Loading...
Planning Commission Agenda 04-04-2017 (Joint Meeting) AGENDA REGULAR MEETING - MONTICELLO PLANNING COMMISSION th Tuesday, April 4, 2017 - 6:00 p.m. Mississippi Room, Monticello Community Center Special Joint Meeting Mississippi Room - 5:00 PM Concept Stage Planned Unit Development for Multi-Lot Industrial Development Applicant: Ken Spaeth Commissioners: John Alstad, Brad Fyle, Sam Murdoff, Marc Simpson, Lucas Wynne Council Liaison: Charlotte Gabler Staff: Angela Schumann, Steve Grittman (NAC), Jacob Thunander, John Rued ADMINISTER OATH OF OFFICE TO NEWLY APPOINTED MEMBER JOHN ALSTAD 1. General Business A. Call to Order B. Consideration of approving minutes th a. Regular Meeting Minutes March 7, 2017 th b. Special Meeting Minutes March 7, 2017 C. Citizen Comments D. Consideration of adding items to the agenda 2. Public Hearings A. Public Hearing - Consideration of a request for Rezoning to Planned Unit Development, a request for Development Stage Planned Unit Development for Vehicle Sales and Rental, Auto Repair Minor, and Accessory Office and Retail Uses in a B-3 (Highway Business) District Applicant: FRHP Lincolnshire, LLC 3. Regular Agenda A. Consideration of the Community Development Directors Report B. Planned Unit Development Discussion 4. Added Items 5. Adjournment SITE DESIGN CIVIL ENGINEERING NORTHWEST ASSOCIATED CONSULTANTS, INC. __________________________________________________________________ 4150 Olson Memorial Highway, Ste. 320, Golden Valley, MN 55422 Telephone: 763.957.1100 Website: www.nacplanning.com MEMORANDUM TO: Angela Schumann Monticello Planning Commission FROM: Stephen Grittman DATE: March 29, 2017 RE: Monticello Spaeth Industrial PUD Concept Review NAC FILE NO: 191.07 17.02 PLANNING CASE NO: 2017 - 010 Application. This memorandum reviews the elements of an Industrial Planned Unit Development proposed by Ken Spaeth at Lot 2, Block 3, Oakwood Industrial Park, a 4.4 acre vacant parcel along the south side of Dundas Road. The parcel sits between the Thein Well and Polycast Specialties buildings. The property is zoned I-2, Heavy Industrial, as is property to the east, north, and west. To the south are a series of 2- and 4-unit townhouse buildings, developed as Eagle Ridge, and zoned R-PUD. The current proposal is for a PUD Concept Plan review, which is not a formal zoning application, but is intended to provide the applicant an opportunity to get City feedback on a potential development proposal prior to more formal zoning review and the extensive supporting materials that such reviews require. The Planning Commission and City Council will have the opportunity to review the project, ask questions of the proposer, and provide comment as to the issues and elements raised by the project. This memorandum provides an overview of the project, and will serve as an outline for the discussion. No formal approval or denial is offered for a Concept Review. Project Description. Mr. Spaeth has developed a concept plan which shows a series of industrial buildings on eight separate parcels. Each building is 6,976 square feet in area, for a cumulative total of 55,808 square feet of floor area. Because only the front two parcels front on Dundas Road, with 6 parcels served by an internal private common drive, the project requires PUD zoning. The layout of the project relies on a perimeter drive that provides access to, alternatively, parking areas serving the front access points of the buildings, then common truck courts that provide truck access to the service sides of each building. The par including toward Dundas Road on the north, and toward a stormwater pond and then the residential development to the south. The truck and service portions of each of the buildings is internal to the project. The project is anticipated to attract smaller individual industrial concerns that require spaces for office, fabrication, repair, warehousing, and possibly, limited areas of showroom. Occupants would have the opportunity to purchase individual lots subject to the overall PUD and association management requirements. Each building has about 12 parking spaces allocated to their parcel, however, it will be necessary that the parking and grounds will be commonly maintained under an association, so parking quantities would be shared between parcels. Buildings and Site Improvements. The proposer is suggesting engineered metal buildings, which are permitted in the I-2 District. The District regulations state that additional architectural finishes are required where facing a public street, and this treatment would be beneficial facing the adjacent residential areas to the south as well. In addition, the plans identify an area of stormwater management along the south boundary of the property. Buffer requirements and landscaping will benefit the screening and transition from industrial to residential areas. The orientation of the south buildings by placing parking areas, rather truck service areas, will also minimize conflicts between these two land uses. The plans otherwise utilize the entire project area for building, parking, drive lane, landscaping, and truck loading areas. No outdoor storage areas are proposed. Summary. As noted, the Planning Commission and City Council provide comment and feedback at the Concept Review level. City officials should identify any areas of concern that would require amendment to avoid the potential for eventual denial, as well as any elements of the concept that the City would find essential for eventual approval. The staff notes above acknowledge that a significant amount of detail will be added as the project proceeds to a more advanced stage of review. 2 Building a legacy ǤƚǒƩ legacy. 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 March 30, 2017 Ms. Angela Schumann Community Development Director City of Monticello 505 Walnut Street, Suite 1 Monticello, MN 55362 Re: Spaeth Industrial PUD Concept Plan Review City Project No. 2017-010 WSB Project No. 02596-420 Dear Ms. Schumann: We have reviewed the concept plan received on March 27, 2017 and offer the following comments. 1. The proposed two access points from Dundas Road is adequate given the proposed site use, traffic volumes on Dundas Road and alignment with existing access points. 2. Stormwater management for the site must provide volume control (i.e. infiltration) and meet water quality requirement per the Citys stormwater checklist that has been provided to the applicants engineer. 3. The applicant should identify where the proposed infiltration basin will discharge to. 4. A more detailed review will be completed when the applicant submits complete civil plans and a stormwater management report. Please give me a call at 763-271-3236 if you have any questions or comments regarding this letter. Thank you. Sincerely, WSB & Associates, Inc. Equal Opportunity Employer wsbeng.com K:\\02596-420\\Admin\\Docs\\LTR-a-schumann-Spaeth PUD Concept 033017.docx March 30, 2017 Page 2 Shibani K. Bisson, PE City Engineer cc: Steve Grittman, NAC Enclosure skb K:\\02596-420\\Admin\\Docs\\LTR-a-schumann-Spaeth PUD Concept 033017.docx ag- 13 6976 6976 S.F. Birch, River Clump iii rn GRASI, 5TORM1 WATER MANA��-­ Spruce, Black Hills