Loading...
City Council Agenda Packet 11-27-19891 a AGENDA FOR THE MEETING OF THE CITY COUNCIL Monday, November 27, 1989 - 7:00 p.m. Mayor: Ren Maus Council Members: Fran Fair, Warren Smith, Shirley Anderson, Dan Slonigen 1. Call to order. J/ 2. Approval of minutes of the regular meeting held November 13, 1989, 3. Citizens comments/pet it ions, requests, and (,oupiaints. 4. Consideration of accepting park dedication fee - West Prairie Partners Subdivision plat. 5. Consideration or City participation in financing a portion of the Evergreens Subdivision development torts via the assessment process, 6. Consideration of final payment on Project t89-1, Marvin Elwood Road Extension in the Meadows {public project). 7. Consideration of resolutions ordering preparation of assessment roll and setting a public hearing on adoption of assessment roll on Marvin Elwood Road extension - Meadows Subdivision. 8. Consideration of accepting the improvements associated with the Meadows ( Second Addition (private project) . 9. Consideration of replacing electric motor for deep well turban pump in well A1. 10. Consideration of amendments to snow plowing/reimval policy and adoption of revised snow plowing and removal plan. 11. Consideration of bills for the month of November. 12. Adjournment. A MINUTES REGULAR MEETING - MONTICELLO CITY COUNCIL Monday, November 13, 1989 - 7:00 p.m. Members Present: Fran Fair, Warren Smith, Ren Maus, Shirley Anderson, Dan Blonigen Member; Absent: None Approval of minutes. After discussion, motion uade by Dan Blonigen and seconded by Shirley Anderson to approve the meeting minutes as presented. Motion carried unanimously. 3. Citizens coimnents. petitions, requests and complaints. ..one forthcoming. Public hearing on the adoption of a supplemental assessment roll for the 89-03 inprovement project (Oakwood Industrial Park overlay). And Consideration of adopting an assessment roll for certification to County Auditor. City Engineer John Badalich explained that the original bituminous paving within the Oakwood Industrial Park was always planned and designed for a 7 ton capacity. According to Badalich the original feasibility study was prepared by OSM covering sewer and water extensions within the Industrial Park along with bituminous paving, which included curb 6 gutter, and storm sewer improvements estimated at a total cost of $800,000. Those costs were reviewed at a public hearing on April 25, 1977, at which time the project was tabled and no action again was taken until May 9, 1977, at which time the Council ordered preparation of plans and specs for servicing Oa;.cod Industrial Park with water and sewer only, with bituminous paving, curb 6 gutter, and storm sewer improvements being deleted from the project. John Badrlich went on to note that the records seem to indicate, and it was his recollection that development of the streets in this area would occur under a phased approach and the original bituminous overlay was designed for 7 ton capacity with the intent to install the additional bituminous at such time that the curb and gutter is installed. Dale Lungwitz stated that the Oakwood Industrial Partnership originally asked for a 9 ton road, not a 7 ton road. Dan Blonigen replied that "You thought you were getting a 9 ton road and you got a 7 ton road. If the City had insisted on a 9 ton road how much would you have spent extra for the 9 ton road. By putting a 7 ton road in at the start you ended up saving considerable money over the life of the original road." Jay Morrell nnted that he would not have purchased the structure in the Industrial Park had he known that the roads were of a 7 ton design. He went on to request that the Council consider the same 80/20 split of expenses that was used in assessing the properties that benefited from the atreetecape project. 0 a Council Minutes - 11/13/89 Ken Maus noted that streetscape and industrial park roads cannot be fairly compared in terms of establishing assessment policy. Fran Fair stated that once the roads are installed they are there for everyone's use. After installation the roads should be the responsibility of the City and improvement costs associated with established roads should be paid for via ad velorum taxes. Dan Blonigen stated that he is not disputing that once a road is established that the City should pay its share to maintain it, however, this road is different. The iuprovemient completed represents an upgrade, not maintenance. Ken Maus noted that when George Phillips requested to downgrade the original 1977 project there was no evidence indicating that the Partnership wanted to have the street portion of the project reduced from 9 ton to 7 ton. It appears then that it was very likely a City decision to downgrade the roads from 9 ton to 7 ton and it may have never been formally requested. Motion was made by Fran Fair to reaffirm the previous assessment formula which called for a 808 project cost paid for by the City and 208 by the benefiting property owners. Motion seconded by Warren Smith. Voting in favor: Fran Fair, Warren Smith, Ken Maus. Opposed: Shirley Anderson and Dan Blonigen. Motion carried. 5. Continuation of public hearing for sanitary sewer extension on Oakwood Drive. This item was continued from the previous meeting pending input from Stuart Hoglund, who is the major benifiting property owner of the proposed project. A letter submitted by Mr. Hoglund indicated that he does not support the extension of sanitary sewer as proposed. Deferal of the assessment was discussed. However, no method of defering the Hoglund assessment was established. Rick Wolfsteller noted that the Comfort Inn is presently for sale and that transaction may impact the method by which the cost of the project would be assessed against the benefiting property owners. Since the terms of the transaction are not understood at this time, it might make sense to table the matter until all the potential affected property owners are talked to. Ken Maus and Fran Fair concurred that the City might want to postpone a decision on this matter until after the sale of the land. Motion made by Shirley Anderson and seconded by Fran Fair to postoone a decision on this matter to the first regulAr meeting in Docember. Motion carried unanimously. Motion made by Fran Fair and seconded by Dan Blonigen to allow Lee Parks to upgrade the private sanitary sewer by installing a holding tank if it is found that such an upgrade is absolutely necessary. Motion carried unanimously. 0 Council Minutes - 11/13/89 Review Pinewood Cozmminity Playground Plans, receive project update. Cheryl Fuller, representing the Pinewood Coimnunity Playground Organization, was present to provide Council with an update on the progress of the playground project. Fuller reviewed the preliininary design plan and requested input from Council. Fuller also noted to Council that Roger Mack will be serving on a co,mnittee which will be reviewing the plans in further detail. Ken Maus asked if restrooin facilities will be provided at the playground site. Cheryl Fuller responded by saying that a nearby restroom on the school site is available for use by individuals using the play structure. Ken Maus also suggested that the school district may wish to consider striping of the parking area associated with the play structure. After discussion, Ken Maus thanked Cheryl for the update and encouraged the playground coimnittee to keep up the good work. 7. Consideration of a conditional use request to allow a tri-plex in an R-2 (single and two fainily residential) zone. Applicant: Brad 6 Cindy Pyle. Assistant Administrator O'Neill explained that Brad and Cindy Pyle requested a conditional use permit which would allow an existing house to be converted into a tri-plex. The property in which the property is located consists of 22,077 sq. ft, of area, which is more than the minimum amount of land necessary for a tri-plex. However, the site plan fails to utilize the full land area potential of the property in a manner that will minitnize the negative impacts created by the tri-plex. O'Neill went on to note that at its regular meeting on November 7th, the Planning Crumnission conducted a public hearing and then recwmnended that Council deny the conditional use request, based on the fact that the site plan is to be designed in a »nner that does not properly utilize the space available. In addition, the site plan is contrary to the City ordinance because the development is not consistent with the character of the neighborhood, the use will tend to depreciate the adjoining property and there is not a demonstrated need for the tri-plex. O'Neill went on to note that the Planning Coimnission did not close the door to an approval of this conditional use permit contingent on development of a new site plan which would call for two suitable, usable parking spaces developed in the rear of the property, with such spaces gaining street access directly onto Maple Street. After discussion, motion made by Warren Smith and seconded by Fran Fair to approve conditional use request to allow a tri-plex in the R-2 zone, subject to the following conditions: A. No ware than A developed parking spaces allowed to front Third St., ° including the enclosed garage space. 1 B. Garage openings must face Third St. S Council Minutes - 11/13/89 Vi C. The driveway access to Third St, shall be no wider than 24'. All _ yard area outside of the driveway shall be sodded so as to prevent ,t utilization of green area as parking area. A��op p gen t +ti r�) � I r` 'it"a 6a an bite- H ��r t eM., 5lort ,wr !' o. Curb cut and bitumnal;, inous parking surface with access to Maple Street S must be installed by June 1, 1990, and be sufficient to accomodate i two vehicles. Prior to June 1, 1990, a temporary gravel surface in this area is allowable. a' fi 1` E. No use of third unit is allowed until the curb cut and gravel surface �1 is installed. Motion carried unanimously. B. Consideration of permit which would allow development of a single mobile home site at the licntside Mobile Home Park in Monticello. Assistant Administrator O'Neill informed Council that Don Heikes has submitted a request to the city of Monticello which calls for development of a single mobile home site in addition to the 17 sites now existing at his mobile home park. O'Neill explained that Planning Commission conducted a public hearing regarding this matter and received testimony from Scott Hill and the Cemnetary Association. As a result of this testimony and input from staff, Planning Commmission recommended approval of a permit to add a single mobile home lot contingent on the developer fulfilling a number of conditions. Mr. Heikes stated that he intends on complying with all of the conditions listed. Ken Maus noted that Mr. Hill brought up other concerns that the City should be dealing with, such as the problem with unlicensed mobile homes in the mobile home park. Maus also suggested that a stop sign be installed &c the entrance of the mobile home park per the suggestion .rade by Scott Hill. After discussion, motion was trade to allow expansion of the west Side Park with the addition of a single mobile home site, subject to the following conditions: A. The mobile home site may be located no further than 300' from an existing fire hydrant. B. Bituminous driveway shall be installed to provide access to the mobile home expansion site. C. The trailer shall be installed on a concrete slab, as approved by the building inapector. D. Electric, phone, and cable line shall be installed underground. F.. Storm shelter shall be provided at the lower level of the duplex which is maintained by the park caretaker living in the upper floor. The shelter shall have a sign placed above the door and all new tenants shall be informed of the emergency shelter. 4 9' Council Minutes - 11/13/89 F. Expansion of the mobile home park in this area shall be limited to a single mobile home site. No further requests for additional mobile home sites shall be approved without meeting all of the park expansion requirements. G. Snow removal, grounds, and driveway maintenance, water and sewer maintenance will be performed by the owner/operator and/or his agent. H. A fence 6' in height shall be installed along the northern edge of the property. The fence shall be 6' high, and 90% opaque. This fence shall be installed from the cemetery side of the retaining wall. I. Developer shall install a retaining wall of sufficient height and strength to prevent erosion into the `cemetery property. Motion carried unanimously. 5(��,rgrc;e a 9. Consideration of final plat approval for Prairie West subdivision. There being no appeals forthcoming by individuals or the City Council to the variance request associated with Lot 5, Block 1 plat, motion was made by Fran Fair, and seconded by Warren Smith to approve the final plat of the Prairie West subdivision. Voting in favor: Fran Fair, Ren Maus, Warren Smith, Shirley Anderson. Opposed: Dan Blonigen. 10. Simple subdivision request to allow a B-3 (highway business/eoimnercial lot) to be subdivided into 2 coronercial lots. Variance request to allow zero lot line setback requirement. Applicant: The Lincoln Coupanies. Assistant Adninistrator O'Neill informed Council that the Lincoln Coirpanies, owners of the Monticello Mall are proposing a siirple subdivision which would create a separate parcel on which the new K -Mart addition would be placed. The separate identity created by this subdivision would allow the developer to obtain the necessary financing for the K -mart addition. In addition, the proposed subdivision will create a zero lot line between the new property and the existing wall of the inall. Therefore, a variance to the sideyard setback requirement is necessary. This proposal to create a zero lot line setbnck should not be a problem so long as the actual developm-nt occurs. .