC)
Property: Legal: PID 155024002070
Address: 406 East 7th Street
Planning Case Number: 2014 - 015
A. REFERENCE & BACKGROUND
Request(s): Conditional Use Permit for a School (Alternative
Learning Program)
Deadline for Decision: July 4, 2014
Land Use Designation: Places to Shop
Zoning Designation: IBC, Industrial and Business Campus District
The purpose of the IBC, Industrial Business Campus
District is to provide for the establishment of limited
light industrial business offices, limited light
manufacturing, wholesale showrooms and related uses
in an environment which provides a high level of
amenities, including landscaping, preservation of
natural features, architectural controls, and other
features.
Overlays/Environmental
Regulations Applicable: Freeway Bonus Sign District
Current Site Use: Business/Industrial (Work Force Center, warehousing
and vacant building space)
Surrounding Land Uses:
North: Multiple Family Residential
East: Vacant/undeveloped commercial land
South: I-94/Industrial
West: Vacant/undeveloped commercial land
Project Description: The Monticello School District’s alternative learning
“Turning Point Program” presently occupies a portion
of a small building located at 1248 Edmonson Avenue
Planning Commission Agenda – 06/03/14
2
NE. The Program provides an alternative learning
environment for students who are challenged by
traditional educational programs. The Program
currently serves 45 students and has outgrown its
present facility. As a result, the School District wishes
to lease a portion of the 43,295 square foot industrial
building which occupies the subject site. Specifically,
the School District wishes to lease 4,343 square feet of
space located on the west side the building. With the
additional space, the School District expects a growth
rate of 8 to 15 students a year with a maximum
staff/student capacity of 125 persons.
To accommodate the use, only interior building
modifications are proposed. In this regard, the only
proposed exterior modification is a wall sign which
would identify the alternative learning program.
The use will be accessed from the north via an existing
East 7th Street access drive.
ANALYSIS
The applicants are seeking approval of a conditional use permit to allow a school use
within an IBC, Industrial and Business Campus zoning district. Historically, the ALP
was located in an I-2 District, which allowed the use by interim use permit. Under
the more recent update to the zoning ordinance, K-12 school uses are allowed by
conditional use permit in the IBC district. Therefore, the newly proposed location
requires a conditional use permit rather than IUP.
Conditional Use Permit Evaluation Criteria.
Approval of a conditional use permit application requires that the City find that
conditions can be established to ensure that all of the following criteria will always be
met (Section 2.4(D)(4)(a)):
(i) The conditional use will not substantially diminish or impair property values
within the immediate vicinity of the subject property;
Comment: Recognizing that no exterior modifications to the subject site are
proposed, the proposed school use is not expected to diminish or impair area
property values. This condition is met.
(ii) The conditional use will not be detrimental to the health, safety, morals, or
welfare of persons residing or working near the use;
Planning Commission Agenda – 06/03/14
3
Comment: The proposed use is not anticipated to have a detrimental affect on
persons in the surrounding area or within other building tenant spaces. This
condition is met.
(iii) The conditional use will not impede the normal and orderly development of
surrounding property for permitted uses predominant in the area;
Comment: The proposed school use is not expected to negatively impact or interfere
with the operations of nearby uses or other building tenants. Further, the use is not
expected to limit future occupancy by a more traditional industrial user (should the
need arise). The school’s occupation of a portion of the existing building is not
expected to impact the orderly development of surrounding uses. This condition is
met.
(iv) The conditional use will not pose an undue burden on public utilities or roads,
and adequate sanitary facilities are provided;
Comment: While the school use may alter current traffic patterns upon the subject
site, traffic generated by the use is well within the capabilities of East 7th Street which
serves the subject property. This condition is met.
(v) The conditional use can provide adequate parking and loading spaces, and all
storage on the site can be done in conformance with City code requirements;
Comment: A total of 203 off-street parking stalls presently exist upon the subject site.
The site easily accommodates the uses according to the zoning ordinance standards.
Of the 203 spaces, 75 would be available for use by the school even if the remainder
of the building were to be occupied by office uses. Based on current patterns, the
applicants expect that fewer than one half of their maximum student population will
drive to school. In this regard, a maximum of one car for every two students is
expected. With a maximum staff/student capacity of 125 persons, an off-street
parking demand of 63 spaces results which is well-within the provided parking
supply. Also to be noted is that ample land area exists upon the site for parking lot
expansion should a need for additional stalls arise at some future point. This
condition is met.
(vi) The conditional use will not result in any nuisance including but not limited to
odor, noise, or sight pollution;
Comment: As noted, no exterior modifications to the site are proposed. Thus, the
proposed use is not anticipated to generate any odor, noise or sight pollution
nuisances. This condition is met.
(vii) The conditional use will not unnecessarily impact natural features such as
woodlands, wetlands, and shorelines; and all erosion will be properly controlled;
Comment: The subject site will not impact any woodlands, wetlands, shorelands.
Further, no site alterations are proposed which would result in erosion impacts. This
condition is met.
Planning Commission Agenda – 06/03/14
4
(viii) The conditional use will adhere to any applicable additional criteria outlined in
Chapter 5 for the proposed use.
Comment: One of the conditions imposed upon school uses relates to adequate
access. A portion of the student population is expected to be transported to and from
the school via bus. With this in mind, an assurance should be made that proper area
exists upon the site for bus maneuvering and drop-off/pick-up activities. As a
condition of CUP approval, this issue should be addressed by the applicants via
indication on site plan documents (to the satisfaction of the City).
B. ALTERNATIVE ACTIONS
1. Motion to adopt Resolution 2014-058 to approve the conditional use permit to
allow a school (Monticello School District Alternative Learning Program) in an
IBC, Industrial and Business Campus District based on findings in said resolution
and subject to conditions outlined in the resolution.
2. Motion to deny adoption of Resolution 2014-058 based on findings to be made by
the Planning Commission.
C. STAFF RECOMMENDATION
Recognizing the no exterior modifications to the site are proposed, impacts resulting
from the proposed use are expected to be minimal. Staff recommends approval of the
conditional use permit for the proposed school use subject to conditions.
While the proposed use is not expected to negatively impact surrounding uses and/or
other building tenants, it is recommended that bus circulation and related drop-
off/pick-up activities be addressed to the satisfaction of the City.
Further, it is recommended that any new site signage comply with the applicable
provisions of the Sign ordinance and be subject to sign permit.
D. SUPPORTING DATA
A. Resolution 2014-058
B. Aerial image
C. Applicant Narrative
D. Site Plan
Z. Conditions of Approval
Planning Commission Agenda – 06/03/14
5
EXHIBIT Z
Conditions for Approval
Conditional Use Permit for a K-12 School Use in an
IBC, Industrial and Business Campus District
406 East 7th Street
Lauring Hillside Terrace, Lots 6, 7 and 8, Block 2
.
1. Bus circulation and related drop-off/pick-up activities shall be addressed to the
satisfaction of the City.
2. Any new site signage shall comply with the applicable provisions of the Sign
ordinance and be subject to sign permit.
CITYOFMONTICELLO
WRIGHTCOUNTY,MINNESOTA
PLANNINGCOMMISSION
RESOLUTIONNO.2014-058
1
MotionBy:SecondedBy:
RESOLUTIONREQUESTINGCONDITIONALUSEPERMITFORSCHOOLS,K-12
(MONTICELLOALTERNATIVELEARNINGPROGRAM/TURNINGPOINT)IN
ANIBC(INDUSTRIALANDBUSINESSCAMPUS)DISTRICT
WHEREAS,theMonticelloSchoolDistrictandtheownersofthepropertyat406East7th
Street,Monticello,MN,areseekingaConditionalUsePermittoestablishaschooldistrict
programknownasTurningPointProgramonsaidproperty;and
WHEREAS,theproposedpropertyiszonedIBC,IndustrialandBusinessCampus;and
WHEREAS,K-12 schoolfacilitiessuchastheoneproposedareallowedbyConditionalUse
Permitinthezoningdistrict,subjecttocompliancewithcertainzoningregulations;and
WHEREAS,thePlanningCommissionheldapublichearingonJune3,2014ontheapplication
andtheapplicantandmembersofthepublicwereprovidedtheopportunitytopresent
informationtothePlanningCommission;and
WHEREAS,thePlanningCommissionhasconsideredallofthecommentsandthestaffreport,
whichareincorporatedbyreferenceintotheresolution;and
WHEREAS,thePlanningCommissionoftheCityofMonticellomakesthefollowingFindings
ofFactinrelationtotheapprovaloftheConditionalUsePermit:
1.Theproposedprojectisconsistentwiththeusesandfacilitiesonthesubjectproperty;
2.Theproposedschoolusecanbeconductedonthepropertywithoutnegativeimpact
oncommercialorindustriallanduses;
3.Theproposedusecanbeconductedontheproposedsiteinasafemannerconducive
tobothcommercial/industrialandschoolactivities;
4.Subjecttotheconditionsidentifiedinthestaffreport,andrepeatedherein,the
proposedusewillmeettherequirementsandintentofthezoningordinance.
CITYOFMONTICELLO
WRIGHTCOUNTY,MINNESOTA
PLANNINGCOMMISSION
RESOLUTIONNO.2014-058
2
NOW,THEREFORE,BEITRESOLVED,thatthePlanningCommissionoftheCityof
Monticello,Minnesota,recommendsapprovaloftherequestbasedontheconditionsprovidedin
ExhibitZofthereferencedstaffplanningreport,andaslistedbelow:
1.Buscirculationandrelateddrop-off/pick-upactivitiesshallbeaddressedtothe
satisfactionoftheCity.
2.AnynewsitesignageshallcomplywiththeapplicableprovisionsoftheSignordinance
andbesubjecttosignpermit.
ADOPTEDBY thePlanningCommissionoftheCityofMonticello,Minnesotathis3rddayof
June,2014.
MONTICELLOPLANNINGCOMMISSION
By:_______________________________
BradFyle,Chair
ATTEST:
____________________________________________
AngelaSchumann,CommunityDevelopmentDirector
Conditional Use Permit for Schools, K-12 in an IBC (Industrial and Business Campus) District
Lauring Hillside Terrace, Lots 6, 7 & 8, Block 2, 406 7th Street, PID: 155029002060, 155029002070, 155029002080
2935 Everest Ln. N.
Plymouth, MN 55447
s.binek@comcast.net
763.245.8526
Project Narrative
Monticello Public Schools
Turning Point ALP
Tenant Improvement
5 May 2014
The Monticello Public Schools Turning Point ALP program is presently located in a small
building at 1248 Edmonson Ave NE. The program provides an alternative for high school
students challenged by traditional education programs and necessarily finds the need to present
a location that is also an alternative to a typical educational environment.
The program has reached the limit of their effectiveness in their present location and finds it
necessary to expand. Additionally, they have a need to reinforce a valued and established
relationship with Minnesota Workforce located in the building at 406 East 7th Street. The existing
building provides a lease space of approximately the needed square footage but one with direct,
internal communication to the facilities of Minnesota Workforce which will prove beneficial to
both uses.
The program currently serves approximately forty-five students. With the availability of additional
space it is estimated that the program will be allowed to grow at a rate of eight to fifteen
students per year for the next five years to a maximum program capacity of one-hundred
twenty-five students and staff.
The scope of the work necessary to accommodate Turning Point ALP is completely confined to
interior building remodeling. A review of the tenants presently in the building along with parking
requirements for each use as prescribed by the Ordinance finds sufficient parking exists on-site
to accommodate all uses.
Additionally, while the existing demised lease space does not provide an accessible
entrance/egress, the enhanced relationship with Minnesota Workforce provides an opportunity
to share established accessible building entrances. This strategy for accommodation eliminates
the need to perform any exterior building or site work to accomplish this.
The original building was constructed as an industrial use and, with the addition of Turning Point
to the Workforce use, continues to trend to more of a business/office use. These two tenants
comprise approximately two-thirds of the building area with the bulk of the remainder occupied
by a warehousing/distribution tenant. Because of the change of use, it is considered that the
impact of the building will not be detrimental to surrounding properties in any way.
A site plan is provided in this submittal that establishes existing exterior site elements, provides
for proof of parking, and illustrates the location of the proposed program within the existing
structure. No new sitework, landscaping, site drainage is indicated as none is required for this
Project.
2935 Everest Ln. N.
Plymouth, MN 55447
s.binek@comcast.net
763.245.8526
The existing site access is provided from E 7th Street toward the northwestern corner of the site.
Present site ingress and egress is considered adequate to serve the existing parking provided
which is approximately double that of projected one hundred twenty-five combined staff and
student population at maximum program capacity. Further, the program functions in a manner
that staggers driving trips throughout the day, reducing the impact on traffic patterns on East 7th
Street. Because no exterior work is required due to this tenant improvement work, no existing
site features will be disturbed and site drainage will not be exacerbated by this use.
