Loading...
Planning Commission Agenda 03-02-2016 AGENDA REGULARMEETING-MONTICELLOPLANNINGCOMMISSION Wednesday,March2nd,2016-6:00p.m. MississippiRoom,MonticelloCommunityCenter Commissioners: BradFyle,LindaBuchmann,SamMurdoff,JohnFalenschek, MarcSimpson CouncilLiaison: CharlotteGabler Staff: AngelaSchumann,SteveGrittman(NAC),JohnRued 1. GeneralBusiness A. CalltoOrder B. Considerationofapprovingminutes nd a. RegularMeetingMinutes–February2 ,2016 C. CitizenComments D. Considerationofaddingitemstotheagenda 2. PublicHearings A. PublicHearing–ConsiderationofarequestforConditionalUsePermitintheB-4 (RegionalBusiness)ZoningDistrictforwirelesstelecommunicationsequipment collocationasperChapter4.13,Sections(E-G)TelecommunicationTowersand AntennasoftheMonticelloZoningOrdinance Applicant:Kabat,Brent,BuellConsulting,Inc,\VerizonWireless B. PublicHearing–ConsiderationofarequestforamendmenttotheOfficialZoning MapforrezoningtoCCDResidentialOverlayDistrict(CCD-R)toaccommodate multiplefamilyattachedhousing,includingresidentialusesonthegroundflooras perChapter3.7(J)OverlayZoningDistrictsoftheMonticelloZoningCode Applicant:MastersFifthAvenue,Inc. 3. RegularAgenda A. ConsiderationtorecommendacceptanceoftheInterchangeLandUseStudy B. ConsiderationoftheCommunityDevelopmentDirectorsReport 4. AddedItems 5. Adjournment MINUTES REGULAR MEETING - MONTICELLO PLANNING COMMISSION nd Tuesday, February 2 , 2016 - 6:00 p.m. Mississippi Room, Monticello Community Center Present: Brad Fyle, John Falenschek, Marc Simpson Absent: Linda Buchmann, Sam Murdoff Others: Angela Schumann, Steve Grittman (NAC) , John Rued, Charlotte Gabler 1. General Business A. Call to Order Brad Fyle called the meeting to order at 6:00 p.m. B. Approve minutes TH MARC SIMPSON MOVED TO APPROVE THE JANUARY 5 , 201 6 SPECIAL MEETING MINUTES. JOH N FALENSCHEK SECONDE D THE MOTION. MOTION CARRIED 3 - 0. TH JOHN FALENSCHEK MOVE D TO APPROVE THE JAN UARY 5 , 2016 REGULAR MEETING MINU TES. MARC SIMPSON SECONDED THE MOTION. MOTION CARRI ED 3 - 0. C . Citizen Comments None D. Consideration of adding items to the agenda None 2 Public Hearings . A Continued Public Hearing Consideration of a request for amendment to the . Monticello Zoning Ordinance, Chapter 5, Section 1 Use Table, Section 2 Use - Specific Standards, Section 3 Accessory Use Standards and Chapter 8, Section 4 Definitions for amendments regulating Massage Therapy. Applicant: City of Monticello Angela Schumann summarized that the Planning Commission ha d continued the January public hearing so that staff could to further research and develop a zoning ordinance amendment specific to massage therapy use. S he pointed out that the City Council is scheduled to consider a massage therapy use licensing ordinanc e at its th M onday, February 8 meeting and proposed that the commission take no action at this time to allow staff an opportunity to analyze the outcome and impact of th e decision . Brad Fyle opened the continued public hearing. As there were no c omments, the public hearing was closed. Planning Commission Minutes: 2 /0 2 /16 JOHN FALENSCHEK MO VED TO RECOMMEND NO ACTION ON THIS ITEM AT THIS TIME. MARC SIMPSON SECONDE D THE MOTION. MOTION CARRIED 3 - 0. B. Public Hearing Consideration of a request for amendment to Conditional Use Permit for commercial lodging building addition in the B - 3 (Highway Business) Zoning District as per Chapter 3.5(E) and Chapter 5.2(F)(8) of the Monticello Zoning Ordinance and Co nsideration of a request for sideyard building setback variance as per Chapter 3.5(E) of the Monticello Zoning Ordinance. Applicant: Seifert, Joe/Miller Architects & Builders . Planning Case Number: 2016 - 005 Steve Grittman outlined considerations involv ed in the request for a Conditional Use Permit (CUP) and Variance from s ideyard s etback to accommodate adding 21 rooms to the Best Western hotel located at 89 Chelsea Road. Grittman pointed out that current zoning regulations require a CUP for commercial lodging use in the B - 3 (Highway Business) District and for building height exceed ing two - stor ies . He explained that t he proposed expansion would encroach into the side yard setback from the public right - of - way (ROW) by a few feet at two corners of the building on the eastern side of the property. He suggested that a variance is r easonable due to unique site conditions in which there is a pathway rather than a street within the ROW and the encroachment is minimal. Brad Fyle opened the public hea ring. As there were no comments, the public hearing was closed. Decision 1. Variance from the side yard setback of 20 feet MARC SIMPSON MOVED TO ADOPT RESOLUTION NO. PC - 2016 - 002 APPROVING THE VARIAN CE FOR THE SUBJECT P ROPERTY TO ALLOW ENCROACHMENT INTO THE 20 - FOOT SIDE YARD SETBA CK, BASED ON FINDINGS STATED IN S AID RESOLUTION. JOHN FALENSCHEK SECONDED THE MOTION. MOTION CARRIED 3 - 0. Decision 2. Conditional Use Permit for a hotel building in the B - 3 Highway Business District JOHN FALENSCHEK MOTION TO ADOPT RESOLUTION NO. PC - 2016 - 2003 RECOMMENDING APPROVA L OF THE CONDITIONAL USE PERMIT FOR HOTEL BUILDING EXPAN SION, BASED ON FINDI NGS STATED IN THE RESOLUTION, AND THE CONDITIONS LISTED IN EXHIBIT Z OF THIS REPORT. MARC SIMPSON SECONDE D THE MOTION. MOT ION CARRIED 3 - 0. 2 Planning Commission Minutes: 2 /0 2 /16 EXHIBIT Z Variance, Conditional Use Permit, SILVER FOX Lot - 3 Block - 1 (as platted) 1. The underground phone line be relocated to the utility/drainage easement on the eastern part of the property. 