%fter discussion, motion by Shirley Anderson and seconded by Dan Blonigen to approve the simple subdivision request to allow a B-3 (highway coimnercial) lot to be subdivided into 2 coimnercial lots, subject to the following conditions: A. Developer shall provide easements necessary to accomodate the 7th St. right of way. Such easements would include both the curved or straight alignment. B. Recordinq of the subdivision cannot occur until such time that the actual structure is under development. Council Minutes - 11/13/89 C. Further subdivision of this property must be accomplished via the platting process. Future plats created must incorporate all The Lincoln Companies property, including the mall and the property on which the inall addition will be located. Motion carried unanimously. 11. Consideration of renewing the 1990 fire contract with the Silver Creek Township. Shirley Anderson noted that the dates noted in Article 8 need to be amended to reflect the contract tern. After discussion, motion made by Dan Blonigen and seconded by Shirley Anderson to approve the fire protection agreement as eutlinedand amended. Motion carried unanimously. 12. Consideration of approving on sale liquor license transfer for Comfort Inn. After discussion, motion made by Warren Smith and seconded by Fran Fair to approve the liquor license application as submitted. 13. Consideration of renewing contract oQeration of city Wastewater Treatment Plant with Protessional Services Group. John Simmmola noted that it has been slightly over 3 years since Professional Services Group entered into partnership with the city of Monticello for contract operations of our Wastewater Treatment Plant. Simnola went on to note the reasons why the privatization of the Wastewater Treatment Plant uccurred. 71wse reasons are as follows: 1. Cost being incurred to (run the plant) at efficiencies much greater than that required by the discharge standards. 2. Lack of long term maintenance of plant equipment and facilities. 3. Staffing deficiences due to employee absences and request from treatment plant management for additional personnel. 4. Lack of adequate training of present staff. 5. Lack of proper sludge mnanagement techniques. 6. Imrproper operation of various plant equipment items which required an increase in gas and electrical consumption. 7. Iuproper management at the plant. B. Poor record keeping practices. i q. Lark of commmunication between plant and City Hall. Council Meeting - 11/13/89 For the reasons stated above, the City entered into an agreement with PSG to operate the Wastewater Treatment Plant. Simola went on to outline the positive working relationship that has been established in the last three years. Simola completed his presentation by noting to Council that staff favors continued contract operations of the City's Wastewater Treatment Plant through private partnership with Professional Services Group. Although the city staff has been negotiating with Professional Services Group for several imnths, it was Simla's view that the contract before Council lathe best compromise the City is able to reach. The City could request further negotiations with PSG, however, it is not likely that further negotiations would result in significant benefits to the City. Dan Blonigen noted that under Article G, paragraph 7, point 4, PSG is in the driver's seat when it comes to defining the grounds for determination of the contract. The new grounds for termination consist of two serious performance related incidents within one 60 day period. Dan Blonigen was concerned that that the definintion of serious performance related incidents should be defined by the City and not by PSG. Representatives from PSG indicated that they would be mre than willing to let Council determine which incidents are defined as serious. Representatives from PSG also noted that in spite of this language, the City has significant power and that the City must make a check to PSG once a month. If problems are not corrected, the City can simply withhold their payment to PSG. Ren Maus asked why the contract length did go from 3 years to 5 years. Dan Blonigen noted that he would favor a 3 year contract. PSG is performing well. They need not worry about the City continuing with them after year 3. Wolfsteller noted that a 5 year contract, if reasonable, will save the City the cost and time assoc'3ted with the bidding process. Motion made by Dan Blonigen and seconded by Shirley Anderson to approve the new contract with rofessional Services Group as presented to City Council for an initial annual amount of S32d,070. Motion carried unanimously. 14. Consideration of odor control measures for the Wastewater Collection System and Wastewater Treatment Plant. John Simola explained that for some of our previous agenda items dealing with renewal of PSG's contract, staff has tried to explain the Current odor control problems at the Wastewater Treatment Plant and how efforts to deal with the problem have been less than 100% successful. We have now received the report from Davis Processing Division, a representative for ODIPAS. Their report centers on odor control survey and recommendations for an odor control program resulting for an inspection on October 12, 1909. In addition, we received the teat results from ambles taken in and about the collection system and treatment plant innediately following the original survey. Simola went on to present the information from the tests and outlined staff recommendation as follows. 7 6P Council Minutes - 11/13189 It was the recormnendation of the Public Works Director that the council authorize additional testing and installat-ion of the pilot chemical feed system, which is an injection system in the coliertion system, with the assistance of PSG at a -etup cost of $1,000, plus a :ental cost of $400 per month, plus chemicals as needed at $1.18 per gallon, plus additional testing as - quired. Erti- .ced initial cost of this alternative is in the area of ::3,001). Ken Maus asked, "If Sunny Fresh completes briprovements to our specifications would this eliminate the problem?". John Simola noted that ironically, the changes trade at Sunny Fresh may have actually increased the problem.. Ren also asked, "Should we consider assigning the cost to remedy industrial related set•ar problems to industrial users?". Simola stated, "We may not be able to directly assess, but rates would effectively place the cost with hish users. Additional study will be done.". After further discussion, motion by Shirley Anderson and seconded by Dan Bionigen to install a test pilot chemical feed injection system at an estimated initial cost of $3,000. Motion carried unanimously. 15. Consideration of resolution adopting a proposed preliminary 1990 budget and setting a proposed tax levy. men Maus noted that this proposed tax levy is preliminary only and it is likely that there will be a few items trimmed from the budget. Motion to adopt a resolution setting a proposed levy of $2,778,506 trade by Warren Smith, seconded by Dan Blonigen. notion carried unanimously. SEE RESOLUTION 89-34. 16. Consideration of installing street light at private driveways requested by the Plaza Carwash on Highway 25. John Simola discussed the pros and cons of installing a street light at this location. After this review, Ken Maus noted that there might be a chance to correct the lighting problem by singly by reorienting the existing street lights and asking the Plaza Carwach to modify their light, also. Maus suggested that this alternative be atterpted prior to installation of a new street light. Motion trade by Fran Fair and seconded by Warren Smith to follaw the suggestion made above by Ken Maus. Motion carried unanimously. 17. Consideration of hiring rink attendants for winter skating facilities. John Simola noted that after a fire at the Fcurth Street warming house last winter North Star Risk Services, a risk assessment coiryumy who performs loss control surveys for insurance companies, stated the City should install self extinguishing waste cans in our wdnning house. Additionally, they suggested that we post appropriate warning rules signs. Lastly, the North Star Services ask that we consider adult supervision for City rink areas during periods of peak ups. This was again atreosed in their October 6th letter regarding the pond skating. 8 � i Council Minutes - 11/13/89 Simola went on to outline the proposed hours of peak use which would include weekdays from 4-9 p.m., Saturdays from 9 a.m, to 6 p.m., and Sundays from 1 p.m. to 6 p.m.. This would total approximately 31 hours per facility, excluding holidays or Christmas vacation, which would bring the average hours per week during our overall season up to 35. The total estimated cost to provide rink attendants per the recommendation of North Star Risk Services amounts to $2,300. Ken Maus stated that he is concerned that the rinks are not getting used enough and that it might be difficult to justify hiring of a rink attendant if the rinks are not getting significant use. Ken Maus also noted that he would be in favor of establishing some rules as to when the rink attendant will be a the ice rink. For instance, we may want to close the rinks when the temperature drops below a certain tc:�c:otu:c. Simola noted that he, along with the Park Superintendent and City Attorney, will be developing a list of ice rink rules of operation. After discussion motion made by Warren Smith and seconded by Dan Blonigen to provide rink attendants for the two warming houses during peak skating times, as outlined by the park superintendent and is recommended by North Star Services at an estimated cost of $1,148 per season, for a total cost of approximately $2,300. Motion carried unanimously. 18. Consideration of setting a meeting for the purpose of establishing a 1990 salary wage policy for nonunion personnel. After discussion, motion made by Shirley Anderson, seconded by ?ran Fair to set a meeting for said purpose at 6:30 p.m., December 4, 1989. Mution carried unanimously. 19. Consideration of�roDosed supplement to cooperative construction agreement witn MN -DOT for upgrading Hwy 25. John Simola explained that during the original upgrading of Highway 25, which took place several years ago, the State of Minnesota agreed to plant shrubs along the Hillside Cemetery to reduce maintenance and beautify the area. This planting was to be 1008 State of Minnesota cost. When the original agreement came through, this was not the case and the agreement stated that it was at City cost. At that time the City was informed it would be impractical to amend the entire agreement and the State would follow up later with a supplemental agreement. After discussion, motion was made by Warren Smith and seconded by Shirley Anderson to authorize the proposed supplemental agreement transferring the responsibility of the cost of the shrubbery from the City to the State of Minnesota. Motion carried unanimously. Staff informed Council that Mr. Eisele has asked the City to burn a residential structure located near the fire hall. Nen Maus noted that unless the fire department sees a training value, he suggested that the 9 Council Minutes - 11113189 City not get involved in burning this structure. Dan 8lonigen also noted that safety is the coin issue and that the property owner should compensate the City to cover the training expense. John Siirola requested that the Council provide authorization to temporarily maintain the street right of way associated with the Meadows Second Addition and the Marvin Elwood Road extension. It was Simola's view that the improvements are nearly complete and that the City may at this time undertake plowing of streets and other general maintenance of the utilities until final approval in the near future.. Motion made by Warren Smith and seconded by Fran Fair to authorize snow removal maintenance of 8edman Lane and Marvin Elwood Road. Motion carried unanimously. There being no further discvvsion, mccting ad;ournad. JetNeill Assistant Administrator C 10 0 v�J Council Agenda - 11/27/89 4. Consideration of accepting park dedication fee - West Prairie Partners subdivision plat. (RW) A. REFERENCE. AND BACKGROUND: At the previous Council meeting, approval was given to the West Prairie Partners subdivision plat located adjacent to Pinewood Elementary School. The only item left to discuss concerns the park dedication fee required by City ordinances consisting either of 10% of the land or 10% of the market value in cash. When the preliminary plat was approved :n May of 1989, the developers proposed making a cash contribution rather than land donation to accomplish the park dedication requirements. Enclosed with the agenda you will find a letter from Mr. Jim Metcalf, dated May 4, 1989, outlining how they arrived at what they feel is the market value of this 2-1/2 acre pdreel at appu,xbmately $17,000. Although it has always been assured by the City staff, and I believe also the Council, that we would be accepting cash rather than land since this plat is located next to the elementary school, it has never been determined whether we were agreeable to the proposed $1,700 as meeting the requirements. Our subdivision ordinances specify that cash contribution is to be determined by an appraisal of the property establishing the market value prior to any improvements. The developer is responsible for submitting an appraisal and if the Council so elects can order an additional appraisal on its own. In either case, the appraisals are the responsibility of the developer. As you can see from the proposal submitted by Mr. Metcalf., they are basing the market value of their 2-1/2 acre parcel by subtracting off the two lots of the former Assembly of God Church property to arrive at a value of $77,000 for the Assembly of God Church which was traded for the Baptist Church property. They are also deducting the existing home that was sold for $60,000, leaving what they feel is the market value of the 2-1/2 acre parcel at $17,000. Although I certainly follow their logic