A complete study of existing and required plumbing fixture requirements has been performed
considering both the Turning Point and Workforce spaces. It is found that there is presently
sufficient fixture capacity to meet the requirements of both users and the only work for plumbing
will be to remodel existing rooms in the Turning Point space to provide for accessibility. No
expansion of existing plumbing fixtures is planned as a result of this tenant improvement work.
The entire Turning Point program will be accommodated within the existing building and all
construction will occur within the existing building. With the exception of approval of the
education use as a conditional use within the Industrial and Business Campus District, no other
variance questions or other accommodations are considered necessary to accommodate this
use.
Planning Commission Agenda – 06/03/2014
1
7. Public Hearing – Consideration of an amendment to Conditional Use Permit for
Planned Unit Development for an Outdoor Storage accessory use. Applicant:
AMAX Storage. (NAC)
Property: Legal: Lot 1, Block 2, Amax Addition
Address: 36 Dundas Road
Planning Case Number: 2014 - 025
A. REFERENCE & BACKGROUND
Request(s): The proposal consists of an amendment to an existing
PUD regulating the AMAX Storage facility, by
permitting the expansion of the facility to the south
property line in order to accommodate the storage, use,
and display of a series of individual temporary storage
containers.
Deadline for Decision: July 1, 2014
Land Use Designation: Places to Shop
Zoning Designation: B-3, Highway Business District
The purpose of the “B-3” (highway business) district is
to provide for limited commercial and service activities
and provide for and limit the establishment of motor
vehicle oriented or dependent commercial and service
activities.
Overlays/Environmental
Regulations Applicable: None
Current Site Use: Self-storage facility/U-Haul Truck Rental
Surrounding Land Uses:
North: Dundas Road/Vacant Commercial Land
East: Vacant Commercial Land
South: Vacant Commercial Land
West: Cedar Street/Vacant Commercial Land
Project Description: The applicant proposes to place 12-24 individual
temporary storage containers along the south property
line of the Amax Storage facility site. The containers
will sit between an existing curb line on the property
Planning Commission Agenda – 06/03/2014
2
and a retaining wall to be built near the property
boundary. The applicant proposes to leave the ground
under the storage containers unimproved. The storage
containers will be used for either on- or off-site rental.
ANALYSIS
The property is subject to a Planned Unit Development that was approved originally
more than 10 years ago, then amended twice to accommodate expansion and a plat
that separated the property from the development land to the west. The PUD zoning
was used to allow the multiple principal buildings which include office space, storage
units, and other commercial use space, over a series of individual parcels. In addition
to the self-storage use, the property also stores rental U-Haul vehicles as a part of the
business.
The proposed expansion will serve a combination purpose by providing temporary
storage units for rent. These buildings are pre-fabricated units which are assembled
on the site, then placed for use as storage facilities on the property, or rented and
moved for temporary use off-site.
The applicant proposes to forgo surfacing and screening improvements that would
commonly be required for outdoor storage within the B-3 district.
The ordinance pertaining to outdoor storage requires that the units be screened from
view of the public right of way. The storage units will be placed adjacent to a newly
constructed retaining wall along the south boundary of the property of about 2 – 3.5
feet in height. The units themselves are 16-20 feet in length, and 8 feet high by 8 feet
wide. Thus, the top portion of the units would be visible to the adjoining agricultural
property. The adjoining parcel is guided and zoned for eventual commercial use, and
as such, screening should be less of an issue over time. The units themselves will set
about 30 feet farther from Cedar Street than the southern-most storage building, so
they will not likely be visible to south-bound traffic or from Dundas Road. North-
bound traffic would be able to see them, but as noted, future development on the
adjoining property would likely eliminate that view. The property owner has an
existing block and wrought-iron fence along the west property line that provides some
screening of the property directly from Cedar Street.
The containers will be located along the southern property line, between the existing
curb line and the noted retaining walls. Access to the units will therefore be from an
existing paved surface.
In regard to surfacing, the applicant has indicated that the units will be set on the
existing surface. As a condition of approval, the applicant shall verify the type and
material of the current surface. The material shall be sufficient to control dust, in
accordance with the ordinance for outdoor storage.
Planning Commission Agenda – 06/03/2014
3
To accommodate the proposal as made, staff would recommend that the PUD
amendment is structured as an interim use under the PUD for the temporary storage
containers. The applicant has indicated that if the business expands onto adjacent
property, or does not grow as expected, the temporary storage units would be
removed or changed to a different location on the business property – at that time,
permanent improvements could be required to accommodate the updated plan for the
site.
Staff would propose an extended time period for the interim use to avoid having to
revisit the permit. The applicant indicated that a period of 10 years would be
acceptable to cover the anticipated timeline to any change on the property.
As the retaining wall encroaches into the existing 12’ drainage and utility easement
line, an encroachment agreement will be required for the wall. In addition, it is
recommended that the proposed storage units remain 6’ from the property line.
The applicant is also in the process of confirming drainage patterns on the property,
utilizing the existing stormwater improvements on the west side of the site.
Stormwater patterns are not expected to change, with drainage flowing toward the
west to a series of catch-basins in the applicant’s driveway area, then connecting to
the City’s stormwater pipe in Cedar Street. The applicant has supplied the
preliminary plat, including topographic and existing conditions information.
However, the plat does not show the most recent storm water improvements,
including the catch basins. As such, the drainage information is being charted and
documented at staff’s request, and is expected to be available prior to the Council’s
consideration of the PUD application.
The applicant has moved a small number of existing trees from the south property
line area and relocated them to the southeast corner of the business site. No other
landscaping is proposed as a part of the project.
No further improvements or changes are expected to the property as a part of the
current application, and all previous conditions of PUD approval appear to be met and
in compliance.
B. ALTERNATIVE ACTIONS
1. Motion to adopt Resolution No. 2014-060 recommending approval of an
amendment to Conditional Use Permit for PUD applicable to the Amax Storage
Planned Unit Development, based on findings in said resolution and subject to the
conditions in Exhibit Z.
2. Motion to deny adoption of Resolution 2014-60, based on findings to be made by
the Planning Commission.
Planning Commission Agenda – 06/03/2014
4
C. STAFF RECOMMENDATION
Staff recommends approval of the amendment. The uses on the property are related
to storage and moving and would reasonably include the proposed temporary storage
structures, either as on- or off-site rental. The deferral in required improvements is
intended to address the expectation that extensive improvements to accommodate the
current arrangement would be reevaluated when a larger expansion of the site occurs.
Moreover, as noted in the staff report, screening improvements will not be needed
when the property to the south develops, and other views of the storage area are
screened or blurred by existing buildings and fencing.
D. SUPPORTING DATA
A. Resolution 2014-060
B. Aerial Image
C. Applicant Narrative
D. Site/Preliminary Grading Plan
E. Preliminary Plat for AMAX Addition
F. Storage Container Specification Information
G. Sample Retaining Wall Image
Z. Conditions of Approval
Planning Commission Agenda – 06/03/2014
5
EXHIBIT Z
Amendment to Planned Unit Development
Amax Storage, 36 Dundas Road
Lot 1, Block 2, Amax Addition
.
1. The amendment shall be treated as an interim use under the existing planned unit
development for a period not to exceed ten (10) years, after which the site will
require a new amendment, and be returned to a condition in compliance with all
applicable zoning regulations in effect at that time.
2. The applicant shall mark and submit drainage and stormwater plans identifying
catch basin elevations and drainage patterns, in accordance with the requirements
of the City Engineer.
3. If the area designated for temporary storage units is vacant for a period of at least
twelve months, the amendment shall expire, and the property be returned to a
surface in accordance with zoning regulations.
4. No active business or other occupancy may be made of the temporary storage
buildings, with the exception of storage, and loading or unloading of said storage.
5. The applicant shall verify the type and material of the current surfacing for the
outdoor storage area. The material shall be sufficient to control dust.
6. The applicant shall enter into an encroachment agreement as related to the
retaining wall and placement of outdoor storage within the existing southern
drainage and utility easement. The proposed storage units shall remain 6’ from the
property line.
7. The applicant shall enter into a development agreement with the City specifying
the terms of the PUD, including the termination date as agreed to by the City
Council.
CITYOFMONTICELLO
WRIGHTCOUNTY,MINNESOTA
PLANNINGCOMMISSION
RESOLUTIONNO.2014-060
1
MotionBy:SecondedBy:
ARESOLUTIONRECOMMENDINGAPPROVALOF
ANAMENDMENTTOCONDITIONALUSEPERMITFOR
PLANNEDUNITDEVELOPMENT
FORAMAXSTORAGEAT36DUNDASROAD
WHEREAS,theapplicant,ownerofthepropertyattheabove-namedaddresshasrequested
anamendmenttoanexistingPUD;and
WHEREAS,saidamendmentwillaccommodatealandusethatisconsistentwiththe
existingallowsusesontheproperty;and
WHEREAS,theproposeduse,togetherwiththerecommendedconditionsofapproval,will
constituteausethatisconsistentwiththeintentofthezoningordinanceandcomprehensive
plan;and
WHEREAS,thePlanningCommissionheldapublichearingonJune3,2014onthe
applicationandtheapplicantandmembersofthepublicwereprovidedtheopportunityto
presentinformationtothePlanningCommission;and
WHEREAS,thePlanningCommissionhasconsideredallofthecommentsandthestaff
report,whichareincorporatedbyreferenceintotheresolution;and
WHEREAS,thePlanningCommissionoftheCityofMonticellomakesthefollowing
FindingsofFactinrelationtotherecommendationofapproval:
1.TheproposeduseisconsistentwiththeintentofthezoningordinanceoftheCityof
Monticello;
2.TheproposedusesinthePUD,incombinationwiththefutureintendedchangesto
theproperty,justifytheinterimapprovalsunderthePUDasproposed;
3.ThePUDwillnotbedetrimentaltothereasonableuseanddevelopmentof
surroundingproperty;
4.ThePUDwillnotcreatenegativeimpactsonsurroundingpublicroadwaysorother
publicfacilities.
NOW,THEREFORE,BEITRESOLVED,bythePlanningCommissionoftheCityof
Monticello,Minnesota,thattheamendmenttoPUDforAmaxStorageisrecommendedfor
approval,subjecttothefollowingconditions:
CITYOFMONTICELLO
WRIGHTCOUNTY,MINNESOTA
PLANNINGCOMMISSION
RESOLUTIONNO.2014-060
2
1.Theamendmentshallbetreatedasaninterimuseundertheexistingplannedunit
developmentforaperiodnottoexceedten(10)years,afterwhichthesitewill
requireanewamendment,andbereturnedtoaconditionincompliancewithall
applicablezoningregulationsineffectatthattime.
2.Theapplicantshallmarkandsubmitdrainageandstormwaterplansidentifying
catchbasinelevationsanddrainagepatterns,inaccordancewiththerequirements
oftheCityEngineer.
3.Iftheareadesignatedfortemporarystorageunitsisvacantforaperiodofatleast
twelvemonths,theamendmentshallexpire,andthepropertybereturnedtoa
surfaceinaccordancewithzoningregulations.
4.Noactivebusinessorotheroccupancymaybemadeofthetemporarystorage
buildings,withtheexceptionofstorage,andloadingorunloadingofsaidstorage.
5.Theapplicantshallverifythetypeandmaterialofthecurrentsurfacingforthe
outdoorstoragearea.Thematerialshallbesufficienttocontroldust.
6.Theapplicantshallenterintoanencroachmentagreementasrelatedtothe
retainingwallandplacementofoutdoorstoragewithintheexistingsouthern
drainageandutilityeasement.Theproposedstorageunitsshallremain6’fromthe
propertyline.
7.TheapplicantshallenterintoadevelopmentagreementwiththeCityspecifying
thetermsofthePUD,includingtheterminationdateasagreedtobytheCity
Council.
ADOPTED this3rddayofJune,2014,bythePlanningCommissionoftheCityof
Monticello,Minnesota.
MONTICELLOPLANNINGCOMMISSION
By:_______________________________
BradFyle,Chair
ATTEST:
____________________________________________
AngelaSchumann,CommunityDevelopmentDirector
Amendment to Conditional Use Permit for Planned Unit Development for an Outdoor Storage accessory use
AMAX Addition, Lot 1, Block 2 and 2 unplatted parcels, 36 Dundas Road, PID: 155213002010, 155500142305, 155500142304
APPLICANTNARRATIVE:
1.Temporary(moveable)storagecontainers
a.12fornowmaybe24(total)inthefutureifthingsworkoutasanticipated
b.Sizewillbe8x16or8x20
c.Usewillbeforstorageofpersonalpropertyonand/oroffsite
d.Theboxeswillbesidebysidewithlittleornospacesbetweenthemlikedominos(likely
overeasement)buteasilymovedifneeded.
2.Thegradewillfollowmycurrentconcretedrivearea.
a.Seeabove
3.Retainingwallwillfollowtheelevationofthesouthernpropertyline.
a.Materialwillbeconcrete,approx.height3to4feet
4.Thecornfieldandmorethan100feetfromtheroadwillbethescreening
a.Treestobemovedtotheeastsouthernpropertyline
*Seeattachedchecklistforadditionalinformationrelatedtootherrequiredplans.