2. Compliance with the conditions identified by the City Engineer . C . Public Hearing - Consideration of a request for amendment to Conditional Use Permit in the R - A (Residential Amenities) Zoning District for wireless telecomm service antennae as per Chapter 4.13(G) Telecommunication Towers and Anten nas of the Monticello Zoning Ordinance . Applicant: Richter, Kristine/Black & Veatch Planning Case Number: 2016 - 006 Steve Grittman reported that the applicant, on behalf of AT&T, proposed to replace antenna equipment on an existing tower on property located at Outlot A, Spirit Hills, 6111 Wildwood Way with newer technology to increase area capacity. He noted that the City must accommodate such minor expansions and indicated that a Conditional Use Permit (CUP) is required to co - locat e of anten na equipment on existing structures. Grittman recommend ed approval of the C UP based on finding s that the proposal meets the requirements of the ordinance, and that the proposal replac es existing equipment with no visual or other impacts on surrounding pr operty. Brad Fyle opened the public hearing. As there were no comments, the public hearing was closed. Decision 1: Resolution recommending approval of a n amended CUP for the replacement of existing telecommunication antenna equipment JOHN FALENSCHEK MOVED TO APPROVE RES OLUTION PC - 2016 - 004 RECOMMENDING APPROVA L OF THE CONDITIONAL USE PERMIT PENDING THE STRUCTUR AND APPROVAL. MARC SIMPSON SECONDE D THE MOTION. MOTION CARRIED 3 - 0. 3. Regular Agenda A. Consideration of an update on the Monticello Comprehensive Plan Angela Schumann explained that the purpose of the update is to ensure that the 2008 Monticello Comp rehensive Plan (Comp Plan) remains a relevant resource for land use planning which will help guide development within t he community over time. Schumann presented an analysis of each of the C ore A nnual R eview areas as specified by the Comp Plan . She summarized d evelopment trends and projects from current year s ( including g rowth p rojections and land use trends ), amendments to the Comp Plan , and current development issues and implications for the Comp Plan a nd r ecommended the 3 Planning Commission Minutes: 2 /0 2 /16 following actions : C ontinue d monitor ing of residential housing trends and permitting for any required action Planning Commission involvement in the planning effor t resulting from a proposed review of the downtown plan for possible amendment within 2 - 3 years Continued monitoring of the solar issue and solar proposals in the Monticello Orderly Annexation Area (MO AA) Continued involvement and review of t ransportation initiatives as related to Comp Plan goals and land use planning Schumann pointed out that the Planning Commission would review existing lot inventory within the next few months. B. Schumann noted that staff would schedule a joint Planning Commission and City Council workshop related to permanent and temporary signage in late spring . 4 . Added Items None 5. Adjourn MARC SIMPSON MOVED TO ADJOURN THE MEETING AT 7: 01 PM. JOHN FALENSCHEK SECONDED THE MOTION. MOTION CARRIED 3 - 0. Recorder: Kerry Burri __ Approved: Attest: ____________________________________________ Angela Schumann, Community Development Director 4 PlanningCommissionAgenda–3/02/16 2A.PublicHearing-ConsiderationofarequestforaConditionalUsePermitforCo- locationofaWirelessTelecommunicationServiceAntennaonaCityWatertower. Applicant:VerizonWireless. (NAC) Property: Legal:PartofLot1Block2,JeffersonCommons,Lying NorthoftheSouth150.00FeetThereof Address:NA-SchoolBlvd,Monticello ThesiteisaCity-ownedlotthatcontainsawatertowerin st theJeffersonCommons1 AdditionPlat. PlanningCaseNumber: 2016-003 A. REFERENCE&BACKGROUND Request(s): ConditionalUsePermittoconstructcellular communicationdevicesonthetopoftheCity-ownedwater tower.Theprojectwouldalsoincludeleasingofa33foot by20footspaceforaprefabequipmentbuilding surroundedbyachainlinkfence. DeadlineforDecision: March29th,2016 LandUseDesignation: PlacestoShop ZoningDesignation: B-4RegionalBusinessDistrict Thepurposeofthe“B-4”regionalbusinessdistrictisto providefortheestablishmentofcommercialandservice activitieswhichdrawfromandservecustomersfromthe entirecommunityorregion Theproposeduseisaconditionaluseinthedistrict. CurrentSiteUse: Thesiteiscurrentlyoccupiedbyawatertowerandchain linkfence. SurroundingLandUses: North: B-4RegionalBusinessDistrict East: B-4RegionalBusinessDistrict PlanningCommissionAgenda–3/02/16 South: M-HManufacturedHomeParkDistrict West: B-4RegionalBusinessDistrict ProjectDescription: Theapplicantproposestoconstructwirelessantennason thetopoftheexistingwatertowerandleasespacefora prefabequipmentbuildingontheproperty.Theground equipmentbuildingwillbelocatedonthesouthwest portionoftheproperty.Therewillbethreeantennaarrays of4antennaeeachonthetopofthewatertower. OrdinanceRequirements: Perordinance,aConditionalUsePermitisrequiredforthe newantennaequipment. ANALYSIS Theproposalistoinstallwirelessantennaequipmentonthetopofanexistingwater tower.Theequipmentwillbeapproximately155feetofftheground.Theprojectalso callsforaprefabbuildingonthesouthwestcorneroftheproperty.Thebuildingwill housethewirelessantennaeequipment.Thebuildingwillbesurroundedbyaconcrete padonthenorthandeastsides.Onthesouthsideofthebuilding,abituminousdriveway willservicethebuildingandconnecttoanexistingcurb-cuttothesoutheastpartofthe property.Theprefabbuildingwillbesurroundedbyachainlinkfence. Theequipmentinsidetheprefabbuildingwillexitthebuildingneartherooflineofthe