in arriving at this cost figure, this should not be considered an appraisal, and I do not know if this id truly the market value of the 2-1/2 acre raw piece of land. Taking this procedure one step further, if they had sold the existing house for $77,000, then I would assume they would not be proposing any park dedication at all since their actual cost would have been zero. It could be assumed that they actually got a good deal on the 2-1/2 acres that have been platted and is not necessarily the true market value. prior to the Sirynoveirents. Since the final plat has been approved and is ready for the necessary signatures, the only step remaining to to arrive at a fair park dedication requirement. B. ALTERNATIVE. ACTIONS: 1. Accept the proposal made on Flay 4, 1989, by the developers and establish the market value at $17,000 for the 2-1/2 acres, which j wuuld amuunt Lu $1,700 du d cash cunliibutluu. N Council Agenda - 11/27/89 2. Request the developers obtain an actual appraisal of the property for Council review and determine the park dedication based on 10% of this value. C. STAFF RECOMMENDATION: Although the staff does not dispute the net cost the developers have in the 2-1/2 acre parcel, the staff does question whether this is truly the market value of the property without obtaining an actual appraisal. Because the developers purchase involved acquiring one piece of property and selling off a portion of the property and then tra?ing the balance for the parcel they now have and then also selling off an existing home to arrive at this cost, accepting this method of determining market value could cause problems in the future, as it really has no bearing on true market value because of the coirplicated transaction that occurred. It would appear that if the City plans on its ordinance and requiring appraisals to determine market value, it may be best. to have an outside appraiser establish the market value for this property. It also becomes difficult to compare a small 2-1/2 acre tract of land with other recent subdivisions such as the Par West subdivision in that usually the per acre price is imich lower on a larger piece of property than it is on a smaller piece. If the Council feels that $17,000 is an accurate market value for this property and does not wish to require the developer to provide an appraisal, you can accept the $1,700 as proposed. D. SUPPORTING DATA: Copy of the may 4, 1989, letter from develorxer. l ArTURNEYS AT LAW P.O. a= uE 30 Waal B,oaftp MORUCO q MtrweWU 15762011E JAMES 0. MUCALF 1F1 1`I9I014F. BRAut.EY V. LARSON May 4, 1989 017)2F,3232 MEtn0 (012)121.3393 Mr. Fick Wolfsteller City Administrator Monticello City Hall 250 East Broadway Monticello, MN 55362 REt PROPOSED PLAT OF WEST PRAIRIE PARTNERS Dear Mr. Wolfsteller At its meeting on May 2, 1989, the Planning Cununi.ss.ion recommended the approval of Lhe above -referenced plaL withuut qualification. It is my understanding that this will came before the Council on the 8th of May, and it would be our intention to make a cash contribution, rather than a land donation to accomplish the park requirements. As most of the town already knows, our acquisition cost was $110,000.00 and we have entered into a Contract for Deed arrangement to sell the two 12) lots on Fourth Street for $33,000.00 and have, recently nold the, st:ruuturn 11n rhe• farmor Baptist property for a net $60,000.00. This wuuld lilacs our cont; on the two and ono -half acre parcel at approximately $.17,000.00 or $G,600.00 per acro. ACeordinyly, we are prepared to offer a $1,700.00 contribution to Satisfy the park requirement. We also aro interested in retaining Mr. John Badalich to prepare the plans and specifications for the installation of the water, sanitary sewer, streets and curbs. Since this appears to be a relatively straight forward project where no great discretion would be used as to how the project should be designed, we do not believe that there would be any cunfllcL using Mr. Dadnlich, and we would desire to avoid the additional expense of getting an extra engineer involved. 1 have discussed this matter generally with Mr. Badalich in the pant, and I believe that lie will taquire that lie gets permission to do so from you, or the Council. If you have any questions or wish to discuss the matters raised in this letter further, please call me at your convenience. Sincerely, METC F LARSON ter. ny: JGM:dins Jam r3 MoLca1L,�P y. In response to the above captioned matter, as far as I am concerned the City has now had almost seven months to come up with a determination and I can see of no reason to attend yet another meeting on November 27th. we have attended numerous meetings in the past and have talked to the city staff on numerous occasions, and particularly this matter has been before. the Planning Commission twice and the Council twice regarding the subdivision of this parcel alone. why the matter requires an additional meeting is a mystery to me and I will assume you can carry on without my participation. Also be advised that West Prairie Partners will not pay for the cost of the City making an appraisal, or anybody else making an appraisal, without first having an arrangement concerning who shall do the appraisal, the extent of the appraisal, and the fee involved. The idea of having the property appraised when there is recent evidence of a transaction makes little sense, and oven less when the City and County have appraisers available for establishing the market value of property for real estate tax purposes. I trust that you will, provide the Council with the substance of this letter, or a copy of, it, at or in advanco of the November 27th meeting. If you wish to discuss this further, please contact me at your convenience. if you concludo that I am not Impressed with the time delay encountered and the manner in which the Council may proceed, and I expect they probably would if you recommend it, you are quite correct. Sincerely, METCALF i 118504 7 By: James Metcalf, $4q. JGM: ab l/.J� I//a(tal� C9 eCaiton ATTORNEYS AT LAW P.O. am us 3UV" emWrq U0.1"1%UV.W ons!{ U4W November 22, 1989 JAMESO. METCALF TELEPHONE SRADLV V. LARSON (512) 2953232 Mr. Rick Wolfsteller METRO (612M)421-= City Administrator 250 E. Broadway Monticello, MN 55362 RE: Your letter dated November 20, 1989 regarding west Prairie Partners Subdivision Dear Mr. wolfsteller: In response to the above captioned matter, as far as I am concerned the City has now had almost seven months to come up with a determination and I can see of no reason to attend yet another meeting on November 27th. we have attended numerous meetings in the past and have talked to the city staff on numerous occasions, and particularly this matter has been before. the Planning Commission twice and the Council twice regarding the subdivision of this parcel alone. why the matter requires an additional meeting is a mystery to me and I will assume you can carry on without my participation. Also be advised that West Prairie Partners will not pay for the cost of the City making an appraisal, or anybody else making an appraisal, without first having an arrangement concerning who shall do the appraisal, the extent of the appraisal, and the fee involved. The idea of having the property appraised when there is recent evidence of a transaction makes little sense, and oven less when the City and County have appraisers available for establishing the market value of property for real estate tax purposes. I trust that you will, provide the Council with the substance of this letter, or a copy of, it, at or in advanco of the November 27th meeting. If you wish to discuss this further, please contact me at your convenience. if you concludo that I am not Impressed with the time delay encountered and the manner in which the Council may proceed, and I expect they probably would if you recommend it, you are quite correct. Sincerely, METCALF i 118504 7 By: James Metcalf, $4q. JGM: ab l/.J� Council Agenda - 11/27/89 Consideration of City participation in financing a portion of the Evergreens Subdivision development costs via the assessment process. 0.0. ) A. REFERENCE AND BACKGROUND: As you recall, about a Month ago Kent Kjellberg asked for feedback from Council regarding the potential of utilizing the assessment process to assist with the financing of the Evergreens Subdivision iuproveMents. At that time, Council asked that staff prepare more information or. the matter and bring a potential financing formula back to Council for further review. Before getting into a description of a potential financing plan, I would like to address a number of issues associated with this development. IAN AND MODERATE INCONE HOUSING DVWZ It may be that Mr. Kjeliberg has not been able to receive private financing for this project in part because the demand for the 48 lots that will be created is not strong enough to warrant the risk associated with the high coat to install the Phase I utilities. According to the rough estimates we have been able to pull together on total project cost, it appears that the per lot coat for the first 43 lots in this development will equal almost $13,000, and that is without any land cost incorporated into the price. The reason why these lots are relatively expensive to because an expensive lateral sewer and water connection must be made in order to serve the development. This added cost drives up the per lot cost of this development. The high utilities cost per lot with Phase I would not be as much of an Issue if the type of housing planned for that area was not low and moderate income housing. The goal of the developer is to create inexpensive, affordable lots for individuals that have been locked out of tho single family housing market. I au not sure to what degree the added coat to extend the utilities to the development area reduces the ability of the developer to create lots at a price that is low enough to attract the sector of the market that the developer is after. Staff is concerned that the demand for housing in this particular area may not be great and that it will take a considerable time to sell the 43 lots associated with Phase I. At present, there ars about 80 buildable home sites within the city of Monticello and about 25 now homes built per year. If all of the new homes in the city were built in this development, it would take about two years to fill it up. Obviously, not all of the new hors in Monticello will be built in the Evergreens Subdivision. At the acme time, however, if the price of the lots is low enough and if first tim home buyer financing is available, this development could possibly develop relatively quickly. All in all, it is difficult to say how fast this development will actually fill in. It could be two years, it could be six years. Whatever the can may be, it is important to temraber that the longer it takes fur the develuymwnt to occur, the ware expensive the project becomes, as the interest on the cost to install the utilities keeps mounting as the project lays vacant. Council Agenda - 11/27/89 KJELLBERG FAST POLLUTION PROBLEM It is staff's view that if it was not for the pollution problem associated with the East Park, the City would not likely be getting involved in assisting with the financing of this development. In response to PCA pressure, Mr. Kjellberg has installed a temporary sewer system. This system is marginal at best and does not come near meeting PCA guidelines. In addition to providing lots for first time home buyers, the Evergreens Subdivision provides for the extension of city sewer service to a point at which the Kjellberg East Mobile Hone Park can utilize city sewer and water and, thus, correct this pollution problem. It appears that the single most important reason why the City would participate in this particular project is because City participation would result in the correction of the Kjellberg East Labile Iioca Park pollution -problem. OTHER ISSUES statistics reveal that there does appear to be a pent up demand for affordable single family housing in Monticello. As you know, a considerable number of apartment units have developed in the last few years along with the existing mobile hoe parker and in addition to that, there are a considerable number of homes within the community that are occupied by renters. within that renter community, there are many that wish to own their own home. It ie not known at this time what the actual raw number of individuals is that wish to own, their own home, and it also not known what their income levels are. If one of the City Council's goals is to encourage development of single family housing, is this a location where the City wishes to invest its money? If providing affordable lots to an issue, there are other properties within the community that could be developed more cheaply than the property in question. Therefore, should we be looking at other property that can be developed more economically. If the City's goal to to remove an environmental threat created by the Fast Park sewer, system, is there another cheaper way to correct the problem? It say be an option for the City to examine the cost of a .shallow force min to be run along the County right -of -may all the way to Dundas.. The cost of this project could be assessed back to the benefiting property owner. The coat of this projectisnot known at this timel however, staff may wish to explore looking at this as an option. Another method which might be used to correct the mobile homes park sewer problem is to actually encourage development of an on-site septic system. This alternative may not be feasible because not enough land is available to properly develop this type of system. In addition, the City my not want to encourage development of an expensive on-site system when some day we will be serving this area. At the same time, however, it may bw that sleftluiMmnl ur au oryenciva oa-sits system can be justified because it will be a considerable length