Planning Commission Agenda 06/03/14
8. Public Hearing Consideration of amendments to the Monticello Zoning
Ordinance, Chapters and Sections as follows. Applicant: City of Monticello
Chapter 2, Section 3 (G) (1) Pre-Application Conferences
Chapter 2, Section 4 (D) Conditional Use Permits
Chapter 2, Section 2 (G) Administrative Adjustments
Chapter 3, Section 2 (B), Table 3-1 Base Zoning Districts
Chapter 3, Section 3 (D) (2) Allowable Yard Encroachments
Chapter 3, Section 4(F) R-2 Single and Two-Family Residence District
Chapter 4, Section 3 (C) General Requirements for Fences and Walls
Chapter 4, Section 3 (G) Prohibited Fences
Chapter 4, Section 5 Signs
Chapter 4, Section 8 (F) Residential District Garage Requirements
Chapter 4, Section 11 (C)(2) Residential District Requirements, R-1 District
Chapter 5, Section 1 Use Table, Table 5-1, Uses by District
Chapter 5, Section 2 (A) General Regulations Applicable to All Uses
Chapter 8, Section 4 Definitions
Planning Case Number: 2014-026
A. REFERENCE & BACKGROUND
Request(s): Amendments to the text of the Monticello Zoning
Ordinance
Deadline for Decision: NA
Land Use Designation: NA
Zoning Designation: NA .
ANALYSIS
The Planning Commission is asked to series of amendments to the Monticello Zoning
Ordinance.
The proposed amendments are a result of the
A summary of each of the proposed amendments is provided below, along with the
proposed amendment.
Њ
Planning Commission Agenda 06/03/14
Appropriate renumeration of the ordinance will be addressed by the Deputy City Clerk in
the ordinance document.
1. Chapter 2, Section 3 (G) Pre-Application Conferences
The proposed amendment allows pre-application conferences as an optional meeting and
deletes reference to complete applications. Complete applications are required regardless
of whether pre-application meetings are held.
(G) Pre-application Conferences
1. All prospective applicants are encouragedshall be required to speak with a member of
the Community Development Department prior to submitting an application in order to
review the proposal and to determine the specific materials to be submitted with the
future application. Failure of a prospective applicant to initiate a pre-application
conference shall result in all application materials listed herein for the subject
application being required prior to the application being deemed complete.
2. Discussions that occur during a pre-application conference are not binding on the City
and do not constitute official assurances, representations or approvals by the City or its
officials on any aspects of the plan or application discussed.
2. Chapter 2, Section 2 (G) Administrative Adjustments
Delete in entirety. Administrative adjustments are variances and must be treated as such
via ordinance requirements.
3. Chapter 2, Section 4 (D) Conditional Use Permits
Change expiration and time limits to one year consistent with past ordinance and provide
for one year consistency for all sections of the Time Limit provisions.
(8) Time Limit
(a) Unless otherwise specified in the Conditional Use Permit, the operation of the use and/or
issuance of building permits for permitted structures shall begin within one yearsix
months of the date of the Conditional Use Permit approval. Failure to do so will
invalidate the Conditional Use Permit. Permitted timeframes do not change with
successive owners.
(a)(b) Upon written request, one extension of up to one year may be granted by the
Community Development Department if the applicant can show good cause If the
operation of the use has not commenced within one year of the date of approval, the
Ћ
Planning Commission Agenda 06/03/14
applicant may petition for an extension of time in which to complete the work that has
been granted by the Conditional Use Permit. Such extension shall be requested in writing
and filed with the Community Development Department at least thirty (30) days before
the expiration of the original conditional use permit. The request for extension shall state
facts supporting good cause for extension of the conditional use permit. Such petition
shall be presented to the Planning Commission for a recommendation and to the City
Council for a decision.
(b)(c) If a use operating pursuant to an approved conditional use permit is discontinued
for a period of at least one yearsix months, any further use of the property shall conform
to the requirements of this ordinance. A discontinued conditional use shall not begin
operations again without first obtaining approval of a new conditional use permit.
4. Chapter 3, Section 2 (B), Table 3-1 Base Zoning Districts
No change proposed; error corrected in previous amendment.
5. Chapter 3, Section 3 (D) (2) Allowable Yard Encroachments
This proposed amendment adds a reference to conservation easements as a cue to reviewing staff
that conservations easements may exist on a given property and therefore may prohibit structure
encroachments.
(2) Allowable Yard Encroachments
(a) The following features may encroach into required yards:
(i) Fences and walls that meet the standards in Section 4.3, may encroach into a required
yard, but shall be subject to corner visibility requirements and shall not be placed
within conservation easements unless specifically permitted by the easement.
(ii) Walkways, patios, ramps, stairs, paved areas, and other accessory structures less than
30 inches above grade, and all landscape plantings are exempted from yard
requirements except as may be specifically required by this ordinance, but are subject
to corner visibility requirements and shall not be placed within conservation
easements unless specifically permitted by the easement..
6. Chapter 3, Section 4(F) R-2 Single and Two-Family Residence District
The proposed amendment re-instates language from the previous version of the zoning
ordinance (attached as supporting data), which allowed for varying square footage
requirements per unit by unit type in the R-2 District. By graduating the square footage
requirements, the district will be able to accommodate two-family residences such as
duplexes on a traditional 12,000 square foot single-family lot, while still requiring
Ќ
Planning Commission Agenda 06/03/14
adequate lot area per unit. Under the current ordinance, a duplex in the R-2 would
require 24,000 square feet if not located in the original plat or processed through a PUD.
The proposed amendment does increase the square footage requirements for duplex,
townhome and multi-family units over the previous ordinance. The base density for the
R-2 District, regardless of unit type, also remains intermediate to base densities for R-1
and R-3. Planning Commission will note that townhomes and multi-family uses are only
allowed in the R-2 by conditional use permit and multi-family dwelling units are
restricted to four units.
Maximum Density through PUD or
Performance Standards ў ЎͲЍЍЎ ƭƨ͵ ŅƷ͵ ƦĻƩ
ǒƓźƷ ΛБ͵Љ ǒƓźƷƭ ƦĻƩ ŭƩƚƭƭ ğĭƩĻΜ
Base Density = tĻƩ ƷğĬƌĻ͵ЊЋͲЉЉЉ ƭƨ ŅƷ ƦĻƩ
ǒƓźƷ ƚƩ Ќ͵Џ ǒƓźƷƭ ƦĻƩ ŭƩƚƭƭ ğĭƩĻ ΛЊЉͲБВЉ ƭƨ͵
ŅƷ͵ ƦĻƩ ǒƓźƷ ƚƩ Ѝ͵Љ ǒƓźƷƭ ƦĻƩ ğĭƩĻ źƓ ƷŷĻ
hƩźŭźƓğƌ tƌğƷ ğƭ źƓķźĭğƷĻķ ĬĻƌƚǞΜ͵
Minimum Lot Sizes
R-2 Original
District Plat
Lot 12,000 10,890
Area sq. ft. sq. ft.
Lot 80 feet 66 feet
Width
Unit Type Minimum Lot Area/Unit Base Density
{źƓŭƌĻΏCğƒźƌǤ ЊЉͲЉЉЉ ƭƨǒğƩĻ ŅĻĻƷ Ѝ͵Ќ
5ǒƦƌĻǣΉǞƚΏCğƒźƌǤ ЏͲЉЉЉ ƭƨǒğƩĻ ŅĻĻƷ Џ͵Ћ
ƚǞƓŷƚƒĻ ЏͲЉЉЉ ƭƨǒğƩĻ ŅĻĻƷ Џ͵Ћ
aǒƌƷźΏCğƒźƌǤ ЊЉͲЉЉЉ ŅƚƩ ŅźƩƭƷ ǒƓźƷ њ Џ͵Ћ
ЋͲЉЉЉ ƭƨǒğƩĻ ŅĻĻƷ ŅƚƩ
Ļğĭŷ ğķķźƷźƚƓğƌ ǒƓźƷ
Ѝ
Planning Commission Agenda 06/03/14
7. Chapter 4, Section 3 (C) General Requirements for Fences and Walls
This proposed amendment again adds a reference to conservation easements as a cue to reviewing
staff that conservations easements may exist on a given property and therefore may prohibit
structure encroachments.
(C) General Requirements for Fences and Walls
(1) ,®¢ ³¨®
(a) Fences and walls are permitted anywhere on a lot subject to the following restrictions:
(i) The corner visibility requirements in Section 3.3(D)(2)(b) shall be met.
(ii) Fences and walls shall not be located within public right-of-way unless permitted by
the Community Development Department by written encroachment agreement.
(iii) Fences and walls permitted by the Community Development Department to be within
easements are subject to removal without compensation to the property owner if the
City must access the area for maintenance or improvement purposes.
(iv) Fences and walls shall not be permitted within conservation easements unless
specifically permitted by the easement
8. Chapter 4, Section 3 (G) Prohibited Fences
Amendment simplifies and clarifies code requirement pertaining to fence materials.
(G) Prohibited Fences
(2) Fences or walls made of debris, junk, rolled plastic, sheet metal, wire mesh, plywood,
wooden landscape lattice or waste materials are prohibited in all zoning districts
unless such materials have been recycled and reprocessed for marketing to the general
public as building materials that resemble new building materials and are designed for
use as a fencing material (e.g., picket fencing made from recycled plastic and fiber).
(3) Chicken wire fences.
9. Chapter 4, Section 5 Signs
Amendments proposed to the sign ordinance provide to provide clarity to regulation.
4.5(H)(19)
(b) Regulations governing Dynamic Displays
Ў
Planning Commission Agenda 06/03/14
(1) Applicants for dynamic sign displays shall sign a license agreement
supplemental to the building permit agreeing to operation of a sign in
conformance with these regulations. Violation of these regulations shall
result in forfeiture of the license, and the City shall be authorized to
arrange disconnection of electrical service to the sign displayfacility.
(20) Design and Materials Standards for Signs in Commercial Districts, Industrial
Districts, the CCD District, PUDs, and Performance Based Enhancement
District Mixed Use Development
4.5(J)(3)
Planned unit developments allow for flexibility in sign regulations which shall be
specific to each ordinance for PUD. AS such, this regulation is unnecessary.
In a PUD, Planned Unit Development District, signing restrictions shall be based upon
the individual uses and structures contained in the complex. Signs shall be in compliance
with the restrictions applied in the most restrictive zoning district in which the use is
allowed.
10. Chapter 4, Section 8 (F)(2) Residential District Garage Requirements
The proposed changes are to provide consistency with accessory structure standards as
identified in each district in Chapter 3. At present, they are not consistent.
(c) Residential District Garage Requirements
In all residential zoning districts, all detached single family homes and duplex units shall
include development of an attached or detached garage. The minimum size requirement
for the garage floor shall be 450 sq ft with a minimum garage door opening of 16 ft. with
the following exceptions and/or deviations by district:
(i) R-1 District
An attached garage of at least 550480 square feet shall be constructed as part of any
single family home.
(ii) R-A District
1. An attached garage of at least 700 square feet shall be constructed as part of any
single family home.
2. Garage frontage: From side building line to side building line of any single
family structure, no more than 40% of such building width shall consist of
Garage doors that face the street. Side or rear loaded garages are not subject to
this regulation. An exception shall be made for garage doors that face the street,
Џ
Planning Commission Agenda 06/03/14
but are set back at least ten feet in back of the front building line of the principal
use.
3. No portion of any garage space may be more than five feet closer to the street
than the front building line of the principal single family use.
(iii) R-2 District
An attached garage of at least 450 square feet shall be constructed as part of any
single family home.
(iii)(iv) T-N District
1. A garage of at least 4850 square feet, attached or detached, shall be constructed
as a part of any single family home.
2. Garage frontage: From side building line to side building line of any single
family structure, no more than 50% of such building width shall consist of garage
doors that face the street. Side or rear loaded garages, or detached garages in the
rear yard, are not subject to this regulation. An exception shall be made for
garage doors that face the street, but are set back at least ten feet in back of the
front building line of the principal use.
3. No portion of any garage space may be more than five feet closer to the street
than the front building line of the principal single family use.
11. Chapter 4, Section 11(C) Residential District Requirements
Adds clarification to measurement of façade area for purpose of calculating required
brick or stone.
(2) R-1 District
A minimum of 15% of the front building façade of any structure in the R-1 District, less the
square footage area of te garage doors, shall be covered with brick or stone. Any attached or
major detached accessory building that can be seen from the street shall meet this same
standard. Structures with front facades covered by at least 70% stucco or real wood may
reduce the brick or stone coverage to 5%. The Community Development Department may
approve optional facade treatments when additional architectural detailing so warrants. Such
detailing may include usable front porches, extraordinary roof pitch or other features.
(3) R-A and T-N Districts
A minimum of 20% of the front building façade of any structure in the R-A or T-N zoning
district, less the square footage area of the garage doors, shall be covered with brick or stone.