buildingandtravelovertheexistingchainlinkfencewhichsurroundsthetower.The equipmentwillthengoundergroundandenterthewatertowerfrombelowgrade. Becausetheantennaarrayswillbemountedonanexistinghandrailonthetopofthe tower,theCitywillrequirethatastructuralengineerverifythestructuralcapacityofthe handrailasapartofitsbuildingreview. CommonConditionalUseapplicationmaterialsincludethefollowing: Parking. Thereisnospecificparkingrequirement. Landscaping. Theapplicantisproposingtoplantfourtreesonthe westernpropertyline.Thetreeswillmatchexistingtrees tothesouthoftheprojectsite.Thecurrentplanincludes twoadditionaltreestocontinuethevegetationbetweenthe proposedlocationandtheFibernet“head-end”building. PlanningCommissionAgenda–3/02/16 Theseshouldberemovedfromtheplanastheyarelocated intheareaofagate. Lighting . Noadditionallightingisproposed. Signage. Nosignageisproposed. BuildingDesign. Theequipmentbuildingthatisproposedismadeoutof exposedaggregateconcreteandisaprefabdesign. AccessandCirculation. Thepropertygetsitsaccessfromaprivatestreetthat connectstoSchoolBlvd.Anexistingright-of-wayisin placeforthisaccess.Noadditionaltrafficorimprovements areanticipatedresultingfromthisapplication. GradingandDrainage . Nochangestogradeordrainageareproposed.Thecity Engineerhasreviewedtheproposedplanandhasno commentsatthistime.Additionalreviewwilloccurwith buildingpermit. Utilities. Nocityutilitiesareimpactedbythiswork. ConditionalUsePermitRequirements ThezoningordinancerequiresaConditionalUsePermitforco-locationofwireless antennaequipment.Theapplicantshavesubmittedtherequiredinformationandappearto beincompliancewitheachoftherequiredregulationsofthecode. ThecodeprovidesforaseriesofsubmissionrequirementstopermittheCitytoverify compliancewithachievingthelocationobjectives.Theseincludethefollowing: Signedlease Projectdescriptionandjustification ProofofInsurance Legaldescriptionandsurvey Radiofrequencycoverageanalysis Siteplansforlandscapingandgrading Architecturaldrawings Decommissioningplan Developmentagreementandfinancialsecurities PlanningCommissionAgenda–3/02/16 Someoftheserequirementsareprimarilyrelevanttotheconstructionofanewtower. However,theapplicanthassubmittedtheinformationapplicabletotheantenna constructionandbuildingconstruction,includingthearchitecturaldesign,project description,surveydata,andcoverageanalysisdata. Asnoted,theimpactsareslight;theapplicantseekstoinstallequipmentonthetopofan existingwatertowerandconstructanequipmentbuilding.Theproposedarrayswillbe attachedtoanexistingfenceonthetopofthewatertowerandwillbefivefeetabovethe topofthewatertower.Theequipmentwillnotprotrudebeyondtheedgeofthewater tower. Withregardtoscreening,theadditionalvegetationtoplantedonthewestwillprovide screeningfromadjoiningproperty.Otherexistingvegetationtothesouthandeast providescreeninginthosedirections. Aswithalltelecommunicationsequipmentofthistype,theCityisrequiredtomake reasonableaccommodationstoallowtheuse,basedontechnologyandserviceneedsof theoperatorandthepublic.Moreover,theCitymustaccommodateconstructionofthis typeofequipmentwhentheimpactisnotsubstantial,andthereisnoexpectationof impactsonpublichealth,safety,andwelfare.Theproposedconstructionappearstobe consistentwiththeserequirements. B. ALTERNATIVEACTIONS Decision1:ResolutionrecommendingapprovalofaCUPfortheconstructionof telecommunicationantennaequipmentandequipmentbuilding. 1. MotiontoapproveResolutionPC-2016-005recommendingapprovalofthe ConditionalUsePermitpendingthestructuralengineer’sreviewandapprovaland onthoseconditionsidentifiedinExhibitZ. 2. MotiontodenyResolutionPC-2016-005recommendingConditionalUsePermit, basedonfindingstobemadebythePlanningCommission. Motiontotableactionontherequest,pendingadditionalinformationasidentified 3. bythePlanningCommissionandstaffreport. PlanningCommissionAgenda–3/02/16 C. STAFFRECOMMNDATION StaffrecommendsapprovaloftheConditionalUsePermitpendingthestructural engineer’sreviewandapproval,basedontheapplicationmaterialsprovided,andwith findingsthattheproposalmeetstherequirementsoftheordinance,andthattheproposal isconstructingequipmentwithnovisualorotherimpactsonsurroundingproperty. Formalfindingsareincludedtheattachedresolutionandconditionsareincludedby referenceinExhibitZ. D. SUPPORTINGDATA A. ResolutionPC-2016-005 B. ApplicantNarrative C. ApplicationPlanPacket,including: TitlePage SitePlan GradingPlan EnlargedSitePlan Detail ElevationsandMountingDetail BuildingElevationandFoundationPlan Detail Specifications GroundingPlan BuildingElevations UtilityPlan AntennaLayout SpecificationsandDetails SiteSurvey Z. ConditionsofApproval PlanningCommissionAgenda–3/02/16 ExhibitZ ConditionsofApproval–ConditionalUsePermit VerizonWireless–JeffersonCommonsWaterTower 1. StructuralengineerreviewofthesupportstructuresbytheCity. 2. ContinuedcoordinationwithFiberNetMonticellowithregardtoFiberNetuseand equipmentontheWaterTower. 3. Removalfromtheplanofthe2proposedtreesalongthesouthfencelineinfrontof theexistinggate. 