of time before city services actually reach this area. Council Agenda - 11/27/89 B. ALTERNATIVE ACTIONS: 1. Motion to grant concept approval to City participation in 508 of the Evergreens Subdivision development cost contingent on the following: a. Sewer and water services shall be extended completely through Phase I and Phase II with streets, curb, and gutter installed with Phase I. b. Kjellberg East Mobile Home Park mmmst be connected to the city sewer service at the southerly most Phase II manhole. C. Enlargement of the mobile home park will be allowed only after the sewer extension is complete and operational and in compliance with City specifications. in addition, street ixprovemnents must be complete and storm sewer plans approved and in place. d. The formula used in providing credit to the East Park area assessmc nt per, thc original developer agreement would remain. The original developer agreement stated that the area assessment for the Kjellberg East Mobile Home Park would be reduced an amount equal to the cost to extend utilities from Dundas to the development. Since Kjellberg will be paying 508 of this cost, it was concluded that this credit could remain. e. The area assessument formula associated with Phase I development shall be consistent with the original developer agreement. Under the original developer agreemnent, the lots with Phase I and II would be charged an added $200 hookup fee for sewer and water, and all properties in this area would pay a $4 per quarter surcharge on their water bill. These funds will be used for the future extension of trunk sewer and water to the area when it is needed. I. Kjellberg shall be responsihle for all costs associated with the lift station and piping necessary to provide sewer service to the mobile home park. Development of this facility will meet City requirements. Under this alternative, the City will contribute one-half of the cost to extend the utilities, which will amount to approximately $275,000. In addition, the environmental problem associated with the park will be rectified. IL should be noted that the developer will be financing 508 of the cost of the lots, which mitigates inch of. the City's financial risk in that in the event the assessments are not paid, time. City can retrieve the property and sell it, thereby recovering much of the original cost. Under this agreement, however, the process involved in recovering the property can be long and drawn out, and it could be seven years between default and the time in which the property is recovered. That time period allows the interest on the original City expense to mmunt. And it, therefore, might be questionable as to whether or not the City could recover its cost if the property is to be recovered utilizing the tax delinquency process. / Council Agenda - 11/27/89 2. Motion to approve City participation in the Evergreens Subdivision by financing a portion of the development cost as defined by Council. Under this alternative, Council may want to adjust the 508 level to some other percentage it deems more appropriate; and it can modify or add any conditions that are listed above. 3. Motion to withhold participation in this project. There are a number of reasons why Council may balk at participation in this project: 1) Although the developer is contributing 50% of the project cost, if the project fails and assessments are not paid, the City could lose a portion of its investment even it it gets the property tack within the time allotted by la-. 2) There seem to be indicators that this project may not fill out as quickly as is hoped by the developer. a. The utilities expense per lot is high and, therefore, not consistent with the goal of attracting low and moderate income hone buyers. b. The housing demand, though present, is not clearly defined. c. The physical features of the development may limit its appeal in that there are power linea, gas lines, and no trees in the area. There is a concern that people may silrply not want to live in this area. Under this alternative, the City would need to come up with an alternate plan for correcting the environmental problems associated with the East Park sewer discharge. One of two plans would need to be executed which would call for either developur_nt of a proper on-site system or development of a long, shallow force main extending to the city system. 4. Council may wish to table this matter pending development of further information. Such information would include 1) development of a better understanding of the housing market and potential for rapid sale of the individual lots; 2) take a closer look at the potential and cost to extend a shallow force main to service the Kjellberg Fast Mobile Home Park and look at the potential for encouraging ttjellberg to develop an approved on-site sewer systemt 3) investigate potential for City participation in Minnesota Housing Finance Agency programs which would result in development of a pool of uoney to be utilized by individuals wishing to develop homes in this area. Money would be loaned through this program to these individuals at Minnesota Housing Financing Agency rates or first tflne home buyer rates, which are leas I.han Lhu IWLk6L 1'a LC -S. Council Agenda - 11/27/89 C. STAFF RECOMMENDATION: Originally, Mr. Kjellberg had indicated he would be installing privately his own sewer, water, and street construction for the Evergreens development. Since Mr. Kjellberg has had some difficulty in selling the development to other interested developers, Mr. Kjellberg is basically inquiring as to what level of participation the City would be willing to consider to help get this project going. Although Kent has not petitioned for the iirprovements at this point, he has had some developers interested in the property; but the question has come up whether the developer will be responsible for all of the cost privately or whether the City would consider doing it under Chapter 429 and assessing the project for all or a portion of the cost. I believe it's the staff's opinion that the City should be a little reluctant to crnsider 100; of financing for this project. iraLurally, Lhe more up front money provided by the developer, the less risk there is for the City. In order to encourage development of the Evergreens, the City may have to get involved in a 429 project; but staff feels that -the large percentage of the project cost should be provided by the developer to avoid pure speculation putting all the risk on the City. The staff certainly sees an advantage to the City participating in this project if we can also solve the sewer problem at the East Kjellberg Trailer Park As a result, at a miniimim, if this becomes a City project, we believe Mr. Kjellberg should be required to hook up the trailer park to our sanitary sewer system as part of Phase I. As far as the amount of participation required from the developer, we have used 50% for your consideration; but this percentage could he adjusted if you wish. As a result, staff would support alternatives 11 or i2 provided the Kjellberg East Trailer Park is connected as part of this project. For the City to continue to grow and provide residential development, it may be necessary for the City to get involved again in Chapter 429 projects to help finance these improvements. But at the same time, the City has to be cautious as to the amount of up front money that 1s required to ensure that a developer Is serious and has his own equity involved in the project. D. SUPPORTING DATA: Cost breakdown estimate using 506 up front money and 708 up front unney; Area map. PROGRAM FOR CITY PARTICIPATION IN EVERGREENS SUBDIVISION CITY PARTICIPATIO 50% IN PHASE 1 UTILITIES ONLY. TALL UTILITIES ISANITARY IL1FT STATICNITOTAL IPHASE 1, INCLOSISEWER IAND PIPES I 1DUNDAS ERTEN ITHROUGH ISERVING MOB I I IPHASE 2 IHOME PARK I I I I I TOTAL COST I $549.000 1 $25.000 1 $30.000 1$604.060 ($450, 000-22%) I I I I CITY I I I I 1 $274,500 1 so I $0 1$274,500 I I I 1 DEVELOPER trul'Ic�'tY t4kltl•Kt.t'IYY I I I I 1 $274,500 1 $25.000 1 $30,000 1$329,500 I I I I 11.�Y.Y<tY lt—�tY-1�K+Y /t Y1/iYttRY tY�1AY• MYtt�l y 1 NUMBER OF LOTS 48 DEVELOPED PHASE 1 CAST PER LOT $11,438 CITY PARTICIPATIO 30% IN PHASE 1 UTILITIES ONLY. TALL UTILITIES ISANITARY (LIFT STATICNITOTAL [PHASE 1, INCLDSISEWER [AND PIPES I 10UNDAS ERTEN ITHROUGH ISERVING MOB I I IPHASE 2 IHOME PARK I I I I I TOTAL COST 1 $549,000 1 $25,000 1 $30,000 1$604,000 ($450,000`229) 1 I I I / CITY I I I I 1 $164,700 1 $0 1 $0 1$164,700 DEVELOPER I I I I 1 $384,300 1 $25.000 1 $30,000 1$439,300 I I 1 1 i 1„ Council Agenda - 11/27/89 6. Consideration of final payment on Project ¢89-1, Marvin Elwood Road Extension In the Meadows. (public project) (J.S.) A. REFERENCE AND BACKGROUND: The city of Monticello contracted with Channel Construction to extend Marvin Elwood Road as part of the Meadows Improvement Project. The estimated cost of the contract was $100582.10. The final construction cost of the project is $10,582.10. The City to date has paid all but $1,000 of this amount. The work has been completed on the extension of Marvin Elwood Road. The work has been found to be satisfactory and the city staff recoumnends final payment to Channel Construction. Final payment will be in the amount of $1,000 and is pending receipt of the proper lien waivers and the State of Minnesota forms. B. AL UERNATIVE ACTIONS: 1. Make final payment to Channel Construction in the amount of $1,000, pending receipt of lien waivers and State of Minnesota required forms. 2. Not to make final payment. C. STAFF RECOMMENDATIONS: It is the staff recounnendation that City Council authorize payment in the amount of $1,000 to Channel Construction as outlined in alternative $1. D. SUPPORTING DATA: Copy of original bid sheet for the project. 4 R r r MEYER-ROHLIN, INC. (� t lGiNEERS-LAND SURVEYORS 1111 Hwv 25 N.. Buffalo, Minn. 55313 Phone 612.682.1781 \ October 19, 1989 City of Monticello c/o Jeff O'Neil, Asst Administrator 250 East Broadway Monticello, MN 55362 Re: Marvin Elwood Road The Meadows Second Addition Monticello, Minnesota Dear Mr. O'Neil: The Contractor for the above referenced project has requested partial payment for work completed to date. Below you shall find the quantities for the work performed. I BID "A" - Street: Marvin Elwood Road i Item Bid Inst. No. Item Qty. Qty, Unit Unit Price Total Price 1. Subgrade preparation 1285 1316 a. y. $ 0.45 $ 592.20 2. Class 5 gravel (CV)(inplace) 315 309 C. y. $ 9.30 $ 2873.70 3. 1.}" bituminous base course. MHD 2331 1115 1132 s.y. $ 2.00 $ 2264.00 4. 1+" bituminous wear course, MHD 2341 1115 1132 a. y. $ 2.10 $ 2377.20 5. Surmountable concrete curb G gutter 550 550 1.f. $ 4.50 $ 2475.00 6. Seeding 0.15 0 acre $ 3000.00 $ 0.00 TOTAL BID "A" $10&582&10 memmemm■ l 1„oro P. Meyer, Professional Engineer Robert Rohlin. Licensed Land Surveyor TOTAL WORK COMPLETED TO DATE $10,582.10 LESS RETAINAGE $ 1,000.00 LESS PREVIOUS PARTIAL PAYMENTS $ 0.00 PARTIAL PAYMENT #1 $_9.582.10 We therefore recommend Partial Payment #1 be made to Channel Construction, Inc., in the amount of $9582.10. If you have any questions, please feel free to contact me. Sincerely yours, MEYER-ROHLIN, INC. Norman Gartner Profe$sional Engineer sl cc: File: E-8938 Channel Construction Co., Inc. H.C.H. Construction, Inc. (90 17 vap J'c 29.03vc:t 89A s lt�10±-� S HILL n Council Agenda - 11/27/89 7. Consideration of resolutions ordering preparation of assessment roll and setting a public hearing on adoption of assessment roll on Marvin Elwood Road extension - Meadows Subdvision. (R.W.) A. REFERENCE AND BACKGROUND: This past suimner, the developers of the Meadows Second Addition had engineers, Meyer-Rohlin of Buffalo, prepare plans and specifications for phase I of the Meadows Second Addition. In addition to this private development, Meyer-Rohlin prepared plans and specifications for improving Marvin Elwood Road extension from the Meadows to River Street eliminating the dead-end. The City of Monticello used the plans and specifications and advertised for bids on this City portion of the iiuprovement. Channel Construction of St. Michael was the low bidder and has recently coirpleted the project to the City's satisfaction. The contract price is $10,582.10 plus indirect cost for inspection services and legal fees, etc. With the coirpletion of the project, an assessment hearing can be scheduled in the near future to assess the cost to the two benefiting property owners, Mr. Edgar Klucas and the newly created Lot 1 of the Meadows Second Addition. At the time this project was ordered, the Council gave the developer an understanding that the total assessment for Lot 1 for the 81-1 project and this street extension would not exceed $8,500. The 81-1 assessment for this corner lot totaled $6,179.92, leaving a balance of $2,320.08 that could be assessed to arrive at the $8,500 total. If the Council still is agreeable to this maxtinim assessment, the $2,320 aimunt divided by the front footage of. 7.18 feet equals $10.64 per foot. Applying this $10.64 per foot to Mr. Klucas's side of the road would amw nt to an assessment of $3,226. This would appear to be a logical way of assessing Mr. Klucas's portion of the project and would result in approximately one-half of the project cost being placed on ad valorem and one-half being assessable. The purpose of this agenda item is not to arrive at an assessment figure, but I thought this info enation would refresh your memory in regards to the project. For tonight's meeting, the only action needed by the Council is to adopt two resolutions ordering the preparation of the assessment roll and setting a public hearing date. B. ALTERNATIVE. ACTIONS: 1. Adopt the resolutions ordering the preparation of the assessment roll and setting a public hearing date for the first meeting in January 1990. 