Loading...
Planning Commission Agenda 11-01-2011 (Special/Joint Meeting) AGENDA – SPECIAL MEETING MONTICELLO CITY COUNCIL & MONTICELLO PLANNING COMMISSION Tuesday, November 1st, 2011 6:30 PM Mississippi Room, Monticello Community Center Mayor: Clint Herbst Council: Lloyd Hilgart, Tom Perrault, Glen Posusta, Brian Stumpf Commissioners: Rod Dragsten, Brad Fyle, Charlotte Gabler, William Spartz, and Barry Voight Staff: Angela Schumann, Ron Hackenmueller, Steve Grittman - NAC 1. Call to order. 2. Consideration to approve a Public Values Statement for Collaborative Stage Planned Unit Development. (Lot 2, Block 1 and Lot 2, Block 2, Carcone Addition, 1005 State Hwy 25) Applicant: Weinhold Investments, LLC 3. Adjourn. Planning Commission/City Council Agenda – 11/01/11 1 2. Consideration to approve a Public Values Statement for Collaborative Stage Planned Unit Development. Applicant: Weinhold Investments, LLC (NAC) Property: Legal: Lot 2, Block 1 and Lot 2, Block 2, Carcone Addition Address: 1005 State Highway 25 The subject site is located in the southwest quadrant of Trunk Highway 25 and Interstate 94, north of Chelsea Road. Planning Case Number: 2011-026 A. REFERENCE & BACKGROUND Request(s): Collaborative Stage Planned Unit Development Deadline for Decision: December 19th, 2011 Land Use Designation: Places to Shop Zoning Designation: B-3, Highway Business The purpose of the B-3, Highway Business, District is to provide for and limit the establishment of motor vehicle oriented or dependent commercial and service activities. Current Site Use: The existing buildings and property are in a state of non- use. The applicant is seeking to establish a new Planned Unit Development zoning district to permit and manage the development of property in the southwest quadrant of Trunk Highway 25 and Interstate 94, north of Chelsea Road. The property was the site of the former Monticello Ford dealership, sales lots, storage lot and undeveloped land. The proposed project would consist of the following elements:  Remodeling of the former Monticello Ford building to present a more attractive exterior.  Interior remodeling of the Ford building to accommodate multiple commercial activities and tenants, and retaining some previous uses, including : o Car wash facility o Oil Change facility Planning Commission/City Council Agenda – 11/01/11 2  Replat the Ford property to provide two new development parcels on the south portion of the property.  Develop those two new parcels for commercial uses, prospectively restaurant and professional offices.  Include the Monticello Ford overflow low (west of Sandberg Road) to provide overflow off-site parking for tenants of the remodeled Ford building.  Subdivide the northern-most land from the PUD for purposes of resale to adjoining property owner as automobile sales (subject to separate processing).  Establish a Planned Unit Development zoning district on the subject properties that define the range of commercial uses (B-3 and B-4 District uses), development architecture, and site improvements (parking, landscaping, utilities, etc.) necessary to support the future PUD tenants. List of Submitted Application Materials:  Project Narrative  Site Plans illustrating extent of the PUD property  Ford Building South Elevation sketch  New Professional Office Building Elevation sketch  New Professional Office Building Floor Plan sketch  New Restaurant Building Elevation sketch  New Restaurant Building Floor Plan sketch Process for PUD Application and Review The first step in the PUD process is for the applicant’s preliminary materials to be reviewed by City staff in a pre-application meeting (this was held on Tuesday, October 25). The collaborative process defined by the PUD ordinance begins with a joint meeting with the Planning Commission and City Council. Step 1: Joint Planning Commission/City Council Workshop Meeting Objective: Development of a Project Values Statement The Project Values Statement is intended to lay out the common objectives held by both the City and developer for the PUD. The zoning ordinance identifies the following purpose of Planned Unit Development: Purpose and Intent of a Planned Unit Development The purpose of the Planned Unit Development (PUD) zoning district is to provide greater flexibility in the development of neighborhoods and non-residential areas in order to maximize public values and achieve more creative development outcomes while remaining economically viable and marketable. This is achieved by undertaking a collaborative process that results in a development outcome Planning Commission/City Council Agenda – 11/01/11 3 