4. ExecutionofaleasewiththeCityforthesiteasapprovedbytheCityCouncil. CITYOFMONTICELLO WRIGHTCOUNTY,MINNNESOTA PLANNINGCOMMISSION RESOLUTIONNO.PC-2016-005 ARESOLUTIONOFTHEPLANNINGCOMMISSIONOF THECITYOFMONTICELLORECOMMENDINGAPPROVALOF ACONDITIONALUSEPERMITAMENDMENTRELATINGTO ALLOWTHEPLACEMENTOFTELECOMMUNICATIONSANTENNA EQUIPMENTONANEXISTINGCITYWATERTOWER WHEREAS, theapplicanthasanexistingwirelessservicesantennaarrayonan existingwatertowerinJeffersonCommons,legallydescribedasthatpartofLot1,Block2, lyingnorthofthesouth150feetthereof;and WHEREAS, thesubjectpropertyiszonedB-4,RegionalBusiness,inwhichco- locationofwirelesscommunicationsantennaeareallowedbyConditionalUsePermit;and WHEREAS ,theproposedequipmentwillnotinterferewiththeCity’suseofthe towerforFibernetantennaeorotheruses;and WHEREAS, theheightoftheequipmentabovegradewillminimizeanypotential visualimpactofthereplacementequipment;and WHEREAS, nootherchangesareproposedtothesitethatwouldimpactlandusesin thearea;and WHEREAS, theproposeddevelopmentamendmentisconsistentwiththegeneral intentofthecommunicationsrequirementsofthezoningordinance;and WHEREAS, thePlanningCommissionheldapublichearingtoconsiderthematterat nd itsregularmeetingonMarch2 ,2016andtheapplicantandmembersofthepublicwere providedtheopportunitytopresentinformationtothePlanningCommission;and WHEREAS, thePlanningCommissionhasconsideredallofthecommentsandthe staffreport,whichareincorporatedbyreferenceintotheresolution;and WHEREAS, thePlanningCommissionoftheCityofMonticellomakesthefollowing FindingsofFactinrelationtotherecommendationofapproval: 1. TheproposedamendmentisconsistentwiththeintentoftheMonticello ComprehensivePlan. 2. TheproposedamendmentwillmeettherequirementsoftheMonticelloZoning Ordinance. 1 CITYOFMONTICELLO WRIGHTCOUNTY,MINNNESOTA PLANNINGCOMMISSION RESOLUTIONNO.PC-2016-005 3. Theproposedamendmentwillnotcreateundueburdensonpublicsystems,including streetsandutilities. 4. Theproposedamendmentwillnotcreatesubstantialimpacts,visualorotherwise,on neighboringlanduses. NOW,THEREFORE,BEITRESOLVED, bythePlanningCommissionoftheCityof Monticello,MinnesotathattheproposedConditionalUsePermitamendmentishereby recommendedforapproval. ADOPTED this2nddayofMarch,2016,bythePlanningCommissionoftheCityof Monticello,Minnesota. MONTICELLOPLANNINGCOMMISSION By:_______________________________ BradFyle,Chair ATTEST: ______________________________ AngelaSchumann,CommunityDevelopmentDirector 2 January 27, 2016 VIA FEDERAL EXPRESS City of Monticello 505 Walnut Street Monticello, MN 55362 Re : Verizon Wireless – Application for Conditional Use Permit (Site Ref: MIN Hayward) Proposed Wireless Telecommunications Equipment Collocation on City of Mont icello Water Tower, 3692 School Boulevard, Monticello, MN 55362 (PID # R155 - 176 - 002010 ) To the Planning Commission and City Council of the City of Monticello: Please accept the attached Zoning Narrative together with the enclosed Land Use Application, Condi tional Use Permit Checklist, and telecommunications facility construction drawings and related, supplemental information and documentation as the formal application for a Conditional Use Permit for a proposed Verizon wireless communications facility in the City of Monticello, MN . The facility is to consist of wireless telecommunications antennas affixed to the handrail on top of the above mentioned water tower, associated base station com munications equipment on ground level, and other associated cabling a nd site improvements. As required pursuant to the Conditional Use Permit requirements as detailed within the Zoning Ordinance of the City of Monticello , th e following narrative serves to identify appropriate information pertaining to this application, an d a lso addresses how the proposed telecommunications facility is consistent with the Code. I , or another agent from Buell Consulting , will be in attendance on behalf of Verizon Wireless at the Planning Commission meeting and subsequent City Council meeti ng during which this application will be considered. If any reader of this application has questions, please do not hesitate to call me at (651) 361 - 8110. I look forward to working with the City of Monticello to help improve Verizon Wireless service in t his area. Sincerely, Brent Kabat Site Development Agent Buell Consulting, Inc. bkabat@buellconsulting.com Enclosures ZONING NARRATIVE In general, the proposed Verizon W ireless telecommunications facility adheres to and is consistent with the City of M onticello, Minnesota , Zoning Ordinance (referred to hereinafter as the “Ordinance”) . Specifically, p ursuant to Chapter 4: Finishing Standards, S ection 4.13 “Telecommunication Towers and Antennas , ” the proposed telecommunications tower facility satisfies a pplicable standards of the ordinance as follows: Chapter 4, Section 4.13 – Telecommunication Towers and Antennas Section (E) – Wireless Telecommunications Service Antennae and Antenna Support Structures : (1) Wireless Telecommunications Service Antennae: The co ntemplated antenna collocation is proposed to be installed on the existing water tower, which qualifies as an antenna support structure in conformance with the Ordinance. The proposed collocation is an allowable conditional use. (2) Wireless Telecommunicati ons Service Antennae Support Structures (a) The proposed installation does not require the construction of a new freestanding antenna support structure; sub - item (a) and its subdivisions therefore do not apply to this application. (b) The proposed installation doe s not require the construction of a new freestanding antenna support structure; sub - item (b) and its subdivisions therefore do not apply to this application. Section (F) – General provisions for wireless telecommunications service antennae and antenna supp ort structures (1) The proposed installation does not require the construction of a new freestanding antenna support structure; item (1) therefore does not apply to this application. (2) The proposed installation does not require the construction of a new freestan ding antenna support structure; item (2) therefore does not apply to this application. (3) The proposed installation does not require the construction of a new freestanding antenna support structure; item (3) and its sub - items therefore do not apply to this ap plication. (4) Siting Provisions. (a) The antennae proposed as a component of the contemplated wireless telecommunications facility are planned for collocation on an existing structure (the water tower) in accordance with this sub - item. (b) No part of any proposed a ntenna, the existing water tower (the antenna support structure), or any appurtenances that are accessory to the proposed facility will extend over a public right of way or property line, and will not be sited within a public utility or drainage easement. (c) The proposed installation does not include the construction of a new antenna support structure, sub - item (c) therefore does not apply to this application. (5) Setbacks (a) The applicable rear - yard and side - yard setbacks in the underlying B - 4 Business District ar e zero (0) feet and zero (0) feet, respectively. The proposed base station equipment shelter is the component of the facility to which these setbacks would apply, and the base station equipment shelter has been sited to greatly exceed the minimum setbacks required. (b) The proposed installation does not include the construction of a new antenna support structure, sub - item (b) therefore does not apply. (c) The proposed installation does not include the construction of a new antenna support structure, sub - item (c) therefore does not apply. (6) Design and Construction (a) Except for signage that is or may be required by any manufacturer or federal, state, or local governmental or regulatory agency or authority for the purpose of identifying , warning or informing of pertinent site information , no other advertising signage or other similar display will be placed on the facility. (b) The proposed facility will be constructed in such a way that adheres to the applicable City and State Building Codes. All permits required for constr uction of the facility will be applied for and obtained, as applicable, prior to construction of the facility. (c) As applicable and required by the Ordinance, structure design, mounting and installation of the antennae will comply with manufacturers’ specific ations and will be reviewed, approved, and certified by a licensed professional engineer as necessary. (d) The proposed facility will be grounded for protection against lightning strikes in accordance with applicable provisions of State codes. (e) Base station com munications equipment , as possible, will be housed within an enclosed, prefabricated equi pment shelter that is shown in the enclosed “Rev B” construction drawings. i. The accessory building, or equipment shelter, is a prefabricated concrete structure with a n exposed aggregate exterior that blends in with the immediate surroundings. Landscaping has been proposed for planting along the west side of the proposed equipment shelter to increase the level of screening from property located to the west of the facil ity, and additional arborvitae have been planned for planting to fill in a gap identified by City Planning Staff in the existing row of arborvitae that parallels the southernmost lot li ne of the water tower property. ii. The proposed installation does not incl ude equipment that would require an enclosure on the top of the water tower or a rooftop, sub - item (ii) therefore does not apply. iii. Applicable transmitting, receiving, and switching equipment on ground level will be housed within the proposed equipment shelt er, and landscaping will be included for additional screening as described in item (6)(e)(i) above. iv. N/A – Sub - item (iv) was approved by City of Monticello City Council to be removed from the Ordinance as a consent - agenda approval at the regularly scheduled City Council meeting on November 23, 2015. (7) Lights and Attachments (a) No lighting in addition to any lighting that may already be present on top of the existing water tower will be added or rearranged to illuminate or indicate the presence of the antennas un less required by a Federal or State regulatory authority. (b) A LED light will be present on both the front and the rear of the equipment shelter. The light s are used for security purposes, and the fixtures are designed to direct light downwards to minimize a ny unnecessary light pollution or spillage. The lights are switched on an off automatically by a photovoltaic sensor such that they are only lit during the nighttime hours. (8) Site Landscaping (a) The area within the secure fenced enclosure surrounding Verizon ’s equipment shelter will be maintained by Verizon personnel to control dust, weeds, and drainage. The access driveway is proposed to be constructed of asphalt or bituminous paving and will help to further control dust and weeds. (9) Non - Interference (a) The plan ned antennas transmit signals that are in accordance with Verizon Wireless’s Federal Communications Commission licensure. Because the operating frequencies are unique to what Verizon’s licensure allows , the signals that are transmitted do not , under norma l operating conditions, interfere with other elect ronic or communications devices . Section (G) – Application process and submittal requirements for wireless telecommunications service antenna support structures (1) Submittal Requirements. (a) Verizon Wireless, as the proposed Tenant , and the City of