2. Do not adopt the resolutions - Not a feasible alternative since the project is couplete and the assesamnt roll can i,v riiaa. Council Agenda - 11/27/89 C. STAFF RECOMMENDATION: The staff recomends that both resolutions be adopted now that the project has been completed and accepted. If the Council is still in agreement with not assessing the corner parcel along Marvin Elwood Road more than $8,500 total, I will prepare the notices and actual assessment roll based on this assumption utilizing approximately one-half of the cost for ad valorem. D. SUPPORTING DATA: Two resolutions for adoption. 10 RESOLUTION 89 - RESOLUTION DECLARING COSTS TO BE ASSESSED AND ORDERING PREPARATION OF PROPOSED ASSESSMENT WHEREAS, a contract has been let and the costs determined for the improvement of Marvin Elwood Road Extension to River Street with curb, gutter, bituminous paving, and appurtenant work, and the contract price for such improvement is $10,582.10 and the expenses incurred or to be incurred in the making of such improvements amount to $703.84 so that the total cost of the improvement will be $11,285.94 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF MONTICELLO, MINNESOTA: The portion of the cost of such improvement to be paid by the City is hereby estimated to be $5,739.48 and the portion of the cost to be assessed against benefited property owners is estimated to be 55.546.46 2. The City Administrator shall forthwith calculate the proper amount to be specially assessed for such improvement against every assessable lot, piece, or parcel of land within the district affected, without regard to cash valuation, as provided by law, and he shall file a copy of such proposed assessment in his office for public inspection. Adopted by the Council this 27th day of November, 1989. Ken Maus, Mayor Rick Wolfsteller City Administrator 6) RESOLUTION B9 - RESOLUTION SETTING A HEARING ON THE PROPOSED ASSESSMENT WHEREAS, by a resolution passed by the Council on November 27, 1989, the City Administrator was directed to prepare a proposed assessment of the cost of improving Marvin Elwood Road Extension to River Street with curb, gutter, bituminous paving, and appurtenant work and WHEREAS, the City Administrator has notified the Council that such proposed assessment shall be complete and filed in his office for public inspection. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF MONTICELLO, MINNESOTA: A hearing shall be held on the 8th day of January, 1990, in the City Hall at 7:00 p.m. to pass upon such proposed assessment, and at such time and place all persons owning property affected by such improvement will be given an opportunity to be heard with reference to such assessment. The City Administrator is hereby directed to cause a notice of the hearing on the proposed assessment to be published once in the official newspaper at least two weeks prior to the hearing, and he shall state in the notice the total cost of the improvement. He shall also cause mailed assessment roll not less than two weeks prior to the hearings. Adopted by the Council this 27th day of November, 1989. Rick Woltsteller City Administrator I Ken Maus, Mayor 0 Council Agenda - 11/27/89 B, Consideration of accepting the improvements associated with the Meadows Second Addition (private project). (J.O., J.S.) A. REFERENCE. AND BACKGROUND: Council is asked to consider accepting the improvements associated with the Meadows Second Addition, which included development of a portion of Crocus Lane and installation of sewer and water services. The development created 10 new lots. According to the City Engineer and the Public Works Director, the work has been successfully completed except for a few minor details which should be coiripleted prior to formal acceptance. B. ALTERNATIVE ACTIONS: 1. Motion to accept the Meadows Second Addition iirprovements subject to the following conditions which the developer has 30 days to supply: a. As built drawings showing the actual locations, etc., of the public improvements to be submitted to the City Engineer along with a certification from the developer's engineer that all firprovements have been installed per the specifications. b. The developer's engineer shall submit to the City a detailed grading plan of Lot 1, Block I, which would outline a plan for draining this lot to the northern Burlington Northern right-of-way. C. An escrow aim unt of $50n shall be established for the purpose of providing funds necessary to fully seed the street boulevards. d. The warranty bond shall name the City of Monticello as the third party beneficiary of the warranty. e. The developer shall pay $2.,512, which equals the City expenses associated with inspecting the improvement. Please note that these expenses were higher than originally anticipated because the developer's contractor failed to properly notify the City of work being done which necessitated additional time to track the project and stay on top of the work as it occurred. f. Receipt of lien waivers and State forms. 2. Motion to deny acceptance of the lmprovemnts at this time. As you can see, there are a number of details that need to be cleaned up prior to acceptance. Council inay wish to take the view that these items need to be taken care of prior to approval taking place. it may be, however, that by the time the meeting rolls around, some of these items trey be already taken care of. C. STAFF RECOMMENDATION: Staff recomends that the iirprovements be accepted subject to the conditions listed. According to the developer's engineer, Meyer-Rohlin, the as builto, grading plan, lien waivers, and warranty bond issues will be taken care of prior to the meeting. With these items in place„ there appears to he no reason why the City should not accept these 6 improvements. D. SUPPORTING DATA: Map outlining development area. a� II 0 Zo 0 "9 -t!13 -7 .O!A E Council Agenda - 11/27/89 Consideration of replacing electric motor for deep well turban pump in well $1. (J.S.) A. REFERENCE AND BACKGROUND: Approximately three years ago when the 60 h.p. motor for well $1 failed, we replaced it with a 75 h.p. motor, as recommended by OSM. It was expected that the 75 h.p. motor would be able to handle the higher head pressures expected when the new water reservoir went on line. At the July 10th meeting this year the City Council authorizes; OSM to evaluate well /1 and make design recomm endations for the replacement of the pummp. Calculations for the proposed pumping capacity in heads were somewhat complicated as the pummp needed to perform at low head instances when the new tank had very little water in it and at high head when the tank was operating at full capacity. There was some doubt as to whether the existing 75 h.p. motor was going to have the capdbilities necessary iu dcwmpiish this. OSM completed their computer runs and study and made a recomendation on August 11, 1989. Their recoimnendation was that we use the existing 75 h.p. motor and gave the expected pummping rates, utilizing an American 3 stage line turban pump. As per City Council authorization, we had E.H. Renner b Sons install the recom ended pump at a cost of $7,484.00 , which did not include some of the parts that we had on hand, wiring costs, or the cost of the check valve purchased from the city of Maple Grove for $500. During the startup a problem was noticed forediately. with 10' of water in the new tank, the pump pumped 1,422 gallons per minute, at a system demand of approximately 500,000 gallons per day and the mm for overheated iimnediately. A check of the motor ammperage draw found it to be operating at or above its maximum capacity and is incapable of sustaining the load for any length of time. It is apparent that the discharge head is slightly less than was expected and/or the pump requirements are not as expected, and the mentor cannot operate in that range. To clarify this situation it is important that the Council understand that generally with a lower discharge pressure, a pump pumps more water and therefore requires more horsepower. As the head is increased, the pummp pumps less water and less horsepower is required. If we were to operate well S2 with a low system demand and the water tank full, it is conceivable that it could operate within its horsepower range. However, during a high demand or when the tank is low the pup motor would immediately burn out. As a solution we have considered increasing the discharge pressure by temporarily closing a valve immediately after the pump, thereby causing the pump to pummp mnuch less water. This allowed the pump to pummp only 1,150 gallons per minute and drop the horsepower requirement down into the range that the motor could tolerate. It did, however increase the discharge pressure above 90 p.s.i. and we began to have couplications with the chlorine oystem. It is not practical to try to throttle the flow manually during periods of low head and it would not be beneficial to couplicate the system with an electronically controlled throttling valve. 1t therefore appears to be best to replace the 75 h.p. motor i with the next largest motor, which is a 100 h.p. unit. 12 Council Agenda - 11/27/89 In addition to changing the motor we imist change the starting system for the motor, as it is sized for the 75 h.p. unit. Because of restrictions in the power supply to wells 1 6 2 we must look at a motor that starts under partial load or a motor that starts under soft load. By soft load I am referring to an electronic type of reduced voltage start, taking upwards of 30 to 60 seconds to reach full speed. I have obtained quotes from E.H. Renner 6 Sons for motor and starter combinations and also from Olson Electric for similar type setups. NSP, as well as Olson Electric, has recommended the 100 h.p. across the line start motor coupled with an electronic or reduced voltage start. Based upon the estimates, the package would cost us approximately $9,000. I am currently doing further study as to the differences in the electronic start packages from both vendors and the possibility of rebates from NSP for going to the high efficiency motors. I will have recoimnendat ions for the Council at Monday evening's meeting as to which vendor we should purchase the equipment from. The next phase of our water improvements involves calculations and estimates for design recommendations for well #2 and the four booster station pumps. We are currently working with 031 on their recommendations. It is conceivable that the 75 h.p, motor and starters removed from well el could be used in the refurbishment of well 02. It is too early at this time, however, to affirm that scenario. B. ALTERNATIVE ACTIONS: 1. Authorize the purchase and installation of 100 h.p. across the line start motor, using an electronic soft start or reduced voltage starter at an estimated cost of approximately $9,000. 2. Use a part wind magnetic start 100 h.p. motor, with an estimated cost of the starter and motor exceeding $9,000. 3. Divise some type of throttling system for the existing motor, either through the installation of some type of manual contrul valve or some electronically computerized control system for throttling. C. STAPP RECOMMENDATIONS: It is the recommendation of the Public Works Director, Water Superintendent, and City Engineer that the Council authorize the purchase of the IOU h.p. across the line start motor with soft start capabilities, as outlined above in alternative 11. Purther reconnendations will be made Monday evening. D. SUPPORTING DATA: Copy of the letter of recommendation from OSM. Copy of estimates from Renner and Olson Electric. 13 •Recoimaendation of staff, total S 9,038.00 Less NSP Rebate - 700.00 s 8,338.00 C_ QUOTE SUMMARY MOTOR REPLACEMENT WELL $1 November 22, 1989 Olson Electric E. H. Renner 1. Across the Line Start $ 4,973.00• $ 4,995.00 100 HP high eff. motor (qualify for NSP rebate) 2. LS 2-12 Soft Start S 2,752.00 $ 2,800.00 3. MS 2-12 Soft Start, Power $ 3,200.00• N/A Factor Adjuster 4. Part Winding Start $ 4,850.00 $ 5,234.00 100 HP high eff. motor 5. Magnetic Starter $ 2,250.00 $ 6,099.88 6. Remove and replace motor $ 100.00• $ 400.00 7. Electrical work $ 475.00• N/A B. Head Start if needed N/A $ 290.00• •Recoimaendation of staff, total S 9,038.00 Less NSP Rebate - 700.00 s 8,338.00 C_ ��Orr Scheten Assyo�dai�, Inc 2021 East Hennepin Avenue Minneapolis, MN 55413 \ 612.331-8660 FAX 331-3806 Engine s Sunevom Planners August ll, 1989 City of Monticello 250 E. Broadway Monticello, MN 55362 Attn: John Simola, Public Works Director Re: Water System Upgrade Replacement Pump for Well No. 1 Dear John: We have made computer runs of the Monticello Water Distribution System model under numerous different demands and total system discharge heads. Our conclusions and recommendations from the System Study are as follows: Utilizing an American 3 Stage Line Shaft Turbin No. 12H150 pump and the existing 75 -HP motor we can expect pumping rates of 1224 G.P.M. When the new tower is full and 1473 G.P.M. with 10' of water in the tower and a system demand of 2,700,000 gallon per day. Well No. 1 has the capacity �- to supply these quantities of water. It is my recommendation, that you purchase the American No. 12HISO or a equal pump with the same efficiency characteristics. This will allow you to utilize the existing City owned motor at this time and allow more flexibility when sizing a pumping system for Well No. 2. If you have any questions, please contact Me at any time. Sincerely, ORR-SCHELEN-MAYERON b ASSOCIATES, INC. Put •" Dan Kling, P. DK/cmw 08/89.68 cc: City Administrator 9 NLU-21-1"$? 12.19 FPOH TO 12?5"O.1 P.0' Is A Runfler R sons WELL DRILLING FOR FOI)R GENERPONS 5588 ARVIS STREET NX/ELK RI ERA MN 5330/)612)427-6100 INCORPORATED November 20, 1989 CITY OF MONTICELLO 250 B. Broadway Monticello, MN 55362 ATTR. Mr. John Simola - Public Works Director RE. well 41 8OBJECT. 