exceeding that which is typically achievable through the conventional zoning district. If a development proposal does not demonstrate significant public value benefits above and beyond those achievable under a conventional zoning district, the City reserves the right to deny the PUD rezoning and direct the developer to re-apply under the standard applicable zoning district. The zoning ordinance lays out the following expectations of a PUD application (edited list including only items relevant to this project): Expectations of a Development Seeking a Rezoning to PUD The provisions of this section are intended to achieve the following public values within a PUD zoning district and associated subdivision: (a) Ensure high quality construction standards and the use of high quality construction materials; (d) Promote aestheticall y-pleasing design which fosters a sense of place within the neighborhood and appears attractive and inviting from surrounding parcels; (e) Incorporate extensive landscaping in excess of what is required by code; (f) Provide high-quality park, open space, and trail opportunities that meet or exceed the expectations established in the Comprehensive Plan; (g) Provide a convenient and efficient multi-modal transportation system to service the daily needs of residents at peak and non-peak use levels, with high connectivity to the larger community. (i) Maximize the use of ecologically-based approaches to stormwater management, restore or enhance on-site ecological systems, and protect offsite ecological systems including the application of Low Impact Development (LID) practices; Moreover, the zoning ordinance provides for the following areas of flexibility for PUD requests. PUD Areas of Flexibility (a) The City shall consider an increase in the number of overall units and associated reductions in lot width and size if the PUD provides substantially more site amenities and public values, as outlined in Section 2.4(P)(7), than could be achieved in a conventional residential development for the applicable zoning district. Planning Commission/City Council Agenda – 11/01/11 4 (b) The City shall consider a decrease in the amount of road width required or right-of-way requirements if the PUD provides substantially more site amenities, as outlined in Section 2.4(P)(7), than are found in a conventional residential development for the applicable zoning district. Specifications and standards for streets, utilities, and other public facilities shall be at the discretion of City Council and must protect the health, safety, comfort, aesthetics, economic viability, and general welfare of the city. (c) The City shall consider flexibility with regard to lot size, width, and depth when reviewing a PUD rezoning request. Specifications and standards for lots shall be at the discretion of City Council, and shall encourage a desirable living environment which assists in achieving the goals set out for PUDs. (d) The City shall consider flexibility in the phasing of a PUD development. Changes to the proposed staging or timing of a PUD may be approved by the City Council when necessary or on the showing of good cause by the developer. Adoption of a Public Values Statement As noted above, the goal of the joint meeting will be to develop and approve a Public Values Statement for the project. The Public Values Statement produced by the Joint Meeting process should address the items identified in the “Expectations” section above, along with any other elements deemed important by the City and Developer. As an outline for this statement, the discussion of the Joint Meeting participants may focus on defining the following elements:  Range of Acceptable Building Materials  Architecture, Site Planning, and Design  Landscaping and Related Site Improvements  Expectations for Pathway Connections  Expectations for Transportation, Traffic Control, Street Access, etc.  Expectations for Stormwater Control, as well as other utilities. The Values Statement will be used as the evaluative tool for the City in determining the eventual acceptability of the project for PUD consideration. Thus, it also serves as the design guideline for the developer as they work through the PUD design and review process. For the collaborative PUD process to be successful, it is imperative that the Values Statement addresses as many of the important issues as possible, whether those are developer or community interests. Planning Commission/City Council Agenda – 11/01/11 5 While it is not possible to foresee every eventual issue at the beginning of such a project, the better the Values Statement identifies and addresses