Monticello, as the proposed Landlord , continue to work together as of the time of the preparation of this application to finalize and approve the terms of the contemplated Water Tower Lease . (b) The proposed project, as des cribed above and within the enclosed “Rev B” construction drawings, includes the collocation of Verizon Wireless telecommunications antennas on top of the City of Monticello’s School Boulevard water tower, base station equipment within an enclosed equipmen t shelter on ground level near the south side of the water tower property, and other associated cabling and related equipment. The need for a new wireless telecommunications facility (or “Cell Site”) at this location is driven primarily by the need provide additional capacity to the existing wireless network. Much in the same way that a municipal water service system works, the greater the number of users and the more demand those users place on the municipal water service system, the lower the water pres sure becomes for each user, driving the need to add new water tower to bring the water pressure back up to acceptable levels. This proposed cell site at the School Boulevard water tower will add to the capacity and performance of the wireless network just as a new water tower would add to the capacity and performance of the municipal water service – without this proposed installation, the capacity of the network is strained, and as the demand continues to grow, the more the individual user’s experience wil l deteriorate . For more information on this subject, and to additional justify the need for this proposed cell site, please see the enclosed “RF Coverage Study,” as well as the informative “Introduction to Cellular Technology” document. (c) Please see the en closed Certificate of Liability Insurance as proof of insurance. (d) The legal description of the property on which the improvements are to be located is included as the “Property Description” on the site survey that can be found within the enclosed “Rev B” co nstruction drawings, and reads as follows: That part of Lot 1, Block 2, Jefferson Commons First Addition, Wright County, Minnesota, lying northerly of the southerly 150.00 feet thereof. Together with a permanent easement for drainage and utility purposes over the northerly 6.00 feet of the southerly 150.00 feet of said Lot 1. (e) Please see the site survey that can be found within the enclosed “Rev B” construction drawings. (f) Please see the enclosed “RF Coverage Study” for more information pertaining to this sub - item. In this RF Coverage Study, two existing structures that were identified as possible alternative antenna collocation options (a three story bank building approximately 0.35 miles northeast of the water tower, and an existing monopole communicatio ns tower approximately 1.25 miles northeast of the water tower) are compared to the RF coverage attainable with the proposed antenna installation on the City of Monticello’s School Boulevard water tower. (g) A landscaping plan has been prepared and can be fo und within the enclosed “Rev B” construction drawings that illustrates the proposed planting of arborvitae to provide screening to the equipment shelter on ground level where necessary. (h) Please refer to the site plans that can be found within the enclosed “ Rev B” construction drawings that include topographic and elevational information pertaining to the proposed site. The proposed installation will not require significant alteration of the existing grading and drainage conditions of the water tower site an d , therefore, will have little to no impact on the existing grading and drainage patterns of the site. (i) Please see the enclosed “Rev B” construction drawings for architectural drawings of the appurtenant structures planned for the site. (j) As is currently def ined within Paragraph A of Section Two, “Use and Description of Equipment” of the proposed Water Tower Lease between the City of Monticello and Verizon Wireless, and u nl ess the language that is applicable to the Tenant’s (Verizon) removal of its Tenant Fac ilities (“Tenant Facilities” are defined within the said section of the lease as follows : “…communications facilities and uses incidental thereto, including, without limitation, utility lines, transmission lines, electronic equipment, radio transmitting an d receiving antennas, supporting equipment and structures thereto…” ) , Section Seven, “Termination,” paragraph C will read as follows: “Within sixty (60) days after termination or earlier expiration of this Agreement, Tenant shall remove the Tenant Facilit ies at Tenant’s cost and Expense.” In accordance with paragraph C of Section Seven of the Lease as it is defined above , Verizon would be responsible to remove the Tenant Facilities accordingly (or to “decommission the site”) and the estimated cost to do so is fifty thousand dollars ($50,000.00). The items contemplated to arrive at this cost estimate to decommission Verizon’s proposed facility are as follows: remove antennas; remove feedline, hangers (including those that are welded), mounts, and touch up p aint; remove equipment shelter; remove power and fiber; restore ground [to condition similar to what existed prior to the construction of Verizon’s proposed facility] , and to cover the cost, if required, to involve an engineering firm that would or may be required to review the removal said decommissioning. (k) A s required by the Ordinance , a security in an amount that is equivalent to the estimated