100 BP Motor Quote Dear Mr. Simola, As requested per phone conversation this date, the following is the coat to replace the 75 HP motor with a 100 HP Motor. I. ACROSS THE LINE START MOTOR 1. U.S. 100 HP, 230 Volt, 60 Cycle, 3 Phase, 1800 RPM V.H.S., Premium efficient motor with Non Reverse Rachet. $4,995.00 2. Electronic Motor Starter - 30 Second Acceleration 2,800.00 TOTAL COST FOR ACROSS THE LINE........................................87,195.00 II. PART WIND START MOTOR 1. U.S. 230 Volt, 60 Cycle, 3 Phase, V.H.S. Prem. efficient motor with Non Reverse Rachet. $5,234.00 2. Part Wind Magnetic Starter 6,099.88 TOTAL COST FOR PART WIND START.......................................$11,333.88 Ill. LABOR 6 MATERIAL REQUIRED 1. Headshaft $ 290.00 2. Labor to Remove 6 Install Nev Motor 400.00 3. Labor For Electrical Work By Others TOTAL COST FOR LABOR 6 MATERIAL ........................................$ 690.00 Literature has boon mailed to you on the above motors and starters. If you have any questions on the above, please call me at 427-6100. Best Regards, r Terry Alja( Sales Engineer S.B. RENNER 6 SONS, IAC. LICENSE 071015 JA/ta Al/L56 fi ?M1 Olson CG Coes <2�leclric. `)nc. 240 West Oakwood Drive - Box 686 Monticello, MN 55362 (612)295-2690 November 21, 1989 City of Monticello 250 E. Bdwy. Monticello, MN 55362 Att'n: John Simola Dear John: I have again reviewed Well #1 new starter application for 100 hp motor. I have contacted Bruce Zemke at Northern States Power Co. and it is the opinion of both of us that the 100 hp cross - line starter will not be satisfactory at this location for 100 hp at 240 volts. I therefore recommend a reduced voltage micro processor based starter. Below 1 have listed sane of the advantages of this equipment: A) It has the ability to sense the motor and load conditions at all times and automatically adjust to ideal operation parameter, giving maximum savings and minimum equipment wear. B) Provides motor "ramp" starting and stopping. This greatly lowers demand, and provides check valve closing much smoother. C) Extended motor life, because of the overall control of power factor conditions and stabilizing maximum performance. D) Internal built-in phase loss and low -voltage sensing. E) This starter will fit in, the present enclosure, with sone modifications to the cover. E) The existing controls will be easily adaptable to this system. Below, please see price breakdowns: 3,�oo.00ail MS -2 100 hp microprocessor starter 33;-}58-9 G (this price reflects cost, plus tax, shipping, etc.) Removal of old starter and installation of new starter, rebuilding enclosure door, unhooking old motor, and rehooking new motor, checking and calibrating controller . . . . . . . . . . . $475.00 1 have enclosed some technical information on the controller for your reference. If you have any questions, please feel free to call. Sincerely,I \) W4 �L I:aalcy J. Oleo^, p:ojcct manager OLSON & SONS ELECMIC, INC. Enclosures Olso�i c� ��wis 6leclric. �ar,. 240 West Oakwood Drive - Box 686 Monticello, MN 55362 (612) 295-2690 November 22, 1989 City of Monticello 250 E. Bdwy. Monticello MN 55362 Att'n: John Simola RE: Well #1--100 hp motor Dear John: We have surveyed the above referenced project and are pleased to submit our quote as follows: I. ACROSS THE LINE START MOTOR A. 1. U.S. 100 hp, 230 volt, 60 cycle, 3-phase, 1800 rpm, V.H.S., high -efficiency motor with non -reverse rachet . . $4,210.00 2. U.S. 100 hp, same specs as above, except 92.5% efficiency, freight included . . . . . . . . . .$3,517.00 3. C.E. 100 hp, same specs as above, except 94.7% efficiency, racing should be good for NSP rebate program .$4,973.00 Note: $4,973.00 (cost) - 700.00 (rebate) _ $4,273.00 (actual cost) B. 1. Electronic motor starter IlLC2-12 . . . . . . . . . . . . .$2,531.00 2. Electronic motor starter OLS2-12 . . . . . . . . . . . . .$2,752.00 3. Electronic motor starter #MS2-12 . . . . . . . . . . . . .$3,200.00 II. PART WINDING START MOTOR A. U.S. 100 hp, 230 volt, 60 cycle, 3-phase, 1800 rpm, V.H.S., high -efficiency motor, 94% with non -reverse rachet . . . . . .$4,850.00 B. Part winding magnetic starter . . . . . . . . . . . . . . . . $2,125.00 Add for installation extras . . . . . . . . . . . . . . . . . $125.00 III. LABOR & MATERIAL REQUIRED A. Labor to remove and install new motor, no wiring Labor to install . . . . . . . . . . . . . . . . . . . . . . . .$100.00 This quote is basically for materials only, except for installation of motor. We hope this proposal meets with your approval and that we may be of service to you. Sincerely,u'(:4� i Warren D. Olson OLSON & SONS ELECTRIC, INC. H MS2 Series !MOTORTRONICS; INC. , LGgie'r.'' • Microprocessor Based e Energy Saver X -COU Rump Kicroprocessor Based The Model M32 Reduced Voltage Starter brings a now dimension to solid-state motor control. Its ability to sow motor and load condi• tions of all times and automatically adlud to ideal operas- lop parameters has set a now standard lot solid-state reduced voltage darters. Energy Saler This "self-adjusting" feature maximizes motor power factor and energy savings by cositinually changing the current and voltage applied to the motor to match changing load requirements. W%Ojrou other Power factor otm- iTale are designed to operate an &1zed", manually Wooed curve, the M82 is dealgried to s.tomaticay Opilmlas the power to the load using the low" our• tent level possible. This reduces motor heating and saves energy to many applications. X-CellRamp This state-of-the-art design provides the period maw tamp. By monitoring both motor and Load conditions during dad -up, the bw automatic- ally adjusts the output voltage and current to Provide a very stable and lesser power tamp. Our customers have compared It to the Accelaranon 01 a lot engine; smooth and stable ... far exceeding the typical performance of other voltage end current recap oontrols. Design Benefits Typical APPHOU_ Ons Bares KnorgyConveyors' Reduce@ larush Correct GLadsL1UI=r,' Kdands Drive Train Lde 01111"Is ricto, Machine Twill improvise Power Roduoss Uschard"I stross Cram" and louts S., Reduces Motor Hes"1141 Yam and Pumps is Reducew Dowatleas Compressors 31 Energy Saver/Power Factor Control The microprocessor controlled energy savings circuit Motor life will be extended because of the lower opes- continually monitors load/voltage conditions and sting currents and temperatures. Another benefit is the matches motor performance to the load. Voltage is reduced need for power correction Capacitors. U reduced to maintain energy savings at the lowest cur- rent level. This results in an improved power factor and energy savings when the motors load is below 50%, or t c4 when the lin6:{Cltag• ewoeeds the rated motor voltage. c p.. X -Cell Ramp Provides Smooth Acceleration The mlcreproce sor brings new state-cl-tbe-art per. formance to soft start (reducpd voltage) startirq. Con- Unuous monitoring Cl the motors operating puamsters provides a Unseat power ramp not available on conven- tional analog AC motor controls. This very smooth power ramp eliminates motor jerking with heavy loads. A user selectable current -limit ramp also provides smooth starting for tightly loaded motors. This method of accelerating the load provides smooth, @topless control which greatly reduces wear an power transur ssion components and also prevents product breakage and spillage. Soft -start acceleration reduces motor inrush current up to 70% which eliminates light dimming, power disturbances and voltage transients within the electrical dies 7tion system T w , (%� 700- aarow 1� LW . •, ` . . loo. sea sue , - .. . ` 10 io iD 40 sew• is --d.) 7brgue vs. 77ine for Solt -Start and Acrasa-tbe•Ltne Storting Motor Protection • Thermal Overload Relay Adjustable 630% • Shorted SCR Detection Prevents starting of the motor if SCR is aborted. Additional Features • No Ad)ustments State-of-the-art microprocessor control pro- video continuous monitoring of the motors parameters to achieve "amart" control. The unit automatically adfusts to response to changes in mator/load/voltage conditions to maintain ma*Imum energy savings with the optimum power factor. ZZ I .-Aamwfol taw sow IOD (xt 8.8 @tie D l io m io w Ttaw 19•••adw Power vs• nme for Soft -Start and Across-fbo-line Starting ISO . �A•mr U" ` Xpn 100- sinia �� � I1astWn 0 t io io io Speed vs. 71me for Solt -Start and Across-the•Lfns Starting w • Phase Lasa Detection Automatically shuts down motor d a phaes is 1061. • LED Status Display Monitors system status and provides operator with visual Indications of Run, Now On, Fault. and Stall conditions. • Voltage Transient Protection An RC snubber network bypaeses lrandent voltage changes. • Noise Immunity Field proven ta long term applications. Table A. Dimensions for Open Frame and NEMA Enclosed Models open P.om. Ron. earJonee• Ham Po.r Ha H/114A 410/41' L..(( y .• .. ; 7 � •}; :p H VAC t VACS L W R 210111611411 I +a1; 'pQ, y 75 • :1 U wt ..'IrS.j..Ts r! "C VAC a 30 b 80 W b 125 Z 20 : : t, : 0.0••" I 3 to 2! r 75 to 200 IM to 4W Y .:: g.-33 I 1250 to 350 SW to 7t10' .5f + . • 33 T 114. I 50 to 00 on start up Control Circuit I 5o to 100 .. 129 w See Table A � + NIA •tor .p.et.l mi— a dw Lbd, masuh I.aon. Phase unbalance ttC,A 20D earJonee• Ham 'Typ. Q Ha type It MW573 VAC L..(( y .• .. ; 7 � •}; :p H 5 to 50 15 SIU t' U: ll g 77 .15 u T 100 to 125 +a1; 'pQ, y 75 • :1 U 150 to 200! n yQ; ', iii it • ;b7 l0 250 to ,OD ]{Z ZM� S1 ; _ Co1Pd PawwT ®00 to 700 (0.' reabq is VIE v Type of Load AC Supply Voltage lip Ratings Pourer Circuit Conbgutahon SCR HIV listing Dlagnostle lna:., w a Run (green LLD) St "n (yellow 6[D) SteS (WIM LLD) Fell (rd LID) ON (green ISD) AusRlsy Caelecls Perm C Contacts Control Adjuaseate Torque Power Ramp Current (Jell Rasp Aecelueum Time Mounted an PC board. Three phase, AC induction motor 205, 240, 350,415,450, 579 V•o ( r lo;i), Sa'60 Ha 5 to 700 HP (Contact factory for clings above 700 HP) Su SCR 1200 V with 20040/ 450 V Input 1500 V with 575 V Input Motor or proper steed Motor is reaping Motor In w11 condition Phase low or short.d SCR Line parer present Operates win away ruches full speed 20 to 70% (7 settings) 5•lectable Selectable 5 to 30 eecods (7 settlegs) ONIOPP Overloud Capacity Continuous 1169E One Minute ,009E Thirty eeaontla 450% Ten Seconds SW% Phase Insensitive Operates with any phase relation Power Connections Compression lugs Protective reatusee Phase lase protection on start up Shooed SCA detection on start up Control Circuit Three-wln starVdop control circuit Dimensions See Table A Motor Overload Protection Phase lou Phase unbalance Adjustable "nal overload relay Ambient oampensated He H•rtare required Derating Ceeafelratloos Ambient Temprosturs "bows 50rC High Ieertlal lade Laeerlve logglag duty Ambient Temperature top.r"tbg - 20•C to WC at std curtset Storage - 35•C U 55-C 9 s vi.uv■n Optional (natures are Identified lyy lettere and must be ordered as separate line items. T41blo B. Model Selection Guide .Ron" new an" in bond ca M lad d • typed 1.16 eWA- 1scim sad. whese.et peNMe• cherh eL .sectsere plea hr the full law aurreer rine to M — 4 Is is Ib ooeec•1 F.W. 1 Consult fao-y Iw .1h.. opit— 6 19 1 MLS2.20006a I 1028 2 YM.20010.11 7 11 42 3 M82.2DO15.6 3 2D 54 3 M82.71412a1 3 29 as 3 ML2.200251 4 30IA 4 !d2•IOD30I 20D VAC 40 Joe 4 MS2.2001D•N 208 VAC 6D 125 5 MM-20M•N 5 p 163 9 bw-21MH 8 7B 180 5 1LS2-MIS." 5 too 210 B M32.201" 8 In 323 a M32MMN 8 too 2m 6 M32Z0IMN 6 20D GAD 6 M.9bININ" 7 e le 1 'M52.24006.1 7 — 10 x 2 640 • 15 47 3M522Q)M IXW-WIO-g 0 70 M 2 ='407G6 1M52.3= b its 3 Mffi•31e7}6 1 30 10 4 M52.24=11 = VAC 40 1. 4 M97.24016N 3W VAC 00 in 5 M82-24MN 2 00 153 5 M52.2401113411 3 7e 1.0 6 NS2.24076N 3 —1OD 125 310 Ul 6 8 MUM I bm "12w 3 180 3eD a M52 241WO 4 200 49D • 1463.24200.11 4 Ma7.5'7776i 100 100 4 M67 -87100.N 1 102411=4 wwAc to u 1 td24eo10.6 48D VAC is 21 3 VAN 480159 0 20 27 3 M93 Omit 0 i e4 2 ILS:4SM9 .Ron" new an" in bond ca M lad d • typed 1.16 eWA- 1scim sad. whese.et peNMe• cherh eL .sectsere plea hr the full law aurreer rine to M — 4 Is is Ib ooeec•1 F.W. 1 Consult fao-y Iw .1h.. opit— Distributed By U U MOTORTRONI CS, INC. U 414111110 r.— 0—h. f7.s..rer. ![ I/M nos. !0111 0" J411 - P- /4117 an 100 wpaeas — S.i!! 30 40 7 M52 -41D301 40 92 3 MS2-240401 90 as 3 M32.460601 60 77 4 M52,eeoeo4 75 99 a I.M411075-1 loo 170 4 MS248100.N 440 VAC 129 190 5 b= 411126N 401D VAC 190 leo 8 M92.4115M (o -rd) 200 240 5 M97-48ZO0N 7911 300 8 MU48MO 300 no 8 MSLfgOyN 400 480 6 MW -49 aN Soo 800 7 MS2.41MM 600 720 7 uaf4�N 700 640 • MS346MN 5 61 0 M92.970*f 7.9 TA 1M52.3= 4 10 11 1 MW SM101 19 17 7 ML2•o70161 20 22 2 MSL57 & 29 77 2 M92•S7o262L1 30 32 3 MSM7ME 40 41 3 M32.670101 em VAC w 82 3 MS34=1 919 VAC t1D e1 4 M32.97oe01 ?5 M 4 Ma7.5'7776i 100 100 4 M67 -87100.N IJW IID a M52d719aN 200 200 a M624=11.11 700 290 0 110132.97230.N 300 700 0 M529730M 400 400 • 62A7 M40aN Six) --600 7 M624710D.N •00 •00 9 h1=147111)"--700 700 • Jim "MN Distributed By U U MOTORTRONI CS, INC. U 414111110 r.— 0—h. f7.s..rer. ![ I/M nos. !0111 0" J411 - P- /4117 an 100 wpaeas — Council Agenda - 11/27/89 10. Consideration of amendments to snow plowing/removal policy and adoption of revised snow plowing and removal plan. (J.S.) A. REFERENCE AND BACKGROUND: With the addition of the MN -DOT agreement requiring the City to maintain a portion of the sidewalk along Highway 25 at the I-94 right of way and our new sidewalk ordinance changing the time constraints for removal of snow and ice from sidewalks, it became necessary to amend the City's snow plowing/snow removal policy. At the same time it became apparent that our snow removal plan needed updating. The growth of the City as well as faster and more efficient methods of snow removal required us to update our plan. Copies of the amended policy and the plan are enclosed for your review. Some of the changes that you will note in the plan are timetables for completion of snow plowing activities under normal conditions. Also, the sanding requirements have broadened to include the entire community. In addition, new areas as well as equipment changes have been included. B. ALTERNATIVE ACTIONS: 1. Approve amendments 4,5 pertaining to sidewalks to the snow plowing and removal policy. In addition, this would include the adoption of the A amended snow plowing/removal plan. l 2. Approve the snow plowing/removal policy amendments 4,5 and to modify or change the plan as requested by the City Council. 