Loading...
Planning Commission Agenda Packet 01-18-1977MONTICELLO PLANNING COMMISSION Tuesday - January IS, 1977-7:30 P.M. Chairman Howard Gillham. Members: Fred Topel, Jim Ridgeway, Henry Doerr, Dr. C. D. Bauer, J. W. Miller. V1 . Consideration of election of Chairman and Vice - Chairman. ✓2. Consideration of approval of December 21, 1976 minutes. �. Consideration of Building Permit - Perkins Cake & Steak, Inc. q. Joint Workshop Session with Monticello City Council on Comprehensive Plan. 5. Unfinished business. 6. New business. Mailing to: City Council Dick DwinelI Don Smi Lit El January 18, 1977 PLANNING REPORT APPLICANT: Perkins Cake and Steak LOCATION: Northeast Corner of the Intersection of State Highway 25 and Interstate 94 ACTION REQUESTED: Building Permit PLANNING CONSIDERATIONS: 1. The subject property is approximately 1.4 acres, zoned B-3, Highway Business District. The site plan does not indicate whether the subject property is a lot of record or if it will require a sub- division. It is suggested that the petitioner provide a survey defining the land area. 2. The site plan indicates one building with approximately 4,930 square feet of gross floor area. The site plan does not distinguish between "dining area" and "kitchen area". The Zoning Ordinance requires one off-street parking space for every 40 square feet of gross floor area in the dining area and one off-street parking space for each 80 square feet of kitchen area. Although the site provides 99 off-street parking spaces, this should be measured against the Ordinance requirements. 3. The site plan indicates that the entrance driveways at the "front" of the building are 25 feet. (The scale indicates 24 feet.) The driveway at the rear of the building is indicated at 30 feet. it is recommended that thes"imensions be reversed, giving 30 feet to the entrance drive and -25 feet to the exit drive. In addition, the site plan indicates 25 foot drives between some parking spaces where the actual scale measurement indicates 30 feet. 4. The site plan does not indicate provisions for accommodating trash storage and pick-up. Unless the petitioner proposes to contain trash storage and pick-up entirely within the building, the site plan should indicate where the outside trash storage and pick-up will be located and appropriately enclosed and screened. 5. The site plan does not indicate appropriate green space within the parking lot and landscaping around the periphery of the property. 6. The site plan indicates the provision of one free standing sign in the western corner of the property. However, there is no indication as to the height or the size of such sign. In addition, a flag is proposed for the front of the building situated within 16 feet of the front property line. 7. In summary, the proposed restaurant is an appropriate use for the property. With the technical issues noted above, the restaurant will be a welcomed addition to the Monticello Business Community. '7ii 1 VAY NO. 94 1911 Janue CAKE PND "o S BUI-,Dl AGENDA SUPPLEMENT Agenda ]tem 3. Consideration of Building Permit.. Perkins Cake & Steak, Inc. Perkins Cake & Steak, Inc., of Edina, Mi-nnesota, is proposing a restaurant at the southeast corner of the intersection of Highway 25 and 7th Street in Monticello. (See enclosed map.) The proposed site is currently owned by Texaco, Inc., and Perkins Cake & Steak has a purchase agreement con- tingent upon building permit approval. Following is some relevant data on the proposed restau- rant: Lot Size: 62040 Squarc Feet. (188' x 330') Approximately 11 acres Building Size: 4800 Square Feet (46' x 97' plus entryway) Seating Capacity: Approximately 166 Signs: One Pylon Sign 32' high, approximately 120 sq. ft. Siam on plan indicates height. of 15' but Perkins Cake_ & Steak indicated they would adhere Lo ordi- nance limitation of 32'. Parking: 09 spaces. It would appear that all zoning regulations arc heing adhered to. J. W. Miller will be reviewing the plans to determi rte whether they meet, the State Bu i I d i ng Code. POSSIBLE ACTION: Consideration of approval of building permi t.. REFLRENCES: Plans & Specifications are available at. City Hal I. Enclosed Map of Arca. Enclosed Picture of Building. Agenda ltr-m 4. Joint. Workshop Session With City Council on Comprehensive Plan. Purpose of this meet.ina is outlined on the cover lottrr of the Comprehensive Plan prepared by Howard Dahlgren 14. Associates. Attention should be directed to the Goals and Policies Section, Chapter 3. This section attempts to clarify and list the objectives of the City of Monticello and as such should serve as and guide for future planning decisions. This section should be critiqued very carefully and amendments and deletions can be reviewed at Tuesday's meeting. POSSIBLE ACTION: No specific action is necessary as this is just a draft copy of the Comprehensive Plan. After consensus is received on the draft document a final Guide Plan statement will be prepared and necessary revisions will be made to the map that accompanies the Comprehensive Plan and the Zoning Map. Public Hearing will be held to carry out this task. REFERENCES: Draft Copy of Comprehensive Guide Plan. -2- c4" All, I;r n-1