Any attached or major detached accessory building that can be seen from the street shall meet
this same standard. Structures with front facades covered by at least 70% stucco or real wood
may reduce the brick or stone coverage to 10%.
А
Planning Commission Agenda 06/03/14
12. Chapter 5, Section 1 Use Table, Table 5-1, Uses by District
The amendment removes light industrial uses from commercial B-4 District. Industrial
uses are intended for industrial districts. Although this designation for allowance does
date back to adoption of the original ordinance update in 2001, staff believes it to be in
error. Light manufacturing was not permitted in the previous version of the zoning
ordinance. Continued allowance for light manufacturing as an industrial use in a
commercial district would create the potential for land use issues between neighboring
properties in terms of use impacts. It should be noted that light manufacturing as an
accessory use is provided for in the Accessory Use Table in come commercial districts.
TABLE 5-1: USES BY DISTRICT (cont.)
Use Types
Base Zoning Districts
Additional
C I
A R R R T R R M B B B B I I
Requirements
C B
O A 1 2 N 3 4 H 1 2 3 4 1 2
D C
Industrial Uses
Auto Repair Major
C P P 5.2(G)(1)
Bulk Fuel Sales and Storage P P
5.2(G)(2)
Extraction of Materials
I I I 5.2(G)(3)
General Warehousing
C C P P 5.2(G)(4)
Heavy Manufacturing
C 5.2(G)(5)
A
1
-
Industrial Services
C P None
5
E
Land Reclamation
C C C C C C C C C C C C C C C 5.2(G)(6)
L
B
A
Light Manufacturing
C P P P 5.2(G)(7)
T
E
Machinery/Truck Repair & Sales P P
E
5.2(G)(8)
S
*
Recycling and Salvage Center C C
5.2(G)(9)
Self-Storage Facilities
P C P 5.2(G)(10)
Truck or Freight Terminal
C P P 5.2(G)(11)
Waste Disposal & Incineration C
5.2(G)(12)
Wrecker Services
C P 5.2(G)(13)
13. Chapter 8, Section 4
The amendments to the definitions section add clarity to the two office use designations
within the 5-1A CCD Use table.
Б
Planning Commission Agenda 06/03/14
COMMERCIAL OFFICES: A commercial use involving predominantly administrative,
clerical, or professional operations. Commercial offices may include professional and
administrative training, but shall not include direct retail commercial transaction
activities. Professional training may include classes and training offered by professional
or administrative entities to consumers of professional services.
PROFESSIONAL OFFICE - SERVICES: A commercial use involving administrative,
clerical, or professional operations, and routinely including direct transactions or
consultations with clients for such services. Such uses commonly include legal,
financial, insurance, or real estate services, among others, but do not include retail sales
of stock-in-trade goods.
B. ALTERNATIVE ACTIONS
1. Motion to recommend adoption of the proposed ordinance amendments, based on a
finding based on a finding that the ordinance amendments as proposed continue to support
the Comprehensive Plan, serve to clarify existing ordinance regulations, and support
consistency with current City review process, and to direct staff to prepare the required
Ordinance No. 599 for consideration by the City Council.
2. Motion of other.
C. STAFF RECOMMENDATION
Staff supports the proposed amendments, as they will provide needed clarity and
consistency in the application of the ordinance.
D. SUPPORTING DATA
Chapter 2, Section 3 (G) (1) Pre-Application Conferences, , , excerpt
Chapter 2, Section 4 (D) Conditional Use Permits, excerpt
Chapter 2, Section 2 (G) Administrative Adjustments, excerpt
Chapter 3, Section 2 (A), Table 3-1 Base Zoning Districts, excerpt
Chapter 3, Section 3 (D) (2) Allowable Yard Encroachments, excerpt
Chapter 3, Section 4(F) R-2 Single and Two-Family Residence District, excerpt
Chapter 3, previous ordinance, regulations for Lot Area by Unit, excerpt
Chapter 4, Section 3 (C) General Requirements for Fences and Walls, excerpt
Chapter 4, Section 3 (G) Prohibited Fences, excerpt
Chapter 4, Section 5 Signs, excerpt
Chapter 4, Section 8 (F) Residential District Garage Requirements, excerpt
Chapter 4, Section 11 (C)(2) Residential District Requirements, R-1 District, excerpt
Chapter 5, Section 1 Use Table, Table 5-1, Uses by District, excerpt
Chapter 5, Section 2 (A) General Regulations Applicable to All Uses, excerpt
Chapter 8, Section 4 Definitions, excerpt
В
CHAPTER 2: APPLICATION REVIEWS AND PROCEDURES
Section 2.3 Common Review Procedures & Requirements
Subsection (H) Fees
City of Monticello Zoning Ordinance Page 15
(F) Simultaneous Processing of Applications
Whenever two or more forms of review and approval are required under this ordinance
(e.g., a proposed rezoning and subdivision application), the applications for those
approvals may, at the discretion of the Community Development Department, be
processed simultaneously, so long as all applicable requirements are satisfied for all
applications.
(G) Pre-application Conferences
(1) All prospective applicants shall be required to speak with a member of the
Community Development Department prior to submitting an application in order
to review the proposal and to determine the specific materials to be submitted
with the future application. Failure of a prospective applicant to initiate a pre-
application conference shall result in all application materials listed herein for the
subject application being required prior to the application being deemed complete.
(2) Discussions that occur during a pre-application conference are not binding on the
City and do not constitute official assurances, representations or approvals by the
City or its officials on any aspects of the plan or application discussed.
(H) Fees
(1) Determination of Fees
Fees required to accompany applications submitted under this ordinance shall be
in accordance with the approved fee schedule adopted yearly by the City Council.
(2) Fees to be Paid
No application shall be accepted until all applicable application fees have been
paid.
(3) Refund of Application Fee
Application fees are not administratively refundable except when the Community
Development Department determines that an application was withdrawn prior to
any consideration or review of the application.
(4) Escrow
Application fees may also require payment of an escrow in favor of the City. The
required escrow amount shall be in accordance with the approved fee schedule
adopted yearly by the City Council.
Current Monticello
Fee Schedule
CHAPTER 2: APPLICATION REVIEWS AND PROCEDURES
Section 2.4 Specific Review Procedures & Requirements
Subsection (D) Conditional Use Permits
Page 30 City of Monticello Zoning Ordinance
(8) Time Limit
(a) Unless otherwise specified in the Conditional Use Permit, the operation of the
use and/or issuance of building permits for permitted structures shall begin
within six months of the date of the Conditional Use Permit approval. Failure
to do so will invalidate the Conditional Use Permit. Permitted timeframes do
not change with successive owners.
(b) Upon written request, one extension of up to one year may be granted by the
Community Development Department if the applicant can show good cause.
(c) If a use operating pursuant to an approved conditional use permit is
discontinued for a period of at least six months, any further use of the
property shall conform to the requirements of this ordinance. A discontinued
conditional use shall not begin operations again without first obtaining
approval of a new conditional use permit.
(9) Revocation
In the event that any of the conditions set forth in the permit are violated, the City
Council shall have the authority to revoke the conditional use permit. Before the
revocation is considered, the City Council shall hold at least one public hearing
after proper written notice has been issued in accordance with Section 2.3(I).
Following the hearing and subsequent discussion, the City Council may revoke
the CUP by adopting findings of fact showing there has not been substantial
compliance with the required conditions.
(10) Amendments
A Conditional Use Permit may be amended or modified only in accordance with
the procedures and standards established when originally securing the conditional
use permit. A request for a change in the conditions of approval of a Conditional
Use Permit shall be considered an amendment and subject to the full review
procedure set forth in this subsection. An additional application fee may be
required before the consideration of the amendment request.
CHAPTER 2: APPLICATION REVIEWS AND PROCEDURES
Section 2.4 Specific Review Procedures & Requirements
Subsection (G) Administrative Adjustments
Page 42 City of Monticello Zoning Ordinance
(G) Administrative Adjustments
(1) Purpose and Intent
This purpose and intent of this section is to provide an administrative
mechanism for allowing permitted minor variations, or adjustments, to building
setback or landscape buffer standards of this ordinance based on specific
standards, with the intent of providing relief where application of a standard
creates practical difficulties in allowing development that otherwise advances
the purposes served by this ordinance and is compatible with surrounding
lands.
(2) Authority
The Community Development Department is authorized to review and
approve, approve with conditions, or deny administrative adjustments to
building setback or landscape buffer standards of this ordinance in accordance
with the procedures and standards of this section.
(3) Applicability
(a) Administrative adjustments for building setbacks shall only be considered on
properties exclusively zoned for residential use.
(b) Administrative adjustments for landscape buffers may be considered on all
properties.
(4) Maximum Adjustment
(a) No adjustment shall reduce a building setback by more than 15 percent up to a
maximum of five (5) feet.
(b) No adjustment shall reduce a required landscape buffer to less than five (5)
feet.
(5) Initiation
An application for an administrative adjustment may be initiated by the property
owner or other person with authority to file an application pursuant to Section
2.3(B), Authority to File Applications.
(6) Application
(a) All applications for an administrative adjustment shall be in accordance with
Section 2.3, Common Review Requirements.
zzzzzzzzzzzzzzzzzzzz
zzzzzzzzzzzzzzzzzzzz
zzzzzzzzzzzzzzzzzzzz
zzzzzzzzzzzzzzzzzzzz
zzzzzzzzzzzzzzzzzzzz
zzzzzzzzzzzzzzzzzzzz
zzzzzzzzzzzzzzzzzzzz
zzzzzzzzzzzzzzzzzzzz
zzzzzzzzzzzzzzzzzzzz
zzzzzzzzzzzzzzzzzzzz
zzzzzzzzzzzzzzzzzzzz
zzzzzzzzzzzzzzzzzzzz
zzzzzzzzzzzzzzzzzzzz
zzzzzzzzzzzzzzzzzzzz
zzzzzzzzzzzzzzzzzzzz
Section 2.3:
Common Review
Requirements
Appeal Option if
Applicant
Disagrees with
Decision
Section 2.4(H)
Community
Development
Department Review
/ DECISION
ADMINISTRATIVE
ADJUSTMENTS
Complete
Application
CHAPTER 3: ZONING DISTRICTS
Section 3.2 Districts Established
Subsection (B) Establishment of Overlay Districts
Page 82 City of Monticello Zoning Ordinance
3.2 Districts Established
(A) Establishment of Base Districts
Table 3-1, Base Zoning Districts, sets out the base residential, business, and industrial
zoning districts established by this ordinance.
TABLE 3-1: BASE ZONING DISTRICTS
Abbreviation District Name
Residential Districts
A-O Agricultural Open District
R-A Residential Amenities District
R-1 Single Family Residential District
R-2 Single and Two Family Residential District
T-N Traditional Neighborhood District
R-3 Medium Density Residential District
R-4 Medium-High Residential District
M-H Mobile & Manufactured Home Park District
Business Districts
B-1 Neighborhood Business District
B-2 Limited Business District
B-3 Highway Business District
B-4 Regional Business District
CCD Central Community District
Industrial Districts
IBC Industrial and Business Campus District
I-1 Light Industrial District
I-2 Heavy Industrial District
(B) Establishment of Overlay Districts
Table 3-2, Overlay Zoning Districts, sets out the overlay zoning districts established by
this ordinance.
TABLE 3-2: OVERLAY ZONING DISTRICTS
Abbreviation District Name
FP Flood Plain District
W Wetland District
WS Wild and Scenic Recreational River District
SH Shoreland District
FBS Freeway Bonus Sign District
DW Drinking Water Supply Management Area District
PB Performance Based Enhancement District
SU Special Use Overlay District
CCD-R CCD Residential Overlay District
CHAPTER 3: ZONING DISTRICTS
Section 3.3 Common District Requirements
Subsection (D) Common Yard and Height Requirements
Page 84 City of Monticello Zoning Ordinance
(D) Common Yard and Height Requirements
(1) In General
(a) Unless otherwise authorized by variance, administrative adjustment or PUD,
no lot, yard, or other open space shall be reduced in area or dimension so as to
make such lot, yard, or open space less than the minimum required by this
ordinance; and if the existing yard or other open space as existing is less than
the minimum required, it shall not be further reduced.
(b) A yard or other open area required about a building shall not be included as
part of a yard or other open space for another building.
(2) Allowable Yard Encroachments
(a) The following features may encroach into required yards:
(i) Fences and walls that meet the standards in Section 4.3, may encroach
into a required yard, but shall be subject to corner visibility requirements.
(ii) Walkways, patios, ramps, stairs, paved areas, and other accessory
structures less than 30 inches above grade, and all landscape plantings are
exempted from yard requirements except as may be specifically required
by this ordinance, but are subject to corner visibility requirements.
(iii) In rear and side yards: recreational and laundry drying equipment, arbors
and trellises, balconies, decks, and air conditioning or heating equipment
subject to the following conditions:
1. Setback requirements of environmental protection districts shall
remain applicable.