cost to remove the Tenant Facilities from the Landlord’s water tower and property will be established after the C onditional Use Permit for the proposed wireless telecommunications facility has been approved. (l) Terms and items of the development agreement referenced in this sub - item of the Ordinance are addressed within the proposed draft of the Water Tower Lease to whi ch the City of Monticello and Verizon Wireless will be party to. This lease agreement, its accompanying exhibits, and the Rev B construction drawings that were provided with Conditional Use Permit application describe and illustrate the improvements, remo val requirements in general, and the responsibilities of each party to the proposed Water Tower Lease, financial or otherwise. In addition to the required execution of this proposed Lease by both the City of Monticello and Verizon Wireless, and as establi shed by the Ordinance, this facility shall not be constructed until after the Conditional Use Permit being sought for the project has bee n approved and its reasonable terms or conditions have been defined and established. (m) In accordance with the Ordinance, s hould the Community Development Director and/or City Council specify, determine, or require that any information in addition to what has been provided in accompaniment to this Conditional Use Permit application, said additional information shall be provid ed. PlanningCommissionAgenda–3/02/16 2B. PublicHearing–ConsiderationofarequestforamendmenttotheOfficialZoningMapfor rezoningtoCCDResidentialOverlayDistrict(CCD-R)toaccommodatemultiplefamily attachedhousing,includingresidentialusesonthegroundfloorasperChapter3.7(J)Overlay (NAC) ZoningDistrictsoftheMonticelloZoningCode.Applicant:MastersFifthAvenue,Inc. Property: PlanningCaseNumber: 2016-008 A. REFERENCE&BACKGROUND Request(s): ConsiderationofarezoningaddingtheCCDResidential OverlayDistrictthatwouldaccommodatethedevelopment ofa23-unitmultiplefamilyresidentialbuildinginthe CCD,includingground-floorresidentialunits. DeadlineforDecision: April1,2016 LandUseDesignation: PlacestoWork(ComprehensivePlan) Shopping(EmbracingDowntownMonticelloPlan) ZoningDesignation: CCD–CentralCommunityDistrict,F-1-West25 ShoppingSub-District Thepurposeofthe“CCD”,CentralCommunityDistrict,is toprovideforawidevarietyoflanduses,transportation options,andpublicactivitiesinthedowntownMonticello area,andparticularlytoimplementthegoals,objectives, andspecificdirectivesoftheComprehensivePlan,andin particular,theEmbracingDowntownMonticelloreportand itsDesignGuidelinesuses. CurrentSiteUse: Vacant SurroundingLandUses: North: MixedUse–Commercial,upperfloorresidential East: CommercialOffice South: Parking,CommercialRetail West: Residential,Low-MidDensity 1 PlanningCommissionAgenda–3/02/16 Analysis ProjectDescription. Theapplicantinitiallyrequestedarezoningonthesubjectparcelto addtheCCDResidentialOverlayDistricttoallowthepotentialforaresidential-only project,includingground-floorresidentialunits.However,becausetheproposeddensity exceedstheallowancesunderboththeCCDResidentialOverlayandbaseCCDzoning, theapplicantisproceedingwithaPUDreviewtoensurethattheCitywillsupportthe proposeddensitypriortoundertakingfurtherplandevelopment.Analysisofthat applicationisdescribedinthecompanionreporttothisitem. Theapplicant’sproposalisintendedtoaccommodatetheconstructionofamultiple rd familyresidentialprojectonvacantpropertyatthenortheastcornerof3 Streetand LocustStreet.ThepropertyisintheCCD,andisshownontheCity’splanning documentsasguidedforcommercialuses. InmuchoftheCCD,residentialusesareallowedonupperfloors,withtheexpectation thatmostofthegroundfloorareawillbereservedforcommercial(primarilyretailsales orservice).Onthesiteundercurrentzoning,groundfloorresidentialisnotallowed,with theexpectationintheEmbracingMonticelloplanbeingthatthe2-blockareabetween LocustandHighway25wouldredevelopwithanchorretailshoppingdevelopment. Thislanduseprojectiondoesnotappeartobetakingplace,andamoretraditionalmixed- usepatternhascontinued.Acknowledgingthatsomeareasofthedowntownwouldbe appropriateforresidentialonthegroundfloor,theCityadoptedanoverlayzoningdistrict thatcouldbeappliedtospecificlocationsonacase-by-casebasis. TheapplicantsoughttheCCDResidentialOverlayzoningtoaccommodatetheground- floorresidentialuse.Inreviewingtherezoningrequest,itbecameapparentthattheCCD, includingtheresidentialoverlay,wouldrestrictdensitytoalimitthatmadetheproposed projectinfeasible.IftheparallelPUDrequestispursuedandeventuallyapproved,the sitewouldberezonedtoPUD,andtheoverlaydistrictrequestwouldbeabandoned. Forcomparisonpurposes,thevariousmultiplefamilyregulationsaccommodatethe followingunitcountsanddensityonthethree-quarteracresiteinquestion: ZoningDistrict Density UnitCount CCDBaseZoning 14–18unitsperacre 11–14units CCDResidentialOverlayCCDBase,plusoneunitper9,000 17units,max squarefeetoflotareaforgroundfloor R-4(HighDensity) 19units 25unitsperacre Multi-FamilyResidence 2 PlanningCommissionAgenda–3/02/16 Asnoted,theapplicantisseekingabuildingof23unitsonapproximately.76acres. Thesitemeetsmostofthezoningstandardsthatwouldapplytothedevelopment,with theprimaryexceptionofthedensity. Staffhasnotedbelowsomeofthesiteplanningandarchitecturalitemsthatwould typicallybeencouragedasapartofthisproject.Becausetheinitialrezoningapplication doesnotentailasiteplanreview,theitemsnotedbelowareforthepurposesof examiningthesuitabilityoftheproposedbuildingonthissite.Amoreextensiveplan reviewwouldbeundertakenwiththesubmissionofmorecompletedocuments. Apartfromtheunitcount,thereareahandfulofpreliminarysiteplanningcommentsthat staffwouldmake.Fortherecord,thoseare: rd 1. IncludetheCity’spatternedpavementdesigninthesidewalksalongboth3 StreetandLocust,similartotheon-streetparkingareasalongWalnut. 