3. Make additional amendments to the snow plowing/removal polity and also modify the plan as directed by Council. C. STAFF REDOMENDATIONS: It is the recommendation of the Public works Director and Street Superintendent that the Council approve the amendments 4,5 to the snow plowing/removal policy and approve the plan as presented. Since this is a significant update the staff plane to review the policy at the end of the current snow season and possibly ask the Council to make additional changes at that time. D. SUPPORTING DATA: Copy of the snow plowing/removal policy and snow plowing/removal plan. 14 C SNOW PLOWING/REMOVAL POLICY GENERAL Purpose The purpose of this policy is to establish uniform and consistent guidelines for the plowing and removal of snow within the city of Monticello. Areas of Responsibility Through its adoption, the City Council of Monticello is responsible for the policy established herein. Implementation of this policy is the responsibility of the Street Supervisor in conjunction with the Public Works Director and City Administrator. The chain of commnand is the City Administrator, Public Works Director, and Street Supervisor, in that order. All decisions as to time, method, and materials used on snow plowing/removal operations will be made by the Street Supervisor, Public Works Director, and City Administrator and any amendments are to be in accordance with the amendment section of this policy. Amendments to Policy Any amendments to this policy require Council approval. Whenever possible and practical, amendments should be brought up at Council meetings and should be a mnatter of public record. However, to allow for emergencies or other extenuating circumstances, when time does not permit Council approval or action, the Public Works Director is hereby authorized to amend any portion of this policy he sees fit. If practical, the City Administrator shall be notified and shall approve of any such amendment. Any such amendment wade due to a particular emergency shall be brought to the attention of the Council if the amendment is to be a permanent one. Work Schedule Scheduling of employees is the responsibility of the Street Supervisor under the jurisdiction of the Public Works Director. Overtime should be kept at a minimumn, with all overtime scheduling being approved by the Public Works Director. The Public Works Director shall notify the City Administrator of any unusual amount of overtime to be performed and the reasons. Snow Plowing/Remnoval Schedule Upon accumulation of snowfall, the Street Supervisor will arrange for the street department emmployees to initiate snow plowing procedures (11-10-75, I1). Doergency routes (County Road 75, from West River Street to East County Road 39, including Hart Boulevard past the Hospital and State Highway 25.) will be plowed first and then Third Street (to provide access to all three schools). •State Highway 25 is the responsibility of MN/ROTI City is to remove snow only when authorized. 0 Snow Plowing/Removal Policy Page 2 The Street Supervisor will then coordinate plowing of downtown area: east -west, north -south streets within city proper, outlying areas, and parking lots. Top priority will be given to the actual plowing operations before snow removal. Snow removal will most likely occur the following day or evening. POLICY ON SPECIFIC AREAS Streets All streets within the city limits of Monticello are to be maintained by the City except those portions of County State Aid Roads and Stare Highway 25 which are not covered by reimbursement agreements, I-94 and those streets that have not been accepted by the City. Downtown Area For purposes of this provision of the snow plowing/removal policy, the downtown area is defined as Broadway Avenue from Linn Street to Palm Street and on Pine Street from 4th Street to River Street.• In the downtown area, snow removal operations will take place as soon as possible after all snow plowing has been done, usually the following evening. Snow will be removed only on the above streets within the downtown area, the two funeral homes, Monti Coin Laundry, Trinity Lutheran Church, (11-24-75, 42); all other streets will be plowed only. (13, 11-24-75) Walnut Street, Broadway south to alley. Alleyways The three alleyways in Blocks 34, 35, and 52 shall be maintained by the City. This does not include areas adjacent to the alleyways behind buildings and stores which are the responsibility of the property owner. Sidewalks All sidewalks, except the Sidewalk Iirtprovement Project of 1975, and the Highway 25 aidewalka at the I-94 right-of-way (+4, 11-27-89), shall be maintained by the adjacent property owner. The Sidewalk Improvement Project of 1975, east on Broadway from Lot 12, Block D, to Washington Street and west on Broadway from Lot 10, Block 37, up to, but not including, the Pinewood School property, shall be maintained by the City. Included is that portion in front of the old Senior Citizens Center, the Fire Station, and the sidewalk along the west side of the parking lot at Third and Walnut, and the sidewalk on the west aide of walnut Street lot. The I-94 right-of-way along Highway 25 sidewalk shall be maintained by the City as per a MN/DOT agreement. •AS authorized by MN/DOT. C Snow Plowing/Removal Policy Page 3 Time of removal, ice and snow: The owner or occupant of every building or tract of land within the City fronting upon any street, having a sidewalk abutting upon such premises shall clear such sidewalk opposite said building or tract of land of snow and ice within twenty-four (24) hours following the termination of any snowstorm or the formation of ice from any cause and shall keep the same clear and free from snow and ice. If such snow and ice is not removed by the owner or occupant within the time specified herein, the same shall be removed under the direction of the Director of Public Works and the expense of such removal shall be levied against the property owner as a special assessment and collected as in the case of other special assessments. Parking Lots All city parking lots shall be cleaned of snow and ice as soon as possible after a snowfall. The timing of snow plowing/removal of parking lots and their priority will be dependent upon existing conditions. SNOW PLOWING AND ON -STREET PARKING NOTICE CITY OF MONTICELLO 1. Normal plowing operations will occur during the night (10:00 p.m. to 8:00 a.m.) with top priority given to the emergency routes of State Highway 25, Broadway Avenue to the Hospital and Third Street. Snow removal from parking lots and the downtown areas will normally occur the following night (10:00 p.m. to 7:00 a.m.) 2. All streets will be cleared of motor vehicles after a snow fall. ADDITIONALLY, CITY ORDINANCE PROHIBITS PARKING ON CITY STREETS BETWEEN THE HOURS OF 2:00 A.M. TO 6:00 A.M. REGARDLESS OF WEATHER CONDITIONS. 3. At no time shall the City clear private property or boulevards of snow and ice. 4. Providing access to and maintaining mail boxes will be the sole responsibility of the property owner. Private Property At no time, unless specifically mentioned in this policy or emergency situations, shall the City clear private (residential or coimaercial) property or boulevards of snow or ice. 0 SNOW PLOWING AND REMOVAL PLAN PURPOSE The purpose of this plan is to set down areas of responsibility and describe how each area will be cleared in a snow plowing situation. The following plan and schedule is based upon an average snowfall of six inches (6"). Generally, snow plowing operations will not begin unless snow accumulations of two (2) or more inches are received in the Monticello area. It should also be noted that various conditions can arise which will need special consideration. This plan and the following schedule are to be used only as a general guideline and management tool. The Street Supervisor, under the jurisdiction and general supervision of the Public Works Director, shall initiate all full scale plowing and snow removal activities. It shall be his responsibility to post daily weather bulletins from November 15 through April 15, and he shall be info rind of manpower and equipment availability at any given time during these months. II. PROCEDURE - PLOWING Normal plowing will begin at 10:00 p.m. and be complete by 8:00 a.m. The City will be divided into five plow routes. Each route will be assigned men and equipment as follows: Route p vehicle A b Operator 1. CAT Grader #20, Roger Mack 2. 185 Int. Truck 13, Richard Cline 3. 188 Ford Truck 12, Tom Moores 4. 178 Int. Truck +11, Reith Trippe 5. 181 Chev. Truck #41, Al Gapinski (See city map for routes) vehicle A9 (Ford 1 ton) will be used as a backup in case of equipment breakdown. The other three City eirployees, John Simola, Matt Theisen, and Tony Strande, will be called in as backup operations if the need arises. III. SANDING At the present time, all four large plow trucks are equipped with sanders. All trucks will sand intersections, hills, and curves on the route they are assigned to. Rich Cline in vehicle 13 will sand the area assigned to the grader. Normally, sanding will commence after coupletion of all plowing. operators will be expected to apply enough and and salt mixture to facilitate melting of the desired area the first time around. When weather conditions are beyond the range of sand and salt, small amounts of calcium chloride will be added to trouble spots. When conditions warrant sanding only, every effort shall be made to accoupliah this by 6:00 a.m. using two trucks when necessary. \V I Snow Plowing s Removal Plan Page 2 IV. PARKING LOTS We presently have 12 areas (see map) that can be considered as parking lots. They are: Lot #1, Lot #2, Lot #3, Lot 14, the Liquor Store lot, the City Hall lot, the Fire Hall lots, the Senior Citizens Center lot, the North Walnut Street parking, and the commuter parking lot. Parking lots will normally be plowed last. Lot #1 (Zoo) - Will be plowed by a truck - The snow from this lot will normally be pushed to the south and then piled by the old Fire Hall. Lot #2 (AV Room) - Will be plowed by Truck #3 - The snow from this lot will be pushed to the south and piled n Me center around the island. Lot #3 (Flickers) - Will be plowed by Truck #3 - The snow from this lot will be pushed to the center and piled. No snow shall be pushed east of the parking lot at any time. Lot #4 (Walnut/River Street) - Will be plowed by a truck - The snow from this lot will be plowed to the west and be piled in the northwest corner of the lot. The Liquor Store lot will be plowed by Truck #2 - In front of the store, the snow will be pushed to the east an pdi 0 7n the southeast corner. In the back of the store, the snow will just be plowed to the west. The City Hall lot will be cleared either with the loader or with the 1 ton 4x4. All the snow will be pi%a to the soutE—a-Miwest. The Old Fire Hall lot will be cleared by the loader and truck, with the snow from the back lot being piled in the southeast corner. The snow from the front will be pushed to the south and piled just off the driveway. The Senior Citizens Center lot will be plowed with a truck and the snow shall be pushed to the east and piled on the boulevard. The Walnut Street lot will be plowed with the loader or truck, and the snow will be piled in the northwest corner of the lot. The Library Parking lot is plowed with a truck, the snow is pushed east and South. The New Fire Hall lot will be cleared with Truck #2 or 1 ton 4x4. The snow is pushed west. The Coimmiter Parking lot will be cleared with Truck #2 starting by 4:00 a.m. Snow is pushed all directions. 0 Snow Plowing 6 Removal Plan Page 3 V. ALLEYS Three alleys are maintained by City personnel, and they are: Bordering Parking Lot $3 Bordering Parking Lots 91 5 #2 Behind Maxwell Realty and Johnson's Department Store. All three alleys will be be cleared of snow with the loader. The snow from the first alley will be pushed to the west and piled in the parking lot with the snow from that lot. The second alley will be plowed from Highway 25 east to the second putap house, then piled in the southwest corner of the parking lot. Prom Cedar Street to the puup house will also be piled in the parking lot. The third alley will be cleared from Highway 25 west to Walnut Street, then piled in the northwest corner of the parking lot. A current agreement with Johnsons has theta contract plowing 3/4 of the alley and the staall lot, and the City hauls the snow from the sinall lot where it is deposited by the contractor. The loader will be operated by those individuals available. VI. SIDEWALKS All City maintained sidewalks shall be cleared with a tractor blower. Sidewalks shall be cleared within 24 hours following a snowfall. Keith Trippe will be the primary individual assigned to snow blowing duty. An exception would be the I-94 sidewalk. This, on occasion, could depend on MN/DOT's schedule. VII. SNOW REMOVAL Snow removal will normally be carried out the evening after a snowfall, Broadway will be cleared first followed by the parking lots. If conditions are such that snow cannot be removed in 48 hours, the Public Works Director may consider contracting assistance with hauling and/or loading. VIII. EouIPMEN^ AND MAINTENANCe Pre -plowing checks of equipment will be trade by each operator and shall include the following: Check oil, wipers, washer solvent, power steering, fluid, fuel, tires, lights, flash light, chain, and shovel. C Snow Plowing b Removal Plan Page 4 Post -plowing maintenance will also be performed by the operator and shall include the following: Fill fuel tanks, empty spreader, check cutting edger for wear and loose bolts, make note of any service required on vehicle. Any vehicle deemed unsafe shall be red