the issues, the smoother the collaborative process will be. As such, the Public Values Statement should also focus on overarching elements that relate to the site in question, including the role of this property in the City’s development landscape, and how the range of potential land uses will further the objectives of the City’s Comprehensive Plan. The resulting Values Statement is a POLICY document, not a TECHNICAL one. Therefore, it will identify Goals and Objectives, but not precise design details. It is essentially a mini-Comprehensive Plan for the subject property, used to design and critique the new custom Zoning District being written for the proposed project. Attached to this document is a discussion guide that the participants at the Joint Meeting can utilize to consider the proposed project, and create the Public Values Statement. ALTERNATIVE ACTIONS 1. Motion to approve the Public Values Statement for Weinhold Investments, LLC as developed by the applicant, Planning Commission and City Council on November 1, 2011. 2. Motion of other. SUPPORTING DATA A. Project Narrative B. Site Plans illustrating extent of the PUD property. C. Ford Building South Elevation sketch D. New Professional Office Building Elevation sketch E. New Professional Office Building Floor Plan sketch F. New Restaurant Building Elevation sketch G. New Restaurant Building Floor Plan sketch H. Monticello Zoning Ordinance, Chapter 5 Use Table I. B-3, Highway Business, District Standards J. Carcone Addition, Plat K. Discussion Guide Questions Planning Commission/City Council Agenda – 11/01/11 6 PUBLIC VALUES STATEMENT DISCUSSION GUIDE 1. What design considerations are being used by the Developer that are driving the proposed architectural concepts? 2. What aspects of this site are important for the City officials in seeing that the property is developed to maximize its value to the community? 3. How well does the site function currently for public values, including transportation, stormwater, utilities, and open space or pathways? 4. Are there improvements in these areas that need to be addressed as part of any successful PUD project? 5. What specific list of potential uses is being sought by the developer? 6. Are these uses acceptable to the City? Do they meet the Comprehensive Plan requirements? Are there uses in this list that are unacceptable to the City for this particular site? 7. What specific amenities can the City identify that justifies the use of PUD on this site? Are there others that would be critical in considering final approval of the project? How do these mesh with the developer’s proposals? 8. What specific areas of flexibility or departure from the ordinance requirements are requested by the developer? Do any of these areas of flexibility raise issues for City officials? 9. On balance, is there general agreement that the identified amenities and other objectives justify and outweigh the flexibility being sought? 10. Should the developer be encouraged to proceed with a Concept PUD submission, or should another collaborative meeting be considered to strengthen the common values as a part of the Public Values Statement? Pointmark Construction, LLC 2560 Byrd Avenue North Golden Valley, Minnesota 55422 October 26, 2011 Project Narrative Description of Proposal Weinhold Investments is seeking a Planned Unit Development for the construction of a 16,000 square foot office building and 5,000 square foot restaurant, as well as multiple tenant use of the existing Ford Building. Weinhold Investments’ goals are to create a unique, mixed-use development that revives a highly visible, yet vacant building and car lot along Highway 25. The architectural aesthetics of the development are attractive and inviting, as well as consistent with newly constructed buildings in the area. Weinhold Investments is currently speaking with businesses consistent with the B-3 and B-4 zoning districts. Purpose for Requesting PUD 1. Shared parking amongst buildings, including overflow parking in lot across Sandberg Road under Lot 2 Block 2, Carcone Addition 2. Shared access amongst multiple properties 3. Setback flexibility to help maximize parking availability on current lot 4. Zoning flexibility consistent with zoning districts B-3 and B-4 Advantages of this PUD 1. Repurposing of an existing, vacant building and car lot 2. Utilizing the available lot to add businesses 3. Enhance existing building, consistent with newly constructed buildings in the area 4. Creating flexibility in uses within B-3 and B-4 districts 5. Shared services within PUD such as parking, access, maintenance, etc. 6. Improving