2. ExtendpedestrianaccesssidewalktoWalnuttoconnecttheresidentialtothe commercialcore. rd 3. Extendtheon-streetangledparkingon3 Streetfarthereast(2-3morespaces?) 4. AddstreetlightingtocoordinatewithWalnutStreettheme. 5. ConsideradjustinggaragebuildingsalongDanOlsen’spropertytotheeastback fromtheexistingcurbby2feetorso. 6. Ensurethatgaragebuildingsareattractiveamenitiestothesite–variedrooflines andenhancedmaterials–thecoderequirementforresidentialintheCCDsaysall wallsupto12feetaretobebrick,stone,orglass.Garagewallsshouldnotbe designedasablankflatwall. 7. EnsurethatsiteisseparatedfromLandmarkIbycurbandlandscapedarea. 8. Potentiallyotherelementsbasedonfinaldesign. Thedensityissueisasfollows:Thebasedensityinthecodeis14unitsperacre.This canbeextendedto18unitsperacrebasedonsiteandbuildingplanconsiderations.The groundfloorallowancepermitsoneunitper9,000squarefeet.Addingtheunitcounts togetherwouldaccommodateup17-18unitsonthisthree-quarteracrelot. Iftheprojectisredesignedtothisunitcount,theCCDResidentialOverlayzoningwould beappropriate,andaConditionalUsePermitwouldbeprocessedwiththeCCD ResidentialOverlayrezoning.ThePlanningCommissionandCityCouncilwouldreview asubsequentConditionalUsePermitapplication,whichincludesallofthebuilding,site, andcivilengineeringdetail. 3 PlanningCommissionAgenda–3/02/16 B. ALTERNATIVEACTIONS Decision1.RezoningtoaddtheCCDResidentialOverlayDistricttothesubject property. 1. MotiontorecommendtotheCityCounciladoptionofanordinancerezoningthe subjectpropertybyaddingtheCCDResidentialOverlayDistrict. 2. MotiontorecommendtotheCityCouncilthedenialofanordinancerezoningthe subjectpropertybyaddingtheCCDResidentialOverlayDistrict. 3. MotiontotableactionontheRezoning,pendingadditionalinformation. C. STAFFRECOMMNDATION Staffrecommendstablingactionontherezoningatthistime.Asnoted,theapplicantis pursuingthePUDprocesstoallowagreaterdensitythanthebasezoningwould accommodate.IfthePUDrequestproceeds,itisunlikelythattheoverlaydistrictwould bepursuedfurther. D. SUPPORTINGDATA A. AerialParcelImage B. ApplicantNarrative C. ApplicantConceptProposalPlans 4 PlanningCommissionAgenda:03/02/16 3A.ConsiderationtoreviewthedraftNorthwestMonticelloInterchangeLandUseStudy. (NAC/AS) A. REFERENCE&BACKGROUND ThePlanningCommissionisaskedtoreviewprovidecommentonthedraftlandusestudyfor theareacurrentlydesignated“interchangeplanningarea”withintheCity’sadopted ComprehensivePlan. AsPlanningCommissionmayrecall,thelanduseanalysisofthe“interchangeplanningarea” isdrivenbytheCityCouncil’sdirectiontocompleteanoverallanalysisofinterchange potentialintheNorthwestMonticelloarea.TheCity’sengineeringfirm,WSB&Associates, receivedCouncilapprovaltocompleteaninterchangestudy,whichwillultimatelyyield informationonwhereawesterninterchange(orinterchanges)willbelocated.Aconceptual understandingoflanduseintheareaisrequiredtocompletetheinterchangesitinganalysis andtoMnDOTandFederalHighwayAdministration’sreviewoftheinterchangelocations. Inshort,landuseconceptsareneededtosupportdevelopingtheprimealternativefor interchangelocation. NAChasthereforepreparedananalysisofconceptuallanduseforthe“interchangeplanning area”inNorthwestMonticello.Theanalysisincludesfouralternativeinterchangescenarios. Atthistime,anamendmenttotheComprehensivePlanisnotpartofthescopeofthis analysis.Rather,thestudyillustrateslandusealternativesforthepurposeofanalyzing interchangelocations.Atthetimeaninterchangelocationisidentified,thestudyand conceptswouldserveasthebasisforfuturecomprehensiveplanamendmentstoboththe LandUseandTransportationsectionsoftheplanwhennecessary. B. ALTERNATIVEACTIONS 1. MotiontodirectincorporationofadditionalPlanningCommissioncommentsasstated. C. STAFFRECOMMNDATION SubjecttoanycommentsoftheCommission,thenextstepwillbeacceptanceofthestudyfor incorporationintothelargerinterchangereport.Thelandusestudyprovidesaconceptual understandingoflandusepatternsresultingfromeachinterchangescenario.Commentsof theIEDCwillalsoberequestedforpresentationtotheCommissionandCouncil. D. SUPPORTINGDATA A.DraftNorthwestMonticelloInterchangeLandUseStudy 1 PlanningCommissionAgenda:03/02/16 3B.CommunityDevelopmentDirector’sReport PlanningCommissionRecommendations nd TheCityCounciltookthefollowingactiononFebruary22 asrelatedtoitemsonthe FebruaryagendaofthePlanningCommission: ConsiderationofarequestforamendmenttotheMonticelloZoningOrdinance,Chapter5, Section1–UseTable,Section2–Use-SpecificStandards,Section3–AccessoryUse StandardsandChapter8,Section4–DefinitionsforamendmentsregulatingMassage Therapy Applicant:CityofMonticello Councilaction:CounciladoptedaCityCodeestablishingTherapeuticMassage EnterpriseandMassageTherapistLicenses. ConsiderationofarequestforamendmenttoConditionalUsePermitforcommercial lodgingbuildingadditionintheB-3(HighwayBusiness)ZoningDistrictasperChapter 3.5(E)andChapter5.2(F)(8)oftheMonticelloZoningOrdinanceandConsiderationofa requestforsideyardbuildingsetbackvarianceasperChapter3.5(E)oftheMonticello ZoningOrdinance Applicant: Seifert,Joe/MillerArchitects&Builders ConsiderationofarequestforamendmenttoConditionalUsePermitintheR-A (ResidentialAmenities)ZoningDistrictforwirelesstelecommserviceantennaeasper Chapter4.13(G)TelecommunicationTowersandAntennasoftheMonticelloZoning Ordinance Applicant:Richter,Kristine/Black&Veatch Councilaction:Approvedunanimouslyonconsentagenda. 1