2. A side yard setback of six (6) feet shall be maintained.
3. A setback of twenty (20’) feet shall be maintained from property lines
abutting public streets.
4. A rear yard setback of six (6) feet shall be maintained.
5. No encroachment shall be permitted within an existing or required
easement.
(iv) Appurtenances:
1. Appurtenances are permitted to encroach into a required front or rear
yard setback up to six feet. This provision does not apply to rear
loading units in the T-N zoning district.
2. Appurtenances are permitted to encroach into a required side yard
setback up to three feet. This provision does not apply to units in the
T-N zoning district.
Section 4.3:
Fences & Walls
Section 5.3(B):
General Standards
and Limitations for
Accessory Uses &
Structures
CHAPTER 3: ZONING DISTRICTS
Section 3.4 Residential Base Zoning Districts
Subsection (F) R-2: Single and Two Family Residence District
City of Monticello Zoning Ordinance Page 95
Typical R-2 Lot Configuration
(F) R-2: Single and Two Family Residence District
Section 3.4 (F)
R-2 Single and Two-Family Residence District
The purpose of the "R-2" single and two-family
residential district is to provide for low to moderate
density one and two unit dwellings and directly related
complementary uses.
Maximum Density through PUD or Performance
Standards = 5,445 sq. ft. per unit (8.0 units per gross
acre)
Base Density = 12,000 sq ft per unit or 3.6 units per
gross acre (10,890 sq. ft. per unit or 4.0 units per acre in
the Original Plat as indicated below).
Minimum Lot Sizes
R-2 District Original Plat
Lot Area 12,000 sq. ft. 10,890 sq. ft.
Lot Width 80 feet 66 feet
Typical R-2 Building Types
CHAPTER 3: ZONING DISTRICTS
Section 3.4 Residential Base Zoning Districts
Subsection (F) R-2: Single and Two Family Residence District
Page 96 City of Monticello Zoning Ordinance
TABLE 3-6: R-2 DEVELOPMENT STANDARDS
REQUIRED YARDS (in feet) Max Height
(stories /
feet)
Minimum Floor
Areas
(sq ft)
Minimum
Building
Width (ft)
Minimum Roof Pitch &
Soffit (vertical rise/
horizontal run)
Front
[1]
Interior
Side
Street
Side Rear
Single Family /
Duplex
Building
30 10
[2] 20 30 2.5 stories
35 feet
1,050
foundation
2,000 finishable
(per unit if
applicable)
[3]
24
5” / 12”
No minimum soffit
Townhouse/
Multi Family
Building
30 10 20 30 2.5 stories
35 feet 24
[1]: For the Original Plat of Monticello and Lower Monticello, where adjacent structures (excluding accessory
buildings within same block) have front yard setbacks different from those required, the front yard minimum
setback shall be the average of the adjacent structures. If there is only one (1) adjacent structure, the front
yard minimum setback shall be the average of the required setback and the setback of the adjacent structure.
[2]: Interior side yard setbacks for single family homes on lots of record with a lot width 66 feet or less in the
Original Plat of Monticello and Lower Monticello shall be at least six (6) feet.
[3]: Finishable square footage is exclusive of attached accessory space
Accessory
Structures
An attached garage shall be included with all principal residential structures in the R-2 district.
See Section 5.3(B) for all general standards and limitations on accessory structures.
The minimum floor area for all attached accessory structures shall be 450 sq. ft.
No portion of any attached accessory structure may be more than 10 feet closer to the street that the
principal structure.
Except for single family buildings, any driveway leading directly to an attached accessory structure may not
exceed 18’ in width at the front yard property line
Other
Regulations to
Consult (not
all inclusive)
Section 3.3, Common District Requirements
Section 3.4(B), Standards Applicable to All Residential Base Zoning Districts
Section 4.11, Building Materials
Section 4.8, Off-Street Parking
Section 4.1, Landscaping and Screening Standards
CHAPTER 4: FINISHING STANDARDS
Section 4.3 Fences & Walls
Subsection (C) General Requirements for Fences and Walls
City of Monticello Zoning Ordinance Page 227
4.3 Fences & Walls
(A) Purpose and Intent
The purpose and intent of this section is to regulate the location, height, and appearance
of fences and walls to maintain visual harmony within residential and business districts;
protect adjacent properties from the indiscriminate placement and unsightliness of
fences and walls; and ensure the safety, security, and privacy of properties.
(B) Applicability
(1) In General
Unless exempted in accordance with Section 4.3(B)(2) below, the provisions of
this section shall apply to the construction, reconstruction, or replacement of all
fences or walls in the City. In the event of any conflict between the provisions of
this section and any screening standard in Section 4.1(I), Screening, the latter
shall govern.
(2) Exemptions
The following are exempted from the requirements of this section.
(i) Development in the CCD District
Development on lots in the CCD district is exempt from the standards of this
section.
(ii) Recreational Fencing
Customary fencing provided as a part of a permitted tennis court, athletic
field, or other recreational facility.
(iii) Temporary Fencing
Temporary fencing established around construction sites, demolitions, or
other site conditions unsafe for pedestrians or vehicles, provided it is
consistent with the building code.
(C) General Requirements for Fences and Walls
(1) Location
(a) Fences and walls are permitted anywhere on a lot subject to the following
restrictions:
CHAPTER 4: FINISHING STANDARDS
Section 4.3 Fences & Walls
Subsection (C) General Requirements for Fences and Walls
Page 228 City of Monticello Zoning Ordinance
(i) The corner visibility requirements in Section 3.3(D)(2)(b) shall be met.
(ii) Fences and walls shall not be located within public right-of-way unless
permitted by the Community Development Department by written
encroachment agreement.
(iii) Fences and walls permitted by the Community Development Department
to be within easements are subject to removal without compensation to
the property owner if the City must access the area for maintenance or
improvement purposes.
(b) Fences and walls may be located directly over a property line between two or
more parcels of land held in private ownership.
(c) A certificate of survey may be required by the Community Development
Department to determine the location of fences and walls on a property.
(2) Blocking Natural Drainage Flow
(a) No fence shall be installed so as to block or divert a natural drainage flow on
to or off of any other land.
(b) Drainage swales may not be filled to accommodate the construction of fences
or walls without alternate storm water provisions being reviewed and
approved by the Community Development Department.
(c) Nothing in this section shall be construed to prevent the installation of
temporary fencing to protect existing trees, limit sedimentation, or control
erosion.
(3) Fences and Walls within Buffers
Fences and walls shall be installed so as not to disturb or damage existing
vegetation or installed plant material. The perimeter fencing or wall for a single
development shall be of a uniform style that complies with the standards of this
section.
(4) Permit Requirements
(a) A building permit is required for the construction of any fence or wall that
will be more than six (6) feet in height above grade, or for construction of a
retaining wall that is more than four (4) feet in height from the bottom of the
footing to the top of the wall.
Section 4.10:
Grading, Drainage,
& Erosion Control
Section 4.3(F):
Perimeter Fences
and Walls Abutting
Public Right-of-Way
CHAPTER 4: FINISHING STANDARDS
Section 4.3 Fences & Walls
Subsection (H) Chain Link Fencing
Page 232 City of Monticello Zoning Ordinance
(d) Comply with the standards in Section 4.3(J), Appearance; and
(e) Comply with the requirements of Section 4.1(I), Standards for Required
Screening (if applicable).
(2) New residential developments shall be required to construct conforming fencing
along the rear yards of all double frontage lots that back up to collector or arterial
roadways.
(G) Prohibited Fences
(1) Fences or walls made of debris, junk, rolled plastic, sheet metal, plywood,
wooden landscape lattice or waste materials are prohibited in all zoning districts
unless such materials have been recycled and reprocessed for marketing to the
general public as building materials that resemble new building materials and are
designed for use as a fencing material (e.g., picket fencing made from recycled
plastic and fiber).
(2) Chicken wire fences.
(H) Chain Link Fencing
Chain link fencing shall be allowed, subject to the following standards:
(1) All Districts
In all districts, chain link fences must have a top rail, and barbed ends must be
placed at the bottom of the fence.
(2) Residential Districts
Chain link fencing is permitted on lots within residential zoning districts provided
it does not include opaque slats, and does not exceed a height of four (4) feet.
(3) Business Districts
Chain link fencing shall not be allowed on lots within a business zoning district
unless expressly authorized through approval of a security plan under the
provisions of Section 4.3(E).
(4) Industrial Districts
Chain link fencing shall be allowed on lots within industrial zoning districts
provided it does not include opaque slats and is coated with black or dark green
vinyl.
CHAPTER 4: FINISHING STANDARDS
Section 4.5 Signs
Subsection (I) Temporary Signs
City of Monticello Zoning Ordinance Page 249
(ii) Dynamic sign displays shall not be permitted in any Residential zoning
district.
(iii) Dynamic sign displays shall be permanent signs.
(iv) No dynamic sign display shall change more than one time per three (3)
second period; time and temperature displays may change as frequently as
once every three (3) seconds.
(v) Dynamic sign displays shall be no brighter than other illuminated signs in
the same district.
(vi) Dynamic sign displays shall be designed to freeze the display in the event
of malfunction, and the owner shall discontinue the display immediately
upon malfunction, or upon notice from the City that the display violates
the City’s regulations.
(vii) Applicants for dynamic sign displays shall sign a license agreement
supplemental to the building permit agreeing to operation of a sign in
conformance with these regulations. Violation of these regulations shall
result in forfeiture of the license, and the City shall be authorized to
arrange disconnection of electrical service to the facility.
(viii) No dynamic sign display shall be permitted to be located in a yard or on
the side of a building which abuts a residentially zoned parcel.
(20) Design and Materials Standards for Signs in Commercial Districts,
Industrial Districts, the CCD District, PUDs, and Performance Based Mixed
Use Development
(a) In General
The design and materials of any sign shall be consistent with the building
materials requirements of the district in which the sign is located, and shall be
the same as, or compatible with, the materials and design of the principal
building(s) on the property.
(b) Specific Materials for Pylon Signs
All exposed pole or post structures must be wrapped or faced with stucco,
architectural metal, brick or stone consistent with building architecture.
CHAPTER 4: FINISHING STANDARDS
Section 4.7 Transitional Features
Subsection (B) Applicability
Page 254 City of Monticello Zoning Ordinance
c. To scale plans for all existing and proposed signs of any type
included within the comprehensive sign plan indicating area,
dimensions, height, materials, colors, and means of illumination
(if any).
4. No permit shall be issued for a new or replacement sign for an
individual tenant except upon a determination by the Community
Development Department that it is consistent with the approved
comprehensive sign plan.
(3) In a PUD, Planned Unit Development District, signing restrictions shall be based
upon the individual uses and structures contained in the complex. Signs shall be in
compliance with the restrictions applied in the most restrictive zoning district in
which the use is allowed.
4.6 Underground Utilities
All utilities within or serving new development [e.g. cable television, electrical
(excluding transformers), gas, sewer, telephone, and water lines] shall be placed
underground.
4.7 Transitional Features
(A) Purpose and Intent
Transitional features are architectural elements or site aspects that must be used to ease
the transition between new development and existing structures and community
character. It is the intent of these standards to:
(1) Blend land use types throughout the City to minimize visual conflicts;
(2) Limit the excessive consumption of land though the utilization of large vegetated
buffers to separate potentially conflicting use types; and
(3) Limit interruptions in vehicular and pedestrian connections created by efforts to
segregate uses.
CHAPTER 4: FINISHING STANDARDS
Section 4.8 Off-street Parking
Subsection (F) Standards Applicable to Residential Uses
City of Monticello Zoning Ordinance Page 275
(2) Vehicular Use Area Design in Residential Areas
(a) Curb Cuts and Access
(i) Single family uses shall be limited to one (1) curb cut access per property.
(ii) Curb cut access shall be at a minimum three (3) feet from the side yard
property line in residential districts.
(b) Surfacing
Paving and surfacing requirements for parking and storage of passenger
vehicles, emergency vehicles, recreational vehicles, and small commercial
vehicles for single and two-family dwellings shall be as found in Table 4-9
and Figure 4-11.
(c) Residential District Garage Requirements
In all residential zoning districts, all detached single family homes and duplex
units shall include development of an attached or detached garage. The
minimum size requirement for the garage floor shall be 450 sq ft with a
minimum garage door opening of 16 ft. with the following exceptions and/or
deviations by district:
(i) R-1 District
An attached garage of at least 480 square feet shall be constructed as part
of any single family home.
(ii) R-A District
1. An attached garage of at least 700 square feet shall be constructed as
part of any single family home.
2. Garage frontage: From side building line to side building line of any
single family structure, no more than 40% of such building width
shall consist of Garage doors that face the street. Side or rear loaded
garages are not subject to this regulation. An exception shall be made
for garage doors that face the street, but are set back at least ten feet
in back of the front building line of the principal use.
3. No portion of any garage space may be more than five feet closer to
the street than the front building line of the principal single family
use.