tagged until repairs can be made. IX. MISCELLANEOUS As an added help, the Street Superintendent will post a weather report daily and a weekend forecast on Friday to give the crew a better idea of what is expected as far as snow or bad weather. Each man will be expected to read this before leaving home, and informing the Street Superintendent if he plans on leaving house if the forecast calls for snow. 0 GENERAL FUND AMOUNT CASH DISBURSEMENTS --- NOVEMBER --- 1989 MN. Dept. of Natural Resources - Watercraft, Snowmobile b ATV, reg. 106.00 Preusse Cleaning - Cleaning contract - Carpeir at Fire Hall 190.00 Taylor Land Surveyors, Inc. - Surveying Fees - Water Tower 472.50 Henning b Associates - Professional Services - "-^=_ Tamer 3,117.08 Holmes b Graven - Professional Services - Economic Development 152.80 NuTech Environmental Corp. - Supplies - WWTP 1,181.08 Pace Laboratories - Testing Fees - Water Dept. 30.00 Nelson 011 Co. - Gas - Fire Dept.. 66.15 Wang Laboratories, Inc. - Maintenance Contract - Computers 1,320.00 Gruys, Johnson, b Associates - Computer charges for October 290.00 Business Development Service, Inc. - Professional Services - HRA 1,535.42 Quality Lawn b Maintenance Co. - Landscaping - City Hall b Library 602.20 MN. Public Employer Labor Relations Assoc. - Membership dues 85.00 Gary Anderson - Mileage expense b Insurance reimbursement 215.74 Quality Pet Products - Supplies - Animal Control 113.50 I.C.M.A. Retirement Corp. - Payroll deductions 568.88 State Capitol Credit Union - Payroll deductions 70.04 Wright County Human Services - Payroll deductions 150.46 Management Topics Workshop - Reg. Fees - J. Simola 140.00 Monticello Chamber of Commerce - Expo 89 Reg. Fee 100.00 Olson b Sons Electric, Inc. - Professional Services 1,185.03 Channel Construction Co. - Payment O1 - Meadows -Second Addition 9,582.10 Wright County Highway Dept. - 50 County Maps 50.00 CLicker's T.V. b Appliance - Dehumidifier - Water Tower 239.00 Z. H. Renner b Sons - Deep well turbine b pressure snubbers 7,493.16 Wright County State Bank - FICA, Federal & Medicare W/H 5,211.11 PERA - Payroll. dediictions 1,621.34 Henning b Associates - Professional Services - Water Tower 379.80 Gerald Clement - Recycling prize 50.00 Commissioner of Revenue - State W/H for September 1,669.09 MN. Dept. of Natural Resources - Watercraft, snowmobile b ATV. Reg. 262.00 University of Minnesota - Rog. Fee - Seminar - K. Doty 95.00 Commissioner of Revenue - Water Sales Tax for 3rd. quarter 545.49 Dahlgren, Shardlow b Uban - Profossionnl Services 1.266.92 Elk River Veterinary Clinic - Animal Control Services 13.50 Simplex - Maintenance Agreement - Clock 129.25 Horton Sand 6 Gravel Co. - Gravel, etc. 1,411.00 Braun Engineering - Professional Services 178.25 Municipal Computer Systems (landbook - Subscription - J. O'Neill 32.95 Corrow Sanitation - Garbage Contrnr.t Payment - October 12,046.67 Preusse Cleaning Service - Cleaning contract - City Hall b Fire Hall 450.00 Y.M.C.A. of Mpls. - Monthly contract payment 625.00 Patty Salzwedel - Animal control contract b Adoptions 521.00 Jerry Hermes - Janitorial services at Library 227.50 NorthStar Waterworks Products - Gauges, supplies, etc. 9,154.09 Adopt -A -Pat - Animal Control Services 280.00 If b If Watertower, Inc. - Recanting old Water Tower 9,200.00 Peggy Stoncol - Assessor Salary - Sept. b Oct. 1,750.00 ifd -fir's Gordon Conger - Roplocoment Trees 4,500.00 Arrow Star - Freight Duo on Fire Cabinet 153.50 Paco Laboratories - Professional Services - Water Tower b Water Dept. 240.00 Foodrito Controls = Misc. supplies - Water Dept. 1,531.54 , 3 GENERAL FUND ADIOUNT CliECK CASH DISBURSEMENTS -- NOVEMBER -- L989 D. L. Anderson 6 Assoc. - Supplies - City Hall IL9.17 28752 Dept. of Natural Resources - Snowmobile 6 ATV. Reg. 152.00 28753 Professional Services Group, Inc. - Monthly WWTP Contract. 22,943.43 28754 Norwest Services - Computer Payment - November 2,407.61 28755 Minn U.C. Fund - Unemployment Benefitq 1,277.22 28756 Void --- 28757 I.C.M.A Retirement Trust - Payroll Deductions 568.88 28758 Rick Wolfsteller - Mileage Expense 300.00 28759 State Capitol Credit Union - Payroll Deductions 70.04 28761) Commissioner of Revenue - State W/H for October 1,701.16 28761 Public Employees Retirement Assoc. - Insurance premium 27.00' 28762 Pitney Bowes - Postage machine rental 208.25 28763 I.C.M.A. - Subscription - J. O'Neill 38.95 28764 Lake Country Chapter - Membership Dues - G. Anderson 15.00 28765 Northern States Power Co. - Utilities 7,202.71 28766 Midwest Gas - Utilities 636.33 28767 Polka Dot Recycling - Recycling charges 1,149.37 28768 Bridgewater Telephone Co. 1,215.97 28769 Fair's Garden Center - Misc. shrubs, trees -etc. 359.36 28770 U.S. Postmaster - Postage 500.00 28771 U.S. Postmaster - Postage - Sewer A Water Bills 263.57 28772 Public Employees Retirement Assoc. - Payroll Deductions 1,714.34 28773 Wright County State Bank - FICA, Federal A Medicare W/H 5,851.14 28774 Anoka County Social Services - Payroll Deductions 105.08 28775 Wright County Human Services - Payroll Deductions 75.23 2 6 State Treasurer - State Building Surcharge - 3rd quarter 692.64 2,, ,7 Caldwell Tank, Inc. - Payment 06 - 800,000 Callon Standpipe 54,790.90 28778 Dept. of Natural Resources - Snowmobile 6 ATV Reg. 146.00 28779 Dahlgren, Shardlow b Uban - Professional Services 59.50 28780 Simons, Allyn Marketing, Inc. - Professional Services - Bus Tranap. 270.66 28781 International Conference of Bldg. Officials - Membership Dues 20.00 28782 Action Plus - Temporary Services 748.83 28787 Purcell's Plumbery - Supplies ' 33.38 28784 Buffalo Aviation - Cleaners - Street Dept. 44.83 28785 Hydrotax - Supplies - Street Dept. 244.80 2878f, Student Plans, Inc. - insurance premium - Fire Dept. 542.64 28787 Jeff O'Neill - Travel Expense 127.50 2878r Water Products Co. - Meters, etc. - Water Dept. 4.023.68 28789 Ken Maus - Misc. Expense Reimbursement 139.87 28790 Monticello Times - Legal Publications 1,376.10 28791 Marco Business Products - Typewriter ribbons 6 copy paper 154.96 28792 Teem Laboratories - Degreaser - Sewer Collections 695.28 28793 J M Oil Co. - Gas - Fire Dept. 29.60 28794 Maximum Security - Keya - Water Dept. A2.95 2879r Simonson Lumber Co. - Material i Supplies 547.51 2R79v D B Industries, Inc. - Water Tower Expense 679.53 2879 Communication Auditors - Fire Dept. Paler Repairs 78.25 2879F Adam's Pest Control - Pest control services - City Hall 50.00 28795 Gopher State One -Call, Inc. - Professional Services - Water Dept. 50.00 28801 Unocal - Gas 63.20 2Ha01 McDowall Co. - Repairs - City Hall, Fire Dept. i Library 758.58 Copy Duplicating Products - Copy machine maintenance - Library 40.20 28 Smith A Hayes - Le4el Fees 2,745.81 28804 GENERAL FUND AMOUNT CHECK CASH DISUBRSEMENTS --- NOVEMBER --- 1989 Pat Kovich - Mileage reimbursement 4.00 28805 Morrell Transfer - Freight Charges 81.93 28806 Unitog Rental Services - Uniform rental charges 135.19 28807 Omann Brothers - Sand, etc. - Street Dept. 27.37 28808 Moon Motors - Parts - Park Dept. 48.63 28809 Schillewaert Landscaping - Trees, Landscaping, etc. - Water Tower 15,438.65 28810 Cathy Shuman - Mileage Expense 53.00 28811 Gruys, Johnson 6 Assoc. - Computer Charges - November 290.00 28812 Wright County Treasurer/Auditor - Sheriff's Monthly contract payment 12,049.14 28813 Monticello Ford, Inc. - Repairs - Fire Dept. 356.87 28814 EPA - Supplies - Fire Dept. 258.36 28815 Century Lob - Ice Foe - Street Dept. 278.50 28816 Orr Schelen Mayeron 6 Assoc. - Engineering Fees 6,764.09 28817 Marcie's Farm Service - Twine - Park Dept. 6.95 28818 Dyna Systems - Supplies - Street Dept. 725.27 28819 Harry's Auto Supply - Parte 6 Supplies 211.96 28820 Northern Oxygen Service - Supplies - Fire Dept. 12.30 28821 Sentry Systems, Inc. - Fire Alarm Contract - Fire Dept. 126.00 28822 Monticello Printing - Office supplies b printing 203.75 28823 Monticello Office Products - Office supplies 504.79 28824 Coast to Coast - Supplies \ 604.98 28825 Silver Fox Inn - Room charge - Chamber Meeting &Ash;P(Ao3:'✓�' 31.80 28826 Deter -man Welding 6 Tank Service, Inc. - Tank DiSposal - Old Ford Garal-,e 462.00 28827 Buffalo Bituminous - Paved Patching - Walnut St. 875.00 28828 ineral Rental - Rentals - Sign, scaffole, etc. 155.28 28829 ..ational Bushing 6 Parts - Supplies b Parts 66.66 28830 Al b Julie Nelson - Subscription to newspaper 13.75 28831 Local /49 - Union dues 144.00 28832 National Automobile Dealers - Subscription - Deputy Registrar 39.00 28833 Daly, Bohling 6 O'Connor -Legal Fees 950.00 28834 Diane Jacobson - Travel expense - seminar 27.50 28835 Rick Wolfeteller - Conference expense b meetings 188.85 28836 Monticallo Firs Dept. - Firemen's Wages 1,817.64 28837 Patty Salzwadel - Animal control contract 473.00 28838 Jerry Hermes - Library cleaning contract 227'50 28839 P C Support Center - Rag. Fees - seminar -Schuman, 0"Neill, McGuire 465.00 28840 P C Support Center - Additional Reg. Fees 15.00 2884: Principal Mutual Life Ina. - Insurance premium 7,467.44 28842 M. Dept. of Natural Resources - Snowmobile 6 ATV Reg. 294.00 28643 Jim Hatch Sales - Latern Battery - Street Dept. 25.68 28844 Little Falls Machine Co. - Parts - Snow/Ice Dept. 334.44 28845 Mobil - Gas 366.17 28846 Hoglund Transportation - Fara Box - Bus Transportation 495.00 28847 Mike Cyr - Professional Services - Lighting - Meadow Oak 140.00 28848 A T 6 T Info Systems - Fire Phone Charges 3.96 28849 L N R Services - New keys 6 locks - City Hall 6 Library 242.00 28850 State Treasurer Surplus - File Cabinets, trailer L valve 390.00 28851 Contra Sota - Sludge Disposal - WWTP 1,134.30 2885 'lic ker's T.V. i Appliance - Recording equipment - Council Chambers 2,567.45 28853 , Is GENERAL FUND AMOUNT CHECK CASH DISBURSEMENTS --- NOVEMBER --- 1989 Petty Cash - Petty Cash 55.77 288:4 • MN. State Fire Depart. Assnc. - Dues - Fire Depart. 90.00 28855 Lynette Carr - Recycling prize 50.00 28856 Robert Lagergren - Recycling prize 50.00 28857 011ie Koropchak - Travel Expense 16.00 28858 United States Salt, Inc. - Sand/Salt - Streets 1,518.69 28859 Floor Care Systems - Rug mate - City Hall & Fire Hall 304.81 28860 John Slmola - Travel Expense - Seminar 118.25 28861 Humane Society of Wright County - Animal Control expense 50.00 28862 Karl Kluenenberg - Staining trim at City Hall 45.00 28863 St. Cloud Appraisal - Appraisal Fees - F. Markling property 800.00 28864 Maus Foods - Supplies 339.51 28865 Holmes 6 Graven - Professional Services 1,023.10 28866 Yonak Landfill - Garbage services - Landfill charges 4,249.80 28867 Griefnov Sheet Metal - Repairs 28.00 28868 Grainger - Equipment - Fire Depart. 113.19 28869 Depart. of Trade & Economic Development - Reg. Fees - C. Koropchak 30.00 28870 Payroll for October 31,387.85 TOTAL CASH DISBURSEMENTS 298,604.27 `J LIQUOR FUND CASH DISBURSEMENTS -- NOVEMBER 1989 AMOUNT CFECK NO. Larsen Carpet - New carpet 6 installation charges 5,300.00 14733 Quality Lawn 6 Maintenance Company - Landscaping 312.50 14734 Johnson Brothers Wholesale Liquor - Liquor 1,692.14 14735 Griggs, Cooper 6 Co. - Liquor 2,550.35 - 14736 State Capitol Credit Union - Payroll deductions 250.00 14737 Wright County State Bank - FICA, Federal d Medicare W/H 569.87 14738 PERA - Payroll deductions 177.19 14739 Commissioner of Revenue - State W/H for September 233.59 14740 Ed Phillips 4 Sons Co. - Liquor 2,807.29 14741 Eagle Wine Co. - Wine 1,563.47 14742 Griggs. Cooper 6 Co. - Liquor 2,892.84 14743 Quality Wine d Spirits Co. - Liquor 1.619.17 14744 Johnson Brothers Wholesale Co. - Liquor 1,930.71 14745 State Capitol Credit Union - Payroll deductions 250.00 14746 Commissioner of Revenue - State W/H for October 238.51 14747 PERA - Life insurance premium 9.00 14748 McDowall Company - Repairs 195.12 14749 Day Distributing Co. - Mise. supplies 431.30 14750 Griggs, Cooper d Co. - Liquor 6,995.78 14751 Dahlheimer Distributing Co. - Beer 20,718.55 14752 Olson 6 Sons Electric - Repairs 17.59 14753 Coast to Coast - Misc. supplies 6 outside paint 693.44 14754 TFS Floor Care Systems. Inc. - Floor supplies 9.89 14755 l ton's Ice Co. - Ice 223.45 14756 Gruya. Johnson b Associates, LTD 110,00 14757 Seven Up Bottling Co. - Pop 203.40 14758 Thorpe Distributing Co. - Beer, etc. 12,678.75 14759 Dick Beverage Co. - Beer, etc. 1,831.97 14760 Grosslein Beverage Co. - Beer, etc. 14,041.10 14761 Bernick's Pepsi Cola Co. - Pop 265.95 14762 Jude Candy 6 Tobacco Co. - Misc. supplies 619.53 14763 Monticello Times - Advertising 223.95 14764 Commissioner of Revenue - Sales Tax Due for October 7,571. 9 14765 Quality Wine 6 Spirits Co. - liquor 2,281.97 14766 Ed Phillips 6 Sons. Co. - Liquor 3,138.14 14767 Viking Coca -Coln Co. - Pop • 455.25 14768 Lfefert Trucking - Freight Charges 323.76 14769 Kolles Sanitation - Garbage services 181.70 14770 Johnson Brothers Wholesale Co. - Beer, etc. 3,504.77 14771 Midwest Cas Co. - Utilities 31.77 14772 Bridgewater Telephone Co. - Phone chargee 76. 55 14773 Northern States Power Co. - Utilities 664.49 14774 PERA - Payroll deductions 179.48 14775 Wright County State Bank - FICA. Federal 6 Medicare W/H 600.52 14776 Simonson Lumber Co. - Material for improvements on bldg. 99,25 11,777 Griggs. Cooper h Co. - Liquor 3,943.87 1477R Eagle Wine Co. - Wine 1,275.14 14779 Johnson Brothers Wholesale Liquor Co. - Liquor 556.50 14780 I 'unlity Wine 6 Spirits Co. - Wine 2,259.17 14781 rincfpal Mutual Life Ins. Co. - Insurance premium 775.07 14782 LIQUOR MM CASH DISBURSEMENTS -- NOVEMBER -- 1989 AHOUHT CyrrjR J Floor Care Systems - Rug Mats 166.22 14783 Ed Phillips 6 Sons Co. - Liquor 4,041.86 14784 Griggs, Cooper b Co. - Liquor 6,464.16 14785 Eagle Wine Co. - Wine 224.82 14786 Johnson Brothers Wholesale Liquor Co. - Liquor 3,227.38 14787 O'Hara Companies - Supplies 86.50 14788 St. Cloud Restaurant Supply Co. - Supplies 67.55 14789 City of Monticello - Sever d Water Bill 54.43 14790 Wright County State Bank - Deposit Books 11.35 14791 Maus Foods - Supplies 15.78 14792 Payroll for October 3,791.15 TOTAL CASH DISBURSEMENTS 127,726.69 J :J