the image of a highly visible lot along Highway 25 7. Architectural consistency amongst buildings within PUD Pointmark Construction, LLC 2560 Byrd Avenue North Golden Valley, Minnesota 55422 CHAPTER 5: USE STANDARDS Section 5.1 Use Table Subsection (A) Explanation of Use Table Structure City of Monticello Zoning Ordinance Page 259 TABLE 5-1: USES BY DISTRICT Use Types “P” = Permitted “C” = Conditionally Permitted “I” = Interim Permitted Base Zoning Districts Additional Requirements A O R A R 1 R 2 T N R 3 M H B 1 B 2 B 3 B 4 C C D I B C I 1 I 2 Agricultural Uses Agriculture P P P P P P P P P P P P P P P 5.2(B)(1) Agricultural Sales P 5.2(B)(2) Community Gardens P P P P P P P P P 5.2(B)(3) Stables C 5.2(B)(4) Residential Uses 5.2(C)(1) Attached Dwelling Types 5.2(C)(2)(a) - Duplex P 5.2(C)(2)(b) - Townhouse C P 5.2(C)(2)(c) - Multiple-Family C P C P 5.2(C)(2)(d) Detached Dwelling P P P P P P None Group Residential Facility, Single Family P P P P P 5.2(C)(3) Group Residential Facility, Multi-family P P 5.2(C)(3) Mobile & Manufactured Home / Home Park C C P C C 5.2(C)(4) Civic & Institutional Uses Active Park Facilities (public) P P P P P P P P P P P P P P P None Active Park Facilities (private) P P P P P P P 5.2(D)(1) Assisted Living Facilities C P C P C 5.2(D)(2) Cemeteries C C C C C C 5.2(D)(3) Clinics C P P P C None Essential Services P P P P P P P P P P P P P P P None Hospitals C P P P C 5.2(D)(4) Nursing/Convalescent Home C C C C C C C C P P P 5.2(D)(5) Passenger Terminal C C C C C None Passive Parks and Open Space P P P P P P P P P P P P P P P None Public Buildings or Uses C C C C C C P C C P P P C P P 5.2(D)(6) Schools, K-12 C C C C P C I I 5.2(D)(7) Schools, Higher Education C C None Place of Public Assembly C C C C P C 5.2(D)(8) Utilities (major) C C C C C C C C C C C C C C C 5.2(D)(9) CHAPTER 5: USE STANDARDS Section 5.1 Use Table Subsection (A) Explanation of Use Table Structure Page 260 City of Monticello Zoning Ordinance TABLE 5-1: USES BY DISTRICT Use Types “P” = Permitted “C” = Conditionally Permitted “I” = Interim Permitted Base Zoning Districts Additional Requirements A O R A R 1 R 2 T N R 3 M H B 1 B 2 B 3 B 4 C C D I B C I 1 I 2 Office Uses Offices P P P P P P P 5.2(E) Commercial Uses Adult Uses P 5.2(F)(1) Auction House C 5.2(F)(2) Auto Repair – Minor C C C P P 5.2(F)(3) Automotive Wash Facilities P C C 5.2(F)(4) Bed & Breakfasts C C C C C 5.2(F)(5) Boarding House C 5.2(F)(6) Business Support Services P P P P P none Communications/Broadcasting P P P P 5.2(F)(7) Convenience Stores C P P P 5.2(F)(8) Country Club C 5.2(F)(9) Day Care Centers C C P P P C 5.2(F)(10) Entertainment/Recreation, Indoor Commercial P P C C none Entertainment/Recreation, Outdoor Commercial C C C C 5.2(F)(11) Financial Institution P P P 5.2(F)(12) Funeral Homes P P P 5.2(F)(13) Hotels or Motels C P C P 5.2(F)(14) Kennels (commercial) C 5.2(F)(15) Landscaping / Nursery Business P 5.2(F)(16) Personal Services C P P P 5.2(F)(17) Recreational Vehicle Camp Site C 5.2(F)(18) Repair Establishment C P P P P P 5.2(F)(19) Restaurants C P P C 5.2(F)(20) Retail Commercial Uses (other) P P P 5.2(F)(21) Specialty Eating Establishments C P P P none Vehicle Fuel Sales C C C C 5.2(F)(22) Vehicle Sales and Rental C C 5.2(F)(23) Veterinary Facilities (Rural) C 5.2(F)(24) Veterinary Facilities (Neighborhood) C C C C 5.2(F)(24) Wholesale Sales P P P none CHAPTER 5: USE STANDARDS Section 5.2 Use-Specific Standards Subsection (A) General Regulations Applicable to All Uses City of Monticello Zoning Ordinance Page 261 TABLE 5-1: USES BY DISTRICT Use Types “P” = Permitted “C” = Conditionally Permitted “I” = Interim Permitted Base Zoning Districts Additional Requirements A O R A R 1 R 2 T N R 3 M H B 1 B 2 B 3 B 4 C C D I B C I 1 I 2 Industrial Uses Auto Repair – Major C P P 5.2(G)(1) Bulk Fuel Sales and Storage P P 5.2(G)(2) Extraction of Materials I I I 5.2(G)(3) General Warehousing C C P P 5.2(G)(4) Heavy Manufacturing C 5.2(G)(5) Industrial Services C P 5.2(G)(9) Land Reclamation C C C C C C C C C C C C C C C 5.2(G)(6) Light Manufacturing C P P P 5.2(G)(7) Machinery/Truck Repair & Sales P P 5.2(G)(9) Recycling and Salvage Center C C 5.2(G)(10) Self Storage Facilities P C P 5.2(G)(11) Truck or Freight Terminal C P P 5.2(G)(12) Waste Disposal & Incineration C 5.2(G)(13) Wrecker Services C P 5.2(G)(14) 5.2 Use-Specific Standards (A) General Regulations Applicable to All Uses (1) Combination Uses In commercial and industrial base zoning districts, combination uses may be allowed within the principal building with each use subject to all regulations in this ordinance. Table 3-1: Base Zoning Districts