CHAPTER 4: FINISHING STANDARDS
Section 4.11 Building Materials
Subsection (C) Residential District Requirements
Page 290 City of Monticello Zoning Ordinance
4.11 Building Materials
(A) Purpose
The purpose of these regulations is to enhance the quality and longevity of buildings in
all zoning districts of the City, and to protect citizen investments in property value by
ensuring complementary building style, construction, and appearance.
(B) General Requirements
(1) Consistency required
In all districts, all buildings shall be finished on all sides with consistent
architectural quality, materials, and design.
(2) New materials
In recognition of the ever-changing marketplace for new finishing materials, the
Community Development Department may authorize the use of materials not
listed herein if it is determined that such a material is substantially similar or
superior to one or more of the approved building materials.
(C) Residential District Requirements
(1) All Residence Districts
No metal siding shall be permitted wider than 12 inches or without a one-half
(1/2) inch or more overlap and relief.
(2) R-1 District
A minimum of 15% of the front building façade of any structure in the R-1
District shall be covered with brick or stone. Any attached or major detached
accessory building that can be seen from the street shall meet this same standard.
Structures with front facades covered by at least 70% stucco or real wood may
reduce the brick or stone coverage to 5%. The Community Development
Department may approve optional facade treatments when additional architectural
detailing so warrants. Such detailing may include usable front porches,
extraordinary roof pitch or other features.
CHAPTER 4: FINISHING STANDARDS
Section 4.11 Building Materials
Subsection (D) Business District Requirements
City of Monticello Zoning Ordinance Page 291
(3) R-A and T-N Districts
A minimum of 20% of the front building façade of any structure in the R-A or T-
N zoning district shall be covered with brick or stone. Any attached or major
detached accessory building that can be seen from the street shall meet this same
standard. Structures with front facades covered by at least 70% stucco or real
wood may reduce the brick or stone coverage to 10%.
(4) R-3 District and other Districts with Multiple Family Housing
A R-3 District and other districts with multiple family housing shall be subject to
building material standards as follows: all building walls facing a public street
shall be covered with stone, brick, cultured masonry simulating brick or stone, or
other enhanced materials acceptable to the City Council to an extent not less than
20% of the exposed wall silhouette area. In addition, multiple family structures of
thirteen (13) or more units shall, when lap horizontal siding, be constructed of
heavy gauge steel or cement-board, with no use of vinyl or aluminum permitted.
Natural wood or species that is resistant to decay may be permitted where
approved by the City Council.
(D) Business District Requirements
In all Business Zoning Districts (see table 3-1), the following building materials
standards shall apply.
(1) No galvanized or unfinished steel, galvalum, or unfinished aluminum buildings,
except those specifically designed to have a corrosive designed finish such
as“corten” steel, shall be permitted in the districts listed herein.
(2) Buildings in these zoning districts shall maintain a high standard of architectural
and aesthetic compatibility with conforming surrounding properties to ensure that
they will not adversely impact the property values of the abutting properties and
shall have a positive impact on the public health, safety, and general welfare,
insofar as practicable.
(3) Exterior building finishes in the districts subject to this Section shall consist of
materials compatible in grade and quality to the following:
(a) Brick
(b) Natural Stone
(c) Decorative rock face or concrete block
(d) Cast-in-place concrete or pre-cast concrete panels
CHAPTER 5: USE STANDARDS
Section 5.1 Use Table
Subsection (A) Explanation of Use Table Structure
City of Monticello Zoning Ordinance Page 315
TABLE 5-1: USES BY DISTRICT (cont.)
Use Types
“P” = Permitted
“C” = Conditionally
Permitted
“I” = Interim Permitted
Base Zoning Districts
Additional
Requirements A
O
R
A
R
1
R
2
T
N
R
3
R
4
M
H
B
1
B
2
B
3
B
4
C
C
D
I
B
C
I
1
I
2
Industrial Uses
Auto Repair – Major C
*SE
E
T
A
B
L
E
5-1A
P P 5.2(G)(1)
Bulk Fuel Sales and
Storage P P 5.2(G)(2)
Extraction of Materials I I I 5.2(G)(3)
General Warehousing C C P P 5.2(G)(4)
Heavy Manufacturing C 5.2(G)(5)
Industrial Services C P None
Land Reclamation C C C C C C C C C C C C C C C 5.2(G)(6)
Light Manufacturing C P P P 5.2(G)(7)
Machinery/Truck Repair
& Sales P P 5.2(G)(8)
Recycling and Salvage
Center C C 5.2(G)(9)
Self-Storage Facilities P C P 5.2(G)(10)
Truck or Freight
Terminal C P P 5.2(G)(11)
Waste Disposal &
Incineration C 5.2(G)(12)
Wrecker Services C P 5.2(G)(13)
TABLE 5-1A: CENTRAL COMMUNITY DISTRICT (CCD) USES
Use Types
“P” = Permitted
“C” = Conditionally Permitted
“I” = Interim Permitted
Sub-Districts
Exceptions Additional
Requirements F-1 F-2 F-3 L
Commercial Day Care C C C C none 5.2(F)(11)
Commercial Lodging P P C none 5.2(F)(7)
Commercial Offices – Principal C P P C L-2: NA first floor,
CUP upper floors 5.2(F)(19)
Commercial Recreation: Indoor P P C C none 5.2(F)(12)
Commercial Recreation:
Outdoor C C none 5.2(F)(13)
Convenience Retail C P* C C *F-2 Drive Through by CUP 5.2(F)(9)
Funeral Services C C none 5.2(F)(15)
CHAPTER 5: USE STANDARDS
Section 5.1 Use Table
Subsection (A) Explanation of Use Table Structure
Page 316 City of Monticello Zoning Ordinance
TABLE 5-1A: CENTRAL COMMUNITY DISTRICT (CCD) USES (cont.)
Use Types
“P” = Permitted
“C” = Conditionally Permitted
“I” = Interim Permitted
Sub-Districts
Exceptions Additional
Requirements F-1 F-2 F-3 L
Medical / Clinical Services C P P P L-2: NA first floor,
CUP upper floors 5.2(F)(18)
Personal Services P P P P
L-2: NA first floor,
CUP upper floors
L-3: CUP
5.2(F)(21)
Places of Public Assembly C C C C none 5.2(F)(22)
Professional Office-Services
Including Financial Institutions P P P C L-2: NA first floor,
CUP upper floors
5.2(F)(14)
5.2(F)(20)
Restaurants, Bars < 10,000 SF P P C C none 5.2(F)(25)
Restaurants, Bars > 10,000 SF P C C none 5.2(F)(25)
Retail Sales < 10,000 SF P P C C none 5.2(F)(26)
Retail Sales > 10,000 SF P C C none 5.2(F)(26)
Retail with Service P C C L-2: NA first floor,
CUP upper floors 5.2(F)(26)
Specialty Eating Establishments
< 10,000 SF P* P* C* P* *Drive Through by CUP 5.2(F)(27)
Vehicle Fuel Sales C C C 5.2(F)(28)
Veterinary Facilities C P C C none 5.2(F)(30)
Residential – Upper Floors P P P P L-2: NA
Residential – Street Level C C L-2: NA
Residential – Multiple Family C C L-2: NA
Residential – Townhouse C none
Residential – Single Family C none
Industrial PUD L-3: PUD Only
Public Buildings or Uses C C C P none
CHAPTER 8: RULES & DEFINITIONS
Section 8.4 Definitions
Subsection (B) Lots
Page 440 City of Monticello Zoning Ordinance
OFFICE USE: An establishment primarily engaged in providing professional, financial,
administrative, clerical, and similar services.
OFF-STREET LOADING SPACE: A space accessible from the street, alley or way, in a
building or on the lot, for the use of trucks while loading or unloading merchandise or
materials. Such space shall be of such size as to accommodate one (1) truck of the type
typically used in the particular business.
OPACITY (OPAQUE): A measurement indicating the degree of obscuration of light or
visibility. An object that is 100% opaque is impenetrable by light.
OPEN SALES: Any open land used or occupied for the purpose of buying, selling, and/or
renting merchandise and for the storing of same prior to sale.
OPEN SPACE: An area on a lot not occupied by any structure or impervious surface.
OPEN SPACE, USABLE: A required ground area or terrace area on a lot which is graded,
developed, landscaped, and equipped and intended and maintained for either active or passive
recreation or both, available and accessible to and usable by all persons occupying a dwelling
unit or rooming unit on the lot and their guests. Such areas shall be grassed and landscaped or
covered only for a recreational purpose. Roofs, driveways, and parking areas shall not
constitute usable open space.
ORDINARY HIGH WATER (new shoreland district code): The boundary of public waters
which may include wetlands, and shall be an elevation delineating the highest water level
which has been maintained for a sufficient period of time to leave evidence upon the
landscape, commonly that point where the natural vegetation changes from predominantly
aquatic to predominantly terrestrial. For watercourses, the ordinary high water level is the
elevation of the top of the bank of the channel. For reservoirs and flowages, the
ordinary high water level is the operating elevation of the normal summer pool.
OUTDOOR STORAGE: The keeping, in an un-roofed area, of any goods, junk, material,
merchandise, or vehicles in the same place for more than twenty-four (24) hours. This shall
not include the display of vehicles for sale in a new or used car sales lot. Such activities may
be the principal use of the land or as an accessory use to another principal use.
OUTPATIENT CARE: Medical examination or service available to the public in a hospital.
This service is provided without overnight care and shall be considered a separate,
independent, principal use when combined or operated in conjunction with a hospital.
Planning Commission Agenda 06/03/14
1
9. Analysis related to Interim Ordinance #590, an Interim Ordinance Allowing Places
of Public Assembly on a Temporary Basis as a Principal or Accessory Use in a
B-3(Highway Business) District (NAC)
A. REFERENCE & BACKGROUND
Request(s): In response to the City’s recent establishment of an
interim ordinance associated with the temporary
allowance of “places of public assembly” within B-3,
Highway Business Districts, related background
information has been assembled for the Planning
Commission’s consideration.
ANALYSIS
Interim Ordinance Amendment. This spring, the City Council approved an interim
ordinance to allow “places of public assembly” on a temporary basis (as a principal or
accessory use) in B-3, Highway Business Districts by interim use permit. In
conjunction with such approval, the City Council also approved a specific interim use
permit to allow “a place of public assembly” (Faith Family Life Center) on the former
Cornerstone Chevrolet property located at 3939 Chelsea Road West.
The purpose of an interim ordinance is to allow a municipality to put temporary
standards in place applicable to all or part of its jurisdiction for the purpose of
protecting the planning process and the health, safety and welfare of its citizens
(MS§462.355 Subd.4). Within the duration of the interim ordinance, the City must
also initiate a study to evaluate the potential impact of a policy to consider changes to
its land use controls.
An examination of the City’s existing regulation of “places of public assembly” is
considered an appropriate next step in regard to an evaluation of the use.
“Place of Public Assembly” Definition. The City’s Zoning Ordinance defines a
“place of public assembly” as follows:
An institution or facility that congregations of people regularly attend to
participate in or hold meetings, workshops, lectures, civic activities, religious
services, and other similar activities, including buildings in which such
functions and activities are held.
The preceding definition includes churches, fraternal lodges, and social clubs.
Planning Commission Agenda 06/03/14
2
To be noted is that the preceding definition does not include “motion picture
theaters.” Rather, “motion picture theaters” are considered a type of “indoor
commercial entertainment” as defined in the Ordinance.
Comprehensive Plan. The Land Use Plan, as included in the City’s 2008
Comprehensive Plan, depicts series of “places” for private development. These
include “Places to Live”, “Places to Shop”, “Places to Work”, and “Downtown.”
A “place of public assembly” is a unique use in that it is not necessarily a place to
live, shop or work.
The Comprehensive Plan does however, make reference to “Places for Community”
which appears to include “places of public assembly” from a land use perspective.
According to the Plan, “Places for Community” include public and semi-public land
uses. Public uses include all governmental facilities and schools. The category also
includes churches, cemeteries, hospitals and other institutional uses.
To be noted is that the Comprehensive Plan does not guide the location of new
churches, schools public buildings and other institutional uses. However, the Plan
notes that new “Places for Community” will be needed in the northwest area of the
City as it develops.
The Plan also notes that new institutional uses should be allowed in residential areas
under certain conditions. In this regard, aspects of proposed institutional uses related
to the following must be considered:
Size/scale of development in relation to the surrounding neighborhood.
Parking impacts upon surrounding residential areas.
Traffic impacts.
Lighting and signage should be compatible with surrounding residential areas.
District Allowance. “Places of public assembly”, as defined by the Zoning
Ordinance, are presently allowed within the City as follows:
Zoning District District Purpose District Allowance
R-1, Single Family
Residence
To provide for low density, single
family, detached residential dwelling
units and directly related
complementary uses.
Conditional Use
R-2, Single and Two
Family Residence
To provide for low to moderate density
one and two unit dwellings and
directly related complementary uses.
Conditional Use
TN, Traditional
Neighborhood Residence
To provide for medium density, single
family, detached residential dwelling
units and directly related
complementary uses.
Conditional Use
R-4, Medium-High
Density Residence
To provide for medium to high density
housing in multiple family structures
Conditional Use
Planning Commission Agenda 06/03/14
3
of 13 or more units per building, and at
densities of between 10 and 25 units
per acre.
B-2, Limited Business
To provide for low intensity retail or
service outlets which deal directly with
the customer for whom the goods or
services are furnished.
Permitted Use
CCD, Central
Community District
To provide for a wide variety of land
uses, transportation options, and public
activities in the downtown Monticello
area, and particularly to implement the
goals, objectives, and specific
directives of the Comprehensive Plan,
and in particular, the Embracing
Downtown Monticello report and its
Design Guidelines.
Conditional Use, all
sub-districts
B-3, Highway Business
To provide for limited commercial and
service activities and provide for and
limit the establishment of motor
vehicle oriented or dependent
commercial and service activities.
Interim Use (per
recently approved
amendment)
Performance Standards. Section 5.2 of the Zoning Ordinance establishes a set of
performance standards which are specific to all “places of public assembly” within
the City. These conditions, as reiterated below, are to be applied in addition to basic
general provisions and district standards.
1. Institutions on parcels exceeding 20,000 square feet in area shall be located
with direct frontage on, and access to, a collector or arterial street.
2. The buildings are set back from adjoining residential districts a distance no
less than double the adjoining residential setback.
3. When abutting a residential use in a residential use district, the property shall
be screened with an aesthetic buffer (Table 4-2, Buffer Type “B”) in
accordance with section 4.1(G) of the Ordinance.
4. Adequate off-street parking and access is provided on the site or on lots
directly abutting or directly across a public street or alley to the principal use
in compliance with Section 4.8 of this ordinance and that such parking is
adequately screened and landscaped from surrounding and abutting residential
uses in compliance with Section 4.1(F) of the Ordinance.
5. Adequate off-street loading and service entrances are considered and
satisfactorily provided.
There are a couple of categories of issues raised by the interim use request. These are
summarized below, with staff comments included.
Planning Commission Agenda 06/03/14
4
1. A primary purpose of the City’s Zoning Ordinance is to implement the land use
directives of the City’s Comprehensive Plan. Thus, a primary question to be
answered is whether or not the current Comprehensive Plan policies related to “places
of public assembly” remain applicable. Recognizing that “places of public assembly”
are not specifically referenced in the Plan, the following questions are raised:
a. Are “places of public assembly” clearly a subset of “places for community” as
referenced in the Plan and thus subject to the same land use directives?
Staff Comment: One of the aspects of the code is application of Plan goals to specific
ordinance allowances. The ordinance seems to define Public Assembly as what we
might typically think of as an institutional use, then includes it zones outside of the
land use category (Places for Community) in which it would logically be located. The
purpose of this was the identification of the CCD and B-2 District as districts in
which community-based services would be offered, with an understanding that those
services would be primarily to local residents or businesses. The B-3 District, on the
other hand, is designed to serve, in large part, the traveling public. As such, the B-3
District was not included as a potential location for “Places of Public Assembly”.
b. Is the northwest area of the City still a target area for new “places for
community” which, by understood association, includes “places of public
assembly?”
Staff Comment: Certainly, the northwest area of the city includes the Bertram Lakes
park area, an important, if not dominant, “place for community”. If the park use
constitutes the extent of community land uses in the area, the land use designation
could be seen as muddling that somewhat. Greater definition in the land use plan
might help to address this. That said, other institutional uses are typically sited on a
case-by-case basis, responding to specific requests. The Plan anticipates future
places for community in the northwest, but does not site them.
2. If no changes to the current Comprehensive Plan polices are desired, question exists
whether or not the current provisions of the Zoning Ordinance adequately implement
the Plan’s land use directives related to “places of public assembly.” In this regard,
the following questions are considered worthy of discussion:
a. Should “places of public assembly”, regardless of scale, be allowed in
residential zoning districts?
Staff Comment: The irony of many contemporary religious institutional uses is a
desire for high-exposure, high-access property, with a land use pattern that differs
from commercial businesses that usually populate these areas. At the same time,
church development has evolved to be much more than when churches were
commonly located in the midst of residential neighborhoods. The fact is that
Planning Commission Agenda 06/03/14
5
churches and similar institutional uses have land use characteristics that are neither
compatible with most smaller-scale neighborhoods, nor similar to commercial uses.
The zoning ordinance use of the term “public assembly” could be better defined in
this regard. However, siting church uses in residential areas is so common, it is often
simpler to include these uses in residential zoning districts, preparing special
requirements for them that don’t apply to actual residential development.
Monticello’s ordinance is structured in this way, and it can be a complex matter to
restructure the code to address this single issue. The negative with this approach is
that large-scale church uses are allowed as a matter of right in neighborhoods that
might otherwise object to the levels of activity that some churches generate.
b. Are “places of public assembly” an appropriate allowed use in the City’s CCD
and B-3, Highway Business District? If so, is the present allowance via interim
use permit appropriate?
Staff Comment: This is the crux of the question relating to the City’s interim
ordinance. Currently allowed as permitted uses in the B-2 district and conditional
uses in the CCD, it appears that this inclusion is intended to address the community’s
need for places of public assembly, while recognizing that residentially zoned
properties may not be able to adequately accommodate public assembly in terms of
site design and size. As noted above, many churches are more likely to seek high-
profile commercial sites than the B-2 and CCD. The question for the City is whether
these uses are considered appropriate in these higher-profile sites and specifically in
the B-3 District given its purpose to provide for and limit the establishment of motor
vehicle oriented or dependent commercial and service activities.
c. Are the performance standards specifically related to “places of public
assembly” considered adequate are or some changes desired?
Staff Comment: The presumption here is that the current standards are appropriate,
and that instead, the question is whether a use with these characteristics should be
allowed permanently in the B-3 District.
d. Should the definition of “place of public assembly” be modified to note that
“indoor commercial entertainment” (e.g. motion picture theaters) is not for the
purposes of the Ordinance, considered a “place of public assembly?”
Staff comment: If more permanent changes to the ordinance are to be considered,
definitions should also be addressed. If the City is satisfied with the current land use
pattern and zoning arrangement, the definitions are probably adequate.
SUMMARY
Prior to the current zoning ordinance, the City utilized a specialized zoning district for
institutional uses, including religious institutions. At one point, a concern arose in the
zoning law realm as to whether cities would be required to accommodate church
Planning Commission Agenda 06/03/14
6
assembly uses anywhere that commercial assembly uses are allowed. This concern
was based in a couple of federal laws (“RFRA”- the Religious Freedom Restoration
Act; and “RLUIPA” – the Religious Land Use and Institutionalized Persons Act),
along with a couple of prominent legal challenges in the federal courts.
The essential thrust of these federal actions was a clarification that a zoning authority
could not discriminate against a particular land use merely on the basis of the fact that
the land use was religious in nature. The most commonly applied example of this
principle used a movie theater and a traditional church use. It was proposed that since
both uses have a main assembly hall area, where a city allowed theatres, it must also
allow churches. As a result, many ordinances were written to include “public
assembly” as a land use, and then incorporating it into wherever movie theatres were
allowed.
In Monticello’s ordinance, however, the distinction was essentially focused on the
perceived service area of the facility. As a result, the ordinance was constructed to
allow church uses in residential areas as they traditionally have been, and to
incorporate them into limited commercial districts –those designed to serve local
members of the community as opposed to a more regional focus.
Thus, the real question for the City, related to the interim ordinance, is whether the B-
3 District should be included as an eligible location for public assembly uses as
defined. Historically the City has been reluctant to remove land from its available
stock of potential business locations. Making a change such as this would potentially
reduce available commercial land assuming that some of the existing property
(including the parcel subject to the current IUP) would be converted to public
assembly use, rather than a more traditional auto-related commercial development.
In summary, the current ordinance appears to adequately serve the intent of the
Comprehensive Plan in focusing on the groups of populations being served. Adding
Places of Public Assembly to the B-3 District, and expanding this use to a regionally-
focused land use category would be inconsistent with the City’s original planning
approach, since such a change would expand the potential siting for such uses to
much of the Highway 25 corridor (as currently zoned).
B. ALTERNATIVE ACTIONS
1. Approve calling for a public hearing to consider amendments to the zoning ordinance
establishing Places of Public Assembly as a permanent land use category option in
the B-3 Zoning District.
2. Deny calling for public hearing on the amendment, permitting the current interim
ordinance to expire at the end of August, 2014 and to direct preparation of a
resolution of findings.
Planning Commission Agenda 06/03/14
7
C. STAFF COMMENTS/RECOMMENDATION
If the City is satisfied with the current land use pattern, there would be no necessity to
change the ordinance. The current interim ordinance would expire, as would the IUP
in August.
If the City believes that a broader allowance for public assembly uses is appropriate,
there are two basic options:
1. Amend the zoning ordinance to add public assembly uses in other districts,
such as the B-3. With this alternative, there are some changes to definitions
and other standards requirements that would be appropriate.
2. Reconsider a zoning district that caters specifically to institutional uses, such
as schools, religious assembly uses, and public activities.
3. Consider changing zoning designations for appropriate institutional use
parcels to residential, or perhaps B-2, if such parcels are properly located to
meet the intent of the zoning district. This could be done on a case-by-case
basis at the request of individual property owners.
Staff does not recommend the permanent amendment as related to the interim ordinance.
The structure of the zoning ordinance is set up to create various land use districts based
generally on the intended service population. The ordinance, and the Comprehensive
Plan, treats institutional uses as those that focus their services primarily on the local
community. As such, the inclusion of Places of Public Assembly in the B-2 District and
CCD as the only commercial accommodation for such uses is sensible. Including such
uses in the B-3 district would alter the City’s intent in the design of its ordinance and
other planning regulations.
D. SUPPORTING DATA
A. Interim Ordinance #590
B. Monticello Comprehensive Plan, Chapter 3, Places for Community (see Item 5 exhibit)
C. Monticello Zoning Ordinance, Excerpts:
5.1 – Use Table
5.2 (D) – Regulations for Civic & Institutional Uses
8.4 - Definitions
CHAPTER 5: USE STANDARDS
Section 5.1 Use Table
Subsection (A) Explanation of Use Table Structure
Page 312 City of Monticello Zoning Ordinance
(c) Interim Permitted Uses = I
An “I” indicates that a use may be permitted for a brief period of time
provided certain conditions are met, and a specific event or date can be
established for discontinuance of the use. Inability of the City ]o establish
conditions to adequately control anticipated impacts is justification for denial
of an interim permitted use. Interim Permitted Uses may also be subject to
special regulations as referenced in the “Additional Requirements” column.
(d) Prohibited Uses = Shaded Cells
A shaded cell indicates that the listed use is prohibited in the respective base
zoning district.
(e) Unlisted Uses
If an application is submitted for a use that is not listed in Table 5-1, the
Community Development Department is authorized to classify the new or
unlisted use into an existing Use Type that most closely fits the new or
unlisted use. If no similar use determination can be made, the use will be
considered prohibited in which case an amendment to the ordinance text
would need to be initiated to clarify if, where, and how a proposed use could
be established.
TABLE 5-1: USES BY DISTRICT
Use Types
“P” = Permitted
“C” = Conditionally
Permitted
“I” = Interim Permitted
Base Zoning Districts
Additional
Requirements A
O
R
A
R
1
R
2
T
N
R
3
R
4
M
H
B
1
B
2
B
3
B
4
C
C
D
I
B
C
I
1
I
2
Agricultural Uses
Agriculture P P P P P P P P P P P P
*SE
E
T
A
B
L
E
5
-1A
P P P 5.2(B)(1)
Agricultural Sales P 5.2(B)(2)
Community Gardens P P P P P P P P P 5.2(B)(3)
Stables C 5.2(B)(4)
CHAPTER 5: USE STANDARDS
Section 5.1 Use Table
Subsection (A) Explanation of Use Table Structure
City of Monticello Zoning Ordinance Page 313
TABLE 5-1: USES BY DISTRICT (cont.)
Use Types
“P” = Permitted
“C” = Conditionally
Permitted
“I” = Interim Permitted
Base Zoning Districts
Additional
Requirements A
O
R
A
R
1
R
2
T
N
R
3
R
4
M
H
B
1
B
2
B
3
B
4
C
C
D
I
B
C
I
1
I
2
Residential Uses 5.2(C)(1)
Attached Dwelling Types 5.2(C)(2)(a)
- Duplex P C
*SE
E
T
A
B
L
E
5-1A
5.2(C)(2)(b)
- Townhouse C P 5.2(C)(2)(c)
- Multiple-Family C P C C 5.2(C)(2)(d)
Detached Dwelling P P P P P P None
Group Residential
Facility, Single Family P P P P P 5.2(C)(3)
Group Residential
Facility, Multi-Family C C C 5.2(C)(3)
Mobile & Manufactured
Home / Home Park C C C P C 5.2(C)(4)
Civic & Institutional Uses
Active Park Facilities
(public) P P P P P P P P P P P P
*SE
E
T
A
B
L
E
5-1A
P P P None
Active Park Facilities
(private) P P P P P P P 5.2(D)(1)
Assisted Living Facilities C P C 5.2(D)(2)
Cemeteries C C C C C C C 5.2(D)(3)
Clinics/Medical Services C P P C None
Essential Services P P P P P P P P P P P P P P P None
Hospitals C P P C 5.2(D)(4)
Nursing/Convalescent
Home C C C C C C C C C P P 5.2(D)(5)
Passenger Terminal C C C C None
Passive Parks and Open
Space P P P P P P P P P P P P P P P None
Public Buildings or Uses C C C C C C C P C C P P C P P 5.2(D)(6)
Schools, K-12 C C C C C C I I 5.2(D)(7)
Schools, Higher
Education C None
Place of Public Assembly C C C C C P 5.2(D)(8)
Utilities (major) C C C C C C C C C C C C C C C 5.2(D)(9)
Office Uses
Offices P P C P * P P P 5.2(E)
CHAPTER 5: USE STANDARDS
Section 5.1 Use Table
Subsection (A) Explanation of Use Table Structure
Page 314 City of Monticello Zoning Ordinance
TABLE 5-1: USES BY DISTRICT (cont.)
Use Types
“P” = Permitted
“C” = Conditionally
Permitted
“I” = Interim Permitted
Base Zoning Districts
Additional
Requirements A
O
R
A
R
1
R
2
T
N
R
3
R
4
M
H
B
1
B
2
B
3
B
4
C
C
D
I
B
C
I
1
I
2
Commercial Uses
Adult Uses
*SE
E
T
A
B
L
E
5-1A
P P 3.7(K)
Auction House C 5.2(F)(2)
Auto Repair – Minor C C P P 5.2(F)(3)
Automotive Wash Facilities P C 5.2(F)(4)
Bed & Breakfasts C C C C C 5.2(F)(5)
Boarding House C 5.2(F)(6)
Business Support Services P P P P P None
Commercial Lodging C P P 5.2(F)(7)
Communications/Broadcasting P P P P 5.2(F)(8)
Convenience Retail C P P P 5.2(F)(9)
Country Club C 5.2(F)(10)
Day Care Centers C C P P C 5.2(F)(11)
Entertainment/Recreation,
Indoor Commercial P C C C 5.2(F)(12)
Entertainment/Recreation,
Outdoor Commercial C C C C 5.2(F)(13)
Financial Institution P C P 5.2(F)(14)
Funeral Services P P 5.2(F)(15)
Kennels (commercial) C 5.2(F)(16)
Landscaping / Nursery
Business P 5.2(F)(17)
Personal Services C P P P P P 5.2(F)(21)
Recreational Vehicle Camp
Site C C 5.2(F)(23)
Repair Establishment C P P 5.2(F)(24)
Restaurants C P P 5.2(F)(25)
Retail Commercial Uses
(other) P P P 5.2(F)(26)
Specialty Eating
Establishments C P P P 5.2(F)(27)
Vehicle Fuel Sales C C C 5.2(F)(28)
Vehicle Sales and Rental C C 5.2(F)(29)
Veterinary Facilities (Rural) C 5.2(F)(30)
Veterinary Facilities
(Neighborhood) C C C 5.2(F)(30)
Wholesale Sales P P P None
CHAPTER 5: USE STANDARDS
Section 5.1 Use Table
Subsection (A) Explanation of Use Table Structure
City of Monticello Zoning Ordinance Page 315
TABLE 5-1: USES BY DISTRICT (cont.)
Use Types
“P” = Permitted
“C” = Conditionally
Permitted
“I” = Interim Permitted
Base Zoning Districts
Additional
Requirements A
O
R
A
R
1
R
2
T
N
R
3
R
4
M
H
B
1
B
2
B
3
B
4
C
C
D
I
B
C
I
1
I
2
Industrial Uses
Auto Repair – Major C
*SE
E
T
A
B
L
E
5-1A
P P 5.2(G)(1)
Bulk Fuel Sales and
Storage P P 5.2(G)(2)
Extraction of Materials I I I 5.2(G)(3)
General Warehousing C C P P 5.2(G)(4)
Heavy Manufacturing C 5.2(G)(5)
Industrial Services C P None
Land Reclamation C C C C C C C C C C C C C C C 5.2(G)(6)
Light Manufacturing C P P P 5.2(G)(7)
Machinery/Truck Repair
& Sales P P 5.2(G)(8)
Recycling and Salvage
Center C C 5.2(G)(9)
Self-Storage Facilities P C P 5.2(G)(10)
Truck or Freight
Terminal C P P 5.2(G)(11)
Waste Disposal &
Incineration C 5.2(G)(12)
Wrecker Services C P 5.2(G)(13)
TABLE 5-1A: CENTRAL COMMUNITY DISTRICT (CCD) USES
Use Types
“P” = Permitted
“C” = Conditionally Permitted
“I” = Interim Permitted
Sub-Districts
Exceptions Additional
Requirements F-1 F-2 F-3 L
Commercial Day Care C C C C none 5.2(F)(11)
Commercial Lodging P P C none 5.2(F)(7)
Commercial Offices – Principal C P P C L-2: NA first floor,
CUP upper floors 5.2(F)(19)
Commercial Recreation: Indoor P P C C none 5.2(F)(12)
Commercial Recreation:
Outdoor C C none 5.2(F)(13)
Convenience Retail C P* C C *F-2 Drive Through by CUP 5.2(F)(9)
Funeral Services C C none 5.2(F)(15)
CHAPTER 5: USE STANDARDS
Section 5.1 Use Table
Subsection (A) Explanation of Use Table Structure
Page 316 City of Monticello Zoning Ordinance
TABLE 5-1A: CENTRAL COMMUNITY DISTRICT (CCD) USES (cont.)
Use Types
“P” = Permitted
“C” = Conditionally Permitted
“I” = Interim Permitted
Sub-Districts
Exceptions Additional
Requirements F-1 F-2 F-3 L
Medical / Clinical Services C P P P L-2: NA first floor,
CUP upper floors 5.2(F)(18)
Personal Services P P P P
L-2: NA first floor,
CUP upper floors
L-3: CUP
5.2(F)(21)
Places of Public Assembly C C C C none 5.2(F)(22)
Professional Office-Services
Including Financial Institutions P P P C L-2: NA first floor,
CUP upper floors
5.2(F)(14)
5.2(F)(20)
Restaurants, Bars < 10,000 SF P P C C none 5.2(F)(25)
Restaurants, Bars > 10,000 SF P C C none 5.2(F)(25)
Retail Sales < 10,000 SF P P C C none 5.2(F)(26)
Retail Sales > 10,000 SF P C C none 5.2(F)(26)
Retail with Service P C C L-2: NA first floor,
CUP upper floors 5.2(F)(26)
Specialty Eating Establishments
< 10,000 SF P* P* C* P* *Drive Through by CUP 5.2(F)(27)
Vehicle Fuel Sales C C C 5.2(F)(28)
Veterinary Facilities C P C C none 5.2(F)(30)
Residential – Upper Floors P P P P L-2: NA
Residential – Street Level C C L-2: NA
Residential – Multiple Family C C L-2: NA
Residential – Townhouse C none
Residential – Single Family C none
Industrial PUD L-3: PUD Only
Public Buildings or Uses C C C P none
CHAPTER 5: USE STANDARDS
Section 5.2 Use-Specific Standards
Subsection (D) Regulations for Civic and Institutional Uses
City of Monticello Zoning Ordinance Page 329
(d) Adequate off-street parking and access is provided on the site or on lots
directly abutting or directly across a public street or alley to the principal use
in compliance with Section 4.8 of this ordinance and that such parking is
adequately screened and landscaped from surrounding and abutting residential
uses in compliance with Section 4.1(F) of this ordinance.
(e) Adequate off-street loading and service entrances are considered and
satisfactorily provided in accordance with Section 4.9 of this ordinance.
(f) Exterior lighting standards outlined in Section 4.4 of this ordinance shall be
met.
(g) If locating within an industrial zoning district:
(i) A specified termination date is documented.
(ii) The proposed parcel has adequate improved parking to accommodate the
student capacity.
(iii) The proposed building is constructed or altered only in ways which do not
interfere with future refitting for industrial use.
(8) Places of Public Assembly
(a) Institutions on parcels exceeding 20,000 square feet in area shall be located
with direct frontage on, and access to, a collector or arterial street.
(b) The buildings are set back from adjoining residential districts a distance no
less than double the adjoining residential setback.
(c) When abutting a residential use in a residential use district, the property shall
be screened with an aesthetic buffer (Table 4-2, Buffer Type “B”) in
accordance with section 4.1(G) of this ordinance.
(d) Adequate off-street parking and access is provided on the site or on lots
directly abutting or directly across a public street or alley to the principal use
in compliance with Section 4.8 of this ordinance and that such parking is
adequately screened and landscaped from surrounding and abutting residential
uses in compliance with Section 4.1(F) of this ordinance.
(e) Adequate off-street loading and service entrances are considered and
satisfactorily provided.
Section 4.1(F):
Standards for
Vehicular Use Area
Landscaping
Section 4.1(F):
Standards for
Vehicular Use Area
Landscaping
CHAPTER 5: USE STANDARDS
Section 5.2 Use-Specific Standards
Subsection (F) Regulations for Commercial Uses
Page 330 City of Monticello Zoning Ordinance
(9) Utilities (major)
(a) An electrical power facility, substation, or transmission station shall be set
back at least 100 feet from all lot lines. Service or storage yards shall be
prohibited.
(b) All commercial WECS systems shall adhere to the requirements of Section
4.12 in this ordinance.
(E) Regulations for Office Uses
(1) Outdoor storage shall be prohibited.
(2) Buildings or structures with less than 51 percent of office space shall not be
classified as an office use and shall be regulated by the other use of the structure.
(3) If in the B-1 district, the following shall apply:
(a) The traffic generated will not raise traffic volumes beyond the capacity of the
surrounding area.
(b) The architectural appearance of the building housing the office use shall
reflect the building character of the area and shall not be so dissimilar as to
cause impairment of property values or constitute a blighting influence within
the neighborhood.
(c) The provisions of this ordinance are considered and satisfactorily met.
(d) The site shall conform to signage requirements provided under Section 4.5 of
this Code.
(e) The site shall conform to lighting requirements as provided in this ordinance.
The lighting shall be restricted to be consistent with the hours of operation,
within one half hour of open and close times.
(F) Regulations for Commercial Uses
(1) Reserved
(2) Auction House
(a) The architectural appearance and function plan of the building and site shall
not be so dissimilar to the existing buildings or area as to cause impairment in
property values or constitute a blighting influence within a reasonable
distance of the lot.
CHAPTER 8: RULES & DEFINITIONS
Section 8.4 Definitions
Subsection (B) Lots
City of Monticello Zoning Ordinance Page 443
PHASING (in relation to grading): Clearing a parcel of land in distinct phases, with the
stabilization of each phase completed before the clearing of the next.
PLACE OF PUBLIC ASSEMBLY: An institution or facility that congregations of people
regularly attend to participate in or hold meetings, workshops, lectures, civic activities,
religious services, and other similar activities, including buildings in which such functions and
activities are held.
PLAN REQUIREMENTS AND DESIGN GUIDELINES: Manual detailing City
specifications for all plan requirements.
PLANNED UNIT DEVELOPMENT: A type of development which may incorporate a
variety of land uses planned and developed as a unit. The planned unit development is
distinguished from the traditional subdivision process of development in that zoning standards
such as density, setbacks, height limits, and minimum lot sizes may be altered by negotiation
and agreement between the developer, the municipality, and the Commissioner of Natural
Resources as may be required.
PLANTING STRIP: Areas intended for the placement of vegetation within the interior of
vehicular use areas or along street right-of-way edges, typically between the back of the curb
and the inside edge of the sidewalk.
PORTABLE CONTAINER: A large container designed and rented or leased for the
temporary storage of commercial, industrial, or residential household goods that does not
contain a foundation or wheels for movement.
PRINCIPAL USE: The main use of land or buildings as distinguished from subordinate or
accessory uses.
PUBLIC BUILDING OR USE: Any facility, including but not limited to buildings and
property that are leased or otherwise operated or funded by a governmental body or public
entity.
PUBLIC WATERS: Any waters as defined in Minnesota Statutes, section 103G.005, Subd.
15, 15a.
REACH (in relation to flood plains): A hydraulic engineering term to describe a longitudinal
segment of a stream or river influenced by a natural or man -made obstruction. In an urban
area, the segment of a stream or river between two consecutive bridge crossings would most
typically constitute a reach.
Planning Commission Agenda: 06/04/14
1
10. Community Development Director’s